Attachment 10 - Key Personnel.docx

DOCX document 101 KB Posted

Attached to
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Asheville, NC |
Solicitation number
36C77626R0066
Issued by

About this file

This is a Key Personnel Qualifications template for a VA construction project. The document requires offerors to submit detailed qualifications for four key personnel positions: Project Manager, Onsite Superintendent, Site Safety & Health Officer (SSHO), and CQC Systems Manager. Each position requires submission of a separate form detailing general information (name, project role, years with company), educational background, and relevant experience documentation. For the Project Manager and Onsite Superintendent roles, offerors must demonstrate a minimum of 5 years of construction supervision experience and provide a project narrative describing one completed project of similar size and scope, including project title, location, owner, project value, and completion date. The SSHO and CQC Systems Manager positions require documentation of minimum experience as outlined in the project specifications (Section 01 35 25 for SSHO and Section 01 45 00 for CQC Systems Manager). All submitted qualifications will be incorporated into the proposal submission and count toward the page limitation specified in the CON 100 Instructions to Offerors. This template applies to the EHRM Infrastructure Upgrades project at the VA facility in Asheville, NC (Solicitation Number 36C77626R0066), which involves comprehensive infrastructure upgrades including electrical systems, HVAC, datacenter renovation, communication infrastructure, and hazardous material abatement across multiple campus buildings.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROGRAM CONTRACTING ACTIVITY CENTRAL ● 6100 OAK TREE BLVD SUITE 490 ● INDEPENDENCE, OH 44131

Project Manager (Qualifications) *Qualifications should be provided back to the requestor to incorporate into their proposal, all Qualifications should be included in the proposal submission by the offeror and it will count towards the page limitation listed in the CON 100 Instructions to Offerors.

One form shall be submitted for each Key Personnel Position requested.

1. PROJECT MANAGER GENERAL INFORMATION

· Name: ________________________________

· Project Role: ________________________________

· Years With Company: ________________________________

2. EDUCATIONAL BACKGROUND

3. INFORMATION DEMONSTRATING 5 YEARS OF CONSTRUCTION SUPERVISION EXPERIENCE

4. PROJECT NARRATIVE DEMONSTRATING ONE COMPLETED PROJECT SIMILAR IN SIZE AND SCOPE

· Project Title: ________________________________

· Location: ________________________________

· Owner: ________________________________

· Project Value: ________________________________

· Completion Date: ________________________________

Project Narrative:

Onsite Superintendent (Qualifications) *Qualifications should be provided back to the requestor to incorporate into their proposal, all Qualifications should be included in the proposal submission by the offeror and it will count towards the page limitation listed in the CON 100 Instructions to Offerors.

One form shall be submitted for each Key Personnel Position requested.

1. ONSITE SUPERINTENDENT GENERAL INFORMATION

· Name: ________________________________

2. EDUCATIONAL BACKGROUND

3. INFORMATION DEMONSTRATING 5 YEARS OF CONSTRUCTION SUPERVISION EXPERIENCE

4. PROJECT NARRATIVE DEMONSTRATING ONE COMPLETED PROJECT SIMILAR IN SIZE AND SCOPE

· Project Title: ________________________________

· Location: ________________________________

· Owner: ________________________________

· Project Value: ________________________________

· Completion Date: ________________________________

Project Narrative:

Site Safety & Health Officer (SSHO) (Qualifications) *Qualifications should be provided back to the requestor to incorporate into their proposal, all Qualifications should be included in the proposal submission by the offeror and it will count towards the page limitation listed in the CON 100 Instructions to Offerors.

One form shall be submitted for each Key Personnel Position requested.

1. SSHO GENERAL INFORMATION

· Name: ________________________________

2. EDUCATIONAL BACKGROUND

3. INFORMATION DEMONSTRATING MINIMUM EXPERIENCE OUTLINED IN SPECIFICATIONS SECTION 01 35 25, SECTIONS 1.7 AND 1.8.

CQC System Manager (Qualifications) *Qualifications should be provided back to the requestor to incorporate into their proposal, all Qualifications should be included in the proposal submission by the offeror and it will count towards the page limitation listed in the CON 100 Instructions to Offerors.

One form shall be submitted for each Key Personnel Position requested.

1. CQC SYTEMS MANAGER GENERAL INFORMATION

· Name: ________________________________

2. EDUCATIONAL BACKGROUND

3. INFORMATION DEMONSTRATING MINIMUM EXPERIENCE OUTLINED IN SPECIFICATIONS SECTION 01 45 00 SECTIONS 3.2, 3.4 AND 3.9 image1.tiff

File details come from the government source that posted it. Updated .