I cannot provide a summary of the RFI Responses file as it was not included in the materials provided. While the federal contract opportunity (Solicitation Number 36C77626R0066) for EHRM Infrastructure Upgrades at the Asheville, NC VA Medical Center is described, the actual RFI Responses document itself was not attached or made available for review. To summarize the RFI Responses file, please provide the actual document content or file text.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL QUESTIONS AND
| SOLICITATION #: |
| 36C77626R0066 |
| RESPONSES TRACKING SHEET |
| PROJECT TITLE: |
| 637-22-700 EHRM Infrastructure Upgrades, Ashville, NC |
| # |
| CONTRACTOR QUESTION |
| VA RESPONSE |
| 1 |
| Looking at Spec Book in Spec Section 23-05-41 there are a couple pages that are landscape instead of portrait. They look like they got cut off. |
Spec 23 05 41 rewritten. See Addendum 1 8-6-26 – updated in Amendment 0007
| 2 |
| There are specs for Division 31 and 32 in the Specs, but no Civil plans or Site Work Plans in the plan set. |
Drawings are in solicitation, Dwgs Vol I, attachment 2. Dwgs 00-CI001, 00-CI400, 00-CI401 are updated. See Addendum 1 8-6-26 – updated in Amendment 0007
| 3 |
| In the drawing 00-T601 for this project, It calls out " PROVIDE ONE (1) 3" CORRUGATED INNERDUCT" in multiple lines. |
In checking with 3 different Distribution Partners, they are having great difficulty in locating or even getting pricing on the Three Inch Corrugated Innerduct, as no manufacturer in the USA is making 3" corrugated innerduct anymore. The largest is a 2 inch.
Is there some alternate means and method that can eliminate the 3" innerduct such as armored fiber, or 3-inch 3 cell MAXCELL or (3) 1 .25inch innerducts in lieu of the single 3" innerduct?
Please provide three (3) 1” innerduct for all OSP fiber runs, please refer to sheet 00-T601 and 00-TS100 are updated. See Addendum 1 8-6-26 – updated in Amendment 0007
| 4 |
| Factor 2 - Key Subcontractors / Attachment 9 Clarification |
Factor 2 requires the proposed communications installer to submit three installations of similar size and complexity, and states that similar size is defined as a completed project over $5 million. Attachment 9 further states that projects must “demonstrate Division 27 complexity” and “meet or exceed 5 million dollars of Division 27 complexity work.”
Please confirm whether the $5 million threshold applies to:
(a) the value of the communications installer’s Division 27 scope furnished and installed by the installer, or
(b) the total value of the overall completed project/prime contract, where the communications installer performed a Division 27 scope as part of a larger project.
If the Government intends the threshold to apply only to the communications installer’s scope, please also confirm whether related low-voltage communications, structured cabling, telecommunications infrastructure, and associated Division 27/Division 28 integration work may be counted toward the $5 million threshold when performed by the proposed communications installer.
See solicitation attachment 9. “Offeror to complete 1 form for each project #1-3. No other projects beyond projects 1-3 will be accepted. Projects cannot have more than one system project number. Projects submitted shall be furnished and installed by the communications installer. Shall have a final acceptance date. Shall demonstrate division 27 complexity in the project description and meet or exceed 5 million dollars of division 27 complexity work.”
| 5 |
| Clarification on complete scope of project. Specs reflect possible additional work not reflected in drawings. (See pg. 955 E-1 of specs) |
All scope of work is in plans and specifications.
| 6 |
| Who is providing the Vigilent Control System? (Needed for communication with BAS) |
Controls contractor to provide BACnet compatible controls & optimization software for CRAC units serving new data center. Vigilent is basis of design. Alternate vendors will be subject to engineering and COR review for approval. Refer to updated mechanical drawings (00-M001, 09-MP101, 09-MG601, 14-MP101, 14-MG601, 15-MP101, 15-MP102, 15-MG601, 47-MP400, 47-MP401, 47-MP402, 47-MP403, 47-MP404, 47-MG501, 47-MG601, 62-MP101, 62-MP102, 62-MG601, 70-MP101, 70-MG601, 73-MP101, 73-MG601 and Specs 23 05 11, 23 05 41, 23 09 23) See Addendum 1 8-6-26 – updated in Amendment 0007.
| 7 |
| Who is supplying the Temptrak Control System? ? (Needed for communication with BAS) |
Controls contractor to provide BACnet compatible room temperature/humidity sensors in TRs as shown in drawings. TempTrak is basis of design. Alternate vendors will be subject to engineering and COR review for approval. See drawings and specs from RFI 6.
| 8 |
| Is TCC providing a Server? (See pg. 928 E-1 of specs) |
GC to determine.
| 9 |
| Who is providing the Backdraft dampers for CRAC units (See dwg. 47-MP-401 note 12.) |
GC to determine.
| 10 |
| It is new DDC Network just for the Scope of this project. (See pg. 912 F-4 of specs) |
Controls for this project to be tied into existing DDC system.
| 11 |
| 1JACE/Vigilent System/Temptak system per building? |
Controls contractor to provide BACnet compatible room temperature/humidity sensors in TRs as shown in drawings. TempTrak is basis of design. Alternate vendors will be subject to engineering and COR review for approval. See drawings and specs from RFI 6. JACE Controller is acceptable for our existing DDC.
| 12 |
| A more detailed second site survey is requested for the Division 27 and Division 28 specialty telecommunications subcontractors because the current contract documents leave several material existing-condition and integration items unresolved that directly affect pricing, sequencing, outage planning, and technical risk. The telecommunications and security scopes explicitly state they are dependent on heavily on field-verifying existing cable pathways, rack conditions, available pathway capacity, data outlet locations, active versus abandoned cabling, fiber backbone routes, available network switch/PoE capacity, security head-end tie-ins, camera and access control refeed requirements, and coordination with the existing base building security system/vendor. Because the project occurs in an active VA medical center environment, these unknowns also affect infection-control requirements, ceiling access, escort/access constraints, phasing, and permissible outage windows for communications, fire alarm, access control, and video surveillance systems. A focused second survey by the Division 27/28 specialty team would allow the potential subcontractors to validate the affected telecom rooms, pathways, device locations, rack elevations, existing fiber/copper terminations, and security interfaces before final pricing, reducing the likelihood of assumptions, exclusions, change orders, schedule impacts, or service disruptions during construction. Furthermore, since the VASS and Video Management System for the security system is to be replaced per the Division 28 requirements, request that not only OIT, but the VA police attend and discuss their needs as the end-user of the new VASS and VMS systems. |
The VA does not anticipate conducting an additional site visit.
| 13 |
| Due to the above need for a focused telecommunications second site visit and the fact that primes and subs have just begun teaming arrangements this week following release of the sign-in sheet, request a very health extension to the bid due date. |
Any extensions to the closing date will be posted to SAM.gov.
| 14 |
| Does every installation technician require BICSI RCDD or can the BICSIRCDD requirement be satisfied by having both the integrator/designer and installer engineer on staff with the certification, and the responsible field representative supervising Division 27/28 work by technicians? |
Please follow the solicitation specifications.
| 15 |
| Please confirm whether Section 28 23 00 requires replacement of existing cameras, or whether existing cameras are to remain and be re-fed/integrated into the new VASS/VMS through the replacement telecom racks where shown on the drawings. If replacement is required, please identify which drawings or camera schedules designate cameras to be removed and replaced. |
Existing to remain cameras to be re-fed/integrated into the existing VMS. Ocularius ONSSI (current VMS) to include license.
One such compatible camera: WISENET Q MINI 5MP IP VANDAL DOME CAMERA, 3MM LENS
| 16 |
| Division 27/28 Cutover Responsibility and Procedure. Please clarify the required cutover procedure and responsible parties for Division 27 communications and Division 28 electronic safety/security systems. The drawings indicate that existing cameras and/or devices currently served from decommissioned telecom racks are to be refed from new or replacement racks in new telecom room locations, and that new cameras are to connect to available network switches. Please identify which party is responsible for disconnecting, reconnecting, patching, programming, testing, and accepting each affected system, including the Division 27 contractor, Division 28/security contractor, Johnson Controls/base building security vendor, VA OIT/IT, and VA COR. Bottom line: The documents establish that the contractor must coordinate and plan interruptions, and they assign certain equipment/pathway responsibilities, but they do not provide a sufficiently detailed Division 27/28 cutover plan. |
| GC to coordinate scope of their Div 27 and 28 Subcontractors. Cutover responsibility is a GC requirement to coordinate with VA during their project schedule preparation including required phasing if it applies. |
| 17 |
| Existing Pathway Capacity and Reuse. The drawings indicate that new data cabling may be routed using existing ladder rack/pathways and that existing routing is based on best available information. If an existing pathway is found to be full, blocked, inaccessible, noncompliant, or otherwise unusable, will new pathway installation be handled as a change, or should bidders include replacement/supplemental pathways in the base bid? |
If new cables exceed recommended fill ratio, please provide new cable tray in lieu of using existing cable tray.
| 18 |
| Cat 6A Upgrade / Existing Cable Replacement Scope. Please clarify the intended scope for replacement of existing communications cabling. Are all existing non-Cat 6A, non-rated, abandoned, or undocumented copper cables within the affected areas to be removed and replaced, or only cables specifically indicated on the drawings? |
All non-CAT6A cable within scope is to be upgraded. Refer to general notes 4 on demo sheets:
4. The quantity of telecom drops to be removed, installed, and maintained is based on the information available at the time of design. Prior to construction, telecom drop locations shall be surveyed. Any discrepancies shall be provided to the DOR immediately.
| 19 |
| Security System Vendor / Johnson Controls Requirements. The security drawings reference coordination with the base building security system vendor and include Johnson Controls contact information. Please confirm whether Johnson Controls is the required vendor for access control/video surveillance integration, programming, licensing, and commissioning. If so, should bidders include Johnson Controls’ costs in the base bid, or will the VA contract directly with the vendor? |
There is no designated vendor for any system. Work must be compatible to existing systems at the facility. Currently JCI is integrating the security system.
| 20 |
| Existing Cameras and Head-End Refeed from Decommissioned Telecom Racks. Drawings indicate that existing security head-end equipment is to remain and that existing cameras currently fed from decommissioned telecom racks shall be refed from new/replacement racks in new telecom room locations. Please provide a schedule/list of affected cameras, existing source rack, destination rack, switch/port requirements, cabling pathway, allowable downtime, and whether temporary cabling or phased cutover is required to maintain camera coverage. |
All work is shown on plans and specifications. See RFI 19.
| 21 |
| Security Device Location Finalization. Drawings require coordination with VA Facilities for exact security device locations. Please confirm whether bidders should price devices at the locations shown only or include relocation/rework allowance after VA final device-location review. If exact locations differ from the drawings after award, will relocation of rough-in, conduit, backboxes, cabling, and patching be treated as a change? |
Work and locations are depicted to a general location. Some adjustments can be determined by field decision coordinated with Security on a case by case basis during construction. Submit shop drawings for installed devices for review by VA and AE.
One compatible card reader is 40KHTKS-03-0004XR - Signo 40K PIV, Black/Silver, Term, CRD PFL CSTM, FIPS200BIT, Bluetooth Low Energy
| 22 |
| Active System Outage Windows. Please provide required outage windows and approval procedures for work impacting communications systems, security systems, fire alarm systems, network switches, camera feeds, access control doors, and telecom room cutovers. Please confirm whether after-hours or weekend work is required for cutovers so that such work may be included in the base bid. |
All outages will be coordinated during installation with VA. At least 2 weeks should be planned for in the schedule to coordinate any outages. The GC should anticipate that 25% of the work will be after hours.
| 23 |
| Is there a proprietary Fire Alarm Contractor at the facility? If so, please provide the company name and point of contact. |
| There is no propriety Fire Alarm Contractor for this project. Currently JCI is performing Fire Alarm services. |
| 24 |
| Is there a proprietary Controls Contractor at the facility? If so, please provide the company name and point of contact. |
There is no proprietary DDC for this project. The facility is using a Tridium Niagra product.
| 25 |
| Is there a proprietary Cameras at the facility? If so, please provide the company name and point of contact. |
There is no proprietary camera for this facility. GC must use cameras which align with our system Ocularius ONSSI (current VMS) to include license.
One such compatible camera: WISENET Q MINI 5MP IP VANDAL DOME CAMERA, 3MM LENS VA currently uses JCI for cameras, Status Solutions for panic alarms and Motorola for radios.
| 26 |
| For tech requirements, concerning page limitations: Can you confirm that (CPARS/PPQs, Draft Project Schedule, etc.) does not count towards page limitations? |
Refer to the Solicitation, VA has no issue with page limitations for supporting documentation.
| 27 |
| 00-CI401 – Detail F1 – The underground duct bank path that runs north goes through an existing concrete ramp and planter box. Can the VA provide more details on the existing ramp, handrail, and planter box for demo and reinstallation? Or would the VA provide an alternate route around the existing ramp and planter box? |
VA will work with GC for any field adjustments required during construction.
| 28 |
| 00-CI402 – Detail C1 – Underground duct bank looks like we will have to remove bollards. Does the VA want to reinstall bollards or have new bollards installed? Also, it looks like it’s going through some metal fence, can we remove a section of fence, or do we need to plan on demoing and reinstalling new? |
Any work which requires demolition of existing features must be replaced in kind. VA will assist with required field decisions during construction.
| 29 |
| 00-CI402 – Detail C1 – Duct bank route by bldg. 11 goes through a set of stairs and retaining wall can the VA provide more detail on this location, or can the VA provide an updated route? |
VA will work with GC for any field adjustments required during construction.
| 30 |
| Sheet 00-TS100 shows a sheet note 1 from bldg. 47 to bldg. 70T but drawing 00-CI400 does not show this route. Can the VA confirm which drawing is correct? |
See RFI 2 response new drawings issued. See Addendum 1 8-6-26 – updated in Amendment 0007
| 31 |
| 14-TN100 – Dose not show interior routing of A and B side fiber for bldg. 12, can the VA provide proposed routing? |
Refer to sheet note 4 on 12-TN101.
| 32 |
| Can the VA provide an asbestos report for this project? |
VA will supply current survey to GC when project is awarded.
| 33 |
| Please advise on the badging requirements to work onsite in the VA. |
VA will supply badging requirements to successful bidder. All personnel working at the Facility will be required to be badged.
| 34 |
| Can the VA provide a laydown area on site for the contractors? |
VA will coordinate with successful bidder for laydown areas at the facility.
| 35 |
| Please provide a list and manufacturer of the existing electrical gear onsite. |
VA uses all variety of electrical gear manufacturers. There is no proprietary supplier/vendor.
| 36 |
| 27 13 23 – Communications Optical Fiber Backbone Cabling |
Please confirm, will Maxcell innerduct be required for exterior underground cable pathways? Or is the contractor providing Maxcell innerduct in all interior fiber backbone conduit pathways?
Maxcell is not acceptable. see RFI 3.
| 37 |
| The Telecom Overview (New Work) table lists fiber for Bldg. 47 TRs (BB018, BC118, BF107, 1A137, 1B134, 2A246, 2B212, A301, A401, A501) as "Upgrade to 24ST OM4 and 12ST OS1," while the Existing Conditions table lists the same rooms as "Upgrade to 24ST OM4 and 12ST OS2." The Telecom Equipment Schedule specifies Corning model 024EU4-T4701D20, which is an OS2 cable, and all civil backbone notes specify OS2 singlemode. OS1 (tight-buffered) and OS2 (loose-tube) are distinct products with different installation characteristics. |
Confirm whether OS2 is the correct fiber type for all Bldg. 47 backbone runs. Contractor believes OS2 is the design intent.
Provide OS1 fiber for intrabuilding connection and OS2 fiber for interbuilding connection.
| 38 |
| 00-T001 Telecom Equipment Schedule: |
The following items list "None provided*" for Manufacturer and Model: CAT 6A Outlet Floor Mount; CAT 6A Outlet Wall Mount; Single Gang Workbox with Two Connector Chassis; Single Gang Workbox with One Connector Chassis. Footnote defers model selection to Contractor for A/E review. No minimum performance standard, acceptable manufacturer list, or specification section number is provided for Contractor to validate compliance. General Note 32 requires 4-port outlets but the schedule lists both 1- and 2-connector chassis options.
Provide minimum performance standard (e.g., TIA-568.2-D), acceptable manufacturers, and clarify 1-connector vs. 2-connector chassis selection criteria by location type.
Provide equipment per TIA standards. Connector type dependent on survey.
| 39 |
| 00-T001, General Note 19: |
General Note 19 states Buildings 47 and 62 are known critical locations requiring 24/7 uninterrupted data connectivity during construction, and that "Project COR to provide list of the remaining locations." This list has not been issued. Temporary data connections, switches, CAT6A cable, and fiber must be budgeted and scheduled for all critical locations.
Provide the complete list of critical locations prior to Notice to Proceed so Contractor can properly price and schedule temporary infrastructure.
Critical locations are Bldg 47 and 62.
| 40 |
| 00-GI003, Fire Protection Notes 7 and 9; NFPA 75 (2024), NFPA 2001 (2022): |
Fire Protection Note 7 requires automatic wet-pipe sprinkler systems "throughout including all demarc rooms, main computer rooms, and TRs." Note 9 requires clean agent fire suppression "for the main computer room and backup computer room when required by the VA Fire Protection Design Manual." NFPA 75 (2024), listed as a governing code, generally prohibits wet-pipe sprinklers over active IT equipment and requires clean agent or pre-action systems. The notes are mutually contradictory for the Data Center and Main Computer Room.
