This file is a comprehensive specifications document for infrastructure upgrades at Charles George Veterans' Affairs Medical Center in Asheville, NC (Project No. 637-22-700). The project encompasses renovations and upgrades across 15 buildings (Buildings 2, 3, 4, 5, 6, 7, 9, 11, 12, 14, 15, 47, 62, 70, and 73) and site work, requiring contractor-provided labor, equipment, materials, supervision, and management. Key work scope includes electrical upgrades (panel upgrades, power distribution for normal and emergency systems, uninterruptible power supplies, building management system interfaces), HVAC system reconfiguration and expansion, datacenter renovation (including HVAC, UPS, power distribution, cable management, and fire suppression), communications infrastructure (Cat 6A cabling, data outlets, patch panels), physical security upgrades, fiber backbone infrastructure assessment and upgrades campus-wide with diversified wide area network pathways, hazardous material abatement (asbestos removal), selective demolition, and general construction finishing work (concrete, structural steel, interior framing, doors, ceilings, flooring, painting, fire suppression systems, and plumbing).
The specifications establish standard requirements for contractor operations including security protocols (badge requirements, photography restrictions, sensitive document handling), normal working hours (7:00 AM to 4:30 PM Monday-Friday with prior approval required for outside hours), utility service management with required advance notification (7 days for standard interruptions, 15 days for major system interruptions), phased work coordination to maintain 24/7 medical center operations, warranty management plans with extended warranties for specified systems, as-built documentation requirements, testing and commissioning protocols, operations and storage area restrictions, and mandatory training on equipment operation and maintenance. The document references 559 drawing sheets across multiple disciplines (structural, architectural, electrical, mechanical, plumbing, fire protection, telecommunications, and physical security) and establishes detailed procedures for requests for interpretation, project scheduling with a third-party scheduling consultant requirement, and mandatory participation in 4-month and 9-month post-acceptance warranty inspections.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EHRM INFRASTRUCTURE
UPGRADES
Final Bid Documents Set
Specifications
CHARLES GEORGE
VETERANS’ AFFAIRS MEDICAL CENTER
1100 TUNNEL ROAD, ASHEVILLE NC
PROJECT NO. 637-22-700
December 19, 2025
Charles George VA Medical Center EHRM Infrastructure Upgrades
Project No. 637-22-700
DESIGN PROFESSIONALS OF RECORD
Seal Page
Civil Engineer:
Lowe Jeffrey, PE
Coffman Engineers, Inc. [COFF] License # North Carolina PE051940
Electrical Engineer:
Chen James, PE, RCDD
License # North Carolina PE040390
RCDD Engineer:
Chen James, PE, RCDD
RCDD BICSI Certification #237176
12/18/2025
12/18/2025
DESIGN PROFESSIONALS OF RECORD
Mechanical/Plumbing Engineer:
Bell Robert N., PE
License # North Carolina PE047145
Fire Protection Engineer:
Love Michael B., PE
License # North Carolina PE061936
Structural Engineer:
Roepnack Paul, PE
License # North Carolina PE033610
Consultants Directory - 00 01 03 - 1
SECTION 00 01 03
CONSULTANTS DIRECTORY
PART 1- GENERAL
PROJECT LISTING
A Architect / Physical Security
Awen Solutions Group
Merchant Plaza
Woodbridge, Virginia 22192
B Mechanical /Electrical / Plumbing / Fire Protection Engineer
Coffman Engineers, Inc.
701 Corporate Center Drive, Suite 475
Raleigh, NC 27607
PART 2- PRODUCTS (Not Used)
PART 3- EXECUTION (Not Used)
Consultants Directory - 00 01 03 - 2
THIS PAGE INTENTIONALLY LEFT BLANK
Table of Contents
00 01 10-1
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES
DIVISION 00 – SPECIAL SECTIONS
00 01 03 Consultants Directory
00 01 10 Table of Contents
00 01 15 List of Drawing Sheets
DIVISION 01 – GENERAL REQUIREMENTS
01 00 00 General Requirements
01 26 13 Requests for Interpretation
01 32 16.15 Project Schedules
01 33 23 Shop Drawings, Product Data, and Samples
01 35 26 Safety Requirements
01 42 19 Reference Standards
01 45 00 Quality Control
01 45 29 Testing Laboratory Services
01 45 35 Special Inspections
01 57 19 Temporary Environmental Controls
01 58 16 Temporary Interior Signage
01 74 19 Construction Waste Management
01 81 13 Sustainable Construction Requirements
01 91 00 General Commissioning Requirements
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition
02 41 19
02 82 11
Selective Demolition
Traditional Asbestos Abatement
02 82 13 19 Asbestos Floor Tile and Mastic Abatement
02 82 13 21 Asbestos Roofing Abatement
