Attachment 2 - Drawings Volume I.pdf

PDF 29 MB Posted

Attached to
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Asheville, NC |
Solicitation number
36C77626R0066
Issued by

About this file

This file is a comprehensive drawing index and general notes document for the EHRM Infrastructure Upgrades project at Charles George VA Medical Center in Asheville, North Carolina (Project 637-22-700). The document contains 560 sheets of final bid documents organized across 15 buildings (Buildings 2, 3, 4, 5, 6, 7, 9, 11, 12, 14, 15, 47, 62, 70, and 73) and includes structural, architectural, mechanical, electrical, plumbing, fire protection, telecommunications, and physical security drawings. The project scope encompasses critical infrastructure modernization to support implementation of the Electronic Health Records Modernization (EHRM) system, including upgraded and new telecommunication rooms and enclosures, relocation and construction of a new data center, electrical power distribution upgrades with redundant UPS equipment, MEP technology systems for telecom and data center spaces, HVAC BAS integration, bonding and grounding system upgrades, CAT6A cabling and fiber backbone infrastructure, fire protection and life safety modifications, and asbestos abatement across the campus.

The contract documents specify mandatory compliance with VA design manuals, NFPA standards (101, 13, 72, 75, 99, 2001), IBC and IMC 2021 editions, and local codes where applicable. Key construction requirements include phased demolition and renovation with minimal disruption to ongoing 24/7 clinical operations, infection control risk assessment protocols (ICRA Class III-IV), temporary construction barriers with negative air pressure, coordination with VA facilities and OIT personnel, no more than three telecom rooms under construction simultaneously, and completion of each telecom scope within ten calendar days. The contractor must verify all existing conditions prior to bidding, coordinate with multiple trades and disciplines, maintain accessibility routes, implement fire-rated assemblies and penetration protection, provide static dissipating flooring in telecom rooms, and comply with asbestos abatement specifications for specific identified locations. General notes emphasize that contractors shall not scale drawings, must coordinate work across all trades, and are responsible for all costs related to site conditions, with no additional compensation considered post-award for failure to verify existing conditions.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Addendum 1 8-6-26.zip ZIP file
Attachment 9 - Key Subcontractor Information.docx DOCX document
RFI Responses.docx DOCX document
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001 - Site Visit Agenda.pdf PDF
Amendment 0001.pdf PDF
Amendment 0001 - Site Visit Sign In.pdf PDF
Attachment 8 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 5 - Drawings Volume IV.pdf PDF
36C77626R0066.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 13 - Site Visit Details.pdf PDF
Attachment 6 - Drawings Volume V.pdf PDF
Attachment 10 - Key Personnel.docx DOCX document
Attachment 3 - Drawings Volume II.pdf PDF
Attachment 4 - Drawings Volume III.pdf PDF
Attachment 9 - Key Subcontractor Information.docx DOCX document
Attachment 11 - Division Pricing Template.xlsx XLSX spreadsheet
Attachment 7 - Drawings Volume VI.pdf PDF
Attachment 12 - Wage Determination.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .