Attachment 1 - Specifications.pdf

PDF 17 MB Posted

Attached to
Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Asheville, NC |
Solicitation number
36C77626R0066
Issued by

About this file

This file is a comprehensive specifications document for infrastructure upgrades at Charles George Veterans' Affairs Medical Center in Asheville, NC (Project No. 637-22-700). The project encompasses renovations and upgrades across 15 buildings (Buildings 2, 3, 4, 5, 6, 7, 9, 11, 12, 14, 15, 47, 62, 70, and 73) and site work, requiring contractor-provided labor, equipment, materials, supervision, and management. Key work scope includes electrical upgrades (panel upgrades, power distribution for normal and emergency systems, uninterruptible power supplies, building management system interfaces), HVAC system reconfiguration and expansion, datacenter renovation (including HVAC, UPS, power distribution, cable management, and fire suppression), communications infrastructure (Cat 6A cabling, data outlets, patch panels), physical security upgrades, fiber backbone infrastructure assessment and upgrades campus-wide with diversified wide area network pathways, hazardous material abatement (asbestos removal), selective demolition, and general construction finishing work (concrete, structural steel, interior framing, doors, ceilings, flooring, painting, fire suppression systems, and plumbing).

The specifications establish standard requirements for contractor operations including security protocols (badge requirements, photography restrictions, sensitive document handling), normal working hours (7:00 AM to 4:30 PM Monday-Friday with prior approval required for outside hours), utility service management with required advance notification (7 days for standard interruptions, 15 days for major system interruptions), phased work coordination to maintain 24/7 medical center operations, warranty management plans with extended warranties for specified systems, as-built documentation requirements, testing and commissioning protocols, operations and storage area restrictions, and mandatory training on equipment operation and maintenance. The document references 559 drawing sheets across multiple disciplines (structural, architectural, electrical, mechanical, plumbing, fire protection, telecommunications, and physical security) and establishes detailed procedures for requests for interpretation, project scheduling with a third-party scheduling consultant requirement, and mandatory participation in 4-month and 9-month post-acceptance warranty inspections.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EHRM INFRASTRUCTURE

UPGRADES

Final Bid Documents Set

Specifications

CHARLES GEORGE

VETERANS’ AFFAIRS MEDICAL CENTER

1100 TUNNEL ROAD, ASHEVILLE NC

PROJECT NO. 637-22-700

December 19, 2025

Charles George VA Medical Center EHRM Infrastructure Upgrades

Project No. 637-22-700

DESIGN PROFESSIONALS OF RECORD

Seal Page

Civil Engineer:

Lowe Jeffrey, PE

Coffman Engineers, Inc. [COFF] License # North Carolina PE051940

Electrical Engineer:

Chen James, PE, RCDD

License # North Carolina PE040390

RCDD Engineer:

Chen James, PE, RCDD

RCDD BICSI Certification #237176

12/18/2025

12/18/2025

DESIGN PROFESSIONALS OF RECORD

Mechanical/Plumbing Engineer:

Bell Robert N., PE

License # North Carolina PE047145

Fire Protection Engineer:

Love Michael B., PE

License # North Carolina PE061936

Structural Engineer:

Roepnack Paul, PE

License # North Carolina PE033610

Consultants Directory - 00 01 03 - 1

SECTION 00 01 03

CONSULTANTS DIRECTORY

PART 1- GENERAL

PROJECT LISTING

A Architect / Physical Security

Awen Solutions Group

Merchant Plaza

Woodbridge, Virginia 22192

B Mechanical /Electrical / Plumbing / Fire Protection Engineer

Coffman Engineers, Inc.

701 Corporate Center Drive, Suite 475

Raleigh, NC 27607

PART 2- PRODUCTS (Not Used)

PART 3- EXECUTION (Not Used)

Consultants Directory - 00 01 03 - 2

THIS PAGE INTENTIONALLY LEFT BLANK

Table of Contents

00 01 10-1

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES

DIVISION 00 – SPECIAL SECTIONS

00 01 03 Consultants Directory

00 01 10 Table of Contents

00 01 15 List of Drawing Sheets

DIVISION 01 – GENERAL REQUIREMENTS

01 00 00 General Requirements

01 26 13 Requests for Interpretation

01 32 16.15 Project Schedules

01 33 23 Shop Drawings, Product Data, and Samples

01 35 26 Safety Requirements

01 42 19 Reference Standards

01 45 00 Quality Control

01 45 29 Testing Laboratory Services

01 45 35 Special Inspections

01 57 19 Temporary Environmental Controls

01 58 16 Temporary Interior Signage

01 74 19 Construction Waste Management

01 81 13 Sustainable Construction Requirements

01 91 00 General Commissioning Requirements

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition

02 41 19

02 82 11

Selective Demolition

Traditional Asbestos Abatement

02 82 13 19 Asbestos Floor Tile and Mastic Abatement

02 82 13 21 Asbestos Roofing Abatement

00 01 10-2

SECTION NO. DIVISION AND SECTION TITLES

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete

DIVISION 04 – MASONRY

Division Not Used

DIVISION 05 – METALS

05 12 00 Structural Steel Framing

05 40 00 Cold-Formed Metal Framing

05 50 00 Metal Fabrications

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

06 10 00 Rough Carpentry

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 08 00

07 51 00

Facility Exterior Closure Commissioning

Roof Repair

07 84 00 Firestopping

07 92 00

07 95 13

Joint Sealants

Expansion Joint Cover Assemblies

DIVISION 08 – OPENINGS

08 11 13 Hollow Metal Frames and Doors

08 14 00 Interior Wood Doors

08 31 13 Access Doors and Frames

08 71 00

Door Hardware

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes

09 06 00 Schedule for Finishes

09 22 16 Non-Structural Metal Framing

09 29 00 Gypsum Board

09 51 00 Acoustical Ceilings

00 01 10-3

SECTION NO. DIVISION AND SECTION TITLES

09 62 80 Static Control Fluid-Applied ESD Epoxy Flooring

09 65 13 Resilient Base and Accessories

09 91 00 Painting

DIVISION 10 – SPECIALTIES

10 26 00

10 44 13

Wall and Door Protection

Fire Extinguisher Cabinets

DIVISION 11 – EQUIPMENT

DIVISION 12 – FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural Components

DIVISION 14– CONVEYING EQUIPMENT

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System

21 13 13

21 22 00

Wet-Pipe Sprinkler Systems

Clean Agent Fire Suppression Systems

DIVISION 22 – PLUMBING

22 05 11

22 05 23

22 07 11

22 08 00

22 11 00

Common Work Results for Plumbing

General-Duty Valves for Plumbing Piping

Plumbing Insulation

Commissioning of Plumbing Systems

Facility Water Distribution

22 13 00 Facility Sanitary and Vent Piping

00 01 10-4

SECTION NO. DIVISION AND SECTION TITLES

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC

23 05 12

General Motor Requirements for HVAC and Steam Generation Equipment

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

23 05 93 Testing, Adjusting and Balancing for HVAC

23 07 11 HVAC and Boiler Plant Insulation

23 08 00 Commissioning of HVAC Systems

23 09 23 Direct-Digital Control System for HVAC 23 21 13 Hydronic Piping 23 21 23 Hydronic Pumps

23 23 00 Refrigerant Piping

23 31 00 HVAC Ducts and Casings 23 34 00 HVAC Fans

23 37 00 Air Outlets and Inlets

23 81 00 Decentralized Unitary HVAC Equipment

23 81 23 Computer-Room Air-Conditioners

DIVISION 25 – INTEGRATED AUTOMATION

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations

26 05 19 Low-Voltage Electrical Power Conductors and Cables

26 05 26 Grounding and Bonding for Electrical Systems

26 05 33

26 05 41

26 05 73

Raceway and Boxes for Electrical Systems

Underground Electrical Construction

Overcurrent Protective Device Coordination Study

26 08 00

26 09 23

Commissioning of Electrical Systems

Lighting Controls

26 22 00 Low Voltage Transformers

26 24 16 Panelboards

26 25 11 Busways

00 01 10-5

SECTION NO. DIVISION AND SECTION TITLES

26 26 00 Power Distribution Units for Static, Uninterruptible Power Systems

26 27 26 Wiring Devices

26 29 21 Enclosed Switches and Circuit Breakers

26 33 53

26 43 13

Static Uninterruptible Power Supply

Surge Protective Devices

26 51 00 Interior Lighting

DIVISION 27 – COMMUNICATIONS

27 05 00 Common Work Results for Communications

27 05 11 Requirements for Communications Installations

27 05 26 Grounding and Bonding for Communications Systems

27 05 33 Conduits and Backboxes for Communications Systems

27 05 36 Cable Trays for Communications Systems

27 08 00

27 10 00

Commissioning of Communications Systems

Structured Cabling

27 11 16 Communications Cabinets, Racks, Frames, and Enclosures

27 11 19 Communications Termination Blocks and Patch Panels

27 11 26 Communications Rack Mounted Power Protection and Power Strips

27 13 23 Communications Optical Fiber Backbone Cabling

27 13 23.13 Communications Optical Fiber Splicing and Terminations

27 15 13 Communications Copper Horizontal Cabling

27 16 19 Communications Patch Cords, Station Cords, and Cross Connect Wire

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security

28 05 13 Conductors and Cables for Electronic Safety and Security

28 08 00 Commissioning of Electronic Safety and Security Systems

28 13 00 Physical Access Control System

00 01 10-6

SECTION NO. DIVISION AND SECTION TITLES

28 23 00 Video Surveillance

28 31 00 Fire Detection and Alarm

DIVISION 31 – EARTHWORK

31 20 00 Earthwork

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23

32 12 16

32 17 23

32 90 00

Cement and Concrete for Exterior Improvements

Asphalt Paving

Pavement Markings

Planting

DIVISION 33 – UTILITIES

DIVISION 34 – TRANSPORTATION

DIVISION 48 – ELECTRICAL POWER GENERATION

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

BLDG 00

01-GENERAL

00-GI001 COVER SHEET

00-GI002A SHEET INDEX

00-GI002B SHEET INDEX

00-GI003 GENERAL NOTES AND CODE REQUIREMENTS

00-GI004 GENERAL NOTES

00-GI005 ARCHITECTURAL ABBREVIATIONS & SYMBOLS

00-GI011 TYPICAL ABAAS REQUIREMENTS

00-GI101 CAMPUS SITE PLAN

01.2-GENERAL CONTRACT

00-GC001 INFECTION CONTROL RISK ASSESSMENT

00-GC010 INFECTION PREVENTION AND CONTROL

00-GC101 CONSTRUCTION SEQUENCE PLAN

00-GC191 FIRE/SMOKE BARRIER DESCRIPTIONS

05-CIVIL

00-CI001 EXISTING CONDITIONS PLAN

00-CI400 COMMUNICATIONS PLAN

00-CI401 COMMUNICATIONS KEY PLAN INSETS

00-CI402 COMMUNICATIONS KEY PLAN INSETS

00-CI403 COMMUNICATIONS KEY PLAN INSETS

00-CI601 CIVIL CONSTRUCTION DETAILS

00-CI602 CIVIL CONSTRUCTION DETAILS

07-STRUCTURAL

00-S001 STRUCTURAL GENERAL NOTES

00-S002 STRUCTURAL GENERAL NOTES

00-S501 TYPICAL CONCRETE DETAILS

00-S502 TYPICAL CONCRETE DETAILS

00-S503 FRAMING DETAILS

08-ARCHITECTURE

00-AE501 INTERIOR FRAMING DETAILS

00-AE502 INTERIOR FRAMING DETAILS

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 2

00-AE511 DOOR DETAILS

00-AE521 PARTITION DETAILS

00-AE522 PARTITION DETAILS

00-AE523 MIISCELLANEOUS DETAILS

00-AE531 CEILING DETAILS

00-AE532 CEILING DETAILS

11-FIRE PROTECTION

00-FA001 FIRE ALARM GENERAL NOTES

00-FX001 FIRE SUPPRESSION GENERAL NOTES

12-PLUMBING

00-P001 PLUMBING GENERAL NOTES & SYMBOLS LEGEND

00-P501 PLUMBING DETAILS

14-MECHANICAL

00-M001 MECHANICAL GENERAL NOTES & SYMBOLS LEGEND

00-M501 MECHANICAL DETAILS

15-ELECTRICAL

00-E001 ELECTRICAL SYMBOLS LEGEND AND SCHEDULES

00-E501 ELECTRICAL DETAILS

00-E502 ELECTRICAL DETAILS

00-E503 ELECTRICAL DETAILS

16-TELECOMMUNICATION

00-T001 TELECOMMUNICATIONS SYMBOLS LEGEND

00-T501 TELECOMMUNICATIONS DETAILS

00-T502 TELECOMMUNICATIONS DETAILS

00-T503 TELECOMMUNICATIONS DETAILS

00-T504 TELECOMMUNICATIONS DETAILS

00-T505 TELECOMMUNICATIONS DETAILS

00-T601 TELECOMMUNICATIONS OSP RISER DIAGRAM

00-TD100 TELECOMMUNICATIONS DEMOLITION SITE PLAN

00-TS100 TELECOMMUNICATIONS SITE PLAN

16.4-SECURITY

00-TY001 SECURITY NOTES SYMBOLS AND ABBREVIATIONS

00-TY501 SECURITY DETAILS

BLDG 2

00-GENERAL

02-GI001 COVER SHEET

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 3

07-STRUCTURAL

02-SF101 STRUCTURAL PLANS

08-ARCHITECTURE

02-AE101 BASEMENT 1ST & 2ND FLOOR PLANS ENLARGED VIEWS AND

ELEVATION

15-ELECTRICAL

02-ED101 ELECTRICAL DEMOLITION PLANS

02-EP101 ELECTRICAL PLANS

02-EP601 ONE-LINE DIAGRAM AND SCHEDULES

16-TELECOMMUNICATION

02-TD101 TELECOMMUNICATIONS DEMOLITION PLANS

02-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

02-TN101 TELECOMMUNICATIONS PLANS

02-TN601 TELECOMMUNICATIONS DIAGRAMS

16.4 - PHYSICAL SECURITY

02-TY102 BASEMENT 1ST & 2ND SECURITY FLOOR PLANS

BLDG 3

01-GENERAL

03-GI001 COVER SHEET

07-STRUCTURAL

03-SF101 STRUCTURAL 1ST & 2ND FLOOR PLAN

08-ARCHITECTURE

03-AE101 1ST & 2ND FLOOR PLANS ENLARGED PLANS AND ELEVATIONS

15-ELECTRICAL

03-ED100 ELECTRICAL BASEMENT DEMOLITION

03-ED101 ELECTRICAL 1ST & 2ND FLOOR DEMOLITION

03-EP100 ELECTRICAL BASEMENT PLAN

03-EP101 ELECTRICAL 1ST & 2ND FLOOR PLAN

03-EP601 ONE-LINE DIAGRAM AND SCHEDULES

16-TELECOMMUNICATIONS

03-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION

03-TD101 TELECOMMUNICATIONS 1ST & 2ND FLOOR DEMOLITION

03-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

03-TN100 TELECOMMUNICATIONS BASEMENT PLAN

03-TN101 TELECOMMUNICATIONS 1ST & 2ND FLOOR PLAN

03-TN601 TELECOMMUNICATIONS DIAGRAMS

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 4

03-TY102 1ST & 2ND FLOOR SECURITY PLANS

BLDG 4

04-GI001 COVER SHEET

7-STRUCTURAL

04-SF101 STRUCTURAL 1ST & 2ND FLOOR PLAN

08-ARCHITECTURE

04-AE101 BASEMENT 1ST & 2ND FLOOR PLANS ENLARGED PLANS

ELEVATION

15-ELECTRICAL

04-ED100 ELECTRICAL BASEMENT DEMOLITION

04-ED101 ELECTRICAL 1ST & 2ND FLOOR DEMOLITION

04-EP100 ELECTRICAL BASEMENT PLAN

04-EP101 ELECTRICAL 1ST & 2ND FLOOR PLAN

04-EP601 ONE-LINE DIAGRAM AND SCHEDULES

16-TELECOMMUNICATION

04-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION

04-TD101 TELECOMMUNICATIONS 1ST & 2ND FLOOR DEMOLITION

04-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

04-TN100 TELECOMMUNICATIONS BASEMENT PLAN

04-TN101 TELECOMMUNICATIONS 1ST & 2ND FLOOR PLAN

04-TN601 TELECOMMUNICATIONS DIAGRAMS

04-TY101 1ST & 2ND FLOOR SECURITY PLANS

BLDG 5

05-GI001 COVER SHEET

07-STRUCTURAL

05-SF101 STRUCTURAL PLANS

08-ARCHITECTURE

05-AE101 BASEMENT 1ST & 2ND FLOOR OVERALL FLOOR PLANS

15-ELECTRICAL

05-ED101 ELECTRICAL DEMOLITION PLANS

05-EP101 ELECTRICAL PLANS

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 5

05-EP601 ONE-LINE DIAGRAM AND SCHEDULES

16-TELECOMMUNICATION

05-TD101 TELECOMMUNICATIONS DEMOLITION PLANS

05-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

05-TN101 TELECOMMUNICATIONS PLANS

05-TN601 TELECOMMUNICATIONS DIAGRAMS

05-TY102 1ST & 2ND FLOOR SECURITY PLANS

BLDG 6

06-GI001 COVER SHEET

07-STRUCTURAL

06-SF101 STRUCTURAL 1ST & 2ND FLOOR PLAN

08-ARCHITECTURE

06-AE101 BASEMENT 1ST & 2ND FLOOR PLANS ENLARGED PLANS &

ELEVATION

15-ELECTRICAL

06-ED100 ELECTRICAL BASEMENT DEMOLITION

06-ED101 ELECTRICAL 1ST & 2ND FLOOR DEMOLITION

06-EP100 ELECTRICAL BASEMENT PLAN

06-EP101 ELECTRICAL 1ST & 2ND FLOOR PLAN

06-EP601 ONE-LINE DIAGRAM AND SCHEDULES

16-TELECOMMUNICATION

06-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION

06-TD101 TELECOMMUNICATIONS 1ST & 2ND FLOOR DEMOLITION

06-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

06-TN100 TELECOMMUNICATIONS BASEMENT PLAN

06-TN101 TELECOMMUNICATIONS 1ST & 2ND FLOOR PLAN

06-TN601 TELECOMMUNICATIONS DIAGRAMS

06-TY101 BASEMENT 1ST & 2ND SECURITY FLOOR PLANS

BLDG 7

07-GI001 COVER SHEET

07-STRUCTURAL

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 6

07-SF101 STRUCTURAL1ST & 2ND FLOOR PLAN

08-ARCHITECTURE

07-AE101 OVERALL FLOOR PLANS - BASEMENT 1ST & 2ND FLOOR PLANS

07-AE401 ENLARGED FLOOR PLANS & INTERIOR ELEVATIONS

15-ELECTRICAL

07-ED100 ELECTRICAL BASEMENT DEMOLITION

07-ED101 ELECTRICAL 1ST & 2ND FLOOR DEMOLITION

07-EP100 ELECTRICAL BASEMENT PLAN

07-EP101 ELECTRICAL 1ST & 2ND FLOOR PLAN

07-EP601 ONE-LINE DIAGRAM AND SCHEDULES

16-TELECOMMUNICATION

07-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION

07-TD101 TELECOMMUNICATIONS 1ST & 2ND FLOOR DEMOLITION

07-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

07-TN100 TELECOMMUNICATIONS BASEMENT PLAN

07-TN101 TELECOMMUNICATIONS 1ST & 2ND FLOOR PLAN

07-TN601 TELECOMMUNICATIONS DIAGRAMS

07-TY102 1ST & 2ND FLOOR SECURITY PLANS

BLDG 9

01 - GENERAL

09-GI001 COVER SHEET

07-STRUCTURAL

09-SF101 STRUCTURAL 1ST FLOOR PLAN

09-SF102 STRUCTURAL 2ND FLOOR PLAN

09-SF103 STRUCTURAL 3RD FLOOR PLAN

08-ARCHITECTURE

09-AE101 OVERALL FLOOR PLANS - BASEMENT & 1ST FLOOR

09-AE102 OVERALL FLOOR PLANS - 2ND & 3RD FLOORS

09-AE401 ENL. FLOOR PLAN & RCP DEMO PLAN & RCP INT. ELEV. - 1ST & 2ND

FLOOR

09-AE402 ENL. FLOOR PLAN & RCP DEMO PLAN & RCP INT. ELEV. - 3RD FLOOR

09-AE301 BUILDING SECTIONS

11-FIRE PROTECTION

09-FX101 FIRE SUPPRESSION 1ST FLOOR PLAN

09-FX102 FIRE SUPPRESSION 2ND FLOOR PLAN

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 7

09-FX103 FIRE SUPPRESSION 3RD FLOOR PLAN

12-PLUMBING

09-PD101 PLUMBING 1ST 2ND & 3RD FLOOR DEMOLITION PLANS

09-PP101 PLUMBING 1ST 2ND & 3RD FLOOR PLANS

14-MECHANICAL

09-MD101 MECHANICAL 1ST 2ND & 3RD FLOOR DEMOLITION PLANS

09-MP101 MECHANICAL 1ST 2ND & 3RD FLOOR PLANS

09-MG601 MECHANICAL SCHEDULES

15-ELECTRICAL

09-ED100 ELECTRICAL BASEMENT DEMOLITION

09-ED101 ELECTRICAL 1ST FLOOR DEMOLITION

09-ED102 ELECTRICAL 2ND FLOOR DEMOLITION

09-ED103 ELECTRICAL 3RD FLOOR DEMOLITION

09-EP100 ELECTRICAL BASEMENT PLAN

09-EP101 ELECTRICAL 1ST FLOOR PLAN

09-EP102 ELECTRICAL 2ND FLOOR PLAN

09-EP103 ELECTRICAL 3RD FLOOR PLAN

09-EP601 ONE-LINE DIAGRAM AND SCHEDULES

09-EP602 PANEL SCHEDULES

09-EP603 PANEL SCHEDULES

09-EP604 PANEL SCHEDULES

16-TELECOMMUNICATION

09-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION

09-TD101 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION

09-TD102 TELECOMMUNICATIONS 2ND FLOOR DEMOLITION

09-TD103 TELECOMMUNICATIONS 3RD FLOOR DEMOLITION

09-TD401 TELECOMMUNICATIONS DEMOLITION ENLARGED PLANS

09-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

09-TD602 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

09-TN100 TELECOMMUNICATIONS BASEMENT PLAN

09-TN101 TELECOMMUNICATIONS OVERALL 1ST FLOOR PLAN

09-TN102 TELECOMMUNICATIONS OVERALL 2ND FLOOR PLAN

09-TN103 TELECOMMUNICATIONS OVERALL 3RD FLOOR PLAN

09-TN401 ENLARGED TELECOMMUNICATIONS PLANS

09-TN601 TELECOMMUNICATIONS RACK ELEVATIONS

09-TN602 TELECOMMUNICATIONS RACK ELEVATIONS

09-TN603 TELECOMMUNICATIONS RISER DIAGRAM

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 8

09-TY101 1ST 2ND 3RD FLOOR SECURITY PLANS

BLDG 11

11-GI001 COVER SHEET

07-STRUCTURAL

11-SF101 STRUCTURAL BASEMENT & 1ST FLOOR PLAN

08-ARCHITECTURE

11-AE101 BASEMENT & 1ST FLOOR PLAN ENLARGED VIEWS & TE ELEVATION

15-ELECTRICAL

11-ED101 ELECTRICAL BASEMENT & 1ST FLOOR DEMOLITION

11-EP101 ELECTRICAL BASEMENT & 1ST FLOOR PLAN

11-EP601 ONE-LINE DIAGRAM AND SCHEDULES

16-TELECOMMUNICATION

11-TD101 TELECOMMUNICATIONS DEMOLITION BASEMENT & 1ST FLOOR

11-TN101 TELECOMMUNICATIONS BASEMENT & 1ST FLOOR FLOOR PLAN

11-TN601 TELECOMMUNICATIONS DIAGRAMS

11-TY101 BASEMENT & 1ST FLOOR SECURITY PLAN

BLDG 12

12-GI001 COVER SHEET

07-STRUCTURAL

12-SF101 STRUCTURAL 1ST FLOOR PLAN

08-ARCHITECTURE

12-AE101 1ST FLOOR PLAN ENLARGED FLOOR PLAN & INTERIOR ELEVATION

15-ELECTRICAL

12-ED101 ELECTRICAL 1ST FLOOR DEMOLITION

12-EP101 ELECTRICAL 1ST FLOOR PLAN

12-EP601 ONE-LINE DIAGRAM AND SCHEDULES

16-TELECOMMUNICATION

12-TD101 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION

12-TN101 TELECOMMUNICATIONS 1ST FLOOR PLAN

12-TN601 TELECOMMUNICATIONS DIAGRAMS

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 9

12-TY101 1ST FLOOR SECURITY PLAN

BLDG 14

14-GI001 COVER SHEET

07-STRUCTURAL

14-SF100 STRUCTURAL BASEMENT PLAN

14-SF101 STRUCTURAL 1ST & 2ND FLOOR PLAN

08-ARCHITECTURE

14-AE100 OVERALL FLOOR & DEMO PLAN - BASEMENT

14-AE101 OVERALL FLOOR & DEMO PLAN - 1ST & 2ND FLOOR

14-AE301 BUILDING SECTIONS

14-AE400 ENLARGED FLOOR PLANS & RCP'S SCHEDULES

14-AE401 ELEVATIONS

12-PLUMBING

14-PD101 PLUMBING 1ST AND 2ND FLOOR DEMOLITION

14-PP101 PLUMBING 1ST AND 2ND FLOOR PLAN

14-MECHANICAL

14-MD101 MECHANICAL 1ST AND 2ND FLOOR DEMOLITION

14-MG601 MECHANICAL SCHEDULES

14-MP101 MECHANICAL 1ST AND 2ND FLOOR PLAN

15-ELECTRICAL

14-ED100 ELECTRICAL BASEMENT DEMOLITION

14-ED101 ELECTRICAL 1ST AND 2ND FLOOR DEMOLITION

14-EP100 ELECTRICAL BASEMENT PLAN

14-EP101 ELECTRICAL 1ST AND 2ND FLOOR PLAN

14-EP601 ONE-LINE DIAGRAM AND SCHEDULES

14-EP602 PANEL SCHEDULES

16-TELECOMMUNICATION

14-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION

14-TD101 TELECOMMUNICATIONS DEMOLITION 1ST AND 2ND FLOOR

14-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

14-TN100 TELECOMMUNICATIONS BASEMENT PLAN

14-TN101 TELECOMMUNICATIONS 1ST AND 2ND FLOOR PLAN

14-TN601 TELECOMMUNICATIONS DIAGRAMS AND RACK ELEVATIONS

14-TN602 TELECOMMUNICATIONS RISER DIAGRAM

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 10

14-TY101 BASEMENT SECURITY PLAN

14-TY102 1ST & 2ND FLOOR SECURITY PLANS

BLDG 15

15-GI001 COVER SHEET

07-STRUCTURAL

15-SF100 STRUCTURAL BASEMENT PLAN

15-SF101 STRUCTURAL 1ST FLOOR PLAN

15-SF102 STRUCTURAL 2ND FLOOR PLAN

15-SF103 STRUCTURAL 3RD FLOOR PLAN

08-ARCHITECTURE

15-AE401 ENLARGED FLOOR PLANS RCP'S SCHEDULES

15-AE451 INTERIOR ELEVATIONS

15-AE452 EXTERIOR ELEVATION

15-AD401 ENLARGED DEMO PLANS

15-AE101 OVERALL FLOOR PLANS - BASEMENT & 1ST FLOOR

15-AE102 OVERALL FLOOR PLANS - 2ND & 3RD FLOOR

15-AE301 BUILDING SECTION

11 - FIRE PROTECTION

15-FX100 FIRE SUPPRESSION BASEMENT PLAN

15-FX101 FIRE SUPPRESSION 1ST FLOOR PLAN

15-FX102 FIRE SUPPRESSION 2ND FLOOR PLAN

15-FX103 FIRE SUPPRESSION 3RD FLOOR PLAN

12-PLUMBING

15-PD101 PLUMBING BASEMENT & 1ST FLOOR DEMOLITION PLANS

15-PD102 PLUMBING 2ND & 3RD FLOOR DEMOLITION PLANS

15-PP101 PLUMBING BASEMENT & 1ST FLOOR PLANS

15-PP102 PLUMBING 2ND & 3RD FLOOR PLANS

14-MECHANICAL

15-MD101 MECHANICAL BASEMENT & 1ST FLOOR DEMOLITION PLANS

15-MD102 MECHANICAL 2ND & 3RD FLOOR DEMOLITION PLANS

15-MP101 MECHANICAL BASEMENT & 1ST FLOOR PLANS

15-MP102 MECHANICAL 2ND & 3RD FLOOR PLANS

15-MG601 MECHANICAL SCHEDULES

15-ELECTRICAL

15-ED100 ELECTRICAL BASEMENT DEMOLITION

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 11

15-ED101 ELECTRICAL 1ST FLOOR DEMOLITION

15-ED102 ELECTRICAL 2ND FLOOR DEMOLITION

15-ED103 ELECTRICAL 3RD FLOOR DEMOLITION

15-ED401 ELECTRICAL ENLARGED DEMOLITION PLANS

15-EP100 ELECTRICAL BASEMENT PLAN

15-EP101 ELECTRICAL 1ST FLOOR PLAN

15-EP102 ELECTRICAL 2ND FLOOR PLAN

15-EP103 ELECTRICAL 3RD FLOOR PLAN

15-EP401 ELECTRICAL ENLARGED PLANS

15-EP601 ONE-LINE DIAGRAM AND SCHEDULES

15-EP602 PANEL SCHEDULES

15-EP603 PANEL SCHEDULES

16-TELECOMMUNICATION

15-TD100 TELECOMMUNICATIONS DEMOLITION BASEMENT

15-TD101 TELECOMMUNICATIONS DEMOLITION 1ST FLOOR

15-TD102 TELECOMMUNICATIONS DEMOLITION 2ND FLOOR

15-TD103 TELECOMMUNICATIONS DEMOLITION 3RD FLOOR

15-TD401 TELECOMMUNICATIONS DEMOLITION ENLARGED PLANS

15-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

15-TD602 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

15-TN100 TELECOMMUNICATIONS BASEMENT PLAN

15-TN101 TELECOMMUNICATIONS 1ST FLOOR PLAN

15-TN102 TELECOMMUNICATIONS 2ND FLOOR PLAN

15-TN103 TELECOMMUNICATIONS 3RD FLOOR PLAN

15-TN401 TELECOMMUNICATIONS ENLARGED PLANS

15-TN601 TELECOMMUNICATIONS RACK ELEVATIONS

15-TN602 TELECOMMUNICATIONS RACK ELEVATIONS

15-TN603 TELECOMMUNICATIONS RISER DIAGRAM

15-TY401 ENLARGED SECURITY FLOOR PLANS

BLDG 47

47-GI001 COVER SHEET

47-GI002 SHEET INDEX

01 - GENERAL CONTRACT

47-GC100 SEQUENCING PLAN - BASEMENT

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 12

47-GC101 SEQUENCING PLAN - 1ST FLOOR

47-GC102 SEQUENCING PLAN - 2ND FLOOR

47-GC103 SEQUENCING PLAN - 3RD FLOOR

47-GC104 SEQUENCING PLAN - 4TH FLOOR

47-GC105 SEQUENCING PLAN - 5TH FLOOR

07-STRUCTURAL

47-SF100 STRUCTURAL BASEMENT PLAN - OVERALL

47-SF101 STRUCTURAL 1ST FLOOR PLAN - OVERALL

47-SF102 STRUCTURAL 2ND FLOOR PLAN - OVERALL

47-SF400 STRUCTURAL ENLARGED BASEMENT PLANS

47-SF402 STRUCTURAL ENLARGED BASEMENT PLAN

47-SF403 STRUCTURAL ENLARGED 1ST FLOOR PLANS

47-SF404 STRUCTURAL ENLARGED 2ND FLOOR PLANS

08-ARCHITECTURE

47-AD400A ENLARGED DEMO FLOOR & RC PLANS - BASEMENT

47-AD400B ENLARGED DEMO FLOOR & RC PLANS - BASEMENT

47-AD400C ENLARGED DEMO FLOOR & RC PLANS - BASEMENT (DATA CENTER)

47-AD401A ENLARGED DEMO FLOOR & RC PLANS - 1ST FLOOR

47-AD401B ENLARGED DEMO FLOOR & RC PLANS - 1ST FLOOR

47-AD401C ENLARGED DEMO FLOOR & RC PLANS - 1ST FLOOR

47-AD402 ENLARGED DEMO FLOOR & RC PLANS - 2ND FLOOR

47-AD403 ENLARGED DEMO FLOOR & PLANS - 3RD 4TH & 5TH FLOORS

47-AE100 OVERALL FLOOR & DEMO PLAN - BASEMENT

47-AE101 OVERALL FLOOR & DEMO PLAN - 1ST FLOOR

47-AE102 OVERALL FLOOR & DEMO PLAN - 2ND FLOOR

47-AE103 OVERALL FLOOR PLAN ENLARGED DEMO & ARCH PLANS - 3RD FLOOR

47-AE104 OVERALL FLOOR PLAN ENLARGED DEMO & ARCH PLANS - 4TH FLOOR

47-AE105 OVERALL FLOOR PLAN ENLARGED DEMO AND ARCH PLANS - 5TH FLOOR

47-AE106 OVERALL ROOF DEMO PLAN

47-AE351 BUILDING SECTIONS (TR STACKS)

47-AE400A ENLARGED FLOOR & RC PLANS - BASEMENT

47-AE400B ENLARGED FLOOR PLAN - BASEMENT (DATA CENTER)

47-AE400C ENLARGED RC PLAN - BASEMENT (DATA CENTER)

47-AE401A ENLARGED FLOOR & RC PLANS - 1ST FLOOR

47-AE401B ENLARGED FLOOR & RC PLANS - 1ST FLOOR

47-AE402 ENLARGED FLOOR & RC PLANS - 2ND FLOOR

47-AE403 ENLARGED FLOOR & RC PLANS - 3RD 4TH & 5TH FLOOR

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 13

47-AE451 INTERIOR ELEVATIONS

47-AE452 INTERIOR ELEVATIONS

47-AE453 EXTERIOR ELEVATION

47-AE601 SCHEDULES

11-FIRE PROTECTION

47-FA100 FIRE DETECTION AND ALARM BASEMENT PLAN - OVERALL

47-FA101 FIRE DETECTION AND ALARM 1ST FLOOR PLAN - OVERALL

47-FA107 FIRE DETECTION AND ALARM PLAN - DATA CENTER

47-FX100 FIRE SUPPRESSION BASEMENT PLAN - OVERALL

47-FX101 FIRE SUPPRESSION 1ST FLOOR PLAN - OVERALL

47-FX102 FIRE SUPPRESSION 2ND FLOOR PLAN - OVERALL

47-FX103 FIRE SUPPRESSION 3RD FLOOR PLAN

47-FX104 FIRE SUPPRESSION 4TH FLOOR PLAN

47-FX105 FIRE SUPPRESSION 5TH FLOOR PLAN

47-FX107 FIRE SUPPRESSION PLAN - DATA CENTER

47-FX108 CLEAN AGENT SUPPRESSION SYSTEM - DATA CENTER

12-PLUMBING

47-PP100 PLUMBING BASEMENT PLAN - OVERALL

47-PP101 PLUMBING 1ST FLOOR PLAN - OVERALL

47-PP102 PLUMBING 2ND FLOOR PLAN - OVERALL

47-PP103 PLUMBING 3RD FLOOR PLAN - OVERALL

47-PP104 PLUMBING 4TH FLOOR PLAN - OVERALL

47-PP105 PLUMBING 5TH FLOOR PLAN - OVERALL

47-PD400 ENLARGED PLUMBING BASEMENT DEMOLITION PLANS

47-PD401 ENLARGED PLUMBING DATA CENTER DEMOLITION

47-PD402 ENLARGED PLUMBING 1ST FLOOR DEMOLITION PLANS

47-PD403 ENLARGED PLUMBING 2ND FLOOR DEMOLITION PLANS

47-PD404 ENLARGED PLUMBING 3RD 4TH AND 5TH FLOOR DEMOLITION

47-PP400 ENLARGED PLUMBING BASEMENT PLANS

47-PP401 ENLARGED PLUMBING DATA CENTER PLAN

47-PP402 ENLARGED PLUMBING 1ST FLOOR PLANS

47-PP403 ENLARGED PLUMBING 2ND FLOOR PLANS

47-PP404 ENLARGED PLUMBING 3RD 4TH AND 5TH FLOOR PLANS

47-PG501 PLUMBING SCHEDULES

14-MECHANICAL

47-MP100 MECHANICAL BASEMENT PLAN - OVERALL

47-MP101 MECHANICAL 1ST FLOOR PLAN - OVERALL

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 14

47-MP102 MECHANICAL 2ND FLOOR PLAN - OVERALL

47-MP103 MECHANICAL 3RD FLOOR PLAN - OVERALL

47-MP104 MECHANICAL 4TH FLOOR PLAN - OVERALL

47-MP105 MECHANICAL 5TH FLOOR PLAN - OVERALL

47-MP106 MECHANICAL ROOF PLAN - OVERALL

47-MD400 ENLARGED MECHANICAL BASEMENT DEMOLITION

47-MD401 ENLARGED MECHANICAL DATA CENTER DEMOLITION

47-MD402 ENLARGED MECHANICAL 1ST FLOOR DEMOLITION

47-MD403 ENLARGED MECHANICAL 2ND FLOOR DEMOLITION

47-MD404 ENLARGED MECHANICAL 3RD 4TH AND 5TH FLOOR DEMOLITION

47-MP400 ENLARGED MECHANICAL BASEMENT PLANS

47-MP401 ENLARGED MECHANICAL DATA CENTER PLAN

47-MP402 ENLARGED MECHANICAL 1ST FLOOR PLANS

47-MP403 ENLARGED MECHANICAL 2ND FLOOR PLANS

47-MP404 ENLARGED MECHANICAL 3RD 4TH AND 5TH FLOOR PLANS

47-MP405 ENLARGED MECHANICAL ROOF PLANS

47-MG501 MECHANICAL CONTROLS DETAILS

47-MG601 MECHANICAL SCHEDULES

15-ELECTRICAL

47-ED100 ELECTRICAL BASEMENT DEMOLITION - OVERALL

47-ED101 ELECTRICAL 1ST FLOOR DEMOLITION - OVERALL

47-ED102 ELECTRICAL 2ND FLOOR DEMOLITION - OVERALL

47-ED103 ELECTRICAL 3RD FLOOR DEMOLITION

47-ED104 ELECTRICAL 4TH FLOOR DEMOLITION

47-ED105 ELECTRICAL 5TH FLOOR DEMOLITION

47-ED400 ELECTRICAL ENLARGED BASEMENT DEMOLITION

47-ED401 ELECTRICAL ENLARGED DEMOLITION - DATA CENTER

47-ED402 ELECTRICAL ENLARGED 1ST FLOOR DEMOLITION

47-ED403 ELECTRICAL ENLARGED 2ND FLOOR DEMOLITION

47-EP100 ELECTRICAL BASEMENT PLAN - OVERALL

47-EP101 ELECTRICAL 1ST FLOOR PLAN - OVERALL

47-EP102 ELECTRICAL 2ND FLOOR PLAN - OVERALL

47-EP103 ELECTRICAL 3RD FLOOR PLAN

47-EP104 ELECTRICAL 4TH FLOOR PLAN

47-EP105 ELECTRICAL 5TH FLOOR PLAN

47-EP106 ELECTRICAL ROOF PLAN

47-EP400 ELECTRICAL ENLARGED BASEMENT PLANS

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 15

47-EP401 ELECTRICAL ENLARGED PLAN - DATA CENTER

47-EP402 ELECTRICAL ENLARGED 1ST FLOOR PLANS

47-EP403 ELECTRICAL ENLARGED 2ND FLOOR PLANS

47-EP601 ONE-LINE DIAGRAMS

47-EP602 ONE-LINE DIAGRAMS

47-EP603 PANEL SCHEDULES

47-EP604 PANEL SCHEDULES

47-EP605 PANEL SCHEDULES

47-EP606 PANEL SCHEDULES

47-EP607 PANEL SCHEDULES

47-EP608 PANEL SCHEDULES

47-EP609 PANEL SCHEDULES

47-EP610 PANEL SCHEDULES

47-EP611 PANEL SCHEDULES

47-EP612 PANEL SCHEDULES

47-EP613 ELECTRICAL SCHEDULES

16-TELECOMMUNICATION

47-TD100 TELECOMMUNICATIONS BASEMENT DEMOLITION - OVERALL

47-TD101 TELECOMMUNICATIONS BASEMENT DEMOLITION - PART A

47-TD102 TELECOMMUNICATIONS BASEMENT DEMOLITION - PART B

47-TD103 TELECOMMUNICATIONS BASEMENT DEMOLITION - PART C

47-TD104 TELECOMMUNICATIONS BASEMENT DEMOLITION - PART D

47-TD110 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION - OVERALL

47-TD111 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION - PART A

47-TD112 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION - PART B

47-TD113 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION - PART C

47-TD114 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION - PART D

47-TD120 TELECOMMUNICATIONS 2ND FLOOR DEMOLITION - OVERALL

47-TD130 TELECOMMUNICATIONS 3RD FLOOR DEMOLITION

47-TD140 TELECOMMUNICATIONS 4TH FLOOR DEMOLITION

47-TD150 TELECOMMUNICATIONS 5TH FLOOR DEMOLITION

47-TD400 TELECOMMUNICATIONS ENLARGED BASEMENT DEMOLITION

47-TD401 TELECOMMUNICATIONS ENLARGED DEMOLITION - DATA CENTER

47-TD402 TELECOMMUNICATIONS ENLARGED 1ST FLOOR DEMOLITION

47-TD403 TELECOMMUNICATIONS ENLARGED 2ND FLOOR DEMOLITION

47-TD601 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD602 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 16

47-TD603 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD604 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD605 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD606 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD607 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD608 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD609 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD610 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD611 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD612 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD613 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD614 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD615 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD616 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD617 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD618 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD619 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD620 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TD621 EXISTING TELECOMMUNICATIONS RACK ELEVATIONS

47-TN100 TELECOMMUNICATIONS BASEMENT PLAN - OVERALL

47-TN101 TELECOMMUNICATIONS BASEMENT PLAN - PART A

47-TN102 TELECOMMUNICATIONS BASEMENT PLAN - PART B

47-TN103 TELECOMMUNICATIONS BASEMENT PLAN - PART C

47-TN104 TELECOMMUNICATIONS BASEMENT PLAN - PART D

47-TN110 TELECOMMUNICATIONS 1ST FLOOR PLAN - OVERALL

47-TN111 TELECOMMUNICATIONS 1ST FLOOR PLAN - PART A

47-TN112 TELECOMMUNICATIONS 1ST FLOOR PLAN - PART B

47-TN113 TELECOMMUNICATIONS 1ST FLOOR PLAN - PART C

47-TN114 TELECOMMUNICATIONS 1ST FLOOR PLAN - PART D

47-TN120 TELECOMMUNICATIONS 2ND FLOOR PLAN

47-TN130 TELECOMMUNICATIONS 3RD FLOOR PLAN

47-TN140 TELECOMMUNICATIONS 4TH FLOOR PLAN

47-TN150 TELECOMMUNICATIONS 5TH FLOOR PLAN

47-TN400 TELECOMMUNICATIONS ENLARGED BASEMENT PLANS

47-TN401 TELECOMMUNICATIONS DATA CENTER

47-TN402 TELECOMMUNICATIONS ENLARGED 1ST FLOOR PLANS

47-TN403 TELECOMMUNICATIONS ENLARGED 2ND FLOOR PLANS

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 17

47-TN600 TELECOMMUNICATIONS RISER DIAGRAM

47-TN601 TELECOMMUNICATIONS RACK ELEVATIONS

47-TN602 TELECOMMUNICATIONS RACK ELEVATIONS

47-TN603 TELECOMMUNICATIONS RACK ELEVATIONS

47-TN604 TELECOMMUNICATIONS RACK ELEVATIONS

47-TN605 TELECOMMUNICATIONS RACK ELEVATIONS

47-TN606 TELECOMMUNICATIONS RACK ELEVATIONS

47-TN607 TELECOMMUNICATIONS RACK ELEVATIONS

47-TN608 TELECOMMUNICATIONS RISER DIAGRAM

47-TN609 TELECOMMUNICATIONS RISER DIAGRAM

47-TN610 TELECOMMUNICATIONS RACK ELEVATIONS

47-TN611 TELECOMMUNICATIONS RACK ELEVATIONS

47-TN612 TELECOMMUNICATIONS RACK ELEVATIONS

47-TN613 TELECOMMUNICATIONS RACK ELEVATIONS

47-TN614 TELECOMMUNICATIONS RACK ELEVATIONS

16.4 - PHYSICAL SECURITY

47-TY100A SECURITY PLAN - BASEMENT

47-TY100B SECURITY PLAN - BASEMENT (DATACENTER)

47-TY101 SECURITY PLAN - 1ST FLOOR

47-TY102 SECURITY PLANS - 2ND FLOOR

47-TY103 SECURITY PLANS - 3RD 4TH & 5TH FLOORS

BLDG 62

62-GI001 COVER SHEET

07-STRUCTURAL

62-SF100 STRUCTURAL BASEMENT PLAN

62-SF101 STRUCTURAL 1ST FLOOR PLAN

62-SF102 STRUCTURAL 2ND FLOOR PLAN

08-ARCHITECTURE

62-AD401 1ST & 2ND FLOOR ENLARGED DEMO FLOOR PLANS & RCP'S

62-AE101 OVERALL FLOOR & DEMO PLAN - 1ST FLOOR

62-AE102 OVERALL FLOOR & DEMO PLAN - 2ND FLOOR

62-AE103 OVERALL DEMO ROOF PLAN

62-AE401 1ST & 2ND FL. - ENLARGED FLOOR PLANS RCP'S & INT.

ELEVATIONS

11-FIRE PROTECTION

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 18

62-FX101 FIRE SUPPRESSION 1ST FLOOR PLAN

62-FX102 FIRE SUPPRESSION 2ND FLOOR PLAN

12-PLUMBING

62-PD101 PLUMBING 1ST FLOOR DEMOLITION PLAN

62-PD102 PLUMBING 2ND FLOOR DEMOLITION PLAN

62-PP101 PLUMBING 1ST FLOOR PLAN

62-PP102 PLUMBING 2ND FLOOR PLAN

14-MECHANICAL

62-MD101 MECHANICAL 1ST FLOOR DEMOLITION PLAN

62-MD102 MECHANICAL 2ND FLOOR DEMOLITION PLAN

62-MP101 MECHANICAL 1ST FLOOR PLAN

62-MP102 MECHANICAL 2ND FLOOR PLAN

62-MP103 MECHANICAL ROOF PLAN

62-MG601 MECHANICAL SCHEDULES

15-ELECTRICAL

62-ED101 ELECTRICAL 1ST FLOOR DEMOLITION

62-ED102 ELECTRICAL 2ND FLOOR DEMOLITION

62-EP101 ELECTRICAL 1ST FLOOR PLAN

62-EP102 ELECTRICAL 2ND FLOOR PLAN

62-EP103 ELECTRICAL ROOF PLAN

62-EP601 ONE-LINE DIAGRAM AND SCHEDULES

62-EP602 PANEL SCHEDULES

62-EP603 PANEL SCHEDULES

16-TELECOMMUNICATION

62-TD100 TELECOMMUNICATIONS DEMOLITION BASEMENT

62-TD101 TELECOMMUNICATIONS DEMOLITION 1ST FLOOR

62-TD102 TELECOMMUNICATIONS DEMOLITION 2ND FLOOR

62-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

62-TN100 TELECOMMUNICATIONS BASEMENT PLAN

62-TN101 TELECOMMUNICATIONS 1ST FLOOR PLAN

62-TN102 TELECOMMUNICATIONS 2ND FLOOR PLAN

62-TN601 TELECOMMUNICATIONS DIAGRAMS

62-TN602 TELECOMMUNICATIONS RISER DIAGRAM

16.4 - PHYSICAL SECURITY

62-TY101 1ST FLOOR SECURITY PLAN

62-TY102 2ND FLOOR SECURITY PLAN

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 19

BLDG 70

01 - GENERAL

70-GI001 COVER SHEET

07-STRUCTURAL

70-SF101 STRUCTURAL 1ST FLOOR PLAN

08-ARCHITECTURE

70-AD101 1ST FLOOR DEMO PLAN & DEMO RCP

70-AE101 1ST FLOOR PLAN RCP DOOR SCHEDULE & INTERIOR ELEVATIONS

12-PLUMBING

70-PP101 PLUMBING 1ST FLOOR PLANS

14-MECHANICAL

70-MP101 MECHANICAL 1ST FLOOR PLANS

70-MP102 MECHANICAL ROOF PLAN

70-MG601 MECHANICAL SCHEDULES

15-ELECTRICAL

70-ED101 ELECTRICAL DEMOLITION 1ST FLOOR

70-EP101 ELECTRICAL 1ST FLOOR PLAN

70-EP102 ELECTRICAL ROOF PLAN

70-EP601 ONE-LINE DIAGRAM AND SCHEDULES

16-TELECOMMUNICATION

70-TD101 TELECOMMUNICATIONS DEMOLITION 1ST FLOOR

70-TD401 TELECOMMUNICATIONS DEMOLITION ENLARGED PLAN

70-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

70-TN101 TELECOMMUNICATIONS 1ST FLOOR PLAN

70-TN601 TELECOMMUNICATIONS DIAGRAMS

70-TY101 1ST FLOOR SECURITY PLAN

BLDG 73

73-GI001 COVER SHEET

07-STRUCTURAL

73-SF101 STRUCTURAL 1ST FLOOR PLAN

08 - ARCHITECTURE

73-AD101 1ST FLOOR DEMO PLAN ENLARGED PLAN & ENLARGED RCP

73-AE101 1ST FLOOR PLAN RCP DOOR SCHEDULE & INTERIOR ELEVATIONS

12-PLUMBING

Project No. 637-22-700

December 19, 2025

List of Drawing Sheets

00 01 15 - 20

73-PP101 PLUMBING 1ST FLOOR PLAN

14-MECHANICAL

73-MP101 MECHANICAL 1ST FLOOR PLAN

73-MP102 MECHANICAL ROOF PLAN

73-MG601 MECHANICAL SCHEDULES

15-ELECTRICAL

73-ED101 ELECTRICAL 1ST FLOOR DEMOLITION

73-EP101 ELECTRICAL 1ST FLOOR PLAN

73-EP102 ELECTRICAL ROOF PLAN

73-EP601 ONE-LINE DIAGRAM AND SCHEDULES

16-TELECOMMUNICATION

73-TD101 TELECOMMUNICATIONS 1ST FLOOR DEMOLITION

73-TD601 TELECOMMUNICATIONS DEMOLITION RACK ELEVATIONS

73-TN101 TELECOMMUNICATIONS 1ST FLOOR PLAN

73-TN601 TELECOMMUNICATIONS DIAGRAMS

16.4 - PHYSICAL SECURITY

73-TY101 1ST FLOOR SECURITY PLAN

Grand total: 559

End

General Requirements

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including selective demolition in existing structures, furnish labor and materials and perform work for the Charles George VA Medical Center

EHRM Upgrades as required by drawings and specifications.

B. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting

Officer.

C. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.

D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

E. Contractor Work Hours

1. Normal working hours for this contract will be from 7:00AM to 4:30PM

(local time) Monday through Friday except for weekends and established Federal Holidays.

2. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.

01 00 00 -2

1.3 STATEMENT OF BID ITEM(S)

A. GENERAL CONSTRUCTION: BASE BID Work includes general construction, alterations, necessary removal of portions of existing structures and construction and certain other items.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer Representative, COR, so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Guards: NA

D. Key Control: NA

E. Document Control:

01 00 00 -3

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of the Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in a specified location following VA standards and procedures using Engineering Document

Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic, shall be performed and tracked through the EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of 5 permits shall be issued for the General

Contractor and its employees for parking in designated areas only.

Contractor to coordinate with VA Medical Center Facility Manager.

01 00 00 -4

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with the normal functioning of the Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, 01 00 00 -5 and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by the Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

I. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

1. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor

01 00 00 -6 intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor.

J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

K. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

01 00 00 -7

2. Contractor shall submit a request to interrupt any such services to the COR, in writing, 7 days in advance of proposed interruption.

Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.

01 00 00 -8

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from selective demolition, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to reinstallation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

2. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.8 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and

01 00 00 -9…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .