This file contains architectural and engineering drawings for the EHRM Infrastructure Upgrades project at Charles George VA Medical Center in Asheville, NC (Project 637-22-700). The drawing package covers Buildings 3, 4, and 5, with detailed plans for structural, electrical, telecommunications, and physical security systems.

The drawings specify comprehensive infrastructure work including electrical panel upgrades with new 30-ampere L5-30R twist-locking receptacles in wall-mounted telecommunications enclosures on first and second floors; Cat6A cabling replacements throughout all three buildings with new fiber optic backbone infrastructure (144-strand fiber optic patch panels with LC connectors); 12-unit wall-mounted cabinets with UPS and PDU equipment; and bonding and grounding systems compliant with TIA-607 standards. Telecommunications work includes demolition of existing Cat6 and below cabling, wall-mounted fiber boxes, and non-compliant patch panels, with installation of new fiber distribution from Building 47 data center cores to each building's telecommunications enclosures. Electrical scope includes load calculations for new telecommunications equipment (5,760 VA per building), new circuit breakers in existing panels (Panels 3A, 3B, 4A, 4B, 5A, 5B), and coordination with existing 225-ampere disconnects and building transformers. Physical security additions require new camera installations (360-degree ceiling-mounted with supplemental IR), access control card readers, motion detectors, and door position switches coordinated with Johnson Controls base building systems. All work requires field verification of existing conditions, asbestos abatement as necessary per specifications, coordination with VA operations, and compliance with fire/smoke wall ratings.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Addendum 1 8-6-26.zip ZIP file
RFI Responses.docx DOCX document
Attachment 9 - Key Subcontractor Information.docx DOCX document
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001 - Site Visit Sign In.pdf PDF
Amendment 0001.pdf PDF
Amendment 0001 - Site Visit Agenda.pdf PDF
Attachment 9 - Key Subcontractor Information.docx DOCX document
Attachment 6 - Drawings Volume V.pdf PDF
Attachment 4 - Drawings Volume III.pdf PDF
36C77626R0066.pdf PDF
Attachment 8 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 12 - Wage Determination.pdf PDF
Attachment 11 - Division Pricing Template.xlsx XLSX spreadsheet
Attachment 7 - Drawings Volume VI.pdf PDF
Attachment 5 - Drawings Volume IV.pdf PDF
Attachment 13 - Site Visit Details.pdf PDF
Attachment 10 - Key Personnel.docx DOCX document
Attachment 2 - Drawings Volume I.pdf PDF
Attachment 1 - Specifications.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet List

Sheet Number Sheet Name

BLDG 3

03-GI001 COVER SHEET

03-SF101 STRUCTURAL 1ST & 2ND FLOOR PLAN

03-AE101 1ST & 2ND FLOOR PLANS, ENLARGED PLANS AND ELEVATIONS

03-ED100 ELECTRICAL BASEMENT DEMOLITION

03-ED101 ELECTRICAL 1ST & 2ND FLOOR DEMOLITION

03-EP100 ELECTRICAL BASEMENT PLAN

03-EP101 ELECTRICAL 1ST & 2ND FLOOR PLAN

03-EP601 ONE-LINE DIAGRAM AND SCHEDULES

03-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION

03-TD101 TELECOMMUNICATIONS 1ST & 2ND FLOOR DEMOLITION

03-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

03-TN100 TELECOMMUNICATIONS BASEMENT PLAN

03-TN101 TELECOMMUNICATIONS 1ST & 2ND FLOOR PLAN

03-TN601 TELECOMMUNICATIONS DIAGRAMS

03-TY102 1ST & 2ND FLOOR SECURITY PLANS

Grand total: 15

SITE KEY PLAN

TUNNELL ROAD

R

IC

E V

IL

L E

R O

A D

V E

T E

R A

N S

D R

IV

E

ARNOLD ROAD

A R

N O

L D

R O

A D

FINAL BID DOCUMENTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

DESIGN TEAM

OWNER

ARCHITECT / CONTRACT PRIME

MECHANICAL / ELECTRICAL /

PLUMBING / FIRE PROTECTION /

STRUCTURAL ENGINEER

Charles George VA Medical Center 1100 Tunnel Road Asheville, NC 28805 Contact: Daniel Chaparro Office: (916) 843-7187 Cell: (916) 542-3038

Awen Solutions Group 215 N. Payne Street, Suite 122 Alexandria, VA 22314 Contact: Amy Carr acarr@awensolutions.com

(720) 703-0640

Coffman Engineers, Inc.

701 Corporate Center Drive, Suite 475 Raleigh, NC 27607 Contact: Lars Iverson lars.iverson@coffman.com

(919) 670-3668

EHRM INFRASTRUCTURE UPGRADES

FINAL BID DOCUMENTS

FOR OFFICIAL USE ONLY

Facilities Management

Services

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.A .A

S H

E

H R

M .r v t

/1 /2

:4

:0

A

M

03-GI001

COVER SHEET

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

CHARLES GEORGE VA MEDICAL CENTER

12.19.2025

1100 TUNNEL ROAD ASHEVILLE, NC 28805

BLDG 3

Revisions: Date:

SHEET 65 of 559

UP

OFFICE

OFFICE

OFFICE

HALL

ENTRY

OFFICE

OFFICE

OFFICE

OFFICE TOILET TOILET

CLOSET

OFFICE

OFFICEOFFICE OFFICE OFFICE

HALL

CLOSET

GENERAL NOTES:

(N) WALL MOUNTED TELECOM ENCLOSURE. PROVIDE BACKING PER DETAIL

WALL MOUNT ENCLOSURE TO BACKING PER MANUFACTURER'S

INSTALLATION INSTRUCTIONS.

00-S503

1. FIRE/SMOKE WALL RECORD DRAWINGS WERE NOT PROVIDED BY THE STATION. FIELD-VERIFY

EXISTING PARTITION WALLS TO IDENTIFY FIRE/SMOKE RATING AND PROVIDE ALL REQUIRED

MEASURES AND APPROPRIATE EQUIPMENT IN ACCORDANCE WITH THE VERIFIED PARTITION TYPE.

PLAN

NORTH

N

FINAL BID DOCUMENTS

FOR OFFICIAL USE ONLY

www.coffman.com

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607 ph 919.314.6686

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

03/04/24

Facilities Management

Services

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.S .A

S H

E

H R

M .r v t

/1 /2

:1

:1

P M

03-SF101

STRUCTURAL 1ST & 2ND FLOOR PLAN

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES BLDG 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

1/4" = 1'-0"

1 STRUCTURAL 1ST FLOOR PLAN

1/4" = 1'-0"

2 STRUCTURAL 2ND FLOOR PLAN

DU MBHRevisions: Date:

12.12.2025

11 12/19/2025 SHEET 66 of 559

03-AE101

OFFICE

OFFICE

OFFICE

HALL

ENTRY

OFFICE

OFFICE

OFFICE

03-AE101

OFFICE TOILET TOILET

CLOSET

OFFICE

OFFICEOFFICE OFFICE OFFICE

HALL

CLOSET

T01

T02A03

54 TOTAL WAOS/48 (MAX. WAO PER TE)

= 1.125 TE'S REQUIRED IN BLDG 3 (2 TE'S

PROVIDED). (1) HALF-HEIGHT (12 RU) TE

BEING PROVIDED PER FLOOR

03-AE101

OFFICE

D01

T02 A03

T01

54 TOTAL WAOS/48

(MAX. WAO PER TE) =

1.125 TE'S REQUIRED IN

BLDG 3 (2 TE'S

PROVIDED). (1) HALF-

HEIGHT (12 RU) TE

BEING PROVIDED PER

FLOOR

03-AE101

OFFICE

D01

D01

T02

A03

T01

1. COORDINATE WITH FIRE PROTECTION, MECHANICAL, ELECTRICAL, PLUMBING,

TELECOMMUNICATIONS, AND SECURITY PLANS FOR ADDITIONAL

REQUIREMENTS NOT SHOWN ON THIS DRAWING.

2. DIMENSIONS PRECEDED BY A TILDE (~) ARE APPROXIMATE, SUBJECT TO FIELD

VERIFICATION.

3. ASBESTOS-CONTAINING PIPE INSULATION AND FITTINGS MAY BE FOUND IN

PIPE CHASES, WALLS AND OTHER HIDDEN AREAS THROUGHOUT THE

BUILDING. IF THESE MATERIALS HAVE TO BE DISTURBED DURING THE

PROJECT, ABATEMENT MUST BE CONDUCTED PER SPECIFICATION 02 82 11.

4. ASPHALT ROOFING MATERIALS SHOULD BE ASSUMED TO CONTAIN ASBESTOS.

IF THESE MATERIALS HAVE TO BE DISTURBED DURING THE PROJECT,

ABATEMENT MUST BE CONDUCTED PER SPECIFICATION 02 82 13.21.

5. FIRE/SMOKE WALL RECORD DRAWINGS WERE NOT PROVIDED BY THE STATION.

FIELD-VERIFY EXISTING PARTITION WALLS TO IDENTIFY FIRE/SMOKE RATING

AND PROVIDE ALL REQUIRED MEASURES AND APPROPRIATE EQUIPMENT IN

ACCORDANCE WITH THE VERIFIED PARTITION TYPE.

