Attachment 5 - REVISED DRAWING L-101 FOR UPSIZED SHRUBS AND TREES.pdf

PDF 527 KB Posted

Attached to
Y1DB--612-163 Construct Social Work Consolidated Clinic Space (VA-21-00019843)
Solicitation number
36C77622B0016
Issued by

About this file

This document is a landscape planting plan for the construction of social work and expanded clinical space at the Department of Veterans Affairs facility located at 3551 Femoyer Street in Mather, California. The plan specifies that the site will include new sidewalks, parking areas, a two-story building, and landscaping elements such as shrubs, trees, boulders, and irrigation systems. A variety of plant species are identified by their botanical names, quantities, and container sizes to be installed. Details are provided for edging, mulching, and root barriers. The related federal contract opportunity is solicitation number 36C77622B0016 for the construction of the social work consolidated clinic space at the specified VA location, with an agency point of contact listed as the Department of Veterans Affairs Technology Acquisition Center Austin.

View the file

Other files

File Type Posted
36C77622B0016 0003.docx DOCX document
36C77622B0016 0002.docx DOCX document
Attachment 4 - SECTION 12 24 00 Window Shades.pdf PDF
Attachment 3 - Mather Social Services RFI number 1.pdf PDF
Attachment 1 - 105126.18 SOLID PLASTIC LOCKERS.pdf PDF
Attachment 2 - AL13 Panel Submittal.pdf PDF
36C77622B0016 0001.docx DOCX document
Attachment 3 - Contractor Safety and Environmental Record Evaluation Form.docx DOCX document
Attachment 8 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 13- VHA Supplemental Contract Requirements for Ensuring Adeq COVID-19 Safety Protocols for Fed Contractors rev2.docx DOCX document
Attachment 9 - COVID-19 Safety Protocols 12-14-21.pdf PDF
36C77622B0016_1.docx DOCX document
Attachment 10 - 20220404_Mather Construction Combined drawings 3.15.21 VOLUME I.pdf PDF
Attachment 11 - 20220404_Mather Construction Combined drawings 3.15.21 VOLUME II.pdf PDF
Attachment 6 - 01 32 16 - Project Schedules Master Spec 20180330.docx DOCX document
Attachment 2 - Release of Claims.docx DOCX document
Attachment 1 - Site Visit - Map.docx DOCX document
Attachment 12 - 20220404_Mather Construction Combined drawings 3.15.21 VOLUME III.pdf PDF
Attachment 4 - 20220404_2020-1204 Mather (612-163) 100_ CD Specs - Volume 1 (04-04-2024).pdf PDF
Attachment 7 - DBA Wage Rate - Sacramento County - 2-4-22.pdf PDF
Attachment 5 - 20210401_2020-1204 Mather (612-163) 100_ CD Specs - Volume 2 (03-31-2021).pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEMOYER STREET

FU

TU

RE

E

XT

EN

SI

O

N O

F

PE

TE

R

A.

M cC

UE

N

BL

VD

(N .I.

C.

EXISTING SIDEWALK

EN

TR

Y/

EG

R

ES

S (N

.I.

C

PA

R

KI

N G

(N .I.

C

SIDEWALK

S

ID

EW

AL

K

FU

TU

R E

SI

D

EW

AL

K (N

.I.

C

PARKING (N.I.C.)

ENTRY/

EGRESS (N.I.C.)

HANDICAP

PARKING

ENTRY

S

ID

EW

AL

K

SIDEWALK

NEW 2 STORY

BUILDING

SIDEWALK

SI

D

EW

AL

K

SIDEWALK

BOLLARDS - SEE

ARCHITECTURAL

DRAWINGS

TRASH

R

LA

C

A

A

A

A

A

A

A

A

A A

A

A A

A

LA

LA

LA

LA

LA

LA

LA

LA

LA

LA

C

C

C

C

C

C

R

R R

R R

R

R

R

R

R

RR

LA

LA

LA

LA

LA

LA

RR

R

R

R

R R

R

R

R

C

C

C

R

R

LA

LA

R R

LA

R

LA

LA

LA

R

C

LA

LA

LA

LA

LA

0 5 10 20 30

GRAPHIC SCALE - FEET

SCALE: 1" = 10'

PROVIDE ROCK DISSIPATOR

AT ALL DOWNSPOUTS.

