This document is a set of electrical construction plans for a U.S. Department of Veterans Affairs facility renovation project located in Vancouver, Washington. The plans were prepared by an architect/engineer of record and are designated as fully sprinklered construction documents for Building 001 and associated structures.

The electrical plans provide detailed floor-by-floor and building-by-building layouts across multiple levels and areas, including Level 00 (demolition plan), Level 01, Level 02, Level 03, Level 04, roof lighting protection plans, and mezzanine electrical plans. The drawings depict electrical service distribution, panel locations, circuit routing, lighting layouts, equipment connections, and protective device placements for various functional areas including residential spaces, medical facilities, administrative offices, mechanical rooms, and support areas. Key infrastructure elements shown include fire riser water pipes, surge protection devices, main water service connections, XFMR (transformer) installations, generator equipment, battery banks, panel boards rated at various voltages (kVA ratings), and bonding/grounding systems. The plans reference multiple buildings (BLDG 001, 002, 003, 004, 005, 006, 007, 011, and 012) with corresponding electrical systems and note "no work to be performed" designations on certain areas. General notes on the drawings address floor plan details, equipment locations, circuit tracing, grounding specifications, and contractor responsibilities for installation and coordination.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

002-G-05

EP501

8 PROVIDE (1) 2" RACEWAY AND (1) 24"Wx24"Hx10D

JUNCTION BOX FOR FUTURE POWER MONITORING DATA

CABLING FROM "09-AHF-9" AND NEARBY POWER METERS

TO BUILDING 3, CONTROL ROOM 102. RACEWAY SHALL

BE PROVIDED WITH 200-LBS PULL STRING. PROVIDE ALL

MOUNTING HARDWARE AND STAINLESS STEEL

FASTENERS AS REQUIRED. COORDINATE WITH EXISTING

CONDITIONS AND VA FOR EXACT INSTALLATION

LOCATION.

JUNCTION BOX FOR INTERCEPTION.

PROVIDE WATER PIPE BOND.4

File details come from the government source that posted it. Updated .