Attachment 5 - Drawings Volume IV.pdf

PDF 20 MB Posted

Attached to
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Asheville, NC |
Solicitation number
36C77626R0066
Issued by

About this file

These are the final bid documents for the EHRM (Electronic Health Records Management) Infrastructure Upgrades to Building 47 at the VA Medical Center in Asheville, North Carolina, consisting of mechanical, electrical, and plumbing design plans and specifications. The project is located at 1100 Tunnel Road, Asheville, NC 28805, with Project Number 637-22-700 and Building 47 designated as the subject facility.

The mechanical scope includes installation of ductless split-system HVAC units throughout multiple floors (basement through 5th floor and roof level), with detailed plans showing equipment locations, refrigerant line routing, and condensate management. The project specifies Vertiv WLM series mini-split indoor units and Vertiv CUD series outdoor condensing units for standard areas, plus Liebert CRAC (Computer Room Air Conditioning) units for the new data center, and specialized equipment for telecommunications spaces. Key mechanical components include multiple indoor/outdoor unit pairs (47-IDU and 47-ODU designations), four CRAC units (47-CRAC-1A/1B and 47-CRAC-2A/2B), condensing units (47-CU-1A/1B and 47-CU-2A/2B), and control systems with Vigilent monitoring integration for the data center. The electrical scope encompasses new and modified branch panels, busway systems rated 60-600 amperes distributed across floors, UPS systems (UPS-A and UPS-B), comprehensive building power distribution infrastructure, and emergency power provisions. The plans provide detailed panel schedules, one-line diagrams for critical and equipment branches, and equipment specifications with electrical ratings and circuit assignments throughout the building. Design documents include full-scale mechanical floor plans (basement through roof), enlarged demolition and new construction details, partition legends identifying fire barriers and smoke barriers, and comprehensive equipment and materials schedules prepared by Awen Solutions Group (Architecture/Engineer of Record) under VA Facilities Management Services for final bid distribution.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Addendum 1 8-6-26.zip ZIP file
Attachment 9 - Key Subcontractor Information.docx DOCX document
RFI Responses.docx DOCX document
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001 - Site Visit Agenda.pdf PDF
Amendment 0001.pdf PDF
Amendment 0001 - Site Visit Sign In.pdf PDF
Attachment 8 - Limitations on Subcontracting - Construction.docx DOCX document
36C77626R0066.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 13 - Site Visit Details.pdf PDF
Attachment 6 - Drawings Volume V.pdf PDF
Attachment 10 - Key Personnel.docx DOCX document
Attachment 3 - Drawings Volume II.pdf PDF
Attachment 4 - Drawings Volume III.pdf PDF
Attachment 9 - Key Subcontractor Information.docx DOCX document
Attachment 2 - Drawings Volume I.pdf PDF
Attachment 11 - Division Pricing Template.xlsx XLSX spreadsheet
Attachment 7 - Drawings Volume VI.pdf PDF
Attachment 12 - Wage Determination.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .