Attachment 5 Schedule of Material Submittals.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
RPR Transformers Substations, Multi Federal contract opportunity
Solicitation number
FA557525B0002
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

The document is a Schedule of Material Submittals for Project QUUG 23-1017, detailing comprehensive submission requirements for a transformer substation project at Moron Air Base, Spain. The solicitation (FA557525B0002) is specifically targeted at local Spanish contractors, with a project value between $500,000 and $1,000,000, covering electrical infrastructure work including transformer installations, high voltage switchgear, conduit systems, lighting, and associated electrical components.

Key submission dates include a pre-proposal conference on 5 June 2025, question submission deadline of 20 June 2025, and bid submission deadline of 30 June 2025. The schedule outlines 81 specific material submittals across multiple sections, requiring documentation such as warranty letters, construction schedules, work plans, environmental protection plans, transformer test reports, installation certificates, technical drawings, and operational manuals. The solicitation emphasizes compliance with Spanish legislative requirements and prioritizes using Spanish materials, labor, and equipment. The project is being managed by the Department of the Air Force's United States Air Forces in Europe - Air Forces Africa, with funding availability uncertain and the bid acceptance period extended through 31 December 2025.

View the file

Other files for this federal contract opportunity

Other files attached to RPR Transformers Substations, Multi, newest first.
File Type Posted
Concept drawings Rev1.pdf PDF
Questions and Answers - Transformers.pdf PDF
Attachment 1a Specifications (Eng)- Transformers Multi.PDF PDF
Solicitation - FA557525B0002.pdf PDF
Attachment 1b Specifications (Esp)- Transformers Multi.PDF PDF
Attachment 2 Photos.pdf PDF
Attachment 6 QUUG 23-1017 CCE blank.xlsx XLSX spreadsheet
Attachment 3 QUUG 23-1017 Concept drawings.pdf PDF
Attachment 4 Record Drawings.pdf PDF
Attachment 7 Underground dist switchgear Specs.pdf PDF
Attachment 8 DataSheets compilation.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 23-1017PROJECT TITLE

RPR, Transformers Substations, MULTI

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 01
1Warranty letter1Prior to Final Inspection (FI)
2Base utility connection request1AC+15
3Construction Schedule1AC+10
4Work Plan1AC+10
5Progress Schedule1AC+10
6Mobility Plan1AC+15
7Project sign1AC+15
8Quality Control Plan1AC+15
9Environmental protection plan1AC+15
10Waste & construction debris management certificate1Prior to FI
11As-Built drawings1Prior to FI
12Spatial Data1Prior to FI
13Key Personnel1AC+15
14Personel listing1AC+15
15Health and safety program1AC+15
16O&M Manuals1Prior to FI
SECTION 02 41 00
17Demolition plan
18Manager of waste from demolition and construction1
19Authorized dump or treatment and recovery plant1
20Delivery and disposal certificate of waste from construction and demolition1
SECTION 26 11 16
21Pre-Fabricated Transformer Shelter1
22Pre-Fabricated Transformer Shelter1
23Transformer Bldg #15361
24Transformer Bldg #1551 & wells1
21Transformer BAK 12 North & south1
25HV Switchgear1
26High Voltage Cable RHZ1 OL1
27High Voltage Terminals11
28Transformer Losses Report Bldg #15361
29Transformer Losses Report Bldg #1551 & wells.1
30Transformer Losses Report BAK 12 North & South.1
29Installation of HV installations - Company AT11AC+15
30Installation of HV installations - Individual AT11AC+15
31Transformer Routine Test Bldg #1536.1
32Transformer Routine Test Bldg #1551 & Wells.1
33Transformer Routine Test BAK 12 North & South.1
34Field Quality Control1
SECTION 26 20 00
35RMC Conduit and fittings, 1 x type1
36Junction and pull boxes1
37Outlet boxes and covers1
38Wires and cables1
39Circuit breakers1
40Panelboards1
41Surge Protective Device1
42Device Plates1
43Receptacles1
44Toggle Switches1
45Network Analyzer1
46Labels1
47Panelboards1
48One-line Diagram Bldg #15361
49One-line Diagram Bldg #1551 & wells.1
50One-line Diagram BAK 12 North & South.1
51Devices subject to manual operation1Facility Acceptance -5
521000-Volt wiring test1Facility Acceptance -5
53Panelboards11
54Single line diagram of the "as-built"1
55Schematic diagram1
56Active electrical equipment O&M Manuals1
SECTION 26 51 00
57LED Luminaire1
58LED Drivers1
59LED Emergency Drivers1
55Operating Test1
56Test Report1
57Luminaire Useful Life Certificate1
58Luminaire Warranty1
SECCIÓN 26 56 00
59LED Luminaires1
60LED Drivers1
61Lighting fixtures1
61Photocell1
62Operating Test1
63Test Report1
64Luminaire Useful Life Certificate1
65Luminaire Warranty1
SECTION 31 23 00.00 20
66Material proposed as backfill, soil & topsoil1
67Backfill material1Upon test execution
68Compaction1Upon test execution
SECTION 32 92 19
69Seed1
70Fertilizer1
71Topsoil1
SECTION 33 71 02.00 20
72Conduits1
73Underground Low-Voltage Cables1
74Buried Warning and Identification Tape1
75Ground wires1
76Manholes11
77Manhole covers111
78Pre-manufactured low voltage splices1
79Ground rods1
80Exothermic welding11
81Field acceptance checks and tests11

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N