T02

A03

T01

PLASTIC SHEETING (VISQUEEN)

DEMOLITION LEGEND

WALK-OFF MATS

FINAL BID DOCUMENTS

PLAN

NORTH

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

OVERALL PLAN SHEET NOTES

TR LEGEND

TR TO BE DECOMMISSIONED

EXISTING TR

NEW TR

EXPANDED TR

NEW DATA CENTER

NEW TELECOM ENCLOSURE (TE)

EXISTING DATA CENTER

ENTRANCE ROOM

FINAL BID DOCUMENTS

FOR OFFICIAL USE ONLY

Facilities Management

Services

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.A .A

S H

E

H R

M .r v t

/1 /2

:4

:1

A

M

03-AE101

1ST & 2ND FLOOR PLANS, ENLARGED

PLANS AND ELEVATIONSAwen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

1/4" = 1'-0"

1 OVERALL FLOOR PLAN - 1ST FLOOR

1/4" = 1'-0"

2 OVERALL FLOOR PLAN - 2ND FLOOR

KEY TAG DESCRIPTION

A03 4'-0" x 8'-0" AC GRADE 3/4" TRADE SIZE FIRE RATED PLYWOOD BACKBOARD

PAINTED HIGH-GLASS WHITE WITH TWO COATS OF FIRE RESISTANT PAINT

D01 PROVIDE WALK OFF MATS AND PLASTIC SHEETING (VISQUEEN) AT

CONSTRUCTION AREAS.

T01 NEW TELECOMMUNICATIONS ENCLOSURE (TE), SEE

TELECOMMUNICATION DRAWINGS

T02 BONDING BUS BAR (SBB), SEE TELECOMMUNICATIONS DRAWINGS

ENLARGED PLAN KEYNOTES

3/4" = 1'-0"

3 ENLARGED PLAN - 1ST FLOOR (TE)

3/4" = 1'-0"

4 ENLARGED PLAN - 2ND FLOOR (TE)

3/8" = 1'-0"

6 2ND FL TE ELEV.

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

1 1 2 3 4 5 6 7

3/8" = 1'-0"

FEETSCALE

3/8" = 1'-0"

5 1ST FL TE ELEV.

1 1 2 3

3/4" = 1'-0"

FEETSCALE

IF ASBESTO-CONTAINING MATERIAL HAS TO BE DISTURBED DURING THE PROJECT, ABATERMENT MUST BE CONDUCTED PER SPECIFICATION 02 81 11. REFER TO ASBESTOS RE-INSPECTION REPORT FOR MORE DETAILED INFORMATION.

ABATEMENT QUANTITY SCHEDULE - BLDG. 3

LOCATION MATERIAL DISCRIPTION QUANTITY

CRAWLSPACE/

FLOOR/ WALL/

CEILING CHASES

ASBESTOS-CONTAINING PIPE INSULATION AND FITTINGS MAY BE FOUND ON

STEAM LINE INSULATION AND HERD ELBOWS & FITTINGS ON STEAM LINES.

AS REQUIRED BASED ON FIELD

CONDITIONS WITHIN THE WORK

AREA

ROOF

ASBESTOS-CONTAINING ASHPHALT SHINGLES, FELT, AND MASTICS MAY BE

FOUND IN ROOF ASSEMBLY.

AS REQUIRED BASED ON FIELD

CONDITIONS WITHIN THE WORK

AREA

SHEET 67 of 559

J INZ E CHEN

SEAL

040390

N

O

RT

H CAROLIN

A

P R

FO

ESS ON

A L

I

N E

GINEER

(E) 3A

(E) 3B

PLAN

NORTH

N

FOR OFFICIAL USE ONLY

www.coffman.com

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607 ph 919.314.6686

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTSFacilities Management

Services

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

12/18/2025

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.E .A

S H

E

H R

M .r v t

/1 /2

:1

:0

P M

03-ED100

ELECTRICAL BASEMENT DEMOLITION

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES BLDG 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

1/4" = 1'-0"

1 ELECTRICAL BASEMENT DEMOLITION

GENERAL NOTES:

CONTRACTOR SHALL COORDINATE WITH TELECOM AND FIELD-VERIFY LOCATION OF EXISTING BASEMENT TELECOM ENCLOSURE AND ASSOCIATED ELECTRICAL INFRASTRUCTURE. DEMOLISH EXISTING DUPLEX RECEPTACLE LOCATED NEAR OR INSIDE EXISTING BASEMENT TELECOM ENCLOSURE. DEMOLISH CIRCUIT AND ALL ASSOCIATED HARDWARE BACK TO SOURCE.

1. REFER TO 00-E001 FOR GENERAL NOTES, DEMOLITION NOTES, AND LEGENDS.

2. DEMOLITION PLANS ARE CONCEPTUAL, NOT ALL DEVICES TO BE DEMOLISHED ARE SHOWN. BASEMENT EQUIPMENT LAYOUT IS

SHOWN BASED ON BEST AVAILABLE INFORMATION.

3. ELECTRICAL PANEL LOCATIONS SHOWN FOR REFERENCE ONLY. ALL PANELS ARE EXISTING TO REMAIN.

Revisions: Date: SHEET 68 of 559

040390

N

O

RT

H CAROLIN

A

P R

FO

ESS ON

A L

I

N E

GINEER

OFFICE

OFFICE

OFFICE

HALL ENTRY

OFFICE

OFFICE

OFFICE

OFFICE

CLOSET

TOILET

TOILET

CLOSET

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

HALL

PLAN

NORTH

N

FOR OFFICIAL USE ONLY

www.coffman.com

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607 ph 919.314.6686

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTSFacilities Management

Services

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

12/18/2025

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.E .A

S H

E

H R

M .r v t

/1 /2

:1

:0

P M

03-ED101

ELECTRICAL 1ST & 2ND FLOOR

DEMOLITIONAwen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES BLDG 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

1/4" = 1'-0"

1 ELECTRICAL 1ST FLOOR DEMOLITION

1/4" = 1'-0"

2 ELECTRICAL 2ND FLOOR DEMOLITION

GENERAL NOTES:

1. REFER TO 00-E001 FOR GENERAL NOTES, DEMOLITION NOTES, AND LEGENDS.

2. ELECTRICAL PANEL LOCATIONS SHOWN FOR REFERENCE ONLY. ALL PANELS ARE EXISTING TO REMAIN.

LOCATION OF NEW TELECOM ENCLOSURE TO BE INSTALLED UNDER THIS PROJECT. ENSURE WALL IS CLEAR OF ANY OBSTRUCTING ELECTRICAL EQUIPMENT, SUCH AS RECEPTACLES, SWITCHES, ETC. COORDINATE WITH VA COR TO REMOVE OR

RELOCATE ANY DEVICES AS NECESSARY.

Revisions: Date: SHEET 69 of 559

040390

N

O

RT

H CAROLIN

A

P R

FO

ESS ON

A L

I

N E

GINEER

(E) 3B

(E) 3A

PLAN

NORTH

N

FOR OFFICIAL USE ONLY

www.coffman.com

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607 ph 919.314.6686

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTSFacilities Management

Services

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

12/18/2025

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.E .A

S H

E

H R

M .r v t

/1 /2

:1

:0

P M

03-EP100

ELECTRICAL BASEMENT PLAN

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES BLDG 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

1/4" = 1'-0"

1 ELECTRICAL BASEMENT PLAN

GENERAL NOTES:

1. FIRE/SMOKE WALL RECORD DRAWINGS WERE NOT PROVIDED BY THE STATION. FIELD-VERIFY EXISTING PARTITION WALLS TO IDENTIFY FIRE/SMOKE RATING AND PROVIDE ALL REQUIRED MEASURES AND APPROPRIATE EQUIPMENT IN ACCORDANCE WITH

THE VERIFIED PARTITION TYPE.

2. REFER TO 00-E001 FOR GENERAL NOTES AND LEGENDS.

3. NO NEW ELECTRICAL SCOPE IN BASEMENT, PLAN SHOWN FOR REFERENCE ONLY.

4. ELECTRICAL PANEL LOCATIONS SHOWN FOR REFERENCE ONLY. ALL PANELS ARE EXISTING TO REMAIN.

Revisions: Date: SHEET 70 of 559

040390

N

O

RT

H CAROLIN

A

P R

FO

ESS ON

A L

I

N E

GINEER

L5-30R L5-30R

(E) 3A: 39

(E) 3B: 41

(E) 3B: 35

PBB

(E) 3B: 35

OFFICE

OFFICE

OFFICE

HALL ENTRY

OFFICE

OFFICE

OFFICE

1 L5-30R L5-30R

(E) 3A: 41 (E) 3B: 39

(E) 3B: 37

(E) 3B: 37

2SBB

OFFICE

CLOSET

TOILET

TOILET

CLOSET

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

HALL

PLAN

NORTH

N

FOR OFFICIAL USE ONLY

www.coffman.com

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607 ph 919.314.6686

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTSFacilities Management

Services

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

12/18/2025

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.E .A

S H

E

H R

M .r v t

/1 /2

:1

:0

P M

03-EP101

ELECTRICAL 1ST & 2ND FLOOR PLAN

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES BLDG 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

1/4" = 1'-0"

1 ELECTRICAL 1ST FLOOR PLAN

1/4" = 1'-0"

2 ELECTRICAL 2ND FLOOR PLAN

GENERAL NOTES:

1. FIRE/SMOKE WALL RECORD DRAWINGS WERE NOT PROVIDED BY THE STATION. FIELD-VERIFY EXISTING PARTITION WALLS TO IDENTIFY FIRE/SMOKE RATING AND PROVIDE ALL REQUIRED MEASURES AND APPROPRIATE EQUIPMENT IN ACCORDANCE WITH THE

VERIFIED PARTITION TYPE.

