Attachment 12-648-20-116 Drawings 224-239.pdf

PDF 14 MB Posted

Attached to
Z2DA--CON 648-20-116 Correct Electrical FCA Deficiencies Bldgs. /Site (Vancouver)
Solicitation number
36C26026R0040
Issued by

About this file

This document is a set of electrical schedules and design specifications for Building 18 at a U.S. Department of Veterans Affairs facility located in Vancouver, Washington. The drawings are prepared by Spees Design Build and represent 100% construction documents for electrical work.

The document contains detailed electrical schedules for multiple buildings (Buildings 18, 19, and 27) including panelboard schedules, switchboard layouts, protective device charts, and conduit/wire routing specifications. Key electrical infrastructure components specified include panelboards (18-2A1, 18-2A2, 18-2B1), switchboards (18-2SDS1, 18-2SDS2, 4MDS, MDS), and grounding systems with bonding conductors routed in conduit where exposed and bare when underground. The schedules detail circuit descriptions, voltage ratings, amperage, mounting locations, load types (lighting, receptacles, large motors, other), demand factors, and estimated demand calculations across multiple phases. Specific wire sizes and conduit specifications are provided, including 600 kcmil and 3/0 AWG conductors. The document also includes building grounding and conduit schedules for cable trays and protection devices. All work is shown as revised on the electrical schedules with cross-references to specific sheet numbers within the construction document set.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FROM TO QTY SIZE (QTY) & SIZE GROUND

SIZE

018-P-01 PANELBOARD "18-2B1 SECT 1/2" SWITCHBOARD "18-2SDS2" PANELBOARD "18-2B1 SECT 1/2" 1 4" (4) 600 kcmil 3 AWG - 018-P-02 PANELBOARD "18-2A1 SECT 1/2" SWITCHBOARD "18-2SDS1" PANELBOARD "18-2A1 SECT 1/2" 2 2" (4) 3/0 AWG 3 AWG - 018-P-03 PANELBOARD "18-2A2 SECT 1/2" SWITCHBOARD "18-2SDS1" PANELBOARD "18-2A2 SECT 1/2" 2 EXIST. (4) 3/0 AWG 3 AWG 2

018-G-01 SERVICE EQUIPMENT BOND PANEL "4MDS" GROUND ROD 1 - - 3/0 AWG 1

018-G-02 AIR TERMINAL BOND ESE AIR TERMINAL GROUND ROD 1 - - 2 AWG -

018-G-03 GROUNDING ARRAY GROUND ROD GROUND ROD 1 - - 3/0 AWG 1

NOTE(S):

1. GROUNDING ELECTRODE SYSTEM BONDING CONDUCTORS SHALL BE ROUTED IN CONDUIT WHERE EXPOSED AND SHALL BE BARE WHEN UNDERGROUND.

2. EXISTING RACEWAY SHALL BE REUSED.

BLDG 18 GROUNDING - CONDUIT AND WIRE SCHEDULE

CONDUIT

TAG SERVICE

ROUTING CONDUIT CONDUCTORS

NOTES