Attachment_6_-_140P4225R0007_PROJECT_EXPERIENCE.docx

DOCX document 14 KB Posted

Attached to
Shenandoah National Park (SHEN) Access Routes
Solicitation number
140P4225R0007
Issued by

About this file

The document is a Past Project Experience form for Solicitation No. 140P4225R0007, designed to capture detailed information about a contractor's previous project work. The form provides a structured template for contractors to document their experience, including project specifics such as contract type, work performed, award and completion dates, project size, and contract method. The form requires contractors to provide comprehensive details about their past projects, including the type of work (new construction, renovation, repair), contract structure (firm-fixed price, cost/time and material), and a detailed description of project relevance.

The associated federal contract opportunity is for repairing Big Meadows Campground Access Routes at Shenandoah National Park. It is a competitive HUBZone set-aside acquisition with an estimated project value between $1-5 million, classified under NAICS code 237310 for Highway, Street, and Bridge Construction. The contract is expected to be a firm-fixed price award using best value tradeoff, with a performance period of 75 calendar days. A site visit is scheduled for June 25, 2025, and the project will follow Davis Bacon wage rates for Page County, Virginia. The solicitation is issued by the Department of the Interior National Park Service Northeast Region.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Past Project Experience Solicitation No. 140P4225R0007

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects.

7. Construction Project:

Award Amount: Final Price: Facility Size/Total Square Footage:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

8. Provide a detailed description of the project and the relevancy to the solicited project requirements.

File details come from the government source that posted it. Updated .