00 01 10-2
SECTION NO. DIVISION AND SECTION TITLES
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete
DIVISION 04 – MASONRY
Division Not Used
DIVISION 05 – METALS
05 12 00 Structural Steel Framing
05 40 00 Cold-Formed Metal Framing
05 50 00 Metal Fabrications
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 08 00
07 51 00
Facility Exterior Closure Commissioning
Roof Repair
07 84 00 Firestopping
07 92 00
07 95 13
Joint Sealants
Expansion Joint Cover Assemblies
DIVISION 08 – OPENINGS
08 11 13 Hollow Metal Frames and Doors
08 14 00 Interior Wood Doors
08 31 13 Access Doors and Frames
08 71 00
Door Hardware
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes
09 06 00 Schedule for Finishes
09 22 16 Non-Structural Metal Framing
09 29 00 Gypsum Board
09 51 00 Acoustical Ceilings
00 01 10-3
SECTION NO. DIVISION AND SECTION TITLES
09 62 80 Static Control Fluid-Applied ESD Epoxy Flooring
09 65 13 Resilient Base and Accessories
09 91 00 Painting
DIVISION 10 – SPECIALTIES
10 26 00
10 44 13
Wall and Door Protection
Fire Extinguisher Cabinets
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural Components
DIVISION 14– CONVEYING EQUIPMENT
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System
21 13 13
21 22 00
Wet-Pipe Sprinkler Systems
Clean Agent Fire Suppression Systems
DIVISION 22 – PLUMBING
22 05 11
22 05 23
22 07 11
22 08 00
22 11 00
Common Work Results for Plumbing
General-Duty Valves for Plumbing Piping
Plumbing Insulation
Commissioning of Plumbing Systems
Facility Water Distribution
22 13 00 Facility Sanitary and Vent Piping
00 01 10-4
SECTION NO. DIVISION AND SECTION TITLES
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC
23 05 12
General Motor Requirements for HVAC and Steam Generation Equipment
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
23 05 93 Testing, Adjusting and Balancing for HVAC
23 07 11 HVAC and Boiler Plant Insulation
23 08 00 Commissioning of HVAC Systems
23 09 23 Direct-Digital Control System for HVAC 23 21 13 Hydronic Piping 23 21 23 Hydronic Pumps
23 23 00 Refrigerant Piping
23 31 00 HVAC Ducts and Casings 23 34 00 HVAC Fans
23 37 00 Air Outlets and Inlets
23 81 00 Decentralized Unitary HVAC Equipment
23 81 23 Computer-Room Air-Conditioners
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations
26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 33
26 05 41
26 05 73
Raceway and Boxes for Electrical Systems
Underground Electrical Construction
Overcurrent Protective Device Coordination Study
26 08 00
26 09 23
Commissioning of Electrical Systems
Lighting Controls
26 22 00 Low Voltage Transformers
26 24 16 Panelboards
26 25 11 Busways
00 01 10-5
SECTION NO. DIVISION AND SECTION TITLES
26 26 00 Power Distribution Units for Static, Uninterruptible Power Systems
26 27 26 Wiring Devices
26 29 21 Enclosed Switches and Circuit Breakers
26 33 53
26 43 13
Static Uninterruptible Power Supply
Surge Protective Devices
26 51 00 Interior Lighting
DIVISION 27 – COMMUNICATIONS
27 05 00 Common Work Results for Communications
27 05 11 Requirements for Communications Installations
27 05 26 Grounding and Bonding for Communications Systems
27 05 33 Conduits and Backboxes for Communications Systems
27 05 36 Cable Trays for Communications Systems
27 08 00
27 10 00
Commissioning of Communications Systems
Structured Cabling
27 11 16 Communications Cabinets, Racks, Frames, and Enclosures
27 11 19 Communications Termination Blocks and Patch Panels
27 11 26 Communications Rack Mounted Power Protection and Power Strips
27 13 23 Communications Optical Fiber Backbone Cabling
27 13 23.13 Communications Optical Fiber Splicing and Terminations
27 15 13 Communications Copper Horizontal Cabling
27 16 19 Communications Patch Cords, Station Cords, and Cross Connect Wire
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security
28 05 13 Conductors and Cables for Electronic Safety and Security
28 08 00 Commissioning of Electronic Safety and Security Systems
28 13 00 Physical Access Control System
00 01 10-6
SECTION NO. DIVISION AND SECTION TITLES
28 23 00 Video Surveillance
28 31 00 Fire Detection and Alarm
DIVISION 31 – EARTHWORK
31 20 00 Earthwork
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23
32 12 16
32 17 23
32 90 00
Cement and Concrete for Exterior Improvements
Asphalt Paving
Pavement Markings
Planting
DIVISION 33 – UTILITIES
DIVISION 34 – TRANSPORTATION
DIVISION 48 – ELECTRICAL POWER GENERATION
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
BLDG 00
01-GENERAL
00-GI001 COVER SHEET
00-GI002A SHEET INDEX
00-GI002B SHEET INDEX
00-GI003 GENERAL NOTES AND CODE REQUIREMENTS
00-GI004 GENERAL NOTES
00-GI005 ARCHITECTURAL ABBREVIATIONS & SYMBOLS
00-GI011 TYPICAL ABAAS REQUIREMENTS
00-GI101 CAMPUS SITE PLAN
01.2-GENERAL CONTRACT
00-GC001 INFECTION CONTROL RISK ASSESSMENT
00-GC010 INFECTION PREVENTION AND CONTROL
00-GC101 CONSTRUCTION SEQUENCE PLAN
00-GC191 FIRE/SMOKE BARRIER DESCRIPTIONS
05-CIVIL
00-CI001 EXISTING CONDITIONS PLAN
00-CI400 COMMUNICATIONS PLAN
00-CI401 COMMUNICATIONS KEY PLAN INSETS
00-CI402 COMMUNICATIONS KEY PLAN INSETS
00-CI403 COMMUNICATIONS KEY PLAN INSETS
00-CI601 CIVIL CONSTRUCTION DETAILS
00-CI602 CIVIL CONSTRUCTION DETAILS
07-STRUCTURAL
00-S001 STRUCTURAL GENERAL NOTES
00-S002 STRUCTURAL GENERAL NOTES
00-S501 TYPICAL CONCRETE DETAILS
00-S502 TYPICAL CONCRETE DETAILS
00-S503 FRAMING DETAILS
08-ARCHITECTURE
00-AE501 INTERIOR FRAMING DETAILS
00-AE502 INTERIOR FRAMING DETAILS
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 2
00-AE511 DOOR DETAILS
00-AE521 PARTITION DETAILS
00-AE522 PARTITION DETAILS
00-AE523 MIISCELLANEOUS DETAILS
00-AE531 CEILING DETAILS
00-AE532 CEILING DETAILS
11-FIRE PROTECTION
00-FA001 FIRE ALARM GENERAL NOTES
00-FX001 FIRE SUPPRESSION GENERAL NOTES
12-PLUMBING
00-P001 PLUMBING GENERAL NOTES & SYMBOLS LEGEND
00-P501 PLUMBING DETAILS
14-MECHANICAL
00-M001 MECHANICAL GENERAL NOTES & SYMBOLS LEGEND
00-M501 MECHANICAL DETAILS
15-ELECTRICAL
00-E001 ELECTRICAL SYMBOLS LEGEND AND SCHEDULES
00-E501 ELECTRICAL DETAILS
00-E502 ELECTRICAL DETAILS
00-E503 ELECTRICAL DETAILS
16-TELECOMMUNICATION
00-T001 TELECOMMUNICATIONS SYMBOLS LEGEND
00-T501 TELECOMMUNICATIONS DETAILS
00-T502 TELECOMMUNICATIONS DETAILS
00-T503 TELECOMMUNICATIONS DETAILS
00-T504 TELECOMMUNICATIONS DETAILS
00-T505 TELECOMMUNICATIONS DETAILS
00-T601 TELECOMMUNICATIONS OSP RISER DIAGRAM
00-TD100 TELECOMMUNICATIONS DEMOLITION SITE PLAN
00-TS100 TELECOMMUNICATIONS SITE PLAN
16.4-SECURITY
00-TY001 SECURITY NOTES SYMBOLS AND ABBREVIATIONS
00-TY501 SECURITY DETAILS
BLDG 2
00-GENERAL
02-GI001 COVER SHEET
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 3
07-STRUCTURAL
02-SF101 STRUCTURAL PLANS
08-ARCHITECTURE
02-AE101 BASEMENT 1ST & 2ND FLOOR PLANS ENLARGED VIEWS AND
ELEVATION
15-ELECTRICAL
02-ED101 ELECTRICAL DEMOLITION PLANS
02-EP101 ELECTRICAL PLANS
02-EP601 ONE-LINE DIAGRAM AND SCHEDULES
16-TELECOMMUNICATION
02-TD101 TELECOMMUNICATIONS DEMOLITION PLANS
02-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS
02-TN101 TELECOMMUNICATIONS PLANS
02-TN601 TELECOMMUNICATIONS DIAGRAMS
16.4 - PHYSICAL SECURITY
02-TY102 BASEMENT 1ST & 2ND SECURITY FLOOR PLANS
BLDG 3
01-GENERAL
03-GI001 COVER SHEET
07-STRUCTURAL
03-SF101 STRUCTURAL 1ST & 2ND FLOOR PLAN
08-ARCHITECTURE
03-AE101 1ST & 2ND FLOOR PLANS ENLARGED PLANS AND ELEVATIONS
15-ELECTRICAL
03-ED100 ELECTRICAL BASEMENT DEMOLITION
03-ED101 ELECTRICAL 1ST & 2ND FLOOR DEMOLITION
03-EP100 ELECTRICAL BASEMENT PLAN
03-EP101 ELECTRICAL 1ST & 2ND FLOOR PLAN
03-EP601 ONE-LINE DIAGRAM AND SCHEDULES
16-TELECOMMUNICATIONS
03-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION
03-TD101 TELECOMMUNICATIONS 1ST & 2ND FLOOR DEMOLITION
03-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS
03-TN100 TELECOMMUNICATIONS BASEMENT PLAN
03-TN101 TELECOMMUNICATIONS 1ST & 2ND FLOOR PLAN
03-TN601 TELECOMMUNICATIONS DIAGRAMS
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 4
03-TY102 1ST & 2ND FLOOR SECURITY PLANS
BLDG 4
04-GI001 COVER SHEET
7-STRUCTURAL
04-SF101 STRUCTURAL 1ST & 2ND FLOOR PLAN
08-ARCHITECTURE
04-AE101 BASEMENT 1ST & 2ND FLOOR PLANS ENLARGED PLANS
ELEVATION
15-ELECTRICAL
04-ED100 ELECTRICAL BASEMENT DEMOLITION
04-ED101 ELECTRICAL 1ST & 2ND FLOOR DEMOLITION
04-EP100 ELECTRICAL BASEMENT PLAN
04-EP101 ELECTRICAL 1ST & 2ND FLOOR PLAN
04-EP601 ONE-LINE DIAGRAM AND SCHEDULES
16-TELECOMMUNICATION
04-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION
04-TD101 TELECOMMUNICATIONS 1ST & 2ND FLOOR DEMOLITION
04-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS
04-TN100 TELECOMMUNICATIONS BASEMENT PLAN
04-TN101 TELECOMMUNICATIONS 1ST & 2ND FLOOR PLAN
04-TN601 TELECOMMUNICATIONS DIAGRAMS
04-TY101 1ST & 2ND FLOOR SECURITY PLANS
BLDG 5
05-GI001 COVER SHEET
07-STRUCTURAL
05-SF101 STRUCTURAL PLANS
08-ARCHITECTURE
05-AE101 BASEMENT 1ST & 2ND FLOOR OVERALL FLOOR PLANS
15-ELECTRICAL
05-ED101 ELECTRICAL DEMOLITION PLANS
05-EP101 ELECTRICAL PLANS
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 5
05-EP601 ONE-LINE DIAGRAM AND SCHEDULES
16-TELECOMMUNICATION
05-TD101 TELECOMMUNICATIONS DEMOLITION PLANS
05-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS
05-TN101 TELECOMMUNICATIONS PLANS
05-TN601 TELECOMMUNICATIONS DIAGRAMS
05-TY102 1ST & 2ND FLOOR SECURITY PLANS
BLDG 6
06-GI001 COVER SHEET
07-STRUCTURAL
06-SF101 STRUCTURAL 1ST & 2ND FLOOR PLAN
08-ARCHITECTURE
06-AE101 BASEMENT 1ST & 2ND FLOOR PLANS ENLARGED PLANS &
ELEVATION
15-ELECTRICAL