Confirm the required fire suppression system type for the Data Center (Bldg. 47, Room BC131B) and Backup Computer Room. Confirm whether wet-pipe, clean agent, or a pre-action/clean agent combination is the design intent, and which governs where a conflict The notes are not contradictory. The Data Center is required to comply with NFPA 75 requirements and will receive a clean agent suppression system, as well as a wet-pipe sprinkler system. NFPA 75 does not require the use of preaction sprinkler systems.
| 41 |
| 00-GI003, Asbestos Notes; Spec Sections 02 82 11, 02 82 13.19, 02 82 13.21: |
Drawing 00-GI003 identifies ACM in multiple buildings where telecom work is in scope and states, "The contractor should refer to the existing hazmat report maintained by the Station; no new hazmat report has been prepared as part of the project." Specific ACM locations are called out including Bldg. 47 Basement Room BF107 (floor tile/mastic), Bldg. 47 1st Floor 1H113 (black mastic), Bldg. 47 5th Floor A501 (floor tile/mastic), Bldg. 15 2nd Floor Room 211/213 (floor tile/mastic), and Bldg. 14 1st Floor Room 106 (floor tile). The referenced station hazmat report has not been included as a contract document.
Provide the existing ACM/hazmat survey report for all in-scope buildings.
See RFI 32.
| 42 |
| Confirm whether ACM disturbance in telecom pathway areas (conduit installation through walls/floors) is included in base scope or will be addressed as a differing site condition per FAR 52.236-2. |
See RFI 32.
| 43 |
| 00-E001, Power Equipment Schedule; 27 05 00: |
The Power Equipment Schedule shows three different UPS battery runtime requirements: (1) Data Center UPS (Xtreme Power M90U-140): 10 minutes at full load; (2) Rack-mount UPS for standard TRs (Vertiv ITA2-05KRT208C): 15 minutes at 100% load; (3) Rack-mount UPS for Buildings 70 & 73 (Eaton 9PX6KSP): optional extended battery with runtime noted as "verify with VA prior to installation." Spec Section 27 05 00 separately specifies a 1-hour minimum full-load UPS runtime for cabinet UPS systems, which conflicts with all drawing-specified runtimes.
Confirm the VA-required minimum battery runtime for (a) the Data Center UPS, (b) standard TR rack-mount UPS, and (c) Buildings 70 & 73 UPS. Confirm which requirement governs where the specification and drawings conflict.
- UPS battery runtimes shown on drawings were done in accordance with VA design guide documents.
- For (a), refer to Spec 26 33 53, paragraph 2.1.B. Data Center UPS to have 10-minute battery runtime.
- For (b) and (c), refer to Spec 27 11 26, paragraphs 2.2.H, 2.4.H, and 2.6.H. Rack-mounted UPS to have a minimum 10 minutes’ runtime at 70% load. This includes standard TR and TE rack-mount UPSs, and Buildings 70 & 73 UPSs.
- see Spec 27 05 00. See Addendum 1 8-6-26 – updated in Amendment 0007
| 44 |
| 00-GI003, General Notes 1–5; RFP 2.17: |
RFP Section 2.17 directs that all references to "bid" and "bidder" in specifications and drawings be replaced with "proposal" and "offeror." General Notes on Drawing 00-GI003 continue to use "bid" and "bidder" throughout (e.g., GN-1: "contractor should visit the site prior to bid"; GN-3: "no additional compensation will be considered after project has been awarded for failure to verify existing conditions”. The ambiguity affects whether site verification obligations applied pre-proposal or are a post-award risk assumption.
Confirm that General Notes 1 and 3 apply to the pre-proposal period and that contractor's price includes pre-proposal site verification. Confirm no additional risk is transferred post-award beyond what was verifiable pre-proposal.
We are conducting this procurement in accordance with FAR part 15. The correct term is proposal and not bid. The term bid is used in FAR part 14 procurements.
The awarded contract will be firm fixed price. Please see 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION) included in the solicitation.
| 45 |
| 00-T001, General Notes 24 and 25: |
GN-24 states "Copper horizontal cable distance of 262 ft used for basis of coverage of each telecom room for diamond study." GN-25 states "The maximum horizontal cable distance from the patch panel to any drop shall not exceed 295 ft." These two values are presented concurrently without clarifying the relationship between the design basis and the contractual maximum, creating scheduling and cost ambiguity for outlier runs between 262 ft and 295 ft.
Confirm whether (1) 262 ft is the TR placement design basis only, with 295 ft as the permitted field maximum, and (2) runs between 262–295 ft are compliant without prior COR approval, or whether additional TRs or COR-directed modifications are required.
The basis of 262 ft is the TR placement design basis only; the 295 ft requirement is the permitted field maximum.
| 46 |
| 47-MG601 (Mechanical Schedules); Spec Sections 23 81 00, 23 81 23: |
The Mini-Split Indoor/Outdoor Unit Schedules across all buildings (Bldg. 47, 15, 70) consistently specify refrigerant R32 for all Vertiv split systems. However, Spec Section 23 81 00 (Decentralized Unitary HVAC Equipment) calls for refrigerant R32 or R-454B, and Spec Section 23 81 23 (Computer-Room Air-Conditioners), Part 2.1.L for floor-mounted units specifies R-407C or R-410A, while Part 2.2.H for wall-mounted units also specifies R-407C or R-410A. R32, R-407C, R-410A, and R-454B are not interchangeable refrigerants and require different system components, charging procedures, and certifications. The basis-of-design equipment (Vertiv WLM/CUD series) uses R32, which conflicts with the spec-listed options for CRAC units.