2. REFER TO 00-E001 FOR GENERAL NOTES, LEGENDS, AND POWER EQUIPMENT SCHEDULE. PROVIDE UPS AND PDU EQUIPMENT IN

EACH TELECOM ENCLOSURE AS SPECIFIED.

3. REFER TO 03-EP601 FOR BUILDING ONE-LINE AND PANEL SCHEDULES.

4. REFER TO TELECOM DRAWINGS FOR EQUIPMENT AND TELECOM ENCLOSURE LAYOUT.

5. ELECTRICAL PANEL LOCATIONS SHOWN FOR REFERENCE ONLY. ALL PANELS ARE EXISTING TO REMAIN.

6. REFER TO 00-E502, DETAILS 1 & 2 FOR TYPICAL EQUIPMENT ELEVATION FOR TELECOM ENCLOSURE INSTALLATIONS. INSTALL, CONNECT, AND ENERGIZE RACK POWER EQUIPMENT AS SPECIFIED.

PROVIDE TWO (2) NEMA L5-30R TWIST LOCKING RECEPTACLES MOUNTED INSIDE WALL MOUNTED TELECOM ENCLOSURE.

COORDINATE FINAL INSTALLATION AND MOUNTING HEIGHT WITH ENCLOSURE INSTALLATION.

BOND RACK BONDING BUSBAR (RBB) TO THE SBB. SBB SHALL BE BONDED BACK TO THE BUILDING PBB. REFER TO GROUNDING

AND BONDING DETAIL(S) ON SHEET 03-TN601 FOR FURTHER DETAILS.

BOND RACK BONDING BUSBAR (RBB) TO THE PBB. CONTRACTOR SHALL LOCATE THE BUILDING MAIN GROUND BAR AND BOND THE PBB BACK TO IT. REFER TO GROUNDING AND BONDING DETAIL(S) ON SHEET 03-TN601 FOR FURTHER DETAILS.

FOR VERTICALLY STACKED QUAD RECEPTACLES, REFER TO DETAIL 1/00-E502 FOR INSTALLATION.

Revisions: Date: SHEET 71 of 559

040390

N

O

RT

H CAROLIN

A

P R

FO

ESS ON

A L

I

N E

GINEER

(E) BLDG 4 XFMR

100KVA

12470V-240V

(E) BLDG 2

DISCONNECT

240V, 225A

(E) BLDG 3

DISCONNECT

240V, 225A

(E) PANEL

3B

200A 120/240V

(E) PANEL

3A

200A 120/240V

(E) BLDG 4

DISCONNECT

240V, 225A

(E) PANEL

4B

150A 120/240V

(E) PANEL

4A

150A 120/240V

(E) BLDG 5

DISCONNECT

240V, 225A

(E) PANEL

5B

150A 120/240V

(E) PANEL

5A

150A 120/240V

TO CAMPUS MV

DISTRIBUTION

(E) PANEL

2A

200A 120/240V

FOR OFFICIAL USE ONLY

www.coffman.com

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607 ph 919.314.6686

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTSFacilities Management

Services

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

12/18/2025

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.E .A

S H

E

H R

M .r v t

/1 /2

:1

:0

P M

03-EP601

ONE-LINE DIAGRAM AND SCHEDULES

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES BLDG 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

N.T.S.

1 BUILDING 3 PARTIAL ONE-LINE DIAGRAM

1. USE EXISTING BLANK PANEL SPACE. PROVIDE NEW BREAKER, WHICH SHALL MATCH THE EXISTING PANEL MANUFACTURER AND AIC RATING, AND MAINTAIN EXISTING PANEL UL RATING.

Notes:

Total Est. Demand Current: 24 A

Total Conn. Current: 24 A

Total Est. Demand: 5760 VA

Total Conn. Load: 5760 VA

Telecommunications Equipment 5760 VA 100.00% 5760 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 24 A 24 A

Total Load: 2880 VA 2880 VA

41 L5-30R, TE 2ND FLR 30 A 1 1 2880 -- 1 -- SPACE 42

39 L5-30R, TE 1ST FLR 30 A 1 1 2880 -- 1 -- SPACE 40

37 SPACE -- 1 -- -- 1 -- SPACE 38

35 SPACE -- 1 -- -- 1 -- SPACE 36

33 SPACE -- 1 -- -- 1 -- SPACE 34

31 SPACE -- 1 -- -- 1 -- SPACE 32

29 SPARE 20 A 1 0 0 1 20 A SPARE 30

27 (E) BSA CON 20 A 1 0 0 1 20 A SPARE 28

25 (E) UNKNOWN LOAD 20 A 1 0 0 1 20 A (E) OUTSIDE A/C 26

23 -- -- -- -- 0 0 1 20 A (E) OUTSIDE A/C 24

21 (E) OUTSIDE A/C 20 A 2 0 0 1 20 A (E) DOWNSTAIRS HEAT 22

19 (E) UPSTAIRS HEAT 20 A 1 0 0 1 20 A (E) WASHER 20

17 (E) SMOKE DETECTOR 20 A 1 0 0 1 20 A (E) KIT. LITE/REC., DIN. REC 18

15 (E) BATH LTG, W.BR REC/LTG 20 A 1 0 0 1 20 A (E) ATTIC FAN & LITE 16

13 (E) STEAM CONTROL 20 A 1 0 0 1 20 A (E) KIT. REC 14

11 SPARE 20 A 1 0 0 1 20 A (E) BASE LTG, DISP., D LTG/REC 12

9 (E) REC, HALL 20 A 1 0 0 1 20 A (E) HALL LTG, BR LTG/REC 10

7 -- -- -- -- 0 0 1 20 A (E) LTG, REFRIG 8

5 SPARE 20 A 2 0 0 1 20 A SPARE 6

3 -- -- -- -- 0 0 -- -- -- -- 4

1 SPARE 20 A 2 0 0 2 20 A SPARE 2

CKT Circuit Description Trip Poles Notes A B Notes Poles Trip Circuit Description CKT

Enclosure: Type 1 MCB Rating: 200 A

Mounting: SURFACE Wires: 3 Mains Rating: 225 A

Supply From: Phases: 1 Mains Type: MCB

Location: Volts: 120/240 Single A.I.C. Rating: UNKNOWN

Branch Panel: (E) 3A

1. USE EXISTING BLANK PANEL SPACE. PROVIDE NEW BREAKER, WHICH SHALL MATCH THE EXISTING PANEL MANUFACTURER AND AIC RATING, AND MAINTAIN EXISTING PANEL UL RATING.

Notes:

Total Est. Demand Current: 30 A

Total Conn. Current: 30 A

Total Est. Demand: 7200 VA

Telecommunications Equipment 5760 VA 100.00% 5760 VA Total Conn. Load: 7200 VA

REC, 1440 VA 100.00% 1440 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 30 A 30 A

Total Load: 3600 VA 3600 VA

41 L5-30R, TE 2ND FLR 30 A 1 1 2880 -- 1 -- SPACE 42

39 L5-30R, TE 1ST FLR 30 A 1 1 2880 -- 1 -- SPACE 40

37 REC, 2ND FLOOR TE 20 A 1 1 720 -- 1 -- SPACE 38

35 REC, 1ST FLOOR TE 20 A 1 1 720 -- 1 -- SPACE 36

33 SPACE -- 1 -- -- 1 -- SPACE 34

31 SPARE 20 A 1 0 0 1 20 A SPARE 32

29 -- -- -- -- 0 0 1 20 A (E) EXISTING LOAD 30

27 (E) OUTSIDE A/C 20 A 2 0 0 1 20 A SPARE 28

25 (E) DOWNSTAIRS HEAT 20 A 1 0 0 1 20 A SPARE 26

23 (E) SMOKE DETECTOR 20 A 1 0 0 -- -- -- -- 24

21 SPARE 20 A 1 0 0 2 20 A (E) OUTSIDE A/C 22

19 (E) WASHER, DISP., REFRIDGE. 20 A 1 0 0 1 20 A (E) UPSTAIRS HEAT 20

17 (E) LR REC LITE, HALL REC. 20 A 1 0 0 1 20 A SPARE 18

15 (E) HALL LITE/REC, BATH LITE 20 A 1 0 0 1 20 A (E) KIT. REC. 16

13 (E) SUN RM. REC/LITE 20 A 1 0 0 1 20 A (E) SO. BR LITE/REC. 14

11 (E) BACK LITE, DIN REC/LITE 20 A 1 0 0 1 20 A (E) BASE LITE/REC, KIT. LITE 12

9 (E) KIT. REC 20 A 1 0 0 1 20 A SPARE 10

7 -- -- -- -- 0 0 1 20 A (E) ATTIC FAN, REC/LITE 8

5 (E) DRYER 60 A 2 0 0 1 20 A (E) STEAM CONTROL 6

3 -- -- -- -- 0 0 -- -- -- -- 4

1 (E) WATER HEATER 60 A 2 0 0 2 20 A (E) RANGE 2

CKT Circuit Description Trip Poles Notes A B Notes Poles Trip Circuit Description CKT

Enclosure: Type 1 MCB Rating: 200 A

Mounting: SURFACE Wires: 3 Mains Rating: 225 A

Supply From: Phases: 1 Mains Type: MCB

Location: Volts: 120/240 Single A.I.C. Rating: UNKNOWN

Branch Panel: (E) 3B

GENERAL NOTES:

1. REFER TO 00-E001 FOR GENERAL NOTES AND LEGENDS.

2. ALL PANELS ARE EXISTING TO REMAIN. PANELS SHOWN IN BOLD INDICATE SCOPE IN THOSE PANELS.

3. ADDITIONAL LOAD TO BE ADDED TO PANELS AS SHOWN. EXISTING LOAD INFORMATION FOR PANELS WAS UNAVAILABLE AT THE

TIME OF DESIGJN. "PANEL TOTALS" REPRESENT LOAD ADDED TO PANEL.