06-ED100 ELECTRICAL BASEMENT DEMOLITION
06-ED101 ELECTRICAL 1ST & 2ND FLOOR DEMOLITION
06-EP100 ELECTRICAL BASEMENT PLAN
06-EP101 ELECTRICAL 1ST & 2ND FLOOR PLAN
06-EP601 ONE-LINE DIAGRAM AND SCHEDULES
16-TELECOMMUNICATION
06-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION
06-TD101 TELECOMMUNICATIONS 1ST & 2ND FLOOR DEMOLITION
06-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS
06-TN100 TELECOMMUNICATIONS BASEMENT PLAN
06-TN101 TELECOMMUNICATIONS 1ST & 2ND FLOOR PLAN
06-TN601 TELECOMMUNICATIONS DIAGRAMS
06-TY101 BASEMENT 1ST & 2ND SECURITY FLOOR PLANS
BLDG 7
07-GI001 COVER SHEET
07-STRUCTURAL
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 6
07-SF101 STRUCTURAL1ST & 2ND FLOOR PLAN
08-ARCHITECTURE
07-AE101 OVERALL FLOOR PLANS - BASEMENT 1ST & 2ND FLOOR PLANS
07-AE401 ENLARGED FLOOR PLANS & INTERIOR ELEVATIONS
15-ELECTRICAL
07-ED100 ELECTRICAL BASEMENT DEMOLITION
07-ED101 ELECTRICAL 1ST & 2ND FLOOR DEMOLITION
07-EP100 ELECTRICAL BASEMENT PLAN
07-EP101 ELECTRICAL 1ST & 2ND FLOOR PLAN
07-EP601 ONE-LINE DIAGRAM AND SCHEDULES
16-TELECOMMUNICATION
07-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION
07-TD101 TELECOMMUNICATIONS 1ST & 2ND FLOOR DEMOLITION
07-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS
07-TN100 TELECOMMUNICATIONS BASEMENT PLAN
07-TN101 TELECOMMUNICATIONS 1ST & 2ND FLOOR PLAN
07-TN601 TELECOMMUNICATIONS DIAGRAMS
07-TY102 1ST & 2ND FLOOR SECURITY PLANS
BLDG 9
01 - GENERAL
09-GI001 COVER SHEET
07-STRUCTURAL
09-SF101 STRUCTURAL 1ST FLOOR PLAN
09-SF102 STRUCTURAL 2ND FLOOR PLAN
09-SF103 STRUCTURAL 3RD FLOOR PLAN
08-ARCHITECTURE
09-AE101 OVERALL FLOOR PLANS - BASEMENT & 1ST FLOOR
09-AE102 OVERALL FLOOR PLANS - 2ND & 3RD FLOORS
09-AE401 ENL. FLOOR PLAN & RCP DEMO PLAN & RCP INT. ELEV. - 1ST & 2ND
FLOOR
09-AE402 ENL. FLOOR PLAN & RCP DEMO PLAN & RCP INT. ELEV. - 3RD FLOOR
09-AE301 BUILDING SECTIONS
11-FIRE PROTECTION
09-FX101 FIRE SUPPRESSION 1ST FLOOR PLAN
09-FX102 FIRE SUPPRESSION 2ND FLOOR PLAN
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 7
09-FX103 FIRE SUPPRESSION 3RD FLOOR PLAN
12-PLUMBING
09-PD101 PLUMBING 1ST 2ND & 3RD FLOOR DEMOLITION PLANS
09-PP101 PLUMBING 1ST 2ND & 3RD FLOOR PLANS
14-MECHANICAL
09-MD101 MECHANICAL 1ST 2ND & 3RD FLOOR DEMOLITION PLANS
09-MP101 MECHANICAL 1ST 2ND & 3RD FLOOR PLANS
09-MG601 MECHANICAL SCHEDULES
15-ELECTRICAL
09-ED100 ELECTRICAL BASEMENT DEMOLITION
09-ED101 ELECTRICAL 1ST FLOOR DEMOLITION
09-ED102 ELECTRICAL 2ND FLOOR DEMOLITION
09-ED103 ELECTRICAL 3RD FLOOR DEMOLITION
09-EP100 ELECTRICAL BASEMENT PLAN
09-EP101 ELECTRICAL 1ST FLOOR PLAN
09-EP102 ELECTRICAL 2ND FLOOR PLAN
09-EP103 ELECTRICAL 3RD FLOOR PLAN
09-EP601 ONE-LINE DIAGRAM AND SCHEDULES
09-EP602 PANEL SCHEDULES
09-EP603 PANEL SCHEDULES
09-EP604 PANEL SCHEDULES
16-TELECOMMUNICATION
09-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION
09-TD101 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION
09-TD102 TELECOMMUNICATIONS 2ND FLOOR DEMOLITION
09-TD103 TELECOMMUNICATIONS 3RD FLOOR DEMOLITION
09-TD401 TELECOMMUNICATIONS DEMOLITION ENLARGED PLANS
09-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS
09-TD602 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS
09-TN100 TELECOMMUNICATIONS BASEMENT PLAN
09-TN101 TELECOMMUNICATIONS OVERALL 1ST FLOOR PLAN
09-TN102 TELECOMMUNICATIONS OVERALL 2ND FLOOR PLAN
09-TN103 TELECOMMUNICATIONS OVERALL 3RD FLOOR PLAN
09-TN401 ENLARGED TELECOMMUNICATIONS PLANS
09-TN601 TELECOMMUNICATIONS RACK ELEVATIONS
09-TN602 TELECOMMUNICATIONS RACK ELEVATIONS
09-TN603 TELECOMMUNICATIONS RISER DIAGRAM
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 8
09-TY101 1ST 2ND 3RD FLOOR SECURITY PLANS
BLDG 11
11-GI001 COVER SHEET
07-STRUCTURAL
11-SF101 STRUCTURAL BASEMENT & 1ST FLOOR PLAN
08-ARCHITECTURE
11-AE101 BASEMENT & 1ST FLOOR PLAN ENLARGED VIEWS & TE ELEVATION
15-ELECTRICAL
11-ED101 ELECTRICAL BASEMENT & 1ST FLOOR DEMOLITION
11-EP101 ELECTRICAL BASEMENT & 1ST FLOOR PLAN
11-EP601 ONE-LINE DIAGRAM AND SCHEDULES
16-TELECOMMUNICATION
11-TD101 TELECOMMUNICATIONS DEMOLITION BASEMENT & 1ST FLOOR
11-TN101 TELECOMMUNICATIONS BASEMENT & 1ST FLOOR FLOOR PLAN
11-TN601 TELECOMMUNICATIONS DIAGRAMS
11-TY101 BASEMENT & 1ST FLOOR SECURITY PLAN
BLDG 12
12-GI001 COVER SHEET
07-STRUCTURAL
12-SF101 STRUCTURAL 1ST FLOOR PLAN
08-ARCHITECTURE
12-AE101 1ST FLOOR PLAN ENLARGED FLOOR PLAN & INTERIOR ELEVATION
15-ELECTRICAL
12-ED101 ELECTRICAL 1ST FLOOR DEMOLITION
12-EP101 ELECTRICAL 1ST FLOOR PLAN
12-EP601 ONE-LINE DIAGRAM AND SCHEDULES
16-TELECOMMUNICATION
12-TD101 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION
12-TN101 TELECOMMUNICATIONS 1ST FLOOR PLAN
12-TN601 TELECOMMUNICATIONS DIAGRAMS
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 9
12-TY101 1ST FLOOR SECURITY PLAN
BLDG 14
14-GI001 COVER SHEET
07-STRUCTURAL
14-SF100 STRUCTURAL BASEMENT PLAN
14-SF101 STRUCTURAL 1ST & 2ND FLOOR PLAN
08-ARCHITECTURE
14-AE100 OVERALL FLOOR & DEMO PLAN - BASEMENT
14-AE101 OVERALL FLOOR & DEMO PLAN - 1ST & 2ND FLOOR
14-AE301 BUILDING SECTIONS
14-AE400 ENLARGED FLOOR PLANS & RCP'S SCHEDULES
14-AE401 ELEVATIONS
12-PLUMBING
14-PD101 PLUMBING 1ST AND 2ND FLOOR DEMOLITION
14-PP101 PLUMBING 1ST AND 2ND FLOOR PLAN
14-MECHANICAL
14-MD101 MECHANICAL 1ST AND 2ND FLOOR DEMOLITION
14-MG601 MECHANICAL SCHEDULES
14-MP101 MECHANICAL 1ST AND 2ND FLOOR PLAN
15-ELECTRICAL
14-ED100 ELECTRICAL BASEMENT DEMOLITION
14-ED101 ELECTRICAL 1ST AND 2ND FLOOR DEMOLITION
14-EP100 ELECTRICAL BASEMENT PLAN
14-EP101 ELECTRICAL 1ST AND 2ND FLOOR PLAN
14-EP601 ONE-LINE DIAGRAM AND SCHEDULES
14-EP602 PANEL SCHEDULES
16-TELECOMMUNICATION
14-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION
14-TD101 TELECOMMUNICATIONS DEMOLITION 1ST AND 2ND FLOOR
14-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS
14-TN100 TELECOMMUNICATIONS BASEMENT PLAN
14-TN101 TELECOMMUNICATIONS 1ST AND 2ND FLOOR PLAN
14-TN601 TELECOMMUNICATIONS DIAGRAMS AND RACK ELEVATIONS
14-TN602 TELECOMMUNICATIONS RISER DIAGRAM
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 10
14-TY101 BASEMENT SECURITY PLAN
14-TY102 1ST & 2ND FLOOR SECURITY PLANS
BLDG 15
15-GI001 COVER SHEET
07-STRUCTURAL
15-SF100 STRUCTURAL BASEMENT PLAN
15-SF101 STRUCTURAL 1ST FLOOR PLAN
15-SF102 STRUCTURAL 2ND FLOOR PLAN
15-SF103 STRUCTURAL 3RD FLOOR PLAN
08-ARCHITECTURE
15-AE401 ENLARGED FLOOR PLANS RCP'S SCHEDULES
15-AE451 INTERIOR ELEVATIONS
15-AE452 EXTERIOR ELEVATION
15-AD401 ENLARGED DEMO PLANS
15-AE101 OVERALL FLOOR PLANS - BASEMENT & 1ST FLOOR
15-AE102 OVERALL FLOOR PLANS - 2ND & 3RD FLOOR
15-AE301 BUILDING SECTION
11 - FIRE PROTECTION
15-FX100 FIRE SUPPRESSION BASEMENT PLAN
15-FX101 FIRE SUPPRESSION 1ST FLOOR PLAN
15-FX102 FIRE SUPPRESSION 2ND FLOOR PLAN
15-FX103 FIRE SUPPRESSION 3RD FLOOR PLAN
12-PLUMBING
15-PD101 PLUMBING BASEMENT & 1ST FLOOR DEMOLITION PLANS
15-PD102 PLUMBING 2ND & 3RD FLOOR DEMOLITION PLANS
15-PP101 PLUMBING BASEMENT & 1ST FLOOR PLANS
15-PP102 PLUMBING 2ND & 3RD FLOOR PLANS
14-MECHANICAL
15-MD101 MECHANICAL BASEMENT & 1ST FLOOR DEMOLITION PLANS
15-MD102 MECHANICAL 2ND & 3RD FLOOR DEMOLITION PLANS
15-MP101 MECHANICAL BASEMENT & 1ST FLOOR PLANS
15-MP102 MECHANICAL 2ND & 3RD FLOOR PLANS
15-MG601 MECHANICAL SCHEDULES
15-ELECTRICAL
15-ED100 ELECTRICAL BASEMENT DEMOLITION
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 11
15-ED101 ELECTRICAL 1ST FLOOR DEMOLITION
15-ED102 ELECTRICAL 2ND FLOOR DEMOLITION
15-ED103 ELECTRICAL 3RD FLOOR DEMOLITION
15-ED401 ELECTRICAL ENLARGED DEMOLITION PLANS
15-EP100 ELECTRICAL BASEMENT PLAN
15-EP101 ELECTRICAL 1ST FLOOR PLAN
15-EP102 ELECTRICAL 2ND FLOOR PLAN
15-EP103 ELECTRICAL 3RD FLOOR PLAN
15-EP401 ELECTRICAL ENLARGED PLANS
15-EP601 ONE-LINE DIAGRAM AND SCHEDULES
15-EP602 PANEL SCHEDULES
15-EP603 PANEL SCHEDULES
16-TELECOMMUNICATION
15-TD100 TELECOMMUNICATIONS DEMOLITION BASEMENT
15-TD101 TELECOMMUNICATIONS DEMOLITION 1ST FLOOR
15-TD102 TELECOMMUNICATIONS DEMOLITION 2ND FLOOR
15-TD103 TELECOMMUNICATIONS DEMOLITION 3RD FLOOR
15-TD401 TELECOMMUNICATIONS DEMOLITION ENLARGED PLANS
15-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS
15-TD602 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS
15-TN100 TELECOMMUNICATIONS BASEMENT PLAN
15-TN101 TELECOMMUNICATIONS 1ST FLOOR PLAN
15-TN102 TELECOMMUNICATIONS 2ND FLOOR PLAN
15-TN103 TELECOMMUNICATIONS 3RD FLOOR PLAN
15-TN401 TELECOMMUNICATIONS ENLARGED PLANS
15-TN601 TELECOMMUNICATIONS RACK ELEVATIONS
15-TN602 TELECOMMUNICATIONS RACK ELEVATIONS
15-TN603 TELECOMMUNICATIONS RISER DIAGRAM
15-TY401 ENLARGED SECURITY FLOOR PLANS
BLDG 47
47-GI001 COVER SHEET
47-GI002 SHEET INDEX
01 - GENERAL CONTRACT
47-GC100 SEQUENCING PLAN - BASEMENT
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 12
47-GC101 SEQUENCING PLAN - 1ST FLOOR
47-GC102 SEQUENCING PLAN - 2ND FLOOR
47-GC103 SEQUENCING PLAN - 3RD FLOOR
47-GC104 SEQUENCING PLAN - 4TH FLOOR
47-GC105 SEQUENCING PLAN - 5TH FLOOR
07-STRUCTURAL
47-SF100 STRUCTURAL BASEMENT PLAN - OVERALL
47-SF101 STRUCTURAL 1ST FLOOR PLAN - OVERALL
47-SF102 STRUCTURAL 2ND FLOOR PLAN - OVERALL
47-SF400 STRUCTURAL ENLARGED BASEMENT PLANS
47-SF402 STRUCTURAL ENLARGED BASEMENT PLAN
47-SF403 STRUCTURAL ENLARGED 1ST FLOOR PLANS
47-SF404 STRUCTURAL ENLARGED 2ND FLOOR PLANS
08-ARCHITECTURE
47-AD400A ENLARGED DEMO FLOOR & RC PLANS - BASEMENT
47-AD400B ENLARGED DEMO FLOOR & RC PLANS - BASEMENT
47-AD400C ENLARGED DEMO FLOOR & RC PLANS - BASEMENT (DATA CENTER)
47-AD401A ENLARGED DEMO FLOOR & RC PLANS - 1ST FLOOR
47-AD401B ENLARGED DEMO FLOOR & RC PLANS - 1ST FLOOR
47-AD401C ENLARGED DEMO FLOOR & RC PLANS - 1ST FLOOR
47-AD402 ENLARGED DEMO FLOOR & RC PLANS - 2ND FLOOR
47-AD403 ENLARGED DEMO FLOOR & PLANS - 3RD 4TH & 5TH FLOORS
47-AE100 OVERALL FLOOR & DEMO PLAN - BASEMENT
47-AE101 OVERALL FLOOR & DEMO PLAN - 1ST FLOOR
47-AE102 OVERALL FLOOR & DEMO PLAN - 2ND FLOOR
47-AE103 OVERALL FLOOR PLAN ENLARGED DEMO & ARCH PLANS - 3RD FLOOR
47-AE104 OVERALL FLOOR PLAN ENLARGED DEMO & ARCH PLANS - 4TH FLOOR
47-AE105 OVERALL FLOOR PLAN ENLARGED DEMO AND ARCH PLANS - 5TH FLOOR
47-AE106 OVERALL ROOF DEMO PLAN
47-AE351 BUILDING SECTIONS (TR STACKS)
47-AE400A ENLARGED FLOOR & RC PLANS - BASEMENT
47-AE400B ENLARGED FLOOR PLAN - BASEMENT (DATA CENTER)
47-AE400C ENLARGED RC PLAN - BASEMENT (DATA CENTER)
47-AE401A ENLARGED FLOOR & RC PLANS - 1ST FLOOR
47-AE401B ENLARGED FLOOR & RC PLANS - 1ST FLOOR
47-AE402 ENLARGED FLOOR & RC PLANS - 2ND FLOOR
47-AE403 ENLARGED FLOOR & RC PLANS - 3RD 4TH & 5TH FLOOR
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 13
47-AE451 INTERIOR ELEVATIONS
47-AE452 INTERIOR ELEVATIONS
47-AE453 EXTERIOR ELEVATION
47-AE601 SCHEDULES
11-FIRE PROTECTION
47-FA100 FIRE DETECTION AND ALARM BASEMENT PLAN - OVERALL
47-FA101 FIRE DETECTION AND ALARM 1ST FLOOR PLAN - OVERALL
47-FA107 FIRE DETECTION AND ALARM PLAN - DATA CENTER
47-FX100 FIRE SUPPRESSION BASEMENT PLAN - OVERALL
47-FX101 FIRE SUPPRESSION 1ST FLOOR PLAN - OVERALL
47-FX102 FIRE SUPPRESSION 2ND FLOOR PLAN - OVERALL
47-FX103 FIRE SUPPRESSION 3RD FLOOR PLAN
47-FX104 FIRE SUPPRESSION 4TH FLOOR PLAN
47-FX105 FIRE SUPPRESSION 5TH FLOOR PLAN
47-FX107 FIRE SUPPRESSION PLAN - DATA CENTER
47-FX108 CLEAN AGENT SUPPRESSION SYSTEM - DATA CENTER
12-PLUMBING
47-PP100 PLUMBING BASEMENT PLAN - OVERALL
47-PP101 PLUMBING 1ST FLOOR PLAN - OVERALL
47-PP102 PLUMBING 2ND FLOOR PLAN - OVERALL
47-PP103 PLUMBING 3RD FLOOR PLAN - OVERALL
47-PP104 PLUMBING 4TH FLOOR PLAN - OVERALL
47-PP105 PLUMBING 5TH FLOOR PLAN - OVERALL
47-PD400 ENLARGED PLUMBING BASEMENT DEMOLITION PLANS
47-PD401 ENLARGED PLUMBING DATA CENTER DEMOLITION
47-PD402 ENLARGED PLUMBING 1ST FLOOR DEMOLITION PLANS
47-PD403 ENLARGED PLUMBING 2ND FLOOR DEMOLITION PLANS
47-PD404 ENLARGED PLUMBING 3RD 4TH AND 5TH FLOOR DEMOLITION
47-PP400 ENLARGED PLUMBING BASEMENT PLANS
47-PP401 ENLARGED PLUMBING DATA CENTER PLAN
47-PP402 ENLARGED PLUMBING 1ST FLOOR PLANS
47-PP403 ENLARGED PLUMBING 2ND FLOOR PLANS
47-PP404 ENLARGED PLUMBING 3RD 4TH AND 5TH FLOOR PLANS
47-PG501 PLUMBING SCHEDULES
14-MECHANICAL
47-MP100 MECHANICAL BASEMENT PLAN - OVERALL
47-MP101 MECHANICAL 1ST FLOOR PLAN - OVERALL
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 14
47-MP102 MECHANICAL 2ND FLOOR PLAN - OVERALL
47-MP103 MECHANICAL 3RD FLOOR PLAN - OVERALL
47-MP104 MECHANICAL 4TH FLOOR PLAN - OVERALL
47-MP105 MECHANICAL 5TH FLOOR PLAN - OVERALL
47-MP106 MECHANICAL ROOF PLAN - OVERALL
47-MD400 ENLARGED MECHANICAL BASEMENT DEMOLITION
47-MD401 ENLARGED MECHANICAL DATA CENTER DEMOLITION
47-MD402 ENLARGED MECHANICAL 1ST FLOOR DEMOLITION
47-MD403 ENLARGED MECHANICAL 2ND FLOOR DEMOLITION
47-MD404 ENLARGED MECHANICAL 3RD 4TH AND 5TH FLOOR DEMOLITION
47-MP400 ENLARGED MECHANICAL BASEMENT PLANS
47-MP401 ENLARGED MECHANICAL DATA CENTER PLAN
47-MP402 ENLARGED MECHANICAL 1ST FLOOR PLANS
47-MP403 ENLARGED MECHANICAL 2ND FLOOR PLANS
47-MP404 ENLARGED MECHANICAL 3RD 4TH AND 5TH FLOOR PLANS
47-MP405 ENLARGED MECHANICAL ROOF PLANS
47-MG501 MECHANICAL CONTROLS DETAILS
47-MG601 MECHANICAL SCHEDULES
15-ELECTRICAL
47-ED100 ELECTRICAL BASEMENT DEMOLITION - OVERALL
47-ED101 ELECTRICAL 1ST FLOOR DEMOLITION - OVERALL
47-ED102 ELECTRICAL 2ND FLOOR DEMOLITION - OVERALL
47-ED103 ELECTRICAL 3RD FLOOR DEMOLITION
47-ED104 ELECTRICAL 4TH FLOOR DEMOLITION
47-ED105 ELECTRICAL 5TH FLOOR DEMOLITION
47-ED400 ELECTRICAL ENLARGED BASEMENT DEMOLITION
47-ED401 ELECTRICAL ENLARGED DEMOLITION - DATA CENTER
47-ED402 ELECTRICAL ENLARGED 1ST FLOOR DEMOLITION
47-ED403 ELECTRICAL ENLARGED 2ND FLOOR DEMOLITION
47-EP100 ELECTRICAL BASEMENT PLAN - OVERALL
47-EP101 ELECTRICAL 1ST FLOOR PLAN - OVERALL
47-EP102 ELECTRICAL 2ND FLOOR PLAN - OVERALL
47-EP103 ELECTRICAL 3RD FLOOR PLAN
47-EP104 ELECTRICAL 4TH FLOOR PLAN
47-EP105 ELECTRICAL 5TH FLOOR PLAN
47-EP106 ELECTRICAL ROOF PLAN
47-EP400 ELECTRICAL ENLARGED BASEMENT PLANS
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 15
47-EP401 ELECTRICAL ENLARGED PLAN - DATA CENTER
47-EP402 ELECTRICAL ENLARGED 1ST FLOOR PLANS
47-EP403 ELECTRICAL ENLARGED 2ND FLOOR PLANS
47-EP601 ONE-LINE DIAGRAMS
47-EP602 ONE-LINE DIAGRAMS
47-EP603 PANEL SCHEDULES
47-EP604 PANEL SCHEDULES
47-EP605 PANEL SCHEDULES
47-EP606 PANEL SCHEDULES
47-EP607 PANEL SCHEDULES
47-EP608 PANEL SCHEDULES
47-EP609 PANEL SCHEDULES