Confirm the allowable refrigerant type(s) for (a) all mini-split TR systems (Vertiv WLM/CUD series) and (b) computer room air conditioning CRAC units (Liebert PX023 and DS105). Confirm whether R32 is acceptable for all systems or if alternative refrigerants are required for compliance with specifications.
The CRAC systems serving the new data center and the ductless mini-split systems serving the TRs shall meet the requirements of the 23 81 23 Computer-Room Air-Conditioners spec section. The ceiling cassette split system (47-IDU-BC143C & 47-ODU-BC143C) shall meet the requirements of the 23 81 00 Decentralized Unitary HVAC Equipment spec section.
Alternative options with different refrigerants are subject to engineering and COR approval. Refrigerants shall meet the recent EPA driven transition to GWP < 700.
| 47 |
| 47-MG601, Mini-Split Outdoor Unit Schedule: |
The Outdoor Unit Schedule for Bldg. 47 lists 47-ODU-BC118A and 47-ODU-BC118B with a voltage of "2080 V" rather than the expected 208V shown for all other ODUs in the same schedule. The basis-of-design equipment (Vertiv CUD070) is a 208V, 1-phase, 60Hz unit. All other ODUs in the schedule show 208V. This appears to be a typographical error but creates a discrepancy in the contract documents.
Confirm that 208V, 1-phase is the correct supply voltage for 47-ODU-BC118A and 47-ODU-BC118B, consistent with all other Vertiv CUD070 ODUs in the schedule.
Confirmed, 208V 1-Phase is the correct supply voltage.
| 48 |
| 47-PP403 Sheet Note 3 vs. 47-PP404 (referenced but not confirmed); Sheet Note 4 |
Sheet Note 3 on Drawing 47-PP403 states "3/4" CD discharging into mop sink from 47-IDU-A301 on floor above. See Sheet 1/47-PP404." Sheet Note 4 states "3/4" CD pumped up along refrigerant lineset up to roof. Pipe to spill into nearest roof drain. See 2/47-MP405 for location." These two notes describe two different condensate discharge paths for equipment serving upper-floor TRs, but it is not clear which path applies to which unit, whether both represent different units, or whether this represents a drawing coordination error.
Clarify the intended condensate drainage path for 47-IDU-A301 and 47-IDU-A401/A501. Confirm which units drain to the mop sink and which pump to the roof drain and reference the applicable detail sheets for each.
Condensate from 47-IDU-A301 intended to drain into mop sink within HAC 2E204 on floor below as noted on sheet 3/47-PP403.
Condensate from 47-IDU-A401 to drain into mop sink within HAC 4W418 as noted on sheet 2/47-PP404.
Condensate from 47-IDU-A501 to drain into mop sink within HAC 5W518 as noted on sheet 3/47-PP404.
| 49 |
| 47-EP601, 47-EP602, 47-EP603 (One-Line Diagrams and Panel Schedules): |
Sheet Note 6 on Drawing 47-EP602 states: "Contractor must field-verify the source of supply for existing data center UPS panel. If panel feeder is not sourced from panel C1, Contractor shall provide a new breaker on panel C1 and intercept the existing feeder so that UPS-B is powered via Panel C1." Panel C1 is rated 480Y/277V, 3-phase. UPS-B (Xtreme Power M90U-140) is a 208V, 3-phase, 4-wire unit per the Power Equipment Schedule. If the UPS-B is currently sourced from an existing 480V panel without a step-down transformer, a significant electrical system change would be required. The existing transformer T-UPS (150 KVA, 480V-208Y/120V) is shown feeding panel BC3, but the re-routing logic and voltage compatibility between C1 (480V) and UPS-B (208V input) is not clearly resolved on the drawings.
Clarify the intended source voltage for UPS-B and whether the existing transformer T-UPS remains in the circuit path between Panel C1 and UPS-B. If UPS-B requires
- See drawing 47-EP601 with sheet note #6 re-worded for better clarity. See Addendum 1 8-6-26 – updated in Amendment 0007
- To clarify: the voltages of all equipment shown on the one-line are correct. UPS-B will be fed from BC3, from the step-down transformer.
- Plan for the 480V feeder from Panel C1 to the “UPS DISC” which feeds the 150kVA transformer “T-UPS”. This transformer steps down to 208V to supply the UPS itself. Panel BC3 is 208V and is what directly feeds the UPS-B, and that is not changing.
| 50 |
| Is this project tax exempt for sales tax? |
Please see solicitation clause 52.229-3 and Special Notes
| 51 |
| 01 35 26 1.7 SSHO: can the SSHO dual hat as superintendent? |
Please follow requirements listed in the solicitation specifications and drawings.
| 52 |
| If the monthly inspections are required, can they be performed by our Corporate Safety Officer? |
Please follow requirements listed in the solicitation specifications and drawings.
| 53 |
| Spec section 01 45 00 3.4.B which identifies the qualifications required for the CQC Manager. According to this spec section “The CQC system Manager is required to be a graduate engineer, graduate architect, or a graduate construction manager, with a minimum of 5 years construction experience on construction similar to the scope of this Contract”. This statement would require an on-site person with a 4-year degree in either architecture, engineering, or construction management to be employed full-time, onsite, and for the duration of the project. This is typical of a US Army Corps of Engineer spec reserved for projects with much higher complexity and magnitude than this SDVOSB solicitation for the Department of Veterans Affairs. Enforcement of this spec would require creating an additional high paying position within the onsite staff, thereby increasing monthly overhead project cost to the Government on every project. Meeting this requirement in an industry that already has a significant shortage of labor resources will be both difficult to fill and costly to the project. Based on the size and complexity of this project, we respectfully request that this spec requirement be revised to add the statement “or a construction professional with a minimum of 7 years related work experience” at the end of the sentence quoted above. |
Please follow requirements listed in the solicitation specifications and drawings.
| 54 |
| 01 45 00 3.4 QCM: can the QCM dual hat as superintendent? |
Please follow requirements listed in the solicitation specifications and drawings.
| 55 |
| 01 81 13 3.1.A calls for building flushout procedures. With limited modifications limited to specific areas within the VA hospital, it does not seem as though the intent of the Government is to perform a full building flushout. Does the Government want a full building flush out for the hospital? |
Building 47 does not require a full building flush out.
| 56 |
| If no building flush out is needed for the hospital, will a building flush out be needed for the areas in which HVAC modifications occur under this contract? |
Since scope of this project is largely limited to the conditioning of telecom spaces: data center and telecom rooms, there is only 1 space that will require a flush out per spec 01 81 13 section 3.1(A). Perform flush out on Decommissioned TR BC143 in Bldg 47. No other spaces modified receive direct ventilation and thus should not require a flush out.
| 57 |
| 07 08 00 Facility Exterior Closure Commissioning is typically for testing new windows, doors, and exterior walls for new construction. Is building envelop testing needed for this project? |
Building Envelope Testing is not required.
| 58 |
| If Building envelop testing is needed for this project confirm what system are to be tested. |
See RFI 57.
| 59 |
| If Building envelop testing is needed for this project confirm if the Government or Contractor is responsible for this testing. |
See RFI 57.
| 60 |
| Are clean agent fire extinguishers needed at all TR rooms? |
Yes. See Fire Protection General Note in 00-GI003 for more detail.
| 61 |
| Please provide available life safety drawings, fire barrier drawings, smoke barrier drawings, or other documentation identifying existing rated wall assemblies throughout the project buildings. |
| All existing rated walls are captured in the drawing set. All partitions under the impact of the work must be field verified to identify the assemblies per project general notes in 00-GI003. |
| 62 |
| Are all data devices 1 for 1 replacement? |
Refer to drawings for device quantities.
| 63 |
| Please clearly identify all locations of existing data devices which are not getting replaced with a new data devices and will require wall/ceiling patching and painting. |
Refer to demolition plans which show full-tone hatched data drops of which are not to be replaced with new data devices.
| 64 |
| Please clearly identify all locations of new data device at new locations where there is not an existing data device getting replaced in kind. These will require new stub ups and wall patching and painting. |
Refer to demolition plans which show grayed-out hatched data drops as being reused. Data drops on new plans that are not in line with grayed-out drops on the demolition plans will be the locations of new data devices at new locations.
| 65 |
| Please provide a drop count matrix showing qty of data devices, total Length of CAT6 cabling and total length of fiber optic cabling for all buildings, floors, duct banks, etc. |
All non-CAT6A cable within scope is to be upgraded. Refer to general notes 4 on demo sheets:
4. The quantity of telecom drops to be removed, installed, and maintained is based on the information available at the time of design. Prior to construction, telecom drop locations shall be surveyed. Any discrepancies shall be provided to the DOR immediately.
| 66 |
| Are there any extra/spare devices, equipment or cabling required? |
General note 40 states to provide 10% spare.
| 67 |
| Are all existing wall penetrations to be reused? |
Only where applicable and if within rated assemblies patched according to code requirement.
| 68 |
| Please clearly identify all new wall penetrations needed. |
GC is responsible for reviewing drawings for scope and locations.
| 69 |
| Please clearly identify all existing raceways to be reused on this project. |
Refer to drawings for existing and new raceways.
| 70 |
| Please establish a fill ratio percentage for all existing raceways and penetrations. |
Refer to 00-T001 for cable tray and conduit fill ratios.
| 71 |
| There does not appear to be an analysis of fill ratio in existing pathways and penetrations to be reused. If the space capacity in existing raceways and penetration is above the required percentage will new raceway/penetrations be added via change order? |
If new cables exceed recommended fill ratio, please provide new cable tray in lieu of using existing cable tray.
| 72 |
| In the event existing cable trays are beyond the fill ratio can CAT6 be support using j-hooks? |
CAT 6 cabling not in scope for this project. Cable tray must be used in horizontal applications per specification 27 05 36.
| 73 |
| Are j-hooks acceptable pathways for all CAT6? |
See RFI 72.
| 74 |
| Is fiber optic inside of buildings required to be in cable trays above ceiling? |
See RFI 72.
| 75 |
| Is fiber optic within buildings required to be in conduit in wall and in crawlspace areas? |
Refer to drawings for use of conduit.
| 76 |
| Is armored fiber on j-hook acceptable in lieu of standard fiber in conduit or cable tray? |
See RFI 72.
| 77 |
| Is Fire alarm cabling required to be in rigid conduit? |
Yes, all fire alarm cabling must be installed in minimum ¾" rigid conduit per the specification and the VA Fire Protection Design Manual.
| 78 |
| Is PACS cabling required to be in rigid conduit? |
Install PACS wiring in dedicated raceway or approved cable tray. Unenclosed cable is permitted only in accessible ceilings and hollow gypsum-board partitions. Provide conduit through inaccessible ceilings, masonry/concrete walls, exterior locations, exposed areas, secure-side door penetrations, and from the door junction box to door devices.
| 79 |
| Is video surveillance cabling required to be in rigid conduit? |
Install video-surveillance cabling in dedicated conduit or cable tray. Provide conduit from the nearest approved cable pathway to each camera outlet or backbox and throughout hard-ceiling, inaccessible, or exposed locations.
| 80 |
| Is there any instance where fiber optic cabling can utilize j-hook pathways? |
See RFI 72.
| 81 |
| 07 84 00 1.5.B requires firestopping installer to have special FM 4991 or UL certification. Each firestopping manufacturer provides their own installer training. Will the VA accept the manufacturer installer certification in lieu of the FM or UL certification? |
VA will accept manufacturer installer training certs as part of the submittal process.
| 82 |
| Mechanical drawings require TempTrak sensors to "Integrate with VA's central monitoring system." |
Please provide the following:
i. Existing central monitoring system manufacturer.
ii. Existing monitoring platform.
iii. Communication protocol required for integration.
iv. Existing service provider responsible for programming and commissioning.
See RFI 6.
| 83 |
| What is the existing fire alarm system utilized on campus? |
See RFI 23.
| 84 |
| What company is required to perform the FA work? |
See RFI 23.
| 85 |
| What is the existing DDC system utilized on campus? |
See RFI 6, 24. The existing DDC manufacturer is Tridium Niagra.
| 86 |
| What company is required to perform the DDC work? |
See RFI 6, 24.
| 87 |
| What is the existing PACS system utilized on campus? |
Johnson Control (JCI) System is CCURE 9000.
| 88 |
| What company is required to perform the PACS work? |
There is no mandatory vendor. See RFI 87.
| 89 |
| What is the existing video surveillance system utilized on campus? |
See RFI 25.
| 90 |
| What company is required to perform the video surveillance work? |
See RFI 25.
| 91 |
| Are there any other proprietary systems included in the project? |
There are no proprietary systems. See RFI 6, 15, 19, 21, 23, 24, 25, 83, 85 and 87.
| 92 |
| If there are other proprietary systems provide the contacts for those proprietary contractors? |
See RFI 91.
| 93 |
| The building legend on sheet 00-GI001 includes Bldg 72, though Bldg 72 does not appear on any of the drawings. Is there any work to be done in Bldg 72? |
There is no work in Bldg 72. See 00-GI101 for the work scope.
| 94 |
| Please confirm that all General Contractors submitting a proposal for this project must be Service-Disabled Veteran Owned Small Business (SDVOSB). |
This solicitation is 100% set aside for SDVOSBs.
| 95 |
| Please confirm that contractors for the following spec sections are required to have BICSI Certified Installers: |
a. 28 05 00
b. 28 23 00
See spec.
| 96 |
| Please confirm that contractors for the following spec sections are required to have RCDD Designer: |
a. 27 05 00
b. 28 05 00
c. 28 13 00
d. 28 23 00
See spec.
| 97 |
| Specifically what areas of work must be done after hours: i.e., CAT6A office cutovers, specific shut downs, IT outages, demolition, abatement, etc. |
See RFI 22.
| 98 |
| Will the Government remove and/or relocated all furniture, equipment, etc in areas of work prior to the Contractor being construction in those areas? |
No.
| 99 |
| If the Government will not remove all furniture, equipment, etc, please clearly identify all rooms and equipment to be removed and/or relocated by the Contractor. |
See plans for existing equipment.
| 100 |
| It appears much of the new duct bank, especially those at buildings 2-9, are to be constructed parallel to existing duct bank. Please confirm this is correct. |
For clinical buildings, A and B fiber runs shall maintain 25’ of separation. New duct bank fiber runs to clinical buildings were offset 25’ off of the approximate locations of the existing duct bank where feasible.
| 101 |
| Does the existing duct bank get removed completely after new duct bank and telecom is operational or is it abandoned in place? |
Existing duct bank that is not designated to be reused under this EHRM project shall be abandoned in place.
| 102 |
| There does not appear to be a geotechnical report included with the bid documents. Please provide a geotechnical report showing soil conditions in all areas of disturbed ground. |
There is no geotechnical report.
| 103 |
| If a geotechnical report is not provided, will the Government consider adding a unit price requirement for removal, haul-away and disposal of encountered rock. |
No change to solicitation for rock.
| 104 |
| If a geotechnical report is not provided, typical dewatering at excavations will be included however, excessive dewater due to underground water sources will need to be handled as a change order. Please confirm. |
No change to the solicitation.
| 105 |
| Spec 02 82 11 1.4.B states under definition of Air Monitoring and Clearance Sample the final samples and air clearances inside and outside the regulated areas will be performed by the VPIH. Is this correct? |
See spec.
| 106 |
| Spec 02 82 11 2.2.A.1 states the Contractors IH Technician is responsible for air monitoring inside the regulated work areas. However, 2.2.A.2 states the VPIH shall perform air monitoring outside the regulated areas. Is this correct? |
See spec.
| 107 |
| Spec 02 82 11 2.2.B.1.a states the VPIH will perform background air levels before work begins. Is this correct? |
See spec.
| 108 |
| Is there required separation distances between fiber A and B or can the A and B Fiber runs in the same duct bank for all locations where they are side by side or entering a building? |
See RFI 100. For clinical buildings 2-7, 9, 47, 62, 70T and 73T, separate geodiverse pathways for A and B fiber runs are required. For non-clinical buildings 11, 12, 14 and 15, separate geodiverse A and B fiber runs are not required.
| 109 |
| Is there required separation distances between fiber A and B in duct banks and when entering a building, or can the A and B Fiber runs be in the same duct bank were feasible? |
See RFI 108.
| 110 |
| Please confirm that all existing CAT6 cabling associated with this project has to be removed and replaced. |
See RFI 65.
| 111 |
| If it is not feasible to run negative air exhaust to the exterior, confirm that negative air may be exhausted into spaces inside the building if: the exhaust air is scrubbed using Hepa filtration and exhaust air is monitored for particulates at the point of exhaust. |
See ICRA requirements in plans.
| 112 |
| At locations of roof patching, will the contractor be required to obtain inspections by the existing roofing manufacturer to warranty patches and replacements? |
Any roof work must be completed to maintain existing warranty.
| 113 |
| If contractor is performing non-dust creating activities can work be performed using plastic zip walls/doors in lieu of hard barriers? |
See Enlarged Plan Keynotes, “PROVIDE WALK OFF MATS AND PLASTIC SHEETING (VISQUEEN) AT CONSTRUCTION AREAS.” and find the demolition legend for walk off mats and plastic sheeting locations in enlarged demo plans. Areas with hard barriers planned in the drawing must be protected with hard barriers. Temporary partition locations have been noted in demo enlarged plans and partition detail is in 00-GC001.
| 114 |
| Regarding innerduct in duct banks, is Maxcell acceptable? |
Maxcell is not acceptable. See RFI 3.
| 115 |
| Please provide the most recent fire sprinkler flow tests. |
Design water supply information is provided on Sheet 00-FX001, which includes the results of the annual fire pump test in 2024.
| 116 |
| Spec 05 40 00 appears to delegate design of the cold formed metal studs to the contractor. Is this correct? |
See spec. Detail 10/ 00-S503 was provided where typical metal stud backing is required for equipment as needed.
| 117 |
| Are Starc panel ICRA barriers acceptable for all applications on this project? |
Yes, meet ICRA.
| 118 |
| Are cable tray dividers required to separate CAT6 cables for different systems? |
No.
| 119 |
| Are BIM drawings required for above ceiling coordination for any scope of work? |
BIM shop drawings are required from a mechanical contractor. See spec 23 05 11, section 1.4.G for requirements and further detail.
| 120 |
| It does not appear that all walls to be modified are identified as rated or non-rated. Please clearly identify all rated existing walls. |
See RFI 61.
| 121 |
| Please identify all concrete or masonry walls with new openings or infill. |
Sheet 00-S502 Shows details for typical openings or new walls. Locations of openings are by contractor based on field location where required.
| 122 |
| If there are concrete or masonry walls, what wall type is used to infill? |
Infill should match existing wall construction type.
| 123 |
| The only flooring specification section is for static resistive resinous flooring. Is there patching of existing flooring that is not static resistive resinous? |
Self-leveling compound where required and finish according to finish schedule.
| 124 |
| If there is existing floor patching please provide the type, brand, and model number/color of the existing flooring to be patched. |
See RFI 123.
| 125 |
| Does the seismic rating of these buildings require seismic restraints? |
Yes, follow requirements of ASCE 7
| 126 |
| Regarding rooms to receive HVAC modifications, is a pre and post TAB required? |
Pre-TAB not necessary. Post TAB is only necessary for return grilles in data center. See mechanical drawings sheet 1/MP401 for locations.
| 127 |
| Sheet 47-FX401 shows 7 tanks supplying the clean agent suppression system in the new MCR room for planning purposes only. How many tanks are actually needed? |
The clean agent suppression system is a delegated design item. As indicated in Sheet Note 1 on 47-FX108, a preliminary design estimate resulted in 2466 lb of NOVEC 1230, with 390 lb tanks for planning purposes. Clean agent suppression system subcontractor is responsible for final calculation of required agent volume.
| 128 |
| Does the main grounding conductor from base building panels to each busbar within the TR rooms have to be ran in a complete conduit system through the hospital? |
VA grounding system must be in accordance with TIA-607.
| 129 |
| Does the Fiber backbone within the hospital have to be in a complete conduit system or are J Hooks permitted? |
Fiber backbone must be in a complete conduit system.
| 130 |
| Note 8 on Drawing 09-TN100 states that “existing cable tray for horizontal distribution may be reused if existing cable tray is wire basket. Otherwise, new wire basket tray shall be provided. Contractor to confirm in the field.” Please confirm if ALL existing cable tray throughout the hallways of all buildings is currently wire basket tray and can be reused? |
| See RFI 71. |
| 131 |
| Please confirm the only new cable tray or wire basket tray required is what is shown on the drawings as new within the new TR and TE rooms. |
Please provide only new cable tray or wire basket tray shown as new on the drawings within the new TR and TE rooms.
| 132 |
| It is becoming increasingly difficult to obtain Past Performance Questionnaires from Federal Contracting Officers on a project-by-project basis when they have already completed a CPARS evaluation for us. Considering this, will Government consider allowing us to submit completed CPARS evaluation forms with our proposals in lieu of having our references send the provided PPQ? |
| We are not asking for past performance information in the proposal submission. |
| 133 |
| Due to the fact that this solicitation requires us to “hold” our pricing for 120 calendar days for acceptance and given the recent uncertainty in materials and labor costs; would the government consider including the FAR Clause 52.216-4, Economic Price Adjustment for Labor, and Material in this solicitation? |
No.
| 134 |
| The new administration has indicated that they intend to impose tariffs on many imported goods. Under the Buy American Act components of end products that are sold to the federal government can also be subject to tariffs. These tariffs will most likely cause a significant escalation in material and equipment prices at the time of implementation not only for imported goods, but also items produced domestically that compete with imported goods. Tariffs may also delay the receipt of material/equipment processing times at the ports of entry. The potential monetary and schedule impacts are impossible to quantify prior to any action being taken by the administration. If tariffs are instituted after award of a contract, will the Government provide relief through a contract modification for any unforeseen cost escalations and/or schedule delays created by tariffs? |
The awarded contract will be firm fixed price. Please see 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION) included in the solicitation.
| 135 |
| Is the new BAS intended to operate fully independent of the existing Computrols system, with no required integration? |
See RFI 6, 11, 24.
| 136 |
| Should new BAS, interface to the existing Computrols system (e.g., for alarm monitoring only) be included, or is the new system to be completely standalone unless otherwise directed? |
See RFI 6, 11, 24, 135.
| 137 |
| Sequencing Notes on sheet GI-004 state that no more than 3 telecom rooms can be down at a time. Sequencing notes on sheet GC-101 indicates no more than 2 telecom rooms can be down at a time. Please confirm which is correct. |
Both are correct dependent on GC developed baseline schedule.
| 138 |
| Drawing GI-003 - Asbestos notes indicates various types of Asbestos to expect to find in each building and references the applicable Asbestos specs for additional info. No actual qtys are provided on these drawings or the specs as is typical for Asbestos work on VA projects. Please provide actual qtys of asbestos containing materials that are to be removed along with type of material. This is needed for each building. An asbestos report will not be helpful in providing this info as the info included in these is usually general and not specific to a particular project. |
See RFI 32.
| 139 |
| Due to complexity of project and extreme amount of detail and paperwork required for the technical proposal, we request the bid be extended to end of July at minimum. |
See solicitation.
| 140 |