attachment-5-rfb-dmavs-2026-06.docx
DOCX document 30 KB Posted
- Attached to
- Center Strafford Site MEP Upgrades
- Solicitation number
- RFB DMAVS 2026-06
- Issued by
- Strafford County, New Hampshire
About this file
This document is an execution requirements specification for the Center Strafford Site MEP (Mechanical, Electrical, Plumbing) Upgrades project in New Hampshire. The specification outlines mandatory closeout procedures, including submission of a Substantial Completion Application followed by a Final Application for Payment once all punch list items are completed. The contractor must execute comprehensive final cleaning of interior and exterior surfaces, equipment, fixtures, and site areas prior to final project assessment. The specification requires coordination and notification to the Department seven days prior to start-up of various equipment and systems, with verification of proper installation, manufacturer testing compliance, and submission of written reports confirming proper functioning. The contractor must maintain on-site record documents including marked-up drawings, specifications, addenda, change orders, and shop drawings in both AutoCAD or Revit format and PDF, with two full-size paper sets submitted to the Department prior to final payment.
The contractor is required to submit operation and maintenance documentation in three bound volumes with organized sections including directories, operation and maintenance instructions by system, and project documents with warranties and certificates. Equipment and systems manuals must include performance data, operating procedures, maintenance schedules, spare parts lists, and manufacturer instructions. The contractor must furnish spare parts and maintenance products as specified, obtain executed warranties and bonds from subcontractors and manufacturers within ten days of Substantial Completion, and provide maintenance service during the warranty period. All work is guaranteed against defects for one year from the Date of Substantial Completion, with the contractor responsible for promptly correcting any deficient work at its own expense. Failure to adhere to guarantee terms may result in suspension or debarment from the prequalification list, or require a Letter of Credit equal to a percentage of the contract amount.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| attachment-1-rfb-dmavs-2026-06.docx | DOCX document | |
| attachment-4-rfb-dmavs-2026-06.docx | DOCX document | |
| addendum-2-rfb-dmavs-2026-06.pdf | ||
| addendum-4-rfb-dmavs-2026-06.pdf | ||
| addendum-3-rfb-dmavs-2026-06.pdf | ||
| attachment-7-rfb-dmavs-2026-06.docx | DOCX document | |
| attachment-6-rfb-dmavs-2026-06.docx | DOCX document | |
| attachment-2-rfb-dmavs-2026-06.docx | DOCX document | |
| attachment-10-rfb-dmavs-2026-06.docx | DOCX document | |
| attachment-3-rfb-dmavs-2026-06.docx | DOCX document | |
| attachment-8-rfb-dmavs-2026-06.docx | DOCX document | |
| attachment-11-rfb-dmavs-2026-06-upgrades.pdf | ||
| rfb-dmavs-2026-06.pdf | ||
| addendum-1-rfb-dmavs-2026-06.pdf | ||
| attachment-9-rfb-dmavs-2026-06.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXECUTION REQUIREMENTS
1. CLOSEOUT PROCEDURES
A. Submit a signed Substantial Completion Application attesting that the Contract Documents have been reviewed, Work has been inspected, and that all Work is complete in accordance with Contract Documents and ready for the Department review.
B. Only after completion of all Punch List items and submission of all items the Contractor shall submit a Final Application for Payment identifying total adjusted Contract Sum, previous payments, and sum remaining due.
2. FINAL CLEANING
A. Execute final cleaning prior to final project assessment.
B. Clean interior and exterior glass, surfaces exposed to view; remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft surfaces.
C. Clean equipment and fixtures to sanitary condition with cleaning materials appropriate to surface and material being cleaned. Clean new light fixtures free from dust, dirt and fingerprints.
D. Replace filters of operating equipment.
E. Clean debris from roofs, roof drains, downspouts, and drainage systems.
F. Clean site, sweep paved areas, rake landscaped surfaces.
G. Remove waste and surplus materials, rubbish, and construction facilities from site.
3. STARTING OF SYSTEMS
A. Coordinate schedule for start-up of various equipment and systems.
B. Notify the Department seven days prior to start-up of each item.
C. Verify each piece of equipment or system has been checked for proper lubrication, drive rotation, belt tension, control sequence, and for conditions which may cause damage.
D. Verify tests, meter readings, and specified electrical characteristics agree with those required by equipment or system manufacturer.
E. Verify wiring and support components for equipment are complete and tested.
F. When specified in individual specification Sections, require manufacturer to provide authorized representative to be present at site to inspect, check, and approve equipment or system installation prior to start-up, and to supervise placing equipment or system in operation.
G. Execute start-up under supervision of applicable manufacturer's representative and Contractors' personnel in accordance with manufacturer’s instructions.
H. Submit a written report stating that the equipment or system has been properly installed and is functioning correctly.
4. PROTECTING INSTALLED CONSTRUCTION
A. Protect installed Work and provide special protection where specified in individual specification sections.
B. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.
C. Provide protective coverings at walls, projections, jambs, sills and soffits of openings.
D. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement of heavy objects, by protecting with durable sheet materials.
E. Prohibit traffic or storage upon waterproofed or roofed surfaces. When traffic or activity is necessary, obtain recommendations for protection from waterproofing or roofing material manufacturer.
F. Prohibit traffic from landscaped areas.
5. PROJECT RECORD DOCUMENTS
A. Maintain on site one set of the following record documents; record actual revisions to the Work:
i. Drawings.
ii. Specifications.
iii. Addenda.
iv. Change Orders and other modifications to the Contract.
v. Reviewed Shop Drawings, Product Data, approved submittals and Samples.
vi. Manufacturer's instruction for assembly, installation, and adjusting.
B. Ensure data is complete and accurate, enabling future reference by the Department.
C. Store record documents separate from documents used for construction.
D. Record information concurrent with construction progress, not less than weekly.
E. Specifications: Legibly mark and record at each product section description of actual products installed, including the following:
i. Manufacturer's name and product model and number.
ii. Product substitutions or alternates utilized.
iii. Changes made by Addenda and modifications.
F. Record Drawings and Shop Drawings: Legibly mark each item to record actual construction including:
i. Measured depths of' foundations in relation to finish floor datum.
ii. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.
iii. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work.
iv. Field changes of dimension and detail.
v. Details not on original Contract drawings.
vi. Contractor to provide record drawings in AutoCad or Revit format compatible with current Department software as well as in PDF format.
vii. Contractor to supply two (2) full size paper sets of record drawings to Department.
G. Submit documents to the Department prior to final payment and release of retainage.
6. OPERATION AND MAINTENANCE DATA
A. Submit data bound in 8·1/2 x 11 inch text pages, three D side ring binders with durable plastic covers. (2 complete copies of all materials required.)
B. Prepare binder cover with printed title "OPERATION AND MAINTENANCE INSTRUCTIONS", title of project, and subject matter of binder when multiple binders are required.
C. Internally subdivide binder contents with permanent page dividers, logically organized as described below; with tab titling clearly printed under reinforced laminated plastic tabs.
D. Contents: Prepare Table of Contents for each volume, with each product or system description identified, typed on white paper, in three parts as follows:
i. Part I: Directory, listing names, addresses, and telephone numbers of Architect/Engineers), Contractor, Subcontractors, and major equipment suppliers.
ii. Part 2: Operation and maintenance instructions, arranged by system and subdivided by specification section. For each category, identify names, addresses, and telephone numbers of Subcontractors and suppliers. Identify the following:
a. Significant design criteria.
b. List of equipment.
c. Parts list for each component.
d. Operating instructions.
e. Maintenance instructions equipment and systems.
f. Maintenance instructions for special finishes, including recommended cleaning methods, materials and schedules, and special precautions identifying detrimental agents.
iii. Part 3: Project documents and certificates, including the following as required:
a. Shop drawings and product data.
b. Air and water balance reports.
c. Certificates.
d. Originals and Photocopies of warranties and bonds.
7. MANUAL FOR MATERIALS AND FINISHES
A. Submit one copy of preliminary draft or proposed formats and outlines of contents before start of Work. The Department will review draft and return one copy with comments.
B. For equipment, or component parts of equipment put into service during construction and operated by the Department, submit documents within ten days after acceptance.
C. Submit one copy of completed volumes prior to Substantial Completion. Draft copy be reviewed and returned with Architect/Engineer comments. Revise content of document sets as required prior to final submission.
D. Submit two sets of revised final volumes in final form prior to final inspection.
E. Building Products, Applied Materials, and Finishes: Include product data, with catalog number, size, composition, and color and texture designations. Include information for re-ordering custom manufactured products.
F. Instructions for Care and Maintenance: Include manufacturer's recommendations for cleaning agents and methods, precautions against detrimental agents and methods, and recommended schedule for cleaning and maintenance.
G. Moisture Protection and Weather Exposed Products: Include product data listing applicable reference standards, chemical composition, and details of installation. Include recommendations for inspections, maintenance, and repair.
H. Additional Requirements: As specified in individual product specification sections.
I. Include listing in Table of Contents for design data, with tabbed fly sheet and space for insertion of data.
8. MANUAL FOR EQUIPMENT AND SYSTEMS
A. Submit two copies of preliminary draft or proposed formats and outlines of contents before start of Work. Contract Administrator will review draft and return one copy with comments.
B. For equipment, or component parts of equipment put into service during construction and operated by the Department, submit documents within ten days after acceptance.
C. Submit one copy of completed volumes 15 days prior to Substantial Completion. Draft copy shall be reviewed and returned after Substantial Completion, with Architect/Engineer comments. Revise content of document sets as required prior to final submission.
D. Submit two sets of revised final volumes in final form prior to final inspection.
E. Each Item of Equipment and Each System: Include description of unit or system, and component parts. Identify function, normal operating characteristics, and limiting conditions. Include performance curves, with engineering data and tests, and complete nomenclature and model number of replaceable parts.
F. Panelboard Circuit Directories: Provide electrical service characteristics, controls, and communications; typed and/or by label machine.
G. Include color coded wiring diagrams as installed.
H. Operating Procedures: Include stall-up, break-in, and routine normal operating instructions and sequences. Include regulation, control, stopping, shut-down, and emergency instructions. Include summer, winter, and special operating instructions.
I. Maintenance Requirements: Include routine procedures and guide for preventative maintenance and troubleshooting; disassembly, repair, and reassembly instructions; and alignment, adjusting, balancing, and checking instructions.
J. Include servicing and lubrication schedule, and list of lubricants required.
K. Include manufacturer's printed operation and maintenance instructions.
L. Include sequence of operation by controls manufacturer.
M. Include original manufacturer's parts list, illustrations, assembly drawings, and diagrams required for maintenance.
N. Include control diagrams by controls manufacturer as installed.
O. Include Contractor's coordination drawings, with color coded piping diagrams as installed.
P. Include charts of valve tag numbers, with location and function of each valve, keyed to flow and control diagrams.
Q. Include list of original manufacturer's spare parts, current prices, and recommended quantities to be maintained in storage.
R. Include test and balancing reports as specified in Section 01400.
S. Additional Requirements: As specified in individual product specification sections.
T. Include listing in Table of Contents for design data, with tabbed dividers and space for insertion of data.
9. SPARE PARTS AND MAINTENANCE PRODUCTS
A. Furnish spare parts, maintenance, and extra products in quantities specified in individual specification sections.
B. Deliver to Project site and place in location as directed by State; obtain receipt prior to final payment.
10. PRODUCT WARRANTIES AND PRODUCT BONDS
A. Obtain warranties and bonds executed in duplicate by responsible subcontractors, suppliers, and manufacturers, within ten days after Substantial Completion. All warranties start dates shall be the Substantial Completion Date, if project is phased all warranties to start at the date of Substantial Completion of each phase.
B. Execute and assemble transferable warranty documents and bonds from subcontractors, suppliers, and manufacturers.
C. Verify documents are in proper form, contain full information, and are notarized.
D. Co-execute submittals when required.
E. Include Table of Contents and assemble in three D side ring binder with durable plastic cover.
F. Submit prior to final Application for Payment.
G. Time Of Submittals:
i. For equipment or component parts of equipment put into service during construction with State's permission, submit documents within ten days after acceptance.
ii. Make other submittals within ten days after Date of Substantial Completion, prior to final Application for Payment.
iii. For items of Work for which acceptance is delayed beyond Date of Substantial Completion, submit within ten days after acceptance, listing date or acceptance as beginning or warranty or bond period.
11. MAINTENANCE SERVICE
A. Furnish service and maintenance of components indicated in specification sections during warranty period.
B. Examine system components at frequency consistent with reliable operation. Clean, adjust, and lubricate as required.
C. Include systematic examination, adjustment, and lubrication of components. Repair or replace parts whenever required. Use parts produced by manufacturer of original component.
D. Do not assign or transfer maintenance service to agent or Subcontractor without prior written consent of the Department.
12. GUARANTEE OF WORK
A. Except as otherwise specified, all work shall be guaranteed by the Contractor against defects resulting from the use of inferior materials, equipment or workmanship for one (1) year from the Date of Substantial Completion of the work.
B. If, within any guarantee period, repairs or changes are required in connection with guaranteed work, which in the opinion of the Department, is rendered necessary as a result of the use of materials, equipment or workmanship which are inferior, defective, or not in accordance with the terms of the Contract shall, promptly upon receipt of notice from the Department and at his own expense:
i. Place in satisfactory condition in every particular, all such guaranteed work, correct all defects therein.
ii. Make good all damage to the building or site, or equipment or contents thereof; which in the opinion of the Department is the result of the use of materials, equipment or workmanship which are inferior, defective, or not in accordance with the terms of the Contract.
iii. Make good any work or material, or the equipment and contents of said building or site disturbed in fulfilling any such guarantee.
C. In any case, wherein fulfilling the requirements of the Contract or of any guarantee, embraced in or required thereby, the Contractor disturbs any work guaranteed under another contract, he shall restore such disturbed work to a condition satisfactory to the Department and guarantee such restored work to the same extent as it was guaranteed under such other contracts.
D. If the Contractor, after notice, fails to proceed promptly to comply with the terms of the guarantee, the Department may have the defects corrected and the Contractor and his/her Surety shall be liable for all expense incurred.
E. All special guarantees applicable to definite parts of the work that may be stipulated in the Specifications or other papers forming a part of the Contract shall be subject to the term of this paragraph during the first year of the life of such special guarantee.
F. Failure to adhere to guarantee terms may result in suspension or barring from the prequalification list, or, alternatively, the requirement of' a Letter of Credit or other guaranty equal to a percentage of the Contract amount.
END OF SECTION