47-EP610 PANEL SCHEDULES
47-EP611 PANEL SCHEDULES
47-EP612 PANEL SCHEDULES
47-EP613 ELECTRICAL SCHEDULES
16-TELECOMMUNICATION
47-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION - OVERALL
47-TD101 TELECOMMUNICATIONS BASEMENT DEMOLITION - PART A
47-TD102 TELECOMMUNICATIONS BASEMENT DEMOLITION - PART B
47-TD103 TELECOMMUNICATIONS BASEMENT DEMOLITION - PART C
47-TD104 TELECOMMUNICATIONS BASEMENT DEMOLITION - PART D
47-TD110 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION - OVERALL
47-TD111 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION - PART A
47-TD112 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION - PART B
47-TD113 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION - PART C
47-TD114 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION - PART D
47-TD120 TELECOMMUNICATIONS 2ND FLOOR DEMOLITION - OVERALL
47-TD130 TELECOMMUNICATIONS 3RD FLOOR DEMOLITION
47-TD140 TELECOMMUNICATIONS 4TH FLOOR DEMOLITION
47-TD150 TELECOMMUNICATIONS 5TH FLOOR DEMOLITION
47-TD400 TELECOMMUNICATIONS ENLARGED BASEMENT DEMOLITION
47-TD401 TELECOMMUNICATIONS ENLARGED DEMOLITION - DATA CENTER
47-TD402 TELECOMMUNICATIONS ENLARGED 1ST FLOOR DEMOLITION
47-TD403 TELECOMMUNICATIONS ENLARGED 2ND FLOOR DEMOLITION
47-TD601 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD602 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 16
47-TD603 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD604 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD605 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD606 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD607 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD608 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD609 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD610 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD611 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD612 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD613 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD614 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD615 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD616 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD617 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD618 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD619 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD620 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TD621 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS
47-TN100 TELECOMMUNICATIONS BASEMENT PLAN - OVERALL
47-TN101 TELECOMMUNICATIONS BASEMENT PLAN - PART A
47-TN102 TELECOMMUNICATIONS BASEMENT PLAN - PART B
47-TN103 TELECOMMUNICATIONS BASEMENT PLAN - PART C
47-TN104 TELECOMMUNICATIONS BASEMENT PLAN - PART D
47-TN110 TELECOMMUNICATIONS 1ST FLOOR PLAN - OVERALL
47-TN111 TELECOMMUNICATIONS 1ST FLOOR PLAN - PART A
47-TN112 TELECOMMUNICATIONS 1ST FLOOR PLAN - PART B
47-TN113 TELECOMMUNICATIONS 1ST FLOOR PLAN - PART C
47-TN114 TELECOMMUNICATIONS 1ST FLOOR PLAN - PART D
47-TN120 TELECOMMUNICATIONS 2ND FLOOR PLAN
47-TN130 TELECOMMUNICATIONS 3RD FLOOR PLAN
47-TN140 TELECOMMUNICATIONS 4TH FLOOR PLAN
47-TN150 TELECOMMUNICATIONS 5TH FLOOR PLAN
47-TN400 TELECOMMUNICATIONS ENLARGED BASEMENT PLANS
47-TN401 TELECOMMUNICATIONS DATA CENTER
47-TN402 TELECOMMUNICATIONS ENLARGED 1ST FLOOR PLANS
47-TN403 TELECOMMUNICATIONS ENLARGED 2ND FLOOR PLANS
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 17
47-TN600 TELECOMMUNICATIONS RISER DIAGRAM
47-TN601 TELECOMMUNICATIONS RACK ELEVATIONS
47-TN602 TELECOMMUNICATIONS RACK ELEVATIONS
47-TN603 TELECOMMUNICATIONS RACK ELEVATIONS
47-TN604 TELECOMMUNICATIONS RACK ELEVATIONS
47-TN605 TELECOMMUNICATIONS RACK ELEVATIONS
47-TN606 TELECOMMUNICATIONS RACK ELEVATIONS
47-TN607 TELECOMMUNICATIONS RACK ELEVATIONS
47-TN608 TELECOMMUNICATIONS RISER DIAGRAM
47-TN609 TELECOMMUNICATIONS RISER DIAGRAM
47-TN610 TELECOMMUNICATIONS RACK ELEVATIONS
47-TN611 TELECOMMUNICATIONS RACK ELEVATIONS
47-TN612 TELECOMMUNICATIONS RACK ELEVATIONS
47-TN613 TELECOMMUNICATIONS RACK ELEVATIONS
47-TN614 TELECOMMUNICATIONS RACK ELEVATIONS
16.4 - PHYSICAL SECURITY
47-TY100A SECURITY PLAN - BASEMENT
47-TY100B SECURITY PLAN - BASEMENT (DATACENTER)
47-TY101 SECURITY PLAN - 1ST FLOOR
47-TY102 SECURITY PLANS - 2ND FLOOR
47-TY103 SECURITY PLANS - 3RD 4TH & 5TH FLOORS
BLDG 62
62-GI001 COVER SHEET
07-STRUCTURAL
62-SF100 STRUCTURAL BASEMENT PLAN
62-SF101 STRUCTURAL 1ST FLOOR PLAN
62-SF102 STRUCTURAL 2ND FLOOR PLAN
08-ARCHITECTURE
62-AD401 1ST & 2ND FLOOR ENLARGED DEMO FLOOR PLANS & RCP'S
62-AE101 OVERALL FLOOR & DEMO PLAN - 1ST FLOOR
62-AE102 OVERALL FLOOR & DEMO PLAN - 2ND FLOOR
62-AE103 OVERALL DEMO ROOF PLAN
62-AE401 1ST & 2ND FL. - ENLARGED FLOOR PLANS RCP'S & INT.