24" WIDE X 8'-0" LONG.

4"-6" TAN RIVER COBBLE

6" DEPTH, OVER TYPAR PREMIUM

LANDSCAPE FABRIC

DESCRIPTION

AGAVE MEDIO PICTA 'ALBA'

CENTURY PLANT

CEANOTHUS 'YANKEE POINT'

CARMEL CREEPER

DIETES BICOLOR

FORTNIGHT LILY

LANTANA MONTEVIDENSIS 'ALBA'

WHITE LANTANA

ROSMARINUS OFFICINALIS 'PROSTRATUS'

PROSTRATE ROSEMARY

STREET TREE:

CERCIDIUM X 'DESERT MUSEUM' - PALO VERDE

SHADE TREE:

QUERCUS LOBATA - VALLEY OAK

FLOWERING ACCENT TREE:

ERIOBOTRYA JAPONICA - LOQUAT

GRAY/TAN ANGULAR ROCK OVER WEED FABRIC - TYPAR PREMIUM

LANDSCAPE FABRIC. ROCK TO BE 2"-3" DIAMETER

INDICATES IRRIGATED PLANTER AREA.

AT ALL PLANTED/IRRIGATED AREAS: 4" DEPTH SHREDDED

ORGANIC MULCH

EDGING 1/4" THICK STEEL EDGING, BLACK PAINTED.

DURA EDGE BY JD RUSSELL CO.

TAN COLORED ROUNDED BOULDERS:

BURY BOULDER TO 1/3 DEPTH.

MINIMUM DIMENSIONS 48" X 36" X 36" - QUANTITY: 25

MINIMUM DIMENSIONS 36" X 24" X 24" - QUANTITY: 46

ROOTBARRIER: 10' LENGTH X 20" DEPTH BIOBARRIER ROOTBARRIER

CENTER ON TREE AND INSTALL PER MANUF. DETAILS

ALONG EDGE OF PAVING. DO NOT WRAP AROUND ROOTBALL

REQUIRED AT 6 LOCATIONS

QUANTITY

SIZE

15 GAL.

5 GAL.

5 GAL.

5 GAL.

5 GAL.

36" BOX

STANDARD

36" BOX

STANDARD

36" BOX

STANDARD

DETAIL

SHEET L-301

D-9

D-9

D-9

D-9

D-9

B-9

B-9

B-9

LEGEND

R

LA

C

A

SYMBOL ALT BID SIZE

24" BOX

15 GAL.

15 GAL.

15 GAL.

15 GAL.

48" BOX

STANDARD

48" BOX

STANDARD

48" BOX

STANDARD

IN RED/CLOUDED:

RESPONSES TO BID QUESTIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date

Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

LANDSCAPE PLANTING PLAN

A

Fi le

P at h

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

GM GM

CONSTRUCTION

DOCUMENT SUBMISSION

FULLY SPRINKLERED L-101

DESIGN SOCIAL WORK AND

EXPAND CLINICAL SPACE

3551 Femoyer Street, Mather, CA 95655

12/4/20 Romanyk Consulting Corp. www.romanykconsulting.com

Romanyk Consulting Focusing on what matters

SprinkleredLI

CE

NS

ED

LANDSCAPE ARCHITECT

STATE OF CALIFORN

IA

Ge org e E.L.Mercer No. 4055

Signature Renewal Date: 4-30-21

Date:

12/4/20990 SEACOAST DRIVE, STE 20

IMPERIAL BEACH, CA 91932

PHONE: (619) 882-2499

E-MAIL: 5mercers@sbcglobal.net

GEORGE MERCER ASSOCIATES INC.

NORTH

3308 Preston Road, Suite 350-164, Plano, Texas 75093

612-163

SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS

8/15/2017

9/15/2017

12/5/2017

SD-2 PACKAGE 5/15/2018

DD-1 NON REVIEW 8/02/2018

DD-1 SUBMISSION 8/23/2018

DD-2 SUBMISSION 10/27/2018

CD-1 SUBMISSION 02/10/2019

CD-1 RE-SUBMISSION 04/12/2019

CD-1 RE-SUBMISSION 01/31/2020

CD-2 SUBMISSION 04/30/2020

CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020

File details come from the government source that posted it. Updated .