4. IF SPACE ALLOCATED FOR NEW LOADS IS NOT AVAILABLE DURING CONSTRUCTION, CONTACT THE DOR.

5. DEMAND LOAD CALCULATIONS WERE DONE USING EXISTING INFORMATION FROM PROVIDED AS-BUILTS, SITE OBSERVATIONS, AND PHOTOS. PANELS WITH NEW LOADS ADDED WERE WERE SELECTED USING THE DEMAND LOAD ESTIMATES.

6. PANEL AIC RATINGS SHOWN WERE DONE USING EXISTING INFORMATION FROM PROVIDED AS-BUILTS, SITE OBSERVATIONS, AND

PHOTOS. CONTRACTOR TO VERFIY AIC RATING BEFORE ADDING NEW BREAKERS.

Revisions: Date: SHEET 72 of 559

Expires12-31-28

BICSI ID # 237176

Jinze Chen

PLAN

NORTH

N

FOR OFFICIAL USE ONLY

www.coffman.com

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607 ph 919.314.6686

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTSFacilities Management

Services

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

12/18/2025

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.E .A

S H

E

H R

M .r v t

/1 /2

:5

:4

P M

03-TD100

TELECOMMUNICATIONS BASEMENT

DEMOLITIONAwen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES BLDG 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

1/4" = 1'-0"

1 TELECOMMUNICATIONS BASEMENT DEMOLITION

GENERAL NOTES:

1. REFER TO 00-T001 FOR GENERAL NOTES AND LEGENDS.

2. ALL EXISTING CABLES AND INFRASTRUCTURE NOT CAT6A RATED TO BE DEMOLISHED.

3. NOT ALL DEVICES ARE SHOWN. CONTRACTOR TO VERIFY ALL DATA OUTLET LOCATIONS IN THE FIELD.

4. THE QUANTITY OF TELECOM DROPS TO BE REMOVED, INSTALLED, AND MAINTAINED IS BASED ON THE INFORMATION KNOWN AT THE TIME OF DESIGN. PRIOR TO CONSTRUCTION, TELECOM DROP LOCATIONS SHALL BE SURVEYED. ANY DISCREPANCIES SHALL

BE PROVIDED TO THE DOR IMMEDIATELY.

5. EXISTING ROUTING FOR TELECOM DROPS TO REMAIN SHALL BE MAINTAINED TO THE FULLEST EXTENT.

6. DEMOLITION DETAILS (IN NO PARTICULAR ORDER):

A. REFER TO ENLARGED PLANS FOR ADDITIONAL REQUIREMENTS.

B. CABLE CAT6 AND BELOW HORIZONTAL CABLE SHALL BE REMOVED FROM EXISTING PATCH PANELS BACK TO FINAL DATA

JACK LOCATIONS. CABLE SHALL BE REMOVED BETWEEN EXISTING SWITCH AND PATCH PANEL.

C. PATCH PANELS CURRENTLY NOT DESIGNED FOR CAT6A CABLE SHALL BE REMOVED.

D. WALL PLATES AND RJ-45 JACKS FOR WALL OUTLET BOXES FOR CAT5E, 6 AND BELOW CABLE SHALL BE REMOVED.

E. DATA RACKS SHALL BE REMOVED.

F. HORIZONTAL AND VERTICAL CABLE MANAGEMENT FOR RACKS SHALL BE REMOVED IF APPLICABLE.

G. WALL MOUNTED FIBER BOXES SHALL BE REMOVED.

H. FIBER CABLE AND ENCLOSURES SHALL BE REMOVED BACK TO SOURCE AFTER ALL NEW FIBER CONNECTIONS IN THIS

BUILDING HAVE BEEN CONNECTED. PRIOR TO DEMOLITION, COORDINATE WITH VA COR TO ENSURE ALL FIBER IS INACTIVE

BEFORE DEMOLITION.

I. EXISTING CABLE TRAY TO REMAIN.

J. COPPER PHONE PUNCH DOWN BLOCKS SHALL REMAIN UNLESS OTHERWISE NOTED.

7. DEMOLISH ALL TELECOMMUNICATIONS CABLE THAT IS NOT TERMINATED AT BOTH ENDS AT A CONNECTOR OR OTHER EQUIPMENT AND NOT IDENTIFIED 'FOR FUTURE USE' WITH A TAG. ENSURE DEMOLITION OF ABANDONED CABLE WILL NOT DISRUPT VA OPERATIONS PRIOR TO REMOVAL. WHERE DISRUPTION OF SERVICE OCCURS DUE TO DEMOLISHED CABLE, NEW

CABLE SHALL BE INSTALLED TO RESTORE THE SYSTEM AT THE CONTRACTOR'S EXPENSE.

8. PRIOR TO DEMOLITION, COORDINATE DISPOSAL WITH VA. ALL VA STANDARDS, EPA STANDARDS AND LOCAL STANDARDS MUST BE

FOLLOWED WHEN DISPOSING OF ASBESTOS EXPOSED ITEMS.

1 EXISTING TO REMAIN 1-4"C FROM EXISTING HANDHOLE TO BE REUSED FOR OSP FIBER.

Revisions: Date: SHEET 73 of 559

Jinze Chen

D1/3

D2/3

D1/3

D2/3

D1/3

D1/3

D2/3

D0/3

D1/3

D2/3 D2/3

D1/3

D1/3

OFFICE

OFFICE

OFFICE

HALL ENTRY

OFFICE

OFFICE

OFFICE

D0/3

D1/3

D0/1

D2/3

D2/3

D1/3D1/3 D1/3

D1/3

D2/3

D2/3

D2/3

D1/3

OFFICE

CLOSET

TOILET

TOILET

CLOSET

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

HALL

PLAN

NORTH

N

FOR OFFICIAL USE ONLY

www.coffman.com

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607 ph 919.314.6686

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTSFacilities Management

Services

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

12/18/2025

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.E .A

S H

E

H R

M .r v t

/1 /2

:5

:4

P M

03-TD101

TELECOMMUNICATIONS 1ST & 2ND

FLOOR DEMOLITIONAwen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES BLDG 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

1/4" = 1'-0"

1 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION

1/4" = 1'-0"

2 TELECOMMUNICATIONS 2ND FLOOR DEMOLITION

GENERAL NOTES:

1. REFER TO 00-T001 FOR GENERAL NOTES AND LEGENDS.

2. ALL EXISTING CABLES AND INFRASTRUCTURE NOT CAT6A RATED TO BE DEMOLISHED.

3. NOT ALL DEVICES ARE SHOWN. CONTRACTOR TO VERIFY ALL DATA OUTLET LOCATIONS IN THE FIELD.

4. THE QUANTITY OF TELECOM DROPS TO BE REMOVED, INSTALLED, AND MAINTAINED IS BASED ON THE INFORMATION KNOWN AT THE TIME OF DESIGN. PRIOR TO CONSTRUCTION, TELECOM DROP LOCATIONS SHALL BE SURVEYED. ANY DISCREPANCIES SHALL

BE PROVIDED TO THE DOR IMMEDIATELY.

5. EXISTING ROUTING FOR TELECOM DROPS TO REMAIN SHALL BE MAINTAINED TO THE FULLEST EXTENT.

6. DEMOLITION DETAILS (IN NO PARTICULAR ORDER):

A. REFER TO ENLARGED PLANS FOR ADDITIONAL REQUIREMENTS.

B. CABLE CAT6 AND BELOW HORIZONTAL CABLE SHALL BE REMOVED FROM EXISTING PATCH PANELS BACK TO FINAL DATA

JACK LOCATIONS. CABLE SHALL BE REMOVED BETWEEN EXISTING SWITCH AND PATCH PANEL.

C. PATCH PANELS CURRENTLY NOT DESIGNED FOR CAT6A CABLE SHALL BE REMOVED.

D. WALL PLATES AND RJ-45 JACKS FOR WALL OUTLET BOXES FOR CAT5E, 6 AND BELOW CABLE SHALL BE REMOVED.

E. DATA RACKS SHALL BE REMOVED.

F. HORIZONTAL AND VERTICAL CABLE MANAGEMENT FOR RACKS SHALL BE REMOVED IF APPLICABLE.

G. WALL MOUNTED FIBER BOXES SHALL BE REMOVED.

H. FIBER CABLE AND ENCLOSURES SHALL BE REMOVED BACK TO SOURCE AFTER ALL NEW FIBER CONNECTIONS IN THIS

BUILDING HAVE BEEN CONNECTED. PRIOR TO DEMOLITION, COORDINATE WITH VA COR TO ENSURE ALL FIBER IS INACTIVE

BEFORE DEMOLITION.

I. EXISTING CABLE TRAY TO REMAIN.

J. COPPER PHONE PUNCH DOWN BLOCKS SHALL REMAIN UNLESS OTHERWISE NOTED.

7. DEMOLISH ALL TELECOMMUNICATIONS CABLE THAT IS NOT TERMINATED AT BOTH ENDS AT A CONNECTOR OR OTHER EQUIPMENT AND NOT IDENTIFIED 'FOR FUTURE USE' WITH A TAG. ENSURE DEMOLITION OF ABANDONED CABLE WILL NOT DISRUPT VA OPERATIONS PRIOR TO REMOVAL. WHERE DISRUPTION OF SERVICE OCCURS DUE TO DEMOLISHED CABLE, NEW

CABLE SHALL BE INSTALLED TO RESTORE THE SYSTEM AT THE CONTRACTOR'S EXPENSE.

8. PRIOR TO DEMOLITION, COORDINATE DISPOSAL WITH VA. ALL VA STANDARDS, EPA STANDARDS AND LOCAL STANDARDS MUST BE

FOLLOWED WHEN DISPOSING OF ASBESTOS EXPOSED ITEMS.

Revisions: Date: SHEET 74 of 559

Jinze Chen

(E) RACK

FIBER OPTIC

HORIZONTAL CABLES

PATCH CORD

TOTAL PORTS

WALL-MOUNTED ENCLOSURE TO BE DEMOLISHED. ENCLOSURE WAS UNABLE TO BE LOCATED DUE TO CONSTRUCTION IN BUILDING 3 AT TIME OF DESIGN. FIELD VERIFY LOCATION OF THE EXISTING ENCLOSURE AND DEMOLISH.

FIBER OPTIC PATCH PANEL TO BE DEMOLISHED.

DETAIL NOTES:

FOR OFFICIAL USE ONLY

www.coffman.com

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607 ph 919.314.6686

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTSFacilities Management

Services

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

12/18/2025

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.E .A

S H

E

H R

M .r v t

/1 /2

:5

:4

P M

03-TD601

TELECOMMUNICATIONS DEMOLITION

RACK ELEVATIONSAwen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES BLDG 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

GENERAL NOTES:

1. RACK ELEVATION BASED OFF OF BEST AVAILABLE INFORMATION. PRIOR TO CONSTRUCTION, RACK SHALL BE SURVEYED. ANY

DISCREPANCIES SHALL BE PROVIDED TO THE DOR IMMEDIATELY.

N.T.S.

1 (E) RACK ELEVATION

Revisions: Date: SHEET 75 of 559

Jinze Chen

D2 D2

PLAN

NORTH

N

FOR OFFICIAL USE ONLY

www.coffman.com

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607 ph 919.314.6686

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTSFacilities Management

Services

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

12/18/2025

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.E .A

S H

E

H R

M .r v t

/1 /2

:5

:4

P M

03-TN100

TELECOMMUNICATIONS BASEMENT

PLANAwen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES BLDG 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

1/4" = 1'-0"

1 TELECOMMUNICATIONS BASEMENT PLAN

GENERAL NOTES:

1. FIRE/SMOKE WALL RECORD DRAWINGS WERE NOT PROVIDED BY THE STATION. FIELD-VERIFY EXISTING PARTITION WALLS TO

IDENTIFY FIRE/SMOKE RATING AND PROVIDE ALL REQUIRED MEASURES AND APPROPRIATE EQUIPMENT IN ACCORDANCE WITH

THE VERIFIED PARTITION TYPE.

2. REFER TO 00-T001 FOR GENERAL NOTES AND LEGENDS.

3. ALL EXISTING CABLES AND INFRASTRUCTURE NOT CAT6A RATED TO BE REPLACED WITH CAT6A CABLING.

4. NOT ALL DEVICES ARE SHOWN. CONTRACTOR TO VERIFY ALL DATA OUTLET LOCATIONS IN THE FIELD.

5. THE QUANTITY OF TELECOM DROPS TO BE REMOVED, INSTALLED, AND MAINTAINED IS BASED ON THE INFORMATION KNOWN AT THE TIME OF DESIGN. PRIOR TO CONSTRUCTION, TELECOM DROP LOCATIONS SHALL BE SURVEYED. ANY DISCREPANCIES SHALL

BE PROVIDED TO THE VA COR IMMEDIATELY.

6. WHERE DROP CEILING TILES ARE DISTURBED FOR INSTALLATION OF TELECOMMUNICATIONS CABLE, INNERDUCT, CABLE TRAY, ETC., ENSURE ALL DUST AND PARTICLES ARE CLEANED PRIOR TO LEAVING THE DISTURBED AREA. PROVIDE NEW DROP CEILING

TILES WHERE TILES ARE DAMAGED DURING CONSTRUCTION.

7. ALL ROUTING FOR NEW BACKBONE CABLE SHALL BE ROUTED IN CORRUGATED INNERDUCT.

8. DATA DROPS TO BE FED FROM THE NEW WALL MOUNTED CABINET ON THE CORRESPONDING FLOOR. DATA DROPS IN THE

BASEMENT ARE TO BE FED FROM THE FIRST FLOOR WALL MOUNTED CABINET.

PROVIDE PULL BOX.

1-4"C FROM HANDHOLE TO PULLBOX FOR "A SIDE" FIBER:

PROVIDE 1-4"C CONTAINING ONE (1) 3" CORRUGATED INNERDUCT WITH 2-24ST OS2 FIBER FROM THE "A SIDE" MDA IN THE DATA CENTER OF BUILDING 47 TO FIRST AND SECOND FLOOR TES IN BUILDING 3. CONTRACTOR TO ROUTE CONDUITS THROUGH THE BASEMENT IN FIELD TO AVOID OBSTRUCTIONS AND MINIMIZE DISTURBANCE TO USERS. REFER TO 00-TS100 FOR ADDITIONAL

INFORMATION.

1-4"C FROM EXISTING HANDHOLE TO PULLBOX FOR "B SIDE" FIBER:

IN EXISTING 1-4"C, PROVIDE ONE (1) 3" CORRUGATED INNERDUCT WITH 2-24ST OS2 FIBER FROM THE "B SIDE" MDA IN THE DATA CENTER OF BUILDING 47 TO FIRST AND SECOND FLOOR TES IN BUILDING 3. CONTRACTOR TO ROUTE CONDUITS THROUGH THE BASEMENT IN FIELD TO AVOID OBSTRUCTIONS AND MINIMIZE DISTURBANCE TO USERS. REFER TO 00-TS100 FOR ADDITIONAL

INFORMATION.

1-4"C FROM PULLBOX TO PULLBOX FOR "B SIDE" FIBER:

PROVIDE 1-4"C CONTAINING ONE (1) 3" CORRUGATED INNERDUCT WITH 2-24ST OS2 FIBER FROM THE "B SIDE" MDA IN THE DATA CENTER OF BUILDING 47 TO FIRST AND SECOND FLOOR TES IN BUILDING 3. CONTRACTOR TO ROUTE CONDUITS THROUGH THE BASEMENT IN FIELD TO AVOID OBSTRUCTIONS AND MINIMIZE DISTURBANCE TO USERS. REFER TO 04-TN601 FOR ADDITIONAL

INFORMATION.

2-4"C FROM PULLBOX TO FIRST FLOOR TE:

PROVIDE 1-4"C CONTAINING ONE (1) 3" CORRUGATED INNERDUCT FOR FIBER BACKBONE FROM THE "A SIDE" MDA IN THE DATA CENTER OF BUILDING 47 GOING TO THE FIRST AND SECOND FLOOR TES IN BUILDING 3. ROUTE 1-24ST OS2 FIBER TO EACH TE FROM THE A SIDE MDA. PROVIDE 1-4"C CONTAINING ONE (1) 3" CORRUGATED INNERDUCT WITH 2-24ST OS2 FIBER FROM THE "B SIDE" MDA IN THE DATA CENTER OF BUILDING 47 TO FIRST AND SECOND FLOOR TES IN BUILDING 3. ROUTE 1-24ST OS2 FIBER TO EACH TE FROM

THE B SIDE MDA.

Revisions: Date: SHEET 76 of 559

Jinze Chen

2 5

D2

D2

D2

D2

D2

D2

D2

D2

D2

D2

D2

D2

2' - 0" (TYP.)

(T Y

P

2' - 0" (TYP.)

5 1

D2

D2

D2

D2 D2

D2

D2

D2

D2

D2

D2

D0

D0

PLAN

NORTH

N

FOR OFFICIAL USE ONLY

www.coffman.com

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607 ph 919.314.6686

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTSFacilities Management

Services

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

12/18/2025

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.E .A

S H

E

H R

M .r v t

/1 /2

:5

:4

P M

03-TN101

TELECOMMUNICATIONS 1ST & 2ND

FLOOR PLANAwen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES BLDG 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

1/4" = 1'-0"

1 TELECOMMUNICATIONS 1ST FLOOR PLAN

1/4" = 1'-0"

2 TELECOMMUNICATIONS 2ND FLOOR PLAN

GENERAL NOTES:

1. FIRE/SMOKE WALL RECORD DRAWINGS WERE NOT PROVIDED BY THE STATION. FIELD-VERIFY EXISTING PARTITION WALLS TO

IDENTIFY FIRE/SMOKE RATING AND PROVIDE ALL REQUIRED MEASURES AND APPROPRIATE EQUIPMENT IN ACCORDANCE WITH THE

VERIFIED PARTITION TYPE.

2. REFER TO 00-T001 FOR GENERAL NOTES AND LEGENDS.

3. ALL EXISTING CABLES AND INFRASTRUCTURE NOT CAT6A RATED TO BE REPLACED WITH CAT6A CABLING.

4. CONTRACTOR TO VERIFY ALL DATA OUTLET LOCATIONS IN THE FIELD.

5. THE QUANTITY OF TELECOM DROPS TO BE REMOVED, INSTALLED, AND MAINTAINED IS BASED ON THE INFORMATION KNOWN AT THE TIME OF DESIGN. PRIOR TO CONSTRUCTION, TELECOM DROP LOCATIONS SHALL BE SURVEYED. ANY DISCREPANCIES SHALL

BE PROVIDED TO THE VA COR IMMEDIATELY.

6. WHERE DROP CEILING TILES ARE DISTURBED FOR INSTALLATION OF TELECOMMUNICATIONS CABLE, INNERDUCT, CABLE TRAY, ETC., ENSURE ALL DUST AND PARTICLES ARE CLEANED PRIOR TO LEAVING THE DISTURBED AREA. PROVIDE NEW DROP CEILING

TILES WHERE TILES ARE DAMAGED DURING CONSTRUCTION.

7. ALL ROUTING FOR NEW BACKBONE CABLE SHALL BE ROUTED IN CORRUGATED INNERDUCT.

8. ALL EXISTING DATA DROPS TO BE REFED FROM THE NEW WALL MOUNTED CABINET ON THE CORRESPONDING FLOOR. IF THERE ARE EXISTING DATA DROPS IN THE BASEMENT, THEN THEY ARE TO BE FED FROM THE FIRST FLOOR WALL MOUNTED CABINET.

PROVIDE 4' BY 8' AC GRADE 3/4" TRADE SIZE PLYWOOD BACKBOARD PAINTED HIGH-GLOSS WHITE WITH TWO COATS OF FIRE

RESISTANT PAINT.

PROVIDE NEW PRIMARY BONDING BUS BAR (PBB) ON PLYWOOD BACKBOARD. REFER TO SHEET 00-T501 FOR GROUNDING AND

BONDING DETAILS.

PROVIDE NEW WALL-MOUNTED 12U CABINET ON PLYWOOD BACKBOARD.

PROVIDE NEW SECONDARY BONDING BUS BAR (SBB) ON PLYWOOD BACKBOARD. REFER TO SHEET 00-T501 FOR GROUNDING AND

BONDING DETAILS.

2-4"C FROM PULLBOX TO TE:

PROVIDE 1-4"C CONTAINING ONE (1) 3" CORRUGATED INNERDUCT FOR FIBER BACKBONE FROM THE "A SIDE" MDA IN THE DATA CENTER OF BUILDING 47 GOING TO THE FIRST AND SECOND FLOOR TES IN BUILDING 3. ROUTE 1-24ST OS2 FIBER TO EACH TE FROM THE A SIDE MDA. PROVIDE 1-4"C CONTAINING ONE (1) 3" CORRUGATED INNERDUCT WITH 2-24ST OS2 FIBER FROM THE "B SIDE" MDA IN THE DATA CENTER OF BUILDING 47 TO FIRST AND SECOND FLOOR TES IN BUILDING 3. ROUTE 1-24ST OS2 FIBER TO EACH TE

FROM THE B SIDE MDA.

1-4"C FROM FIRST FLOOR TE TO FIRST FLOOR CEILING FOR HORIZONTAL DISTRIBUTION.

1-4"C FROM SECOND FLOOR TE TO SECOND FLOOR CEILING FOR HORIZONTAL DISTRIBUTION.

Revisions: Date: SHEET 77 of 559

Jinze Chen

CABLE MANAGER

FIRST FLOOR CABINET

FIBER OPTIC

PATCH PANEL

CABLE MANAGER

SWITCH

CABLE MANAGER

PDU

OUTLETS

PDU

UPS

CABLE MANAGER

SECOND FLOOR CABINET

FIBER OPTIC

PATCH PANEL

CABLE MANAGER

SWITCH

CABLE MANAGER

PDU

OUTLETS

PDU

UPS

1 12U WALL-MOUNTED 2-POST CABINET WITH LOCKABLE FRONT DOOR AND

SWING-OUT REAR ACCESS TO EQUIPMENT.

144-STRAND FIBER OPTIC PATCH PANEL WITH SPLICE KIT, LC CONNECTORS,

1U.

1U WIRE MANAGEMENT.

48-PORT UTP CAT6A PATCH PANEL, 1U.

VA LAN SWITCH PROVIDED BY OTHERS.

LOCKING 120V 30A OUTLETS.

RACK MOUNTED PDU. L5-30P INPUT POWER CORD PLUG TYPE AND NEMA

5-20 OUTPUT, 1RU.

RACK MOUNTED UPS. L5-30 INPUT AND L5-30 OUTPUT, CAPACITY NTE 2880

VA, 2U.

DETAIL NOTES:

HORIZONTAL CABLES

HORIZONTAL CABLES + 10% OVERAGE

TOTAL SPARE HORIZONTAL CABLES

(48 x 1) - 27 = 21

HORIZONTAL CABLES

HORIZONTAL CABLES + 10% OVERAGE

TOTAL SPARE HORIZONTAL CABLES

(48 x 1) - 25 = 23

FIBER PP

1 3

LEVEL 1

FIBER PP

1 3

LEVEL 2

FIBER FROM CORE 1 IN BUILDING 47 LANDING ON FIBER OPTIC PATCH PANEL IN TR:

(1) 24ST OS2 SINGLE MODE FIBER

FIBER ORIGINATING FROM CORE 1 IN BUILDING 47:

(2) 24ST OS2 SINGLE MODE FIBER

FIBER FROM CORE 2 IN BUILDING 47 LANDING ON FIBER OPTIC PATCH PANEL IN TR:

(1) 24ST OS2 SINGLE MODE FIBER

FIBER ORIGINATING FROM CORE 2 IN BUILDING 47:

(2) 24ST OS2 SINGLE MODE FIBER

DETAIL NOTES:

BASEMENT

FIRST FLOOR

ELECTRICAL PANEL

GROUND BUS

TO BUILDING

STEEL

TELECOM CABINET BOND

#6 AWG TEBC

#1/0 TBC

CONDUITS ENTERING COMM ROOM

TO GROUNDING BUS (MGB)

#6 AWG TEBC

SECOND FLOOR

ELECTRICAL PANEL

GROUND BUS

SBB

ROOM 2F

#6 AWG ACEG

TO BUILDING

STEEL

TELECOM CABINET BOND

#6 AWG BSB

#6 AWG BSB

#6 AWG ACEG

#1/0 AWG TBB

#6 AWG TEBC

CONDUITS ENTERING COMM ROOM

#6 AWG TEBC

METALLIC TELECOM RACEWAY AND EQUIPMENT SHALL BE GROUNDED. BOND

RACEWAY TO NEAREST TELECOM GROUND BUS USING A TEBC, #6 AWG MINIMUM.

TELECOM GROUNDING SYSTEM MUST BE IN ACCORDANCE WITH TIA-607 AND THE

VA DESIGN STANDARDS.

COAXIAL METAL SHEATH MUST BE GROUNDED AND BONDED PER NEC

REQUIREMENTS.

TBB CONDUCTOR MUST BE SIZED BASED ON THE TABLE BELOW, SIZING OF

TELECOM BONDING BACKBONE.

ACRONYMS

ACEG ALTERNATING CURRENT EQUIPMENT GROUND

BBC BACKBONE BONDING CONDUCTOR

BSB BUILDING STRUCTURE BONDING

MGB MAIN GROUNDING BUS

PBB PRIMARY BONDING BUSBAR

SBB SECONDARY BONDING BUSBAR

TBB TELECOMMUNICATIONS BACKBONE BONDING CONDUCTOR

TBC TELECOMMUNICATIONS BONDING CONDUCTOR

TEBC TELECOMMUNICATIONS EQUIPMENT BONDING CONDUCTOR

GROUNDING NOTES:

1.

2.

3.

4.

#1/0 AWG TBB

SIZING OF TELECOM BONDING BACKBONE

<13

14-20

21-26

27-33

34-41

42-52

53-66

67-84

85-105

106-125

126-150

176-250

151-175

251-300

>301

TBB LINEAR FT

1/0

2/0

3/0

4/0

250KCMIL

300KCMIL

500KCMIL

350KCMIL

600KCMIL

750KCMIL

TBB SIZE (AWG)

FOR OFFICIAL USE ONLY

www.coffman.com

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607 ph 919.314.6686

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTSFacilities Management

Services

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

12/18/2025

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.E .A

S H

E

H R

M .r v t

/1 /2

:5

:4

P M

03-TN601

TELECOMMUNICATIONS DIAGRAMS

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES BLDG 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

N.T.S.

1 CABINET ELEVATIONS

N.T.S.

2 TELECOMMUNICATIONS RISER DIAGRAM

N.T.S.

3 TELECOMMUNICATIONS GROUNDING RISER DIAGRAM

Revisions: Date: SHEET 78 of 559

NEW TE

360°

DPS

W

XT

OFFICE

ENTRY

HALL

OFFICE

OFFICE OFFICE OFFICE

OFFICE

NEW TE

360°

DPS

OFFICE

HALL

TOILET TOILET

CLOSET CLOSET

HALL

OFFICE

OFFICEOFFICEOFFICEOFFICE

X

T

VENDOR CONTACT INFORMATION:

BRIAN SHALLENBERGER

JOHNSON CONTROLS

GREENVILLE-SPARTANBURG, SC

BRIAN.SHALLENBERGER@JCI.COM

SYMBOLS LEGEND:

COORDINATE MOUNTING HEIGHTS AND INSTALLATION DETAILS WITH ARCHITECTURAL

DRAWINGS.

BASE BUILDING SECURITY SYSTEM IS JOHNSON CONTROLS (JCI). COORDINATE SECURITY

SYSTEM CABINETS, HEAD-ENDS, AND ASSOCIATED INFRASTRUCTURE TO FEED NEW

CAMERA AND ACCESS CONTROL DEVICES WITH BASE BUILDING SECURITY VENDOR.

CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR REVIEW AND APPROVAL BY AE WHICH ARE

PREPARED BY BASE BUILDING SECURITY SYSTEM VENDOR. DRAWINGS TO INCLUDE ALL

NECESSARY COMPONENTS AND BACK-END EQUIPMENT LOCATIONS FOR A COMPLETE AND

FULLY FUNCTIONAL SYSTEM.

CONTRACTOR SHALL VERIFY IN FIELD EXISTING AVAILABLE NETWORK SWITCHES. NEW

CAMERAS SHALL BE CONNECTED TO NEAREST AVAILABLE NETWORK SWITCH. FOR BID

PURPOSES, ASSUME 300FT CABLE LENGTH FROM CAMERA TO SECURITY SWITCH.

ACCESS CONTROL SYSTEM: NEW ACCESS CONTROL PROVISIONS TO BE INSTALLED FOR

ALL NEW, RELOCATED, OR EXPANDED TELECOM ROOMS. CONTRACTOR TO COORDINATE

ALL HARDWARE AND LOCATIONS WITH BASE BUILDING SECURITY SYSTEM VENDOR AND VA

STAFF.

SSTV SYSTEM: NEW SECURITY CAMERAS TO BE INSTALLED FOR ALL NEW, RELOCATED, OR

EXPANDED TELECOM ROOMS. CONTRACTOR TO COORDINATE ALL HARDWARE AND

LOCATIONS WITH BASE BUILDING SECURITY SYSTEM VENDOR AND VA STAFF.

ALL CONDUIT AND BACK BOXES REQUIRED FOR THE INSTALLATION OF SECURITY DEVICES

AND EQUIPMENT TO BE PROVIDED BY DIV. 26 CONTRACTOR. COORDINATE WITH THE VA

FACILITIES DEPARTMENT FOR EXACT LOCATION OF DEVICES.

REFERENCE ARCHITECTURAL SHEETS FOR ALL DOOR TYPES, ENCLOSURES, FRAME

DETAILS AND PATHWAYS.

ALL TELECOM RACKS TO BE PROVIDED BY DIV. 27 CONTRACTOR.

ALL SECURITY HEAD-END EQUIPMENT IS EXISTING TO REMAIN. EXISTING CAMERAS BEING

FED FROM DECOMMISSIONED TELECOM RACKS, PER TELECOM DRAWINGS AND SCOPE,

SHALL BE RE-FED FROM NEW/REPLACEMENT RACKS IN NEW TELECOM ROOM LOCATION.

COORDINATE WITH TELECOM DRAWINGS FOR MORE INFORMATION.

COORDINATE WITH DOOR HARDWARE SCHEDULE IN ARCHITECTURAL DRAWING SET FOR

LOCKING MECHANISM TYPE FOR SECURITY INTEGRATION (ELECTRIC LATCH, ELECTRIC

STRIKE, MAGNETIC LOCK). PROVIDE ALL HARDWARE AND ACCESSORIES NECESSARY.

MOTION DETECTOR REX TO BE PROGRAMMED AND INTEGRATED WITH DOOR HARDWARE

TO PREVENT LOCKING OF DOOR IF ROOM IS OCCUPIED. INSTALL REX MOTION SENSOR

ABOVE DOOR FRAME.

PROVIDE TRI-TECH MOTION SENSOR IN TR'S (SEPARATE FROM REX) FOR ROOM

OCCUPANCY MONITORING TIED TO PACS SYSTEM.

SUBMIT COMPLETE ACCESS CONTROL AND VIDEO SURVEILLANCE SUBMITTAL PACKAGE

PER SPECIFICATION SECTIONS 282300-1.5D AND 281300-1.4D.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

CARD READER WITH KEYPAD (W - WALL MTD)

CEILING MTD. CAMERA, 360 DEGREE, W/ SUPPLEMENTAL IR RING.360°

W

ELECTRONIC LOCK

SECURITY ACCESS, SWITCH, BALANCED MAGNETIC CONTROL

MOTION DETECTOR

T-ROOM OCCUPANCY MOTION SENSOR (TRI-TECH- PIR, MICROWAVE, DOPPLER)

X-REQUEST-TO-EXIT MOTION SENSOR (DUAL TECH- PIR, MICROWAVE)

DPS ACCESS CONTROL DOOR POSITION SWITCH

FINAL BID DOCUMENTS

PLAN

NORTH

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

FOR OFFICIAL USE ONLY

Facilities Management

Services

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.A .A

S H

E

H R

M .r v t

/1 /2

:4

:1

A

M

03-TY102

1ST & 2ND FLOOR SECURITY PLANS

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES 3

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

1/4" = 1'-0"

1 1ST FLOOR SECURITY PLAN

1/4" = 1'-0"

2 2ND FLOOR SECURITY PLAN

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

SHEET 79 of 559

Sheet List

BLDG 4

01-GENERAL

04-GI001 COVER SHEET

7-STRUCTURAL

04-SF101 STRUCTURAL 1ST & 2ND FLOOR PLAN

08-ARCHITECTURE

04-AE101 BASEMENT, 1ST & 2ND FLOOR PLANS, ENLARGED PLANS, ELEVATION

15-ELECTRICAL

04-ED100 ELECTRICAL BASEMENT DEMOLITION

04-ED101 ELECTRICAL 1ST & 2ND FLOOR DEMOLITION

04-EP100 ELECTRICAL BASEMENT PLAN

04-EP101 ELECTRICAL 1ST & 2ND FLOOR PLAN

04-EP601 ONE-LINE DIAGRAM AND SCHEDULES

16-TELECOMMUNICATION

04-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION

04-TD101 TELECOMMUNICATIONS 1ST & 2ND FLOOR DEMOLITION

04-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

04-TN100 TELECOMMUNICATIONS BASEMENT PLAN

04-TN101 TELECOMMUNICATIONS 1ST & 2ND FLOOR PLAN

04-TN601 TELECOMMUNICATIONS DIAGRAMS

16.4 - PHYSICAL SECURITY

04-TY101 1ST & 2ND FLOOR SECURITY PLANS

Grand total: 15

SITE KEY PLAN

TUNNELL ROAD

R

IC

E V

IL

L E

R O

A D

V E

T E

R A

N S

D R

IV

E

ARNOLD ROAD

A R

N O

L D

R O

A D

FINAL BID DOCUMENTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

DESIGN TEAM

OWNER

ARCHITECT / CONTRACT PRIME

MECHANICAL / ELECTRICAL /

PLUMBING / FIRE PROTECTION /

STRUCTURAL ENGINEER

Charles George VA Medical Center 1100 Tunnel Road Asheville, NC 28805 Contact: Daniel Chaparro Office: (916) 843-7187 Cell: (916) 542-3038

Awen Solutions Group 215 N. Payne Street, Suite 122 Alexandria, VA 22314 Contact: Amy Carr acarr@awensolutions.com

(720) 703-0640

Coffman Engineers, Inc.

701 Corporate Center Drive, Suite 475 Raleigh, NC 27607 Contact: Lars Iverson lars.iverson@coffman.com

(919) 670-3668

EHRM INFRASTRUCTURE UPGRADES

FINAL BID DOCUMENTS

FOR OFFICIAL USE ONLY

Facilities Management

Services

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.A .A

S H

E

H R

M .r v t

/1 /2

:4

:3

A

M

04-GI001

COVER SHEET

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES 4

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

CHARLES GEORGE VA MEDICAL CENTER

12.19.2025

1100 TUNNEL ROAD ASHEVILLE, NC 28805

BLDG 4

SHEET 80 of 559

CONSULT

MALE TLT.

HAC

FEMALE TLT.

BREAKROOM

OFFICE

CONFERENCE

ROOM

VETERAN GROUP

RM

OFFICE

ENTRY

ENTRY

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

TLT.

TLT.

GENERAL NOTES:

1. FIRE/SMOKE WALL RECORD DRAWINGS WERE NOT PROVIDED BY THE STATION. FIELD-VERIFY EXISTING PARTITION WALLS TO IDENTIFY FIRE/SMOKE RATING AND PROVIDE ALL REQUIRED MEASURES AND APPROPRIATE EQUIPMENT IN ACCORDANCE WITH

THE VERIFIED PARTITION TYPE.

2. FIELD VERIFY EXISTING CONDITIONS.

(N) WALL MOUNTED TELECOM ENCLOSURE. PROVIDE BACKING PER DETAIL

WALL MOUNT ENCLOSURE TO BACKING PER MANUFACTURER'S

INSTALLATION INSTRUCTIONS.

00-S503

PLAN

NORTH

N

FINAL BID DOCUMENTS

FOR OFFICIAL USE ONLY

www.coffman.com

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607 ph 919.314.6686

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

03/04/24

Facilities Management

Services

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.S .A

S H

E

H R

M .r v t

/1 /2

:2

:3

P M

04-SF101

STRUCTURAL 1ST & 2ND FLOOR PLAN

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES BLDG 4

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

1/4" = 1'-0"

1 STRUCTURAL 1ST FLOOR PLAN

1/4" = 1'-0"

2 STRUCTURAL 2ND FLOOR PLAN

DU MBHRevisions: Date:

11 12/19/2025 SHEET 81 of 559

CONSULT

MALE TLT.

HAC

FEMALE TLT.

BREAKROOM

OFFICE

CONFERENCE

ROOM

VETERAN GROUP

RM

OFFICE

04-AE101

ENTRY

ENTRY

BASEMENT

B002

BASEMENT

B001

D09

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

TLT.

TLT.

04-AE101

T01

A03

T02

46 TOTAL WAOS/48 (MAX. WAO

PER TE) = 0.96 TE'S REQUIRED IN

BLDG 4 (2 TE'S PROVIDED). (1)

HALF-HEIGHT (12 RU) TE BEING

PROVIDED PER FLOOR

04-AE101

BREAKROOM

D01

T01

A03

T02

46 TOTAL WAOS/48 (MAX.

WAO PER TE) = 0.96 TE'S

REQUIRED IN BLDG 4 (2 TE'S

PROVIDED). (1) HALF-HEIGHT

(12 RU) TE BEING PROVIDED

PER FLOOR

04-AE1017

OFFICE

D01

T01

A03

T02

1. COORDINATE WITH FIRE PROTECTION, MECHANICAL, ELECTRICAL, PLUMBING,

TELECOMMUNICATIONS, AND SECURITY PLANS FOR ADDITIONAL

REQUIREMENTS NOT SHOWN ON THIS DRAWING.

2. DIMENSIONS PRECEDED BY A TILDE (~) ARE APPROXIMATE, SUBJECT TO FIELD

VERIFICATION.

3. ASBESTOS-CONTAINING PIPE INSULATION AND FITTINGS MAY BE FOUND IN

PIPE CHASES, WALLS AND OTHER HIDDEN AREAS THROUGHOUT THE

BUILDING. IF THESE MATERIALS HAVE TO BE DISTURBED DURING THE

PROJECT, ABATEMENT MUST BE CONDUCTED PER SPECIFICATION 02 82 11.

4. ASPHALT ROOFING MATERIALS SHOULD BE ASSUMED TO CONTAIN

ASBESTOS. IF THESE MATERIALS HAVE TO BE DISTURBED DURING THE

PROJECT, ABATEMENT MUST BE CONDUCTED PER SPECIFICATION 02 82 13.21.

5. FIRE/SMOKE WALL RECORD DRAWINGS WERE NOT PROVIDED BY THE

STATION. FIELD-VERIFY EXISTING PARTITION WALLS TO IDENTIFY FIRE/SMOKE

RATING AND PROVIDE ALL REQUIRED MEASURES AND APPROPRIATE

EQUIPMENT IN ACCORDANCE WITH THE VERIFIED PARTITION TYPE.

T01

A03

T02

PLASTIC SHEETING (VISQUEEN)

DEMOLITION LEGEND

WALK-OFF MATS

FINAL BID DOCUMENTS

PLAN

NORTH

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

OVERALL PLAN SHEET NOTES

TR LEGEND

TR TO BE DECOMMISSIONED

EXISTING TR

NEW TR

EXPANDED TR

NEW DATA CENTER

NEW TELECOM ENCLOSURE (TE)

EXISTING DATA CENTER

ENTRANCE ROOM

FINAL BID DOCUMETNS

FOR OFFICIAL USE ONLY

Facilities Management

Services

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.A .A

S H

E

H R

M .r v t

/1 /2

:4

:3

A

M

04-AE101

BASEMENT, 1ST & 2ND FLOOR PLANS,

ENLARGED PLANS, ELEVATIONAwen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES 4

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

1/4" = 1'-0"

2 OVERALL FLOOR PLAN - 1ST FLOOR

1/4" = 1'-0"

1 OVERALL FLOOR PLAN - BASEMENT

1/4" = 1'-0"

3 OVERALL FLOOR PLAN - 2ND FLOOR

3/8" = 1'-0"

4 ENLARGED PLAN - 1ST FLOOR (TE)

3/8" = 1'-0"

5 ENLARGED PLAN - 2ND FLOOR (TE)

KEY TAG DESCRIPTION

A03 4'-0" x 8'-0" AC GRADE 3/4" TRADE SIZE FIRE RATED PLYWOOD

BACKBOARD PAINTED HIGH-GLOSS WHITE WITH TWO COATS OF FIRE

RESISTANT PAINT

D01 PROVIDE WALK OFF MATS AND PLASTIC SHEETING (VISQUEEN) AT

CONSTRUCTION AREAS.

D02 REMOVE EXISTING CEILING, CEILING SUPPORT, ALL FASTENERS,

LIGHTING FIXTURES, VENTS, AND MEANS OF ATTACHMENT BACK TO

STRUCTURE

D09 REMOVE ALL TELECOMMUNICATIONS EQUIPMENT, SEE

TELECOMMUNICATION DRAWINGS

T01 NEW TELECOMMUNICATIONS ENCLOSURE (TE), SEE

TELECOMMUNICATIONS DRAWINGS

T02 BONDING BUS BAR (SBB), SEE TELECOMMUNICATIONS DRAWINGS

ENLARGED PLAN KEYNOTES

1 1 2 3 4 5 6 7

3/8" = 1'-0"

FEETSCALE

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

3/8" = 1'-0"

7 ELEVATION AT 2ND FL TE

3/8" = 1'-0"

6 ELEVATION AT 1ST FL TE

IF ASBESTO-CONTAINING MATERIAL HAS TO BE DISTURBED DURING THE PROJECT, ABATERMENT MUST BE CONDUCTED PER SPECIFICATION 02 81 11. REFER TO ASBESTOS RE-INSPECTION REPORT FOR MORE...

ABATEMENT QUANTITY SCHEDULE - BLDG. 4

LOCATION MATERIAL DISCRIPTION QUANTITY

FLOOR/ WALL/

CEILING CHASES

ASBESTOS-CONTAINING PIPE INSULATION AND FITTINGS MAY BE

FOUND ON AIR-CELL STEAM LINE INSULATION AND HARD ELBOWS &

FITTINGS ON STEAM LINES.

AS REQUIRED

BASED ON FIELD

CONDITIONS WITHIN

THE WORK AREA

ROOF

ASBESTOS-CONTAINING ASHPHALT SHINGLES, FLET, AND MASTICS

MAY BE FOUND IN ROOF ASSEMBLY.

AS REQUIRED

BASED ON FIELD

CONDITIONS WITHIN

THE WORK AREA

SHEET 82 of 559

040390

N

O

RT

H CAROLIN

A

P R

FO

ESS ON

A L

I

N E

GINEER

(E) 4B

(E) 4A

BASEMENT

B002

BASEMENT

B001

PLAN

NORTH

N

FOR OFFICIAL USE ONLY

www.coffman.com

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607 ph 919.314.6686

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTSFacilities Management

Services

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

SHEET OF12/18/2025

A u to d e s k D o c s /A s h e v ill e E

H R

M

V

/6

-2

-7

.0

.E .A

S H

E

H R

M .r v t

/1 /2

:1

:2

P M

04-ED100

ELECTRICAL BASEMENT DEMOLITION

Awen Solutions Group

215 N. Payne Street, Suite 122

Alexandria, VA 22314

12.19.2025

EHRM INFRASTRUCTURE

UPGRADES BLDG 4

1100 TUNNEL ROAD

ASHEVILLE, NC 28805

637-22-700

GENERAL NOTES:

1. REFER TO 00-E001 FOR GENERAL NOTES, DEMOLITION NOTES, AND LEGENDS.

2. DEMOLITION PLANS ARE CONCEPTUAL, NOT ALL DEVICES TO BE DEMOLISHED ARE SHOWN. BASEMENT EQUIPMENT LAYOUT IS

SHOWN BASED ON BEST AVAILABLE INFORMATION.

3. ELECTRICAL PANEL LOCATIONS SHOWN FOR REFERENCE ONLY. ALL PANELS ARE EXISTING TO REMAIN.

1/4" = 1'-0"

1 ELECTRICAL BASEMENT DEMOLITION