This solicitation is for a construction project to construct social work and consolidated clinic space at the Veterans Affairs Medical Center in Mather, California. Key details include that the project involves constructing new social work space and expanding existing clinical space. The solicitation number is 36C77622B0016 and the opportunity type listed is a solicitation. The contracting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The solicitation includes requirements for construction services to complete this project. The response due date and anticipated award date are not provided in this document.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual for
VISN 21
DESIGN SOCIAL WORK
AND
EXPAND CLINICAL SPACE
3551 FEMOYER STREET
MATHER, CALIFORNIA 95655
CONSTRUCTION DOCUMENT SUBMISSION
December 4, 2020
VOLUME 2
DENISE GROVES, NETWORK CONTRACTING OFFICER (NCO 21)
CONSTRUCTION TEAM II
3801 MIRANDA AVENUE
PALO ALTO, CA 94304
Project Number – 612‐163
Contract Number – VA261‐17‐C‐0044
Romanyk Consulting Corp. Copyright © 2016
PRIVILEGED AND CONFIDENTIAL PROPRIETARY INFORMATION
Design Social Work and Expand Clinical Space Mather, CA Project Number 612-163 December 04, 2020
PROJECT INDEX IDX - 1
DESIGN SOCIAL WORK
AND
EXPAND CLINICAL SPACE
PROJECT INDEX – VOLUME 1 and VOLUME 2
PROJECT INDEX - VOLUME 1
DIVISION SECTION SECTION TITLE PAGE
00 – SPECIAL SECTIONS
000000 Seals Page 1 - 1 Exterior Rendering 1 - 1 Interior Rendering 1 - 1 Finish Materials Board 1 - 1 Geotechnical Investigation Report, dated 10/2/2018 1 - 59
01 - GENERAL REQUIREMENTS
010000 General Requirements i - 20
013216.15 Project Schedules 1 - 10
013323 Shop Drawings 1 - 8 013526 Safety Requirements 1 - 28 014219 Reference Standards 1 - 10 014500 Quality Control 1 - 14 014529 Testing Laboratory Services 1 - 8 017419 Construction Waste 1 - 6 018113 Sustainable Construction 1 - 10
018113.01 Sustainability Certification Requirements (LEED NC V3) 1 - 4 019100 General Commissioning 1 - 58
02 – EXISTING CONDITIONS
024100 Demolition 1 - 4
03 – CONCRETE
033000 Cast-In-Place Concrete 1 - 28
04 – MASONRY
(NO WORK SPECIFIED IN THIS SECTION)
PROJECT INDEX IDX - 2
05 - METALS
051200 Structural Steel Framing 1 - 6 053100 Steel Decking 1 - 8 053600 Composite Metal Decking 1 - 6 054000 Cold Formed Metal Framing 1 - 6
06 – WOOD, PLASTIC AND COMPOSITES
061000 Rough Carpentry 1 - 8 062000 Finish Carpentry 1 - 10
07 - THERMAL AND MOISTURE PROTECTION
070800 Facility Exterior Closure Commissioning 1 - 4
071416.18 Fluid Applied Waterproofing Membrane System 1- 4
071900.18 Under-Slab Vapor Retarder 1 - 2
072113 Thermal Insulation 1 - 6 072200 Roof and Deck Insulation 1 - 6 072726 Fluid-Applied Membrane Air Barriers, Vapor Permeable 1 - 8
074200.18 Aluminum Composite Panels 1 - 8
074265.18 Thermal-Water-Air Resistant Barrier 1 - 14
075423 TPO Roofing 1 - 12
076000.18 Flashing and Sheet Metal 1 - 4
077100.18 Prefinished Metal Coping System 1 - 4
077200 Roof Accessories 1 - 6
077300.18 Type E Roof Scuttle 1 - 4
078100.18 Sprayed Fire-Resistive Materials 1 - 12
078160.18 Intumescent Paint 1 - 6
078400 Firestopping 1 - 6 079200 Joint Sealants 1 - 10
08 - OPENINGS
081113 Hollow Metal Door and Frames 1 - 8
082110.18 Plastic Laminate Doors 1 - 6
083400.18 Special Function Doors 1 - 4
084113 Aluminum Framed Entrances and Storefronts 1 - 10 084413 Glazed Aluminum Curtain Wall 1 - 18
084430.18 Glazed Alum. Curtain Wall (Basis of Design) 1 - 8
084530.18 Exterior Sun Control Devices 1 - 4
084600.18 Sliding Automatic Entrances 1 - 10
085653 Blast Resistant Windows 1 - 6 087100 Door Hardware 1 - 16
087100.18 Door Hardware (Basis of Design) 1 - 14
087101.18 Door Hardware Sets (Basis of Design) 1 - 10
087113 Automatic Door Operators 1 - 6 088000 Glazing 1 - 13
088000.18 Glazing (Basis of Design) 1 - 4
PROJECT INDEX IDX - 3
09 - FINISHES
090516 Subsurface Prep for Floors 1 - 6 090600 Schedule of Finishes 1 - 56
092226.18 Metal Suspension Systems 1 - 6
092400.18 Cement Plaster/Stucco 1 - 4
092900 Gypsum Board 1 - 8 093013 Ceramic/Porcelain Tiling 1 - 16
095100.18 Acoustical Tile Ceilings 1 - 8
096140.18 Modular Paver Warning Surfaces 1 - 4
096513 Resilient Base & Accessories 1 - 4 096516 Resilient Sheet Flooring – Linoleum Flooring 1 - 8 096800 Carpeting 1 - 8 099100 Painting 1 - 22
10 - SPECIALTIES
101400 Signage 1 - 10
102641.18 Bullet Resistant Panels 1 - 2
102650.18 Impact-Resistant Wall Protection 1 - 2
102800 Toilet and Bath Accessories 1 - 10 104413 Fire Extinguishers, Cabinets, and Accessories 1 - 2
105126.18 Solid Plastic Lockers 1- 4
107500 Flag Poles 1 - 4
11 - EQUIPMENT
(NO WORK SPECIFIED IN THIS SECTION)
12 - FURNISHINGS
122400 Window Shades 1 - 4
124840.18 “Basemat” Entrance Systems 1 - 4
13 - SPECIAL CONSTRUCTION
130541 Seismic Restraint for Non-structural Components 1 - 4
14 - CONVEYING SYSTEMS
142400 Hydraulic Elevator 1 - 36
142400.18 Hydraulic Elevator – Basis of Design 1 - 16
PROJECT INDEX IDX - 4
PROJECT INDEX - VOLUME 2
DIVISION SECTION SECTION TITLES PAGE
21 - FIRE SUPPRESSION
210800 Commissioning of Fire Suppression System 1 - 4 211313 Wet-Pipe Sprinkler Systems 1 - 10
22 - PLUMBING
220511 Common Work Results for Plumbing 1 - 22 220512 General Motor Requirements for Plumbing Equipment 1 - 6 220519 Meters and Gages for Plumbing Piping 1 - 6 220523 General Duty Valves for Plumbing Piping 1 - 10 220711 Plumbing Insulation 1 - 16 220800 Commissioning of Plumbing Systems 1 - 4 221100 Facility Water Distribution 1 - 10 221123 Domestic Water Pumps 1 - 8 221300 Facility Sanitary and Vent Piping 1 - 12 221400 Facility Storm Drainage 1 - 12 223400 Fuel Fired Domestic Water Heaters 1 - 14 224000 Plumbing Fixtures 1 - 10
23 -HEATING VENTILATING AND AIR CONDITIONING (Con’t)
230511 Common Work Results for HVAC 1 - 32 230541 Noise and Vibration Control for HVAC Piping 1 - 12 230593 Testing, Adjusting, and Balancing for HVAC 1 - 10 230711 HVAC and Boiler Plan Insulation 1 - 26 230800 Commissioning of HVAC Systems 1 - 3 230923 Direct-Digital Control System for HVAC 1 - 56 232113 Hydronic Piping 1 - 20 232123 Hydronic Pumps 1 - 8 232300 Refrigerant Piping 1 - 10 232500 HVAC Water Treatment 1 - 4 233100 HVAC Ducts and Casings 1 - 16 233400 HVAC Fans 1 - 6 233600 Air Terminal Units 1 - 6 233700 Air Outlets and Inlets 1 - 6 235225 Low-Pressure Water Heating Boilers 1 - 12 237413 Packaged, Outdoor, Central-Station AHUs 1 - 14
PROJECT INDEX IDX - 5
DIVISION 26 - ELECTRICAL
260511 Requirements for Electrical Installation 1 - 10 260519 Low-Voltage Electrical Power Conductors and Cables 1 - 6 260526 Grounding and Bonding for Electrical Systems 1 - 8 260533 Raceway and Boxes for Electrical Systems 1 - 10 260539 Underfloor Raceways for Electrical Systems 1 - 4 260541 Underground Electrical Construction 1- 8 260573 Overcurrent Protective Device Coord. Study 1 - 4 260800 Commissioning of Electrical Systems 1 - 4 260923 Lighting Controls 1 - 7 262200 Low-Voltage Transformers 1 - 4 262413 Distribution Switchboards 1 - 10 262416 Panelboards 1 - 6 262726 Wiring Devices 1 – 6 264100 Facility Lightning Protection 1 - 4 264313 Surge Protective Devices 1 - 4 265100 Interior Lighting 1 - 8 265600 Exterior Lighting 1 - 6
DIVISION 27 - COMMUNICATIONS
270511 Requirements for Communications Installations 1 - 34 270526 Grounding and Bonding for Communications 1 - 8 270533 Raceways and Boxes for Comm. Systems 1 - 12 270800 Commissioning of Comm Systems 1 - 3 271000 Control, Comms, and Signal Wiring 1 - 12 271100 Comms. Equipment Room Fittings 1 - 14 271500 Comms. Structured Cabling 1 - 18 275116 Public Address and Mass Notification Systems 1 - 44
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
280500 Common Work Results for Elect. Safety and Security 1 - 58 280513 Conductors & Cables for Electronic Safety and Security 1 - 12 280526 Grounding & Bonding for Electronic Safety and Security 1 - 8
280528.33 Conduits a& Backboxes for Electronic Safety and Security 1 - 14 280800 Commissioning of Electronic Safety and Security Systems 1 - 4 281300 Physical Access control System 1 - 86 281316 Physical Access Control System & Database Management 1 - 16 281600 Intrusion Detection System 1 - 22 282300 Video Surveillance 1 - 56 282600 Electronic Personal Protection System 1 - 16 283100 Fire Detection and Alarm 1 - 26
PROJECT INDEX IDX - 6
DIVISION 31 – EARTHWORK
312000 Earthwork 1 - 14
DIVISION 32 – EXTERIOR IMPROVEMENTS
320523 Cement and Concrete for Exterior Improvements 1 - 14 321216 Asphalt Paving 1 - 6 328400 Planting Irrigation 1 - 12 329000 Planting 1 - 18
DIVISION 33 – UTILITIES
330800 Commissioning of Site Utility Systems 1 - 4 331000 Water Utilities 1 - 18 333000 Sanitary Sewer 1 - 12
END OF INDEX
21 08 00 - 1
SECTION 21 08 00
COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
PART 1 – GENERAL
1.1 DESCRIPTION
A. The requirements of this Section apply to all sections of Division 21.
B. This project will have selected building systems commissioned. The complete list of equipment and systems to be commissioned is specified in Section 01 91 00 GENERAL
COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING
REQUIRMENTS. A Commissioning Agent (CxA) appointed by the VA will manage the commissioning process.
1.2 RELATED WORK
A. Section 01 00 00 GENERAL REQUIREMENTS.
B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.
C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
1.3 SUMMARY
A. This Section includes requirements for commissioning the Fire Suppression systems, subsystems and equipment. This Section supplements the general requirements specified in
Section 01 91 00 General Commissioning Requirements.
B. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all
Commissioning Team members.
1.4 DEFINITIONS
A. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for definitions.
1.5 COMMISSIONED SYSTEMS
A. Commissioning of a system or systems specified in Division 21 is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s
Operation and Maintenance personnel in accordance with the requirements of Section 01 91
00 and of Division 21, is required in cooperation with the VA and the Commissioning Agent.
21 08 00 - 2
B. The Fire Suppression systems commissioning will include the systems listed in Section 01 91
00 General Commissioning Requirements:
1.6 SUBMITTALS
A. The commissioning process requires review of selected Submittals. The Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01
33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.
B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in
Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.
PART 2 - PRODUCTS (NOT USED)
PART 3 – EXECUTION
3.1 CONSTRUCTION INSPECTIONS
A. Commissioning of the building fire suppression systems will require inspection of individual elements of the fire suppression construction throughout the construction period. The
Contractor shall coordinate with the Commissioning Agent in accordance with Section 01 91
00 and the Commissioning plan to schedule inspections as required to support the
Commissioning Process.
3.2 PRE-FUNCTIONAL CHECKLISTS
A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional
Performance Testing. The Commissioning Agent will prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists.
Completed checklists shall be submitted to the VA and to the Commissioning Agent for review. The Commissioning Agent may spot check a sample of completed checklists. If the
Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the Commissioning Agent determines that a significant
21 08 00 - 3 number of completed checklists for similar equipment are not accurate, the Commissioning
Agent will select a broader sample of checklists for review. If the Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the type of equipment will be returned to the Contractor for correction and resubmission. Refer to SECTION 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for submittal requirements for Pre-Functional Checklists, Equipment Startup Reports, and other commissioning documents.
3.3 CONTRACTORS TESTS
A. Contractor tests as required by other sections of Division 21 shall be scheduled and documented in accordance with Section 01 00 00 GENERAL REQUIREMENTS. All testing shall be incorporated into the project schedule. Contractor shall provide no less than 7 calendar days’ notice of testing. The Commissioning Agent will witness selected Contractor tests at the sole discretion of the Commissioning Agent. Contractor tests shall be completed prior to scheduling Systems Functional Performance Testing.
3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING
A. The Commissioning Process includes Systems Functional Performance Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions.
The Commissioning Agent will prepare detailed Systems Functional Performance Test procedures for review and approval by the COR. The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent will witness and document the testing. The Contractor shall sign the test reports to verify tests were performed. See Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS, for additional details.
3.5 TRAINING OF VA PERSONNEL
A. Training of the VA operation and maintenance personnel is required in cooperation with the
COR and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the requirements of Section 01 91 00. The instruction shall be scheduled in coordination with the COR after submission and approval of formal training
21 08 00 - 4 plans. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS and
Division 21 Sections for additional Contractor training requirements.
- - - E N D -
21 13 13 - 1
SECTION 21 13 13
WET-PIPE SPRINKLER
SYSTEMS
PART 1 – GENERAL
A. Design, installation and testing shall be in accordance with
1. NFPA 13.
B. The design and installation of a hydraulically calculated automatic wet-pipe system complete and ready for operation, for all portions of Building.
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Section 07 84 00, FIRESTOPPING.
C. Section 09 91 00, PAINTING.
D. Section 22 05 23, GENERAL-DUTY VALVES FOR PLUMBING PIPING.
E. Section 28 31 00, FIRE DETECTION AND ALARM.
1.3 DESIGN CRITERIA
A. Design Basis Information: Provide design, materials, equipment, installation, inspection, and testing of the automatic sprinkler system in accordance with the requirements of
NFPA 13.
1. Perform hydraulic calculations in accordance with NFPA 13 utilizing the Area/Density method. Do not restrict design area reductions permitted for using quick response sprinklers throughout by the required use of standard response sprinklers in the areas identified in this section.
2. Sprinkler Protection: Sprinkler hazard classifications shall be in accordance with NFPA 13.
The hazard classification examples of uses and conditions identified in the Annex of NFPA
13 shall be mandatory for areas not listed below. Request clarification from the
Government for any hazard classification not identified. To determining spacing and sizing, apply the following coverage classifications:
a. Light Hazard Occupancies: Patient care, treatment, and customary access areas.
b. Ordinary Hazard Group 1 Occupancies: Laboratories, Mechanical Equipment
Rooms, Transformer Rooms, Electrical Switchgear Rooms, Electric Closets, and
Repair Shops.
c. Ordinary Hazard Group 2 Occupancies: Storage rooms, trash rooms, clean and soiled linen rooms, pharmacy and associated storage, laundry, kitchens, kitchen storage
21 13 13 - 2 areas, retail stores, retail store storage rooms, storage areas, building management storage, boiler plants, energy centers, warehouse spaces, file storage areas for the entire area of the space up to 140 square meters (1500 square feet) and Supply
Processing and Distribution (SPD).
3. Hydraulic Calculations: Calculated demand including hose stream requirements shall fall no less than 10 percent below the available water supply curve.
4. Water Supply: Contractor to obtain.
5. Zoning:
a. For each sprinkler zone provide a control valve, flow switch, and a test and drain assembly with pressure gauge. For buildings greater than two stories, provide a check valve at each control valve.
b. Sprinkler zones shall conform to the smoke barrier zones shown on the drawings.
6. Provide seismic protection in accordance with NFPA 13. Contractor shall submit load calculations for sizing of sway bracing for systems that are required to be protected against damage from earthquakes.
1.4 SUBMITTALS
A. Submit as one package in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level
III or Level IV Sprinkler Technician or stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering. As the Government review is for technical adequacy only, the installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation. Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders and provide an index referencing the appropriate specification section. In addition to the hard copies, provide submittal items in Paragraphs
1.4(A)1 through 1.4(A)5 electronically in pdf format on a compact disc or as directed by the
COR. Submittals shall include, but not be limited to, the following:
1. Qualifications:
a. Provide a copy of the installing contractors fire sprinkler and state contractor’s license.
b. Provide a copy of the NICET certification for the NICET Level III or Level IV Sprinkler
Technician who prepared and signed the detailed working drawings unless the drawings are stamped by a Registered Professional Engineer licensed in the field of
Fire Protection Engineering.
c. Provide documentation showing that the installer has been actively and successfully engaged in the installation of commercial automatic sprinkler systems
21 13 13 - 3 for the past ten years.
2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to the Plans and Calculations chapter of NFPA 13. Drawings shall include graphical scales that allow the user to determine lengths when the drawings are reduced in size.
Include a plan showing the piping to the water supply test location.
3. Manufacturer’s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet.
4. Calculation Sheets:
a. Submit hydraulic calculation sheets in tabular form conforming to the requirements and recommendations of the Plans and Calculations chapter of NFPA 13.
b. Submit calculations of loads for sizing of sway bracing in accordance with NFPA 13.
5. Valve Charts: Provide a valve chart that identifies the location of each control valve.
Coordinate nomenclature and identification of control valves with COR. Where existing nomenclature does not exist, the chart shall include no less than the following: Tag ID
No., Valve Size, Service (control valve, main drain, aux. drain, inspectors test valve, etc.), and Location.
6. Final Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in Section 01 33 23, SHOP
DRAWINGS, PRODUCT DATA, AND SAMPLES. In addition, submittals shall include, but not be limited to, the following:
a. A complete set of as-built drawings showing the installed system with the specific interconnections between the system switches and the fire alarm equipment. Provide a complete set in the formats as follows. Submit items 2 and 3 below on a compact disc or as directed by the COR.
1) One full size (or size as directed by the COR) printed copy.
2) One complete set in electronic pdf format.
3) One complete set in AutoCAD format or a format as directed by the COR.
b. Material and Testing Certificate: Upon completion of the sprinkler system installation or any partial section of the system, including testing and flushing, provide a copy of a completed Material and Testing Certificate as indicated in NFPA 13. Certificates shall be provided to document all parts of the installation.
c. Operations and Maintenance Manuals that include step-by-step procedures required for system startup, operation, shutdown, and routine maintenance and testing. The manuals shall include the manufacturer's name, model number, parts list, and tools that should be kept in stock by the owner for routine maintenance, including the name
21 13 13 - 4 of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization, including address and telephone number, for each item of equipment
d. One paper copy of the Material and Testing Certificates and the Operations and
Maintenance Manuals above shall be provided in a binder. In addition, these materials shall be provided in pdf format on a compact disc or as directed by the
COR.
e. Provide one additional copy of the Operations and Maintenance Manual covering the system in a flexible protective cover and mount in an accessible location adjacent to the riser or as directed by the COR.
1.5 QUALITY ASSURANCE
A. Installer Reliability: The installer shall possess a valid State of California fire sprinkler contractor's license. The installer shall have been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.
B. Materials and Equipment: All equipment and devices shall be of a make and type listed by UL or approved by FM, or other nationally recognized testing laboratory for the specific purpose for which it is used. All materials, devices, and equipment shall be approved by the VA. All materials and equipment shall be free from defect. All materials and equipment shall be new unless specifically indicated otherwise on the contract drawings.
1.6 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced.
The publications are referenced in the text by the basic designation only.
B. National Fire Protection Association (NFPA):
13-13 .......................................... Installation of Sprinkler Systems
25-14 .......................................... Inspection, Testing, and Maintenance of Water-Based Fire
Protection
Systems 101-15 .......................... Life Safety Code
170-15 ........................................ Fire Safety Symbols
C. Underwriters Laboratories, Inc. (UL):
Fire Protection Equipment Directory (2011)
D. Factory Mutual Engineering Corporation
(FM): Approval Guide
PART 2 - PRODUCTS
21 13 13 - 5
2.1 PIPING & FITTINGS
A. Piping and fittings for private underground water mains shall be in accordance with NFPA 13.
1. Pipe and fittings from inside face of building 300 mm (12 in.) above finished floor to a distance of approximately 1500 mm (5 ft.) outside building: Ductile Iron, flanged fittings and 316 stainless steel bolting.
B. Piping and fittings for sprinkler systems shall be in accordance with NFPA 13.
1. Plain-end pipe fittings with locking lugs or shear bolts are not permitted.
2. Piping sizes 50 mm (2 inches) and smaller shall be black steel Schedule 40 with threaded end connections.
3. Piping sizes 65 mm (2 ½ inches) and larger shall be black steel Schedule 10 with grooved connections. Grooves in Schedule 10 piping shall be rolled grooved only.
4. Plastic piping shall not be permitted except for drain piping.
5. Flexible sprinkler hose shall be FM Approved and limited to hose with threaded end fittings with a minimum inside diameter or 1-inch and a maximum length of 6-feet.
2.2 VALVES
A. General:
1. Valves shall be in accordance with NFPA 13.
2. Do not use quarter turn ball valves for 50 mm (2 inch) or larger drain valves.
B. Control Valve: The control valves shall be a listed indicating type. Control valves shall be
UL Listed or FM Approved for fire protection installations. System control valve shall be rated for normal system pressure but in no case less than 175 PSI.
C. Check Valve: Shall be of the swing type with a flanged cast iron body and flanged inspection plate.
D. Automatic Ball Drips: Cast brass 20 mm (3/4 inch) in-line automatic ball drip with both ends threaded with iron pipe threads.
E. Alarm Check Valve: Alarm check valve shall be UL Listed and Factory Mutual Approved. The alarm check valve shall be listed for installation in the vertical or horizontal position. The alarm check valve shall be equipped with a removable cover assembly, gauge connections on the system side and supply side of the valve clapper, variable pressure trim, and an external bypass to eliminate false water flow alarms. The alarm check valve trim piping shall be galvanized. Maximum water working pressure to 250 PSI.
2.3 FIRE DEPARTMENT SIAMESE CONNECTION
A. Brass, exterior fire department connection with brass escutcheon plate, and a minimum of two
65 mm (2-1/2 inch) connections threaded to match those on the local fire protection service, with polished brass caps and chains. Provide escutcheon with integral raised letters
21 13 13 - 6
"Automatic Sprinkler"
2.4 SPRINKLERS
A. All sprinklers shall be FM approved quick response except “institutional” type sprinklers shall be permitted to be UL Listed quick response. Provide FM approved quick response sprinklers in all areas, except that standard response sprinklers shall be provided in freezers, refrigerators, elevator hoistways, elevator machine rooms, and generator rooms.
B. Temperature Ratings: In accordance with NFPA 13 except that sprinklers in elevator shafts and elevator machine rooms shall be no less than intermediate temperature rated and sprinklers in generator rooms shall be no less than high temperature rated.
C. Provide sprinkler guards in accordance with NFPA 13 and when the elevation of the sprinkler head is less than 7 feet 6 inches above finished floor. The sprinkler guard shall be UL listed or
FM approved for use with the corresponding sprinkler.
2.5 SPRINKLER CABINET
A. Provide sprinkler cabinet with the required number of sprinkler heads of all ratings and types installed, and a sprinkler wrench for each type of sprinkler in accordance with NFPA 13.
Locate adjacent to the riser.
B. Provide a list of sprinklers installed in the property in the cabinet. The list shall include the following:
1. Manufacturer, model, orifice, deflector type, thermal sensitivity, and pressure for each type of sprinkler in the cabinet.
2. General description of where each sprinkler is used.
3. Quantity of each type present in the cabinet.
4. Issue or revision date of list.
2.6 SPRINKLER SYSTEM SIGNAGE
A. Rigid plastic, steel or aluminum signs with white lettering on a red background with holes for easy attachment. Sprinkler system signage shall be attached to the valve or piping with chain.
2.7 SWITCHES:
A. OS&Y Valve Supervisory Switches shall be in a weatherproof die cast/red baked enamel, oil resistant, aluminum housing with tamper resistant screws, 13 mm (1/2 inch) conduit entrance and necessary facilities for attachment to the valves. Provide two SPDT switches rated at 2.5 amps at 24 VDC.
B. Water flow Alarm Switches: Mechanical, non-coded, non-accumulative retard and adjustable
21 13 13 - 7 from 0 to 60 seconds minimum. Set flow switches at an initial setting between 20 and 30 seconds.
C. Alarm Pressure Switches: Activation by any flow of water equal to or in excess of the discharge from one sprinkler. The alarm pressure switch shall be UL Listed or Factory Mutual Approved for the application in which it is used. Activation of the alarm pressure switch shall cause an alarm on the fire alarm system control unit.
D. Valve Supervisory Switches for Ball and Butterfly Valves: May be integral with the valve.
2.8 GAUGES
A. Provide gauges as required by NFPA 13. Provide gauges where the normal pressure of the system is at the midrange of the gauge.
2.9 PIPE HANGERS, SUPPORTS AND RESTRAINT OF SYSTEM PIPING
A. Pipe hangers, supports, and restraint of system piping shall be in accordance with NFPA 13.
2.10 WALL, FLOOR AND CEILING PLATES
A. Provide chrome plated steel escutcheon plates.
2.11 ANTIFREEZE SOLUTION
A. Antifreeze solution shall be in accordance with NFPA 13 and shall be compatible with use in a potable water supply.
2.12 VALVE TAGS
A. Engraved black filled numbers and letters not less than 15 mm (1/2 inch) high for number designation, and not less than 8 mm (1/4 inch) for service designation on 19 gage, 40 mm (1-
1/2 inches) round brass disc, attached with brass "S" hook, brass chain, or nylon twist tie.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installation shall be accomplished by the licensed contractor. Provide a qualified technician, experienced in the installation and operation of the type of system being installed, to supervise the installation and testing of the system.
B. Installation of Piping: Accurately cut pipe to measurements established by the installer and work into place without springing or forcing. In any situation where bending of the pipe is required, use a standard pipe-bending template. Concealed piping in spaces that have finished ceilings.
21 13 13 - 8
Where ceiling mounted equipment exists, such as in operating and radiology rooms, install sprinklers so as not to obstruct the movement or operation of the equipment. Sidewall heads may need to be utilized. In stairways, locate piping as near to the ceiling as possible to prevent tampering by unauthorized personnel and to provide a minimum headroom clearance of 2250 mm (seven feet six inches). Piping shall not obstruct the minimum means of egress clearances required by NFPA 101. Pipe hangers, supports, and restraint of system piping, and seismic bracing shall be installed accordance with NFPA 13.
C. Welding: Conform to the requirements and recommendations of NFPA 13.
D. Drains: Provide drips and drains, including low point drains, in accordance with NFPA 13. Pipe drains to discharge at safe points outside of the building or to sight cones attached to drains of adequate size to readily carry the full flow from each drain under maximum pressure. Do not provide a direct drain connection to sewer system or discharge into sinks. Install drips and drains where necessary and required by NFPA 13. The drain piping shall not be restricted or reduced and shall be of the same diameter as the drain collector.
E. Supervisory Switches: Provide supervisory switches for sprinkler control valves.
F. Waterflow Alarm Switches: Install waterflow alarm switches and valves in stairwells or other easily accessible locations.
G. Inspector's Test Connection: Install and supply in accordance with NFPA 13, locate in a secured area, and discharge to the exterior of the building.
H. Affix cutout disks, which are created by cutting holes in the walls of pipe for flow switches and non-threaded pipe connections to the respective waterflow switch or pipe connection near to the pipe from where they were cut.
I. Provide escutcheon plates for exposed piping passing through walls, floors or ceilings.
J. Clearances: For systems requiring seismic protection, piping that passes through floors or walls shall have penetrations sized 50 mm (2 inches) nominally larger than the penetrating pipe for pipe sizes 25 mm (1 inch) to 90 mm (3 ½ inches) and 100 mm (4 inches) nominally larger for penetrating pipe sizes 100 mm (4 inches) and larger.
K. Sleeves: Provide for pipes passing through masonry or concrete. Provide space between the pipe and the sleeve in accordance with NFPA 13. Seal this space with a UL Listed through penetration fire stop material in accordance with Section 07 84 00, FIRESTOPPING. Where core drilling is used in lieu of sleeves, also seal space. Seal penetrations of walls, floors and ceilings of other types of construction, in accordance with Section 07 84 00, FIRESTOPPING.
L. Provide pressure gauges at each water flow alarm switch location and at each main drain connection.
M. For each fire department connection, provide the symbolic sign given in NFPA 170 and locate
2400 to 3000 mm (8 to 10 feet) above each connection location. Size the sign to 450 by 450 mm (18 by 18 inches) with the symbol being at least 350 by 350 mm (14 by 14 inches).
21 13 13 - 9
N. Firestopping shall be provided for all penetrations of fire resistance rated construction. Firestopping shall comply with Section 07 84 00, FIRESTOPPING.
O. Painting of Pipe: In finished areas where walls and ceilings have been painted, paint primed surfaces with two coats of paint to match adjacent surfaces, except paint valves and operating accessories with two coats of gloss red enamel. Exercise care to avoid painting sprinklers. Painting of sprinkler systems above suspended ceilings and in crawl spaces is not required. Painting shall comply with Section 09 91 00, PAINTING. Any painted sprinkler shall be replaced with a new sprinkler.
P. Sprinkler System Signage: Provide rigid sprinkler system signage in accordance with NFPA
13 and NFPA 25. Sprinkler system signage shall include, but not limited to, the following:
1. Identification Signs:
a. Provide signage for each control valve, drain valve, sprinkler cabinet, and inspector’s test.
b. Provide valve tags for each operable valve. Coordinate nomenclature and identification of operable valves with COR. Where existing nomenclature does not exist, the Tag
Identification shall include no less than the following: (FP-B-F/SZ-#) Fire Protection, Building Number, Floor Number/Smoke Zone (if applicable), and Valve Number. (E.g., FP-500-1E-001) Fire Protection, Building 500, First Floor East, Number 001.)
2. Instruction/Information Signs:
a. Provide signage for each control valve to indicate valve function and to indicate what system is being controlled.
b. Provide signage indicating the number and location of low point drains.
3. Hydraulic Placards:
a. Provide signage indicating hydraulic design information. The placard shall include location of the design area, discharge densities, required flow and residual pressure at the base of riser, occupancy classification, hose stream allowance, flow test information, and installing contractor. Locate hydraulic placard information signs at each alarm check valve.
S. Repairs: Repair damage to the building or equipment resulting from the installation of the sprinkler system by the installer at no additional expense to the Government.
T. Interruption of Service: There shall be no interruption of the existing sprinkler protection, water, electric, or fire alarm services without prior permission of the Contracting Officer.
Contractor shall develop an interim fire protection program where interruptions involve occupied spaces. Request in writing at least one week prior to the planned interruption.
3.2 INSPECTION AND TEST
A. Preliminary Testing: Flush newly installed systems prior to performing hydrostatic tests in order
21 13 13 - 10 to remove any debris which may have been left as well as ensuring piping is unobstructed.
Hydrostatically test system, including the fire department connections, as specified in NFPA 13, in the presence of the Contracting Officers Representative (COR) or his designated representative. Test and flush underground water line prior to performing these hydrostatic tests.
B. Final Inspection and Testing: Subject system to tests in accordance with NFPA 13, and when all necessary corrections have been accomplished, advise COR to schedule a final inspection and test. Connection to the fire alarm system shall have been in service for at least ten days prior to the final inspection, with adjustments made to prevent false alarms. Furnish all instruments, labor and materials required for the tests and provide the services of the installation foreman or other competent representative of the installer to perform the tests.
Correct deficiencies and retest system as necessary, prior to the final acceptance. Include the operation of all features of the systems under normal operations in test
3.3 INSTRUCTIONS
A. Furnish the services of a competent instructor for not less than two hours for instructing personnel in the operation and maintenance of the system, on the dates requested by the
COR.
- - - E N D - - -
22 05 11 - 1
SECTION 22 05 11
COMMON WORK RESULTS FOR PLUMBING
PART 1 - GENERAL
A. The requirements of this Section shall apply to all sections of Division 22.
B. Definitions:
1. Exposed: Piping and equipment exposed to view in finished rooms.
C. Abbreviations/Acronyms:
1. ABS: Acrylonitrile Butadiene Styrene
2. AC: Alternating Current
3. ACR: Air Conditioning and Refrigeration
4. AI: Analog Input
5. AISI: American Iron and Steel Institute
6. AO: Analog Output
7. AWG: American Wire Gauge
8. BACnet: Building Automation and Control Network
9. BAg: Silver-Copper-Zinc Brazing Alloy
10. BAS: Building Automation System
11. BCuP: Silver-Copper-Phosphorus Brazing Alloy
12. BSG: Borosilicate Glass Pipe
13. CDA: Copper Development Association
14. C: Celsius
15. CLR: Color
16. CO: Carbon Monoxide
17. COR: Contracting Officer’s Representative
18. CPVC: Chlorinated Polyvinyl Chloride
19. CR: Chloroprene
20. CRS: Corrosion Resistant Steel
21. CWP: Cold Working Pressure
22. CxA: Commissioning Agent
23. db(A): Decibels (A weighted)
24. DDC: Direct Digital Control
25. DI: Digital Input
26. DISS: Diameter Index Safety System
27. DO: Digital Output
28. DVD: Digital Video Disc
29. DN: Diameter Nominal
22 05 11 - 2
30. DWV: Drainage, Waste and Vent
31. ECC: Engineering Control Center
32. EPDM: Ethylene Propylene Diene Monomer
33. EPT: Ethylene Propylene Terpolymer
34. ETO: Ethylene Oxide
35. F: Fahrenheit
36. FAR: Federal Acquisition Regulations
37. FD: Floor Drain
38. FED: Federal
39. FG: Fiberglass
40. FNPT: Female National Pipe Thread
41. FPM: Fluoroelastomer Polymer
42. GPM: Gallons Per Minute
43. HDPE: High Density Polyethylene
44. Hg: Mercury
45. HOA: Hands-Off-Automatic
46. HP: Horsepower
47. HVE: High Volume Evacuation
48. ID: Inside Diameter
49. IPS: Iron Pipe Size
50. Kg: Kilogram
51. kPa: Kilopascal
52. lb: Pound
53. L/s: Liters Per Second
54. L/min: Liters Per Minute
55. MAWP: Maximum Allowable Working Pressure
56. MAX: Maximum
57. MED: Medical
58. m: Meter
59. MFG: Manufacturer
60. mg: Milligram
61. mg/L: Milligrams per Liter
62. ml: Milliliter
63. mm: Millimeter
64. MIN: Minimum
65. NF: Oil Free Dry (Nitrogen)
66. NPTF: National Pipe Thread Female
22 05 11 - 3
67. NPS: Nominal Pipe Size
68. NPT: Nominal Pipe Thread
69. OD: Outside Diameter
70. OSD: Open Sight Drain
71. OS&Y: Outside Stem and Yoke
72. OXY: Oxygen
73. PBPU: Prefabricated Bedside Patient Units
74. PH: Power of Hydrogen
75. PLC: Programmable Logic Controllers
76. PP: Polypropylene
77. PPM: Parts per Million
78. PSIG: Pounds per Square Inch
79. PTFE: Polytetrafluoroethylene
80. PVC: Polyvinyl Chloride
81. PVDF: Polyvinylidene Fluoride
82. RAD: Radians
83. RO: Reverse Osmosis
84. RPM: Revolutions Per Minute
85. RTRP: Reinforced Thermosetting Resin Pipe
86. SCFM: Standard Cubic Feet Per Minute
87. SDI: Silt Density Index
88. SPEC: Specification
89. SPS: Sterile Processing Services
90. STD: Standard
91. SUS: Saybolt Universal Second
92. SWP: Steam Working Pressure
93. TEFC: Totally Enclosed Fan-Cooled
94. TFE: Tetrafluoroethylene
95. THHN: Thermoplastic High-Heat Resistant Nylon Coated Wire
96. THWN: Thermoplastic Heat & Water Resistant Nylon Coated Wire
97. T/P: Temperature and Pressure
98. USDA: U.S. Department of Agriculture
99. V: Volt
100. VAC: Vacuum
101. VA: Veterans Administration
102. VAMC: Veterans Administration Medical Center
103. VAC: Voltage in Alternating Current
22 05 11 - 4
104. WAGD: Waste Anesthesia Gas Disposal
105. WOG: Water, Oil, Gas
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
C. Section 01 74 19, CONSTRUCTION WASTE MANAGEMENT.
D. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.
E. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.
F. Section 05 31 00, STEEL DECKING: Building Components for Attachment of Hangers.
G. Section 05 36 00, COMPOSITE METAL DECKING: Building Components for Attachment of
Hangers.
H. Section 07 84 00, FIRESTOPPING.
I. Section 07 92 00, JOINT SEALANTS.
J. Section 09 91 00, PAINTING.
K. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS.
L. Section 22 05 12, GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT.
M. Section 22 07 11, PLUMBING INSULATION.
N. Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.
O. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
P. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES.
1.3 APPLICABLE PUBLICATIONS
A. The publications listed below shall form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society of Mechanical Engineers (ASME):
ASME Boiler and Pressure Vessel Code -
BPVC Section IX-2013 ............... Welding, Brazing, and Fusing Qualifications
B31.1-2012 ................................. Power Piping
C. American Society for Testing and Materials (ASTM):
A36/A36M-2012 ......................... Standard Specification for Carbon Structural Steel
A575-96(R2013)e1 ..................... Standard Specification for Steel Bars, Carbon, Merchant Quality, M-Grades
E84-2013a .................................. Standard Test Method for Surface Burning Characteristics of
Building Materials
E119-2012a ................................ Standard Test Methods for Fire Tests of Building Construction and Materials
22 05 11 - 5
F1760-01(R2011) ....................... Standard Specification for Coextruded Poly(Vinyl Chloride)
(PVC) Non-Pressure Plastic Pipe Having Reprocessed-Recycled
Content
D. International Code Council, (ICC):
IBC-2012 .................................... International Building Code
IPC-2012 .................................... International Plumbing Code
E. Manufacturers Standardization Society (MSS) of the Valve and Fittings Industry, Inc:
SP-58-2009 ................................ Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application and Installation
SP-69-2003 ................................ Pipe Hangers and Supports - Selection and Application
F. Military Specifications (MIL):
P-21035B ................................... Paint High Zinc Dust Content, Galvanizing Repair (Metric)
G. National Electrical Manufacturers Association (NEMA):
MG 1-2011 ................................. Motors and Generators
H. National Fire Protection Association (NFPA):
51B-2014 .................................... Standard for Fire Prevention During Welding, Cutting and Other
Hot Work
54-2012 ...................................... National Fuel Gas Code
70-2014 ...................................... National Electrical Code (NEC)
I. NSF International (NSF):
5-2012 ........................................ Water Heaters, Hot Water Supply Boilers, and Heat Recovery
Equipment
14-2012 ...................................... Plastic Piping System Components and Related Materials
61-2012 ...................................... Drinking Water System Components – Health Effects
372-2011 .................................... Drinking Water System Components – Lead Content
J. Department of Veterans Affairs (VA):
PG-18-10 .................................... Plumbing Design Manual
PG-18-13-2011 .......................... Barrier Free Design Guide
1.4 SUBMITTALS
A. Submittals, including number of required copies, shall be submitted in accordance with Section
01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES.
B. Information and material submitted under this section shall be marked "SUBMITTED UNDER
SECTION 22 05 11, COMMON WORK RESULTS FOR PLUMBING", with applicable paragraph identification.
C. Contractor shall make all necessary field measurements and investigations to assure that the equipment and assemblies will meet contract requirements and will fit the space available.
22 05 11 - 6
D. If equipment is submitted which differs in arrangement from that shown, provide drawings that show the rearrangement of all associated systems. Approval will be given only if all features of the equipment and associated systems, including accessibility, are equivalent to that required by the contract.
E. Prior to submitting shop drawings for approval, contractor shall certify in writing that manufacturers of all major items of equipment have each reviewed drawings, specifications, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation.
F. Installing Contractor shall provide lists of previous installations for selected items of equipment.
Contact persons who will serve as references, with telephone numbers and e-mail addresses shall be submitted with the references.
G. Manufacturer's Literature and Data: Manufacturer’s literature shall be submitted under the pertinent section rather than under this section.
1. Electric motor data and variable speed drive data shall be submitted with the driven equipment.
2. Equipment and materials identification.
3. Firestopping materials.
4. Hangers, inserts, supports and bracing. Provide load calculations for variable spring and constant support hangers.
5. Wall, floor, and ceiling plates.
H. Submittals and shop drawings for interdependent items, containing applicable descriptive information, shall be furnished together and complete in a group. Coordinate and properly integrate materials and equipment in each group to provide a completely compatible and efficient installation. Final review and approvals will be made only by groups.
I. Coordination Drawings: Complete consolidated and coordinated layout drawings shall be submitted for all new systems, and for existing systems that are in the same areas. The drawings shall include plan views, elevations and sections of all systems and shall be on a scale of not less than 1:32 (3/8 inch equal to one foot). Clearly identify and dimension the proposed locations of the principal items of equipment. The drawings shall clearly show the proposed location and adequate clearance for all equipment, controls, piping, pumps, valves and other items. All valves, trap primer valves, water hammer arrestors, strainers, and equipment requiring service shall be provided with an access door sized for the complete removal of plumbing device, component, or equipment. Equipment foundations shall not be installed until equipment or piping layout drawings have been approved. Detailed layout drawings shall be provided for all piping systems. In addition, details of the following shall be provided.
1. Mechanical equipment rooms.
2. Interstitial space.
22 05 11 - 7
3. Hangers, inserts, supports, and bracing.
4. Pipe sleeves.
5. Equipment penetrations of floors, walls, ceilings, or roofs.
J. Maintenance Data and Operating Instructions:
1. Maintenance and operating manuals in accordance with Section 01 00 00, GENERAL
REQUIREMENTS, Article, INSTRUCTIONS, for systems and equipment. Include complete list indicating all components of the systems with diagrams of the internal wiring for each item of equipment.
2. Include listing of recommended replacement parts for keeping in stock supply, including sources of supply, for equipment shall be provided. The listing shall include belts for equipment: Belt manufacturer, model number, size and style, and distinguished whether of multiple belt sets.
K. Completed System Readiness Checklist provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 22 08 00 COMMISSIONING OF PLUMBING
SYSTEMS.
L. Submit training plans, trainer qualifications and instructor qualifications in accordance with the requirements of Section 22 08 00 COMMISSIONING OF PLUMBING SYSTEMS.
1.5 QUALITY ASSURANCE
A. Products Criteria:
1. Standard Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture, supply and servicing of the specified products for at least 5 years. However, digital electronics devices, software and systems such as controls, instruments, computer work station, shall be the current generation of technology and basic design that has a proven satisfactory service record of at least 5 years.
2. Equipment Service: There shall be permanent service organizations, authorized and trained by manufacturers of the equipment supplied, located within 160 km (100 miles) of the project.
These organizations shall come to the site and provide acceptable service to restore operations within four hours of receipt of notification by phone, e-mail or fax in event of an emergency, such as the shut-down of equipment; or within 24 hours in a non-emergency.
Names, mail and e-mail addresses and phone numbers of service organizations providing service under these conditions for (as applicable to the project): pumps, compressors, water heaters, critical instrumentation, computer workstation and programming shall be submitted for project record and inserted into the operations and maintenance manual.
3. All items furnished shall be free from defects that would adversely affect the performance, maintainability and appearance of individual components and overall assembly.
22 05 11 - 8
4. The products and execution of work specified in Division 22 shall…