ELEVATIONS
11-FIRE PROTECTION
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 18
62-FX101 FIRE SUPPRESSION 1ST FLOOR PLAN
62-FX102 FIRE SUPPRESSION 2ND FLOOR PLAN
12-PLUMBING
62-PD101 PLUMBING 1ST FLOOR DEMOLITION PLAN
62-PD102 PLUMBING 2ND FLOOR DEMOLITION PLAN
62-PP101 PLUMBING 1ST FLOOR PLAN
62-PP102 PLUMBING 2ND FLOOR PLAN
14-MECHANICAL
62-MD101 MECHANICAL 1ST FLOOR DEMOLITION PLAN
62-MD102 MECHANICAL 2ND FLOOR DEMOLITION PLAN
62-MP101 MECHANICAL 1ST FLOOR PLAN
62-MP102 MECHANICAL 2ND FLOOR PLAN
62-MP103 MECHANICAL ROOF PLAN
62-MG601 MECHANICAL SCHEDULES
15-ELECTRICAL
62-ED101 ELECTRICAL 1ST FLOOR DEMOLITION
62-ED102 ELECTRICAL 2ND FLOOR DEMOLITION
62-EP101 ELECTRICAL 1ST FLOOR PLAN
62-EP102 ELECTRICAL 2ND FLOOR PLAN
62-EP103 ELECTRICAL ROOF PLAN
62-EP601 ONE-LINE DIAGRAM AND SCHEDULES
62-EP602 PANEL SCHEDULES
62-EP603 PANEL SCHEDULES
16-TELECOMMUNICATION
62-TD100 TELECOMMUNICATIONS DEMOLITION BASEMENT
62-TD101 TELECOMMUNICATIONS DEMOLITION 1ST FLOOR
62-TD102 TELECOMMUNICATIONS DEMOLITION 2ND FLOOR
62-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS
62-TN100 TELECOMMUNICATIONS BASEMENT PLAN
62-TN101 TELECOMMUNICATIONS 1ST FLOOR PLAN
62-TN102 TELECOMMUNICATIONS 2ND FLOOR PLAN
62-TN601 TELECOMMUNICATIONS DIAGRAMS
62-TN602 TELECOMMUNICATIONS RISER DIAGRAM
16.4 - PHYSICAL SECURITY
62-TY101 1ST FLOOR SECURITY PLAN
62-TY102 2ND FLOOR SECURITY PLAN
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 19
BLDG 70
01 - GENERAL
70-GI001 COVER SHEET
07-STRUCTURAL
70-SF101 STRUCTURAL 1ST FLOOR PLAN
08-ARCHITECTURE
70-AD101 1ST FLOOR DEMO PLAN & DEMO RCP
70-AE101 1ST FLOOR PLAN RCP DOOR SCHEDULE & INTERIOR ELEVATIONS
12-PLUMBING
70-PP101 PLUMBING 1ST FLOOR PLANS
14-MECHANICAL
70-MP101 MECHANICAL 1ST FLOOR PLANS
70-MP102 MECHANICAL ROOF PLAN
70-MG601 MECHANICAL SCHEDULES
15-ELECTRICAL
70-ED101 ELECTRICAL DEMOLITION 1ST FLOOR
70-EP101 ELECTRICAL 1ST FLOOR PLAN
70-EP102 ELECTRICAL ROOF PLAN
70-EP601 ONE-LINE DIAGRAM AND SCHEDULES
16-TELECOMMUNICATION
70-TD101 TELECOMMUNICATIONS DEMOLITION 1ST FLOOR
70-TD401 TELECOMMUNICATIONS DEMOLITION ENLARGED PLAN
70-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS
70-TN101 TELECOMMUNICATIONS 1ST FLOOR PLAN
70-TN601 TELECOMMUNICATIONS DIAGRAMS
70-TY101 1ST FLOOR SECURITY PLAN
BLDG 73
73-GI001 COVER SHEET
07-STRUCTURAL
73-SF101 STRUCTURAL 1ST FLOOR PLAN
08 - ARCHITECTURE
73-AD101 1ST FLOOR DEMO PLAN ENLARGED PLAN & ENLARGED RCP
73-AE101 1ST FLOOR PLAN RCP DOOR SCHEDULE & INTERIOR ELEVATIONS
12-PLUMBING
Project No. 637-22-700
December 19, 2025
List of Drawing Sheets
00 01 15 - 20
73-PP101 PLUMBING 1ST FLOOR PLAN
14-MECHANICAL
73-MP101 MECHANICAL 1ST FLOOR PLAN
73-MP102 MECHANICAL ROOF PLAN
73-MG601 MECHANICAL SCHEDULES
15-ELECTRICAL
73-ED101 ELECTRICAL 1ST FLOOR DEMOLITION
73-EP101 ELECTRICAL 1ST FLOOR PLAN
73-EP102 ELECTRICAL ROOF PLAN
73-EP601 ONE-LINE DIAGRAM AND SCHEDULES
16-TELECOMMUNICATION
73-TD101 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION
73-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS
73-TN101 TELECOMMUNICATIONS 1ST FLOOR PLAN
73-TN601 TELECOMMUNICATIONS DIAGRAMS
16.4 - PHYSICAL SECURITY
73-TY101 1ST FLOOR SECURITY PLAN
Grand total: 559
End
General Requirements
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including selective demolition in existing structures, furnish labor and materials and perform work for the Charles George VA Medical Center
EHRM Upgrades as required by drawings and specifications.
B. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting
Officer.
C. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
E. Contractor Work Hours
1. Normal working hours for this contract will be from 7:00AM to 4:30PM
(local time) Monday through Friday except for weekends and established Federal Holidays.
2. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.
01 00 00 -2
1.3 STATEMENT OF BID ITEM(S)
A. GENERAL CONSTRUCTION: BASE BID Work includes general construction, alterations, necessary removal of portions of existing structures and construction and certain other items.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer Representative, COR, so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Guards: NA
D. Key Control: NA
E. Document Control:
01 00 00 -3
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of the Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in a specified location following VA standards and procedures using Engineering Document
Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic, shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of 5 permits shall be issued for the General
Contractor and its employees for parking in designated areas only.
Contractor to coordinate with VA Medical Center Facility Manager.
01 00 00 -4
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the
Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting
Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the COR.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
G. Execute work so as to interfere as little as possible with the normal functioning of the Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, 01 00 00 -5 and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by the Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
I. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
1. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor
01 00 00 -6 intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor.
J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
K. Utilities Services: Maintain existing utility services for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR
ELECTRONIC SAFETY AND SECURITY for additional requirements.
01 00 00 -7
2. Contractor shall submit a request to interrupt any such services to the COR, in writing, 7 days in advance of proposed interruption.
Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
M. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
01 00 00 -8
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.7 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from selective demolition, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to reinstallation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
2. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.8 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the
COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and
01 00 00 -9…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .