Attachment 3 - Mather Social Services RFI number 1.pdf
PDF 3 MB Posted
- Solicitation number
- 36C77622B0016
About this file
This package includes architectural drawings and specifications for a federal construction project to design social work and expand clinical space at the VA Northern California Health Care System in Mather, California. Key details include constructing a two-story 14,286 square foot building addition with first floor plans showing exam rooms, consultation rooms, waiting areas, offices, and support spaces and second floor plans depicting offices and conference rooms. Mechanical, electrical, plumbing, fire protection, and structural drawings are provided along with interior and exterior elevations, sections, and construction details. The project number is 612-163.
The related federal contract opportunity is a solicitation for the construction work on this project, designated number 36C77622B0016. The solicitation is for a small business set-aside with an anticipated award date in 2022. The required construction work includes all labor, materials, equipment, tools, supervision and services to complete the clinical space expansion at the Mather VA Medical Center as depicted in the architectural drawings and specifications provided.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING LIST
BUILDING SUMMARY
PROJECT INFORMATION
Project Name: Design Social Work and Expand Clinical Space
Project Number: 612-163
Project Location: VA Northern California Health Care System - Mather, CA
Project Purpose/Use: VA Social Services and Outpatient Care
BUILDING AREA:
FIRST FLOOR 7,555.74 GSF
SECOND FLOOR 6,732.62 GSF
TOTAL 14,286 GSF (INCLUDING OUTSIDE STORAGE)
GENERAL NOTES
1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION. THESE DRAWINGS ARE A COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE SEPARATED FOR DISTRIBUTION. THE GENERAL CONTRACTOR SHALL REVIEW ALL DRAWINGS AND PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR FOR INTERDISCIPLINARY COORDINATION.
2. THE GENERAL CONTRACTOR SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK BEING PERFORMED
BEFORE SUBMITTING COST QUOTATIONS FOR WORK.
3. NOTIFY THE ARCHITECT PROMPTLY OF ANY ERRORS, OMISSIONS, INCONSISTENCIES, DISCREPANCIES AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND ITS ASSOCIATED FIELD/PROJECT CONDITIONS SO THAT A RESOLUTION CAN BE PROVIDED PRIOR TO
CONTINUING WITH WORK.
4. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE ARCHITECT
5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING JURISDICTION. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND CERTIFICATES AND SHALL FURNISH COPIES OF
PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.
6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF ANY EXISTING TENANTS OR BUILDING OPERATIONS (IF ANY). THE GENERAL CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO ANY NEW CONSTRUCTION OR
EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
7. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE ON A DAILY BASIS.
8. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE VA COR IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH RESPECT TO DELIVERY
DATE, QUALITY, OR COST, AND IF IT MEETS THE DESIGN INTENT.
9. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE ARCHITECT DOES NOT ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S MEANS AND METHODS OR
FOR TEMPORARY STRUCTURES.
10. DEMOLITION OF EXISTING STRUCTURE(S) IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE CONTRACTOR SHALL
EMPLOY ENGINEERING EXPERTISE AS NEEDED TO ASSIST IN DEMOLITION.
11. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MEETING OSHA REGULATIONS DURING CONSTRUCTION.
12. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GENERAL CONTRACTOR SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE. CLEANING OF MOLD ON GYPSUM BOARD IS NOT
ACCEPTABLE. IF MOLD OCCURS, THE GYPSUM BOARD MUST BE REPLACED.
13. ALL WORK SHOWN ON THESE DRAWINGS IS TO BE CONSIDERED AS "BASE BID" SEE BID ALTERNATE INDEX BELOW AND THE
SPECIFICATIONS FOR FURTHER INFORMATION.
PROJECT TEAM
OWNER
Department of Veterans Affairs Network Contracting Office 21 (NCO 22) 855 M Street, Suite 1020 Fresno, CA 93721
ARCHITECT
Romanyk Consulting (RCC) 3308 Preston Road, Suite 350-164 Plano, TX 75093
Denise Groves, CO denise.groves@va.gov
559-228-6932
Rebecca Olson, AIA
STRUCTURAL ENGINEER
IMEG Corp.
300 North Lake Avenue, 14th Floor Pasadena, CA 91101
Sevan Benjanian, P.E.
PLUMBING ENGINEER
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
CIVIL ENGINEER AND LANDSCAPE
IMEG Corp.
300 North Lake Avenue, 14th Floor Pasadena, CA 91101
IMEG Corp.
300 North Lake Avenue, 14th Floor Pasadena, CA 91101
IMEG Corp.
300 North Lake Avenue, 14th Floor Pasadena, CA 91101
CALIBRE ENGINEERING, INC.
9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129
Mike Iezza, P.E.
Ben Murphy
CONSULTANTS:
Scott Nelson, P.E.
Hanriet Abrahamian, P.E.
LOW VOLTAGE ENGINEER
IMEG Corp.
300 North Lake Avenue, 14th Floor Pasadena, CA 91101
Muhamed Aziz, P.E.
SHEET NUMBERING VICINITY MAPS
1. AREA MAP 2. SITE LOCATION A101
SHEET TYPE
DESIGNATOR
SHEET NUMBER
WITHIN SERIES
DISCIPLINE:
ARCHITECTURAL
GI - GENERAL INFORMATION
GC - GENERAL CONTRACT
AS- ARCHITECTURAL SITE
AD - DEMOLITION
AE- ARCHITECTURAL ELEMENTS
AI- ARCHITECTURAL INTERIORS
AF- ARCHITECTURAL FINISHES
C-CIVIL
CD - DEMOLITION & EROSION CONTROL
CE- EXISTING CONDITIONS
CG - GRADING
CS - CIVIL SITE
CU - CIVIL UTILITIES
L - LANDSCAPE
S- STRUCTURAL
SB - STRUCTURAL SUBSTRUCTURE
SF- STRUCTURAL FRAMING
SJ - STRUCTURAL DETAILS
SK - PERSPECTIVE
FA-FIRE PROTECTION DETECTION AND ALARM
FX- FIRE PROTECTION SUPPRESSION
P- PLUMBING
PS - PLUMBING SITE
PL- PLUMBING FIXTURES
M- MECHANICAL
MH- MECHANICAL HVAC
MJ- MECHANICAL DETAILS
E- ELECTRICAL
EL- ELECTRICAL LIGHTING
ELP-LIGHTNING PROTECTION
EP- ELECTRICAL POWER
ES- ELECTRICAL SITE
ET- ELECTRICAL TELECOMMUNICATIONS
TS- TELECOMMUNICATIONS SITE PLAN
BID ALTERNATE INDEX
BID ALTERNATE#1
BID ALTERNATE #2
BID ALTERNATE #3
BID ALTERNATE #4
BID ALTERNATE #5
BID ALTERNATE #6
SEE SHEETS: 1/AE102, 1/AE105, 1/AE201, 2/AE201,
6/AF101, & 2/AF102
SEE SHEETS: 1/AE101 & 3/AI103
SEE SHEETS: 2/AS101 & 3/AS101
SEE SHEET: 1/AS101
SEE SHEET: 1/AE101, 1/AE201, 2/AE201, 4/AI103, &
5/AI103
SEE SHEET: 1/AS101
*NOTE: ADD ALTERNATES WILL BE CLOUDED ON THE APPLICABLE SHEETS
PETER A. McCUEN BLVD.
F E
M O
Y E
R S
T
APPROVED BUILDING SITE
FUTURE EXTENSION OF MCCUEN
TWO
STORY BUILDING
FOOT PRINT
25' PSDM SETBACK
LINES
SITE
VA MEDICAL
CENTER
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
IMEG CORP. (M,E,P, & S)
300 NORTH LAKE AVENUE, 14TH FLOOR
PASADENA, CA 91101
CALIBRE ENGINEERING, INC. (CIVIL AND LANDSCAPE)
9090 SOUTH RIDGELINE BOULEVARD, SUITE 105
HIGHLANDS RANCH, CO 80129
KLEINFELDER (GEOTECH)
6700 KOLL CENTER PARKWAY
SUITE 120
PLEASANTON, CA 94566
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
B
IM
/V
IS
N
M a th e r
S o c ia l S e rv ic e s B u ild in g /M a th e r
S o c ia l S e rv ic e s
S
D
.r v t
/6
/2
:3
:3
P M
COVER SHEET
GC EM
CONSTRUCTION
DOCUMENT SUBMISSION
FULLY SPRINKLERED
612-163
GI101
DESIGN SOCIAL WORK AND
EXPAND CLINICAL SPACE
3551 Femoyer Street Mather, CA 95655
12/04/2020
DESIGN SOCIAL WORK
AND EXPAND CLINICAL SPACE
Department of Veterans Affairs Site Location
VA Northern California Health Care System
3551 Femoyer Street Mather, CA 95655
Project Number - 612-163 RCC Contract Number - VA261-17-C-0044
CONSTRUCTION DOCUMENT SUBMISSION #2 (RFI #1 - 5.6.22)
DECEMBER 4, 2020
SHEET
NUMBER SHEET TITLE
MH201 HVAC PIPING FIRST FLOOR PLAN
MH202 HVAC PIPING SECOND FLOOR PLAN
MH203 HVAC PIPING ROOF PLAN
MH301 AIR BALANCE SUMMARY
MH401 HVAC CONTROLS
MH402 HEATING WATER FLOW DIAGRAM
MH501 MECHANICAL SECTIONS
MJ601 MECHANICAL DETAILS
MJ602 MECHANICAL DETAILS
MJ603 MECHANICAL DETAILS
E-001 ELECTRICAL SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES
E-002 ELECTRICAL LIGHTING FIXTURE SCHEDULE
E-003 PANEL SCHEDULES
E-004 PANEL SCHEDULES
ES101 ELECTRICAL SITE PLAN
EL101 ELECTRICAL FIRST FLOOR LIGHTING PLAN
EL102 ELECTRICAL SECOND FLOOR LIGHTING PLAN
EL103 ELECTRICAL ROOF LIGHTING PLAN
ELP103 LIGHTING PROTECTION PLAN
EP101 ELECTRICAL FIRST FLOOR POWER PLAN
EP102 ELECTRICAL SECOND FLOOR POWER PLAN
EP103 ELECTRICAL ROOF POWER PLAN
E-201 ELECTRICAL FIRST FLOOR PHOTOMETRIC
CALCULATIONS
E-202 ELECTRICAL SECOND FLOOR PHOTOMETRIC
CALCULATIONS
E-203 ELECTRICAL FIRST FLOOR PHOTOMETRIC
CALCULATIONS-EMERGENCY
E-204 ELECTRICAL SECOND FLOOR PHOTOMETRIC
CALCULATIONS-EMERGENCY
E-205 ELECTRICAL SITE PLAN PHOTOMETRIC
CALCULATIONS
E-206 ELECTRICAL SITE PLAN PHOTOMETRIC
CALCULATIONS-EMERGENCY
E-210 ELECTRICAL CROSS SECTIONS
E-300 ELECTRICAL SINGLE LINE DIAGRAM
E-401 ELECTRICAL DETAILS
E-402 ELECTRICAL DETAILS
E-403 ELECTRICAL DETAILS
E-404 ELECTRICAL DETAILS
E-405 ELECTRICAL DETAILS
E-406 LIGHTNING PROTECTION DETAILS
E-407 LIGHTNING PROTECTION DETAILS
E-408 LIGHTNING PROTECTION DETAILS
ET001 TELECOMMUNICATION SYMBOLS, ABBREVIATIONS,
AND GENERAL NOTES
TS101 TELECOMMUNICATION SITE PLAN
ET101 TELECOMMUNICATION FIRST FLOOR PLAN
ET102 TELECOMMUNICATION SECOND FLOOR PLAN
ET401 TELECOMMUNICATION ENLARGED PLANS
ET402 TELECOMMUNICATION DETAILS
ET403 TELECOMMUNICATION DETAILS
ET404 TELECOMMUNICATION RISER DIAGRAM
ET501 TELECOMMUNICATIONS SCHEDULES
SHEET
NUMBER SHEET TITLE
AI118 SEISMIC DETAILS
AI119 MISCELLANEOUS DETAILS
AF101 MILLWORK ELEVATIONS
AF102 MILLWORK SECTIONS & ENLARGED PLAN
AF103 DOOR AND WINDOW SCHEDULE AND DETAILS
AF104 ROOM FINISH SCHEDULE
AF105A WALL TYPES
AF105B WALL TYPES
AF106 ALUMINUM FRAME TYPES
AF107 ALUMINUM FRAME TYPES
AF108 ALUMINUM FRAME TYPES
FA001 FIRE ALARM GENERAL NOTES AND EQUIPMENT
LIST
FA101 FIRE ALARM FIRST FLOOR PLAN
FA102 FIRE ALARM SECOND FLOOR PLAN
FA200 FIRE ALARM CALCULATIONS AND RISER DIAGRAM
FA301 FIRE ALARM DETAILS
FA302 FIRE ALARM DETAILS
FX001 FIRE PROTECTION SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES
FXS101 FIRE PROTECTION SITE PLAN
FX101 FIRE PROTECTION FIRST FLOOR PLAN
FX102 FIRE PROTECTION SECOND FLOOR PLAN
FX201 FIRE PROTECTION FIRST FLOOR REFLECTED
CEILING PLAN
FX202 FIRE PROTECTION SECOND FLOOR REFLECTED
CEILING PLAN
FX301 FIRE PROTECTION DETAILS
P-001 PLUMBING SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES
P-002 PLUMBING SCHEDULES
P-003 PLUMBING CALCULATIONS
PS101 PLUMBING SITE PLAN
PL101.2 PLUMBING FIRST FLOOR PLAN - UNDERGROUND
PL101A PLUMBING FIRST FLOOR PLAN - WATER
PL101B PLUMBING FIRST FLOOR PLAN - WASTE
PL102A PLUMBING SECOND FLOOR PLAN - WATER
PL102B PLUMBING SECOND FLOOR PLAN - WASTE
PL103 PLUMBING ROOF PLAN
PL201 PLUMBING DOMESTIC WATER RISER DIAGRAMS
PL202 PLUMBING DOMESTIC WATER RISER DIAGRAM
PL203 PLUMBING WASTE AND VENT RISER DIAGRAM
PL204 PLUMBING WASTE AND VENT RISER DIAGRAM
PL205 PLUMBING GAS RISER DIAGRAM
PL206 PLUMBING STORM RISER DIAGRAM
PL301 ENLARGED PLANS
PL401 PLUMBING DETAILS
M-001 MECHANICAL SYMBOLS, ABBREVIATION, AND
GENERAL NOTES
M-002 MECHANICAL SCHEDULES
M-003 MECHANICAL FIRST FLOOR ZONING PLAN
M-004 MECHANICAL SECOND FLOOR ZONING PLAN
MH101 MECHANICAL FIRST FLOOR PLAN
MH102 MECHANICAL SECOND FLOOR PLAN
MH103 MECHANICAL ROOF PLAN
SHEET
NUMBER SHEET TITLE
SJ302 MOMENT FRAME ELEVATIONS
SJ303 MOMENT FRAME ELEVATIONS
SJ304 ELEVATIONS AND BUILDING SECTIONS
SJ401 FOUNDATION DETAILS
SJ402 FOUNDATION DETAILS
SJ403 FOUNDATION DETAILS
SJ501 STEEL DETAILS
SJ502 STEEL DETAILS
SJ601 EXTERIOR STAIR PARTIAL FRAMING PLANS
SJ602 ENCLOSED STAIR PARTIAL FRAMING PLANS
SJ603 STAIR DETAILS
SK101 BUILDING PERSPECTIVES
AS101 ARCHITECTURAL SITE PLAN
AD101 DEMOLITION PLAN
AE101 FIRST FLOOR PLAN
AE102 SECOND FLOOR PLAN
AE103 FIRST FLOOR DIMENSION PLAN
AE104 SECOND FLOOR DIMENSION PLAN
AE105 ROOF PLAN
AE106 FIRST FLOOR REFLECTED CEILING PLAN
AE107 SECOND FLOOR REFLECTED CEILING PLAN
AE201 ELEVATIONS
AE202 ELEVATIONS
AE203 ELEVATIONS
AE204 BUILDING ELEVATION VIEWS
AE205 BUILDING CROSS SECTIONS
AE206 BUILDING LONGITUDINAL SECTIONS
AI101 WALL SECTIONS
AI102 WALL SECTIONS
AI103A WALL SECTIONS
AI103B WALL SECTIONS & GATE ELEVATION
AI104A ENLARGED TOILET PLANS AND ELEVATIONS
AI104B ENLARGED TOILET PLANS AND ELEVATIONS
AI105A ENLARGED STAIR PLANS
AI105B ENLARGED STAIR SECTIONS
AI106 ENLARGED ELEVATOR PLAN AND SECTIONS
AI107 STAIR DETAILS
AI108 STAIR DETAILS
AI109A WALL DETAILS
AI109B WALL DETAILS
AI109C FOUNDATION DETAILS
AI109D FOUNDATION DETAILS
AI110A COLUMN DETAILS
AI110B COLUMN DETAILS
AI110C COLUMN DETAILS
AI111 TYPICAL GYPSUM BOARDS- ELEVATORS - DETAILS
AI112 TYPICAL GYPSUM BOARD ELEVATOR DETAILS
AI113A CEILING DETAILS
AI114B CEILING DETAILS
AI114C CEILING DETAILS
AI115 ROOF DETAILS
AI116 CURVED ROOF AND SUN CONTROL DEVICE
DETAILS
AI117 SEISMIC DETAILS
SHEET
NUMBER SHEET TITLE
GI101 COVER SHEET
GI102 PROJECT DATA
GI103 GENERAL NOTES, ABBREVIATIONS
GC101 FIRST FLOOR LIFE SAFETY PLAN
GC102 SECOND FLOOR LIFE SAFETY PLAN
CE-100 EXISTING CONDITIONS PLAN
CD-100 DEMOLITION AND EROSION CONTROL PLAN
CG-100 GRADING PLAN
CS-100 SITE PLAN
CU-100 OVERALL UTILITY PLAN
L-101 LANDSCAPE PLANTING PLAN
L-201 LANDSCAPE IRRIGATION PLAN
L-301 LANDSCAPE IRRIGATION AND PLANTING DETAILS
S001 STRUCTURAL GENERAL NOTES, LEGEND AND
ABBREVIATIONS
S002 STRUCTURAL GENERAL NOTES
S003 TYPICAL CONCRETE DETAILS
S004 TYPICAL CONCRETE DETAILS
S005 TYPICAL STEEL DETAILS
S006 TYPICAL STEEL DETAILS
S007 TYPICAL STEEL DETAILS
S008 TYPICAL STEEL DETAILS
S009 TYPICAL STEEL DETAILS
S010 TYPICAL STEEL DETAILS
SB101 FOUNDATION PLAN
SF101 SECOND FLOOR FRAMING PLAN
SF102 ROOF FRAMING PLAN
SF103 PARTIAL FRAMING PLANS
SJ301 MOMENT FRAME ELEVATIONS
SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017
SD-1 PACKAGE - RESUBMITTAL
SD-1 PACKAGE - RESUBMITTAL
SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS
8/15/2017
9/15/2017
12/5/2017
SD-2 PACKAGE 5/15/2018
DD-1 NON REVIEW 8/02/2018
DD-1 SUBMISSION 8/23/2018
DD-2 SUBMISSION 10/27/2018
CD-1 SUBMISSION 02/10/2019
CD-1 RE-SUBMISSION 04/12/2019
CD-1 RE-SUBMISSION 01/31/2020
CD-2 SUBMISSION 04/30/2020
CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020
REVIEW SET FOR CONSTRUCTION DOCUMENT SUBMISSION #2 09/24/2020
12/04/2020 CONSTRUCTION DOCUMENT SUBMISSION #2
RFI #1 05/06/2022
RCP NOTES
RCP LEGEND
KEYNOTE LEGEND
1.0
2.0
3.0
4.0
B1 B3 B4 B5
0.1
B6
E L E
V A
T O
RSTAFF AREA
PROCEDURE
TLT.
10A
SOILED
111B
EXAM
EXAM
EXAM
EXAM
CORRIDOR
STORAGE
CONSULT RM.
BREAK RM.
GROUP RM.
EXAM
EXAM
EXAM
ISO. EXAM
CLEAN
111D
CORRIDOR
EXAM
HAC
RECEPTION
TOILET
105A
LAUNDRY
TOILET
1 111
B4.5
B4.9
1.1
B1.4
3.4
STAFF TLT
111A
ELECT.
111C
ELEV EQ
ELECT
CONSULT RM.
A.F.F.10' - 0"
A.F.F.8' - 0"
A.F.F.8' - 0"
AI113A
A.F.F.8' - 2"
A.F.F.9' - 0"
AI113A
AI113A
AI113A
8 10
1 1 1 1 1 A.F.F.12' - 0"
A.F.F.8' - 0"
A.F.F.8' - 0"
A.F.F.10' - 0"A.F.F.10' - 0"A.F.F.10' - 0"A.F.F.10' - 0"A.F.F.10' - 0"A.F.F.10' - 0"
A.F.F.9' - 8"
A.F.F.8' - 0"
A.F.F.10' - 0"
A.F.F.10' - 0"
A.F.F.10' - 0"
A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0"
A.F.F.10' - 0"
A.F.F.10' - 0"
A.F.F.8' - 0"
A.F.F.8' - 2"
A.F.F.9' - 0"
A.F.F.9' - 0"
A.F.F.9' - 0"
A.F.F.9' - 0"
A.F.F.9' - 0"
A.F.F.10' - 0"
A.F.F.10' - 0"
A.F.F.10' - 6"
A.F.F.9' - 6"
A.F.F.10' - 0"
A.F.F.8' - 0"A.F.F.8' - 0"A.F.F.8' - 0"A.F.F.8' - 0"
A.F.F.8' - 0"
TOILET
SHWR ROOM
104A
A.F.F.8' - 0" A.F.F.8' - 0" A.F.F.8' - 0" A.F.F.8' - 0" A.F.F.8' - 0"
A.F.F.10' - 0"
A.F.F.9' - 0"
3.6
0.08
C
C
C
C
C
C
C
C
C
B2
A.F.F.9' - 0"
STAIR
S1
OPEN AIR
EXTERIOR
STAIR
A.F.F.10' - 0"
A.F.F.10' - 0"
A.F.F.10' - 0"
AI113A
A.F.F.9' - 6"
A.F.F.10' - 0"
AI114B
AI114B
A.F.F.9' - 0"
A.F.F.10' - 0"
AI114B
A.F.F.9' - 0"
AI114B
WHEEL
CHAIRS
100A
CORRIDOR
100B
WAITING
VESTIBULE
A.F.F.10' - 0"
/8
12' - 1"
/4
10' - 8"
B2.4
0.9
3.2
0.06
0.05
B4.1 B4.3B3.5B3.3B1.8
0.09
4.3
AI113A
Sim
20'-0" RADIUS
AI114C
8'
0" 8' - 0"
1' - 0"
6' - 0"
1' - 0"
10' - 0 3/8" 9
/2
GYPSUM BOARD
HEADER AT 7'-0"
GYPSUM BOARD
HEADER AT 7'-0"
GYPSUM BOARD
HEADER AT 7'-0"
GYPSUM BOARD
HEADER AT 7'-0"
OPEN TO ABOVE-
SEE SECOND FLOOR
RCP FOR MORE
INFORMATION
/4
/4
ALIGN SQUARE FURR DOWN
WITH SQUARE TILE PATTERN ON
FLOOR.
PROVIDE HEATED AIR CURTAIN
SEE MECHANICAL SHEETS2
MOUNT
@ 80" (MIN)
ABOVE LANDING
MOUNT
@ 9'-0" ABOVE
1ST FLR.
MOUNT
@ 11'-0" ABOVE
GROUND
MOUNT
@ 11'-0" ABOVE
GROUND
MOUNT
@ 11'-0" ABOVE
GROUND
MOUNT
@ 11'-0" ABOVE
GROUND
MOUNT
@ 11'-0" ABOVE
GROUND
MOUNT
@ 11'-0" ABOVE
GROUND
MOUNT
@ 11'-0" ABOVE
GROUND
MOUNT
@ 11'-0" ABOVE
GROUND
MOUNT
@ 9'-0" ABOVE
1ST FLR.
MOUNT
@ 9'-0" ABOVE
1ST FLR.
MOUNT
@ 8'-3" ABOVE
1ST FLR.
10 10 10 10
10 10
A.F.F.10' - 0"
13 13
1313131313
1. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT
OF ANY DIMENSIONAL DISCREPANCIES
DISCOVERED DURING CONSTRUCTION.
2. REFER TO ELECTRICAL DRAWINGS FOR LOCATION
OF EMERGENCY LIGHTING.
3. CENTER CEILING AND LIGHTS IN ALL SPACES
WHERE POSSIBLE, UNLESS OTHERWISE NOTED.
4. REFER TO ELECTRICAL DRAWINGS FOR
LOCATIONS OF UNDER-CABINET LIGHT FIXTURES.
5. GYP. BD. SOFFITS ABOVE UPPER CABINETS SHALL
EXTEND TO TOP OF CABINET (7'-0" UNLESS
OTHERWISE NOTED).
6. THIS SHEET IS FOR LAYOUT ONLY. SEE
ELECTRICAL AND MECHANICAL DRAWINGS FOR
EXACT FIXTURE QUANTITY. ALL SWITCHES,
OUTLETS, LIGHTS, DIFFUSERS, ETC. MUST BE
LOCATED PER ARCHITECTURAL DRAWINGS
WHERE APPLICABLE-COORDINATE WITH MEP
SHEETS AND NOTIFY ARCHITECT OF ANY
DISCREPANCIES.
7. PROVIDE ACCESS PANELS IN GYPSUM CEILINGS
WHERE REQUIRED TO ACCESS ABOVE CEILING
EQUIPMENT. (SEE SPECS)
8. ALL CEILINGS SHALL BE 9'-0" AFF UNLESS
OTHERWISE NOTED.
9. REFER TO FINISH DRAWINGS AF102 FOR CEILING
GRID AND PANEL TYPE AND SIZE.
10. BOTTOM OF GYP. BD. BULKHEADS SHALL BE 8'-0"
AFF UNLESS OTHERWISE NOTED.
11. ALL PARTITION WALLS SHALL EXTEND TO
UNDERSIDE OF DECK ABOVE UNLESS OTHERWISE
NOTED.
12. GYP. BD. CEILINGS SHALL BE CONSTRUCTED PER
DETAIL OR AT G.C. OPTION TO USE AN
APPROVED EQUAL SYSTEM (FOR EX. - USG
CROSS-TEE SUSPENSION SYSTEM) ALL FRAMING
MEMBERS SHALL BE ADEQUATELY SIZED FOR THE
REQUIRED SPAN/SPACING. REFER TO SPECS FOR
ADDITIONAL GYP. BD. INFORMATION. GYP. BD.
CEILINGS SHALL BE INSTALLED PER ASTM C840.
/4 AI117
SD
GWB CEILING/ MOISTURE
RESISTANT IN LAUNDRY, SHOWER
ROOMS AND TOILET ROOMS
SMOKE DETECTOR
(REFER TO FA DWGS)
EXIT SIGN LOCATION
(REFER TO FA DWGS)
DIFFUSER
RETURN
CEILING HEIGHT,
ABOVE FINISH FLOOR
2X2 TEGULAR LAY-IN CEILING
A.F.F.1'-0"
RECESSED CAN
LIGHTING FIXTURE
8' UP/DOWN LED PENDANT
2X4 LED FIXTURE
CHAIN HUNG UTILITY
LED FIXTURE
WALL MOUNTED
UP/DOWN LIGHT
2X2 TEGULAR VINYL COATED
GYP. BD. LAY-IN CEILING
RECESSED LINEAR LED LIGHT
FIXTURE IN GYPSUM BOARD CEILINGS
WALL MOUNTED LIGHT
FIXTURE (EXTERIOR)-
MOUNT AT 9'-0" AFF
DECORATIVE LED PENDANT
LIGHT FIXTURE (WAITING 100)
C CAMERA (EXTERIOR)-MOUNT AT 11'-0"
OFF THE GROUND
DECORATIVE LIGHT FIXTURE-
MOUNT AT 8'-3" AFF (EXTERIOR
FRONT ENTRANCE)
LINEAR DIFFUSER
FIRST AND SECOND FLOOR
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
IMEG CORP. (M,E,P, & S)
300 NORTH LAKE AVENUE, 14TH FLOOR
PASADENA, CA 91101
CALIBRE ENGINEERING, INC. (CIVIL AND LANDSCAPE)
9090 SOUTH RIDGELINE BOULEVARD, SUITE 105
HIGHLANDS RANCH, CO 80129
KLEINFELDER (GEOTECH)
6700 KOLL CENTER PARKWAY
SUITE 120
PLEASANTON, CA 94566
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
B
IM
/V
IS
N
M a th e r
S o c ia l S e rv ic e s B u ild in g /M a th e r
S o c ia l S e rv ic e
.r v t
/6
/2
:3
:2
P M
FIRST FLOOR REFLECTED CEILING
PLAN
GC EM
CONSTRUCTION
DOCUMENT SUBMISSION
FULLY SPRINKLERED
612-163
AE106
DESIGN SOCIAL WORK AND
EXPAND CLINICAL SPACE
3551 Femoyer Street Mather, CA 95655
12/04/2020
1/8" = 1'-0"1
FIRST FLOOR REFLECTED CEILING PLAN
Note Number Note 1 2x2 TEGULAR LAY-IN CEILING
2 MOISTURE RESISTANT GYPSUM BOARD CEILING
3 VINYL COATED GYPSUM BOARD LAY-IN CEILING W/ HOLD DOWN CLIPS
4 EXTERIOR WALL MOUNTED LIGHT FIXTURE
5 WALL MOUNTED LED LIGHT FIXTURE OVER SINK, TYP.
6 LED CAN LIGHTS, TYP.
7 DECORATIVE LED PENDANT LIGHTS, LUMIUM - YTTRIUM OR VA APP. EQ. - TYP.
8 LINEAR LED PENDANT LIGHTS, LUMIUM - RUBIDIUM (CSR) OR VA APPROVED EQ. -
TYP.
9 RECESSED LINEAR LED LIGHT FIXTURE, SELUX M60 OR VA APPROVED EQ. - TYP.
10 2X4 LED LIGHT FIXTURE IN LAY-IN CEILING, TYP.
11 LED CAN LIGHT IN SHOWER, TYP.
12 NO CEILING
13 INSTALL NEW WINDOW BLINDS AT ALL CURTAIN WALL LOCATIONS, TYP. SEE
DETAIL 6/AI119 WINDOW SHADE DETAIL.
SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017
SD-1 PACKAGE - RESUBMITTAL
SD-1 PACKAGE - RESUBMITTAL
SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS
8/15/2017
9/15/2017
12/5/2017
SD-2 PACKAGE 5/15/2018
DD-1 NON REVIEW 8/02/2018
-KEYNOTE SYMBOL#
DD-1 SUBMISSION 8/23/2018
DD-2 SUBMISSION 10/27/2018
CD-1 SUBMISSION 02/10/2019
CD-1 RE-SUBMISSION 04/12/2019
CD-1 RE-SUBMISSION 01/31/2020
CD-2 SUBMISSION 04/30/2020
CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020
REVIEW SET FOR CONSTRUCTION DOCUMENT SUBMISSION #2 09/24/2020
12/04/2020 CONSTRUCTION DOCUMENT SUBMISSION #2
RFI #1 05/06/2022
RCP NOTES
RCP LEGEND
KEYNOTE LEGEND
1.0
2.0
3.0
4.0
B1 B3 B4 B5
0.1
B6
OPEN OFFICE
OFFICE
OFFICE
HAC
TOILET
TOILET
STOR./PRINT
BREAK ROOM
ELEV.
1OFFICE
IT
STORAGE
B4.5
B4.9
1.1
ELECT
B1.4
3.4
AI114B
A.F.F.9' - 4"
A.F.F.10' - 2"
OFFICE
OFFICE
A.F.F.8' - 0" A.F.F.8' - 0"
A.F.F.8' - 0"
A.F.F.8' - 0"
A.F.F.8' - 0"
A.F.F.9' - 2"
A.F.F.10' - 2"
AI114B
A.F.F.9' - 4"
A.F.F.10' - 2"
A.F.F.8' - 0"
AI114BA.F.F.9' - 2"
A.F.F.10' - 2"
A.F.F.9' - 4"
AI114B
STAIR
S1
CONF.
OPEN OFFICE
3.6
0.08
A.F.F.10' - 2"
B2
HVAC
CHASE
AI114B
Sim
AI114B
Sim
AI114B
Sim
A.F.F.10' - 0"
A.F.F.10' - 0"
A.F.F.10' - 0"
AI114B
Sim
A.F.F.8' - 0"
A.F.F.10' - 2"
A.F.F.10' - 0"
A.F.F.8' - 0"
B2.4
0.9
3.2
0.06
0.05
B4.1 B4.3B3.5B3.3B1.8
0.09
4.3
/8
/8
78' - 0 3/8"
11 7/8"
/8
1' - 0 3/8"
AT LANDING
8 8
8 8
MOUNT @ 9'-0"
ABOVE 2ND FLR.
MOUNT @ 9'-0"
ABOVE 2ND FLR.
MOUNT @ 9'-0"
ABOVE 2ND FLR.
MOUNT @ 9'-0"
ABOVE 2ND FLR.
MOUNT @ 9'-0"
ABOVE 2ND FLR.
NO CEILING
13 13
131313
1. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT
OF ANY DIMENSIONAL DISCREPANCIES
DISCOVERED DURING CONSTRUCTION.
2. REFER TO ELECTRICAL DRAWINGS FOR LOCATION
OF EMERGENCY LIGHTING.
3. CENTER CEILING AND LIGHTS IN ALL SPACES
WHERE POSSIBLE, UNLESS OTHERWISE NOTED.
4. REFER TO ELECTRICAL DRAWINGS FOR
LOCATIONS OF UNDER-CABINET LIGHT FIXTURES.
5. GYP. BD. SOFFITS ABOVE UPPER CABINETS SHALL
EXTEND TO TOP OF CABINET (7'-0" UNLESS
OTHERWISE NOTED).
6. THIS SHEET IS FOR LAYOUT ONLY. SEE
ELECTRICAL AND MECHANICAL DRAWINGS FOR
EXACT FIXTURE QUANTITY. ALL SWITCHES,
OUTLETS, LIGHTS, DIFFUSERS, ETC. MUST BE
LOCATED PER ARCHITECTURAL DRAWINGS
WHERE APPLICABLE-COORDINATE WITH MEP
SHEETS AND NOTIFY ARCHITECT OF ANY
DISCREPANCIES.
7. PROVIDE ACCESS PANELS IN GYPSUM CEILINGS
WHERE REQUIRED TO ACCESS ABOVE CEILING
EQUIPMENT. (SEE SPECS)
8. ALL CEILINGS SHALL BE 9'-0" AFF UNLESS
OTHERWISE NOTED.
9. REFER TO FINISH DRAWINGS AF102 FOR CEILING
GRID AND PANEL TYPE AND SIZE.
10. BOTTOM OF GYP. BD. BULKHEADS SHALL BE 8'-0"
AFF UNLESS OTHERWISE NOTED.
11. ALL PARTITION WALLS SHALL EXTEND TO
UNDERSIDE OF DECK ABOVE UNLESS OTHERWISE
NOTED.
12. GYP. BD. CEILINGS SHALL BE CONSTRUCTED PER
DETAIL OR AT G.C. OPTION TO USE AN
APPROVED EQUAL SYSTEM (FOR EX. - USG
CROSS-TEE SUSPENSION SYSTEM) ALL FRAMING
MEMBERS SHALL BE ADEQUATELY SIZED FOR THE
REQUIRED SPAN/SPACING. REFER TO SPECS FOR
ADDITIONAL GYP. BD. INFORMATION. GYP. BD.
CEILINGS SHALL BE INSTALLED PER ASTM C840.
/4 AI117
SD
GWB CEILING/ MOISTURE
RESISTANT IN LAUNDRY, SHOWER
ROOMS AND TOILET ROOMS
SMOKE DETECTOR
(REFER TO FA DWGS)
EXIT SIGN LOCATION
(REFER TO FA DWGS)
DIFFUSER
RETURN
CEILING HEIGHT,
ABOVE FINISH FLOOR
2X2 TEGULAR LAY-IN CEILING
A.F.F.1'-0"
RECESSED CAN
LIGHTING FIXTURE
8' UP/DOWN LED PENDANT
2X4 LED FIXTURE
CHAIN HUNG UTILITY
LED FIXTURE
WALL MOUNTED
UP/DOWN LIGHT
2X2 TEGULAR VINYL COATED
GYP. BD. LAY-IN CEILING
RECESSED LINEAR LED LIGHT
FIXTURE IN GYPSUM BOARD CEILINGS
WALL MOUNTED LIGHT
FIXTURE (EXTERIOR)-
MOUNT AT 9'-0" AFF
DECORATIVE LED PENDANT
LIGHT FIXTURE (WAITING 100)
C CAMERA (EXTERIOR)-MOUNT AT 11'-0"
OFF THE GROUND
DECORATIVE LIGHT FIXTURE-
MOUNT AT 8'-3" AFF (EXTERIOR
FRONT ENTRANCE)
LINEAR DIFFUSER
FIRST AND SECOND FLOOR
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
IMEG CORP. (M,E,P, & S)
300 NORTH LAKE AVENUE, 14TH FLOOR
PASADENA, CA 91101
CALIBRE ENGINEERING, INC. (CIVIL AND LANDSCAPE)
9090 SOUTH RIDGELINE BOULEVARD, SUITE 105
HIGHLANDS RANCH, CO 80129
KLEINFELDER (GEOTECH)
6700 KOLL CENTER PARKWAY
SUITE 120
PLEASANTON, CA 94566
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
B
IM
/V
IS
N
M a th e r
S o c ia l S e rv ic e s B u ild in g /M a th e r
S o c ia l S e rv ic e
.r v t
/6
/2
:3
:2
P M
SECOND FLOOR REFLECTED
CEILING PLAN
GC EM
CONSTRUCTION
DOCUMENT SUBMISSION
FULLY SPRINKLERED
612-163
AE107
DESIGN SOCIAL WORK AND
EXPAND CLINICAL SPACE
3551 Femoyer Street Mather, CA 95655
12/04/2020
1/8" = 1'-0"1
SECOND FLOOR REFLECTED CEILING
PLAN
Note Number Note 1 2x2 TEGULAR LAY-IN CEILING
2 MOISTURE RESISTANT GYPSUM BOARD CEILING
3 VINYL COATED GYPSUM BOARD LAY-IN CEILING W/ HOLD DOWN CLIPS
4 EXTERIOR WALL MOUNTED LIGHT FIXTURE
5 WALL MOUNTED LED LIGHT FIXTURE OVER SINK, TYP.
6 LED CAN LIGHTS, TYP.
7 DECORATIVE LED PENDANT LIGHTS, LUMIUM - YTTRIUM OR VA APP. EQ. - TYP.
8 LINEAR LED PENDANT LIGHTS, LUMIUM - RUBIDIUM (CSR) OR VA APPROVED EQ. -
TYP.
9 RECESSED LINEAR LED LIGHT FIXTURE, SELUX M60 OR VA APPROVED EQ. - TYP.
10 2X4 LED LIGHT FIXTURE IN LAY-IN CEILING, TYP.
11 LED CAN LIGHT IN SHOWER, TYP.
12 NO CEILING
13 INSTALL NEW WINDOW BLINDS AT ALL CURTAIN WALL LOCATIONS, TYP. SEE
DETAIL 6/AI119 WINDOW SHADE DETAIL.
SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017
SD-1 PACKAGE - RESUBMITTAL
SD-1 PACKAGE - RESUBMITTAL
SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS
8/15/2017
9/15/2017
12/5/2017
SD-2 PACKAGE 5/15/2018
DD-1 NON REVIEW 8/02/2018
-KEYNOTE SYMBOL#
DD-1 SUBMISSION 8/23/2018
DD-2 SUBMISSION 10/27/2018
CD-1 SUBMISSION 02/10/2019
CD-1 RE-SUBMISSION 04/12/2019
ROOF
HATCH
CD-1 RE-SUBMISSION 01/31/2020
CD-2 SUBMISSION 04/30/2020
CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020
REVIEW SET FOR CONSTRUCTION DOCUMENT SUBMISSION #2 09/24/2020
12/04/2020 CONSTRUCTION DOCUMENT SUBMISSION #2
RFI #1 05/06/2022
C R
12" (304 mm)
36"
(914 mm)
8" (203 mm)
PLAN VIEW
2” x 4” framing
4” x 6” Posts
Face
6" (152 mm)
96" (2438 mm)
CL
48"
(1218 mm)
Face panel to be an exterior grade.
MDO sheet or an aluminum skin laminated to a wood or plastic core is preferred with edges physically sealed.
U.S. DEPARTMENT
OF VETERAN AFFAIRS
All visible surfaces to be primed and painted
Sign attached together with wood screws & lag bolts
48"(1218 mm)
4” x 6” Posts
Depth & type of footing determined by existing soil conditions
ELEVATION
END VIEW
VA
SOCIAL WORK & EXPAND CLINICAL SPACE
PROJECT #612-163
PARAPET
ROOF MANUFACTURE'S
APPROPRIATE FASTENER & SEAM
PLATE, 12" OC MAX
TPO BONDING ADHESIVE
TPO PARAPET FLASHING
2" WELDED SPLICE, TOP &
BOTTOM
M
IN4
TPO MEMBRANE AS COVER STRIP
NOTES:
MANUFACTURER'S POLYMER OR
METAL BATTEN STRIP MAY BE USED IN
LIEU OF SEAM PLATES. METAL BATTEN
MUST BE USED W/MASONRY
SUBSTRATE.
IF INTERMEDIATE ATTACHMENT STRIP
IS REQUIRED, COMPLETE AS
FOLLOWS:
- NONE REQUIRED TO 3' WALL
HEIGHT.
- ONE STRIP PLACED CENTER OF
WALL HEIGHT TO 6' WALL
HEIGHT.
- ABOVE 6', ONE STRIP EVERY 3'.
PROVIDE MANUFACTURER'S CUT EDGE
SEALANT AS REQUIRED.CUT EDGE SEALANT AS REQUIRED
MIN
2"
SLOPE
ROOF MANUF FASTENER &
SEAM PLATE (SIZE FASTENER
TO PENETRATE METAL DECK)
NOTE: WHEN TPO POLYESTER
REINFORCEMENT IS EXPOSED,
APPLY CUT EDGE TREATMENT TO
ENTIRE EXPOSED EDGE PER
MANUF
2"
6"
WELDED LAP SPLICE
TPO MEMBRANE,
MECHANICALLY ATTACHED
SYSTEM (MAS)
ENTRANCE MAT WITH
POLYAMIDE OR RETREAD INFILLS FOR
OPTIMUM DIRT AND MOISTURE REMOVAL
POLYMER FLEXIBLE JOINER
NATURAL ANODIZED FINISH
LOW PROFILE ALUMINUM
FRAME SCREWED TO FLOOR
FULL SECTION
51mm
SHOCK-ABSORBING CONTINUOUS
VINYL CUSHION FEET
EXTERIOR WALKING SURFACE
shall ALIGN WITH THE
TOP OF THE WALK OFF MAT
RECESS SLAB AS REQUIRED
BY MANUFACTURER TO ALLOW
FOR FLUSH TRANSITION FROM FLOORING
TO WALK OFF MAT
ACCESSIBLE
NOTE
DRINKING FOUNTAINS SHALL COMPLY WITH THE VA BARRIER FREE
DESIGN CRITERIA.
ABA 307 PROTRUDING OBJECTS AND 602
CONTRACTOR TO REFERENCE CURRENT
VA BARRIER FREE DESIGN CRITERIA.
M
IN
M
A X
"EWC
EWC
OASIS BI-LEVEL BARRIER
FREE DRINKING FOUNTAIN2
M
IN
C
L E
A R
M
A X
ACCESSIBLE
DRINKING
FOUNTAINS
LINE OF WALL
OASIS BI-LEVEL BARRIER
FREE DRINKING
FOUNTAIN
4' - 0" CLR. MIN. 6"
/8
/4
15" MIN.5" MAX
MIN.
8"
5" MAX15" MIN.
LINE OF WALL
M
A X
M
IN
C
L E
A R
8".
EQ EQ
NEW CURTAIN
WALL
NEW EXTERIOR WALL
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
IMEG CORP. (M,E,P, & S)
300 NORTH LAKE AVENUE, 14TH FLOOR
PASADENA, CA 91101
CALIBRE ENGINEERING, INC. (CIVIL AND LANDSCAPE)
9090 SOUTH RIDGELINE BOULEVARD, SUITE 105
HIGHLANDS RANCH, CO 80129
KLEINFELDER (GEOTECH)
6700 KOLL CENTER PARKWAY
SUITE 120
PLEASANTON, CA 94566
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
B
IM
/V
IS
N
M a th e r
S o c ia l S e rv ic e s B u ild in g /M a th e r
S o c ia l S e rv ic e
.r v t
/6
/2
:3
:3
P M
MISCELLANEOUS DETAILS
GC EM
CONSTRUCTION
DOCUMENT SUBMISSION
FULLY SPRINKLERED
612-163
AI119
DESIGN SOCIAL WORK AND
EXPAND CLINICAL SPACE
3551 Femoyer Street Mather, CA 95655
12/04/2020
SCALE: 12" = 1'-0"
1CONSTRUCTION SIGN
SCALE: 3" = 1'-0"
2ROOF TYP. TPO WALL SPLICE
SCALE: 3" = 1'-0"
3ROOF TYP. TPO FIELD SPLICE
SCALE: 3/4" = 1'-0"
4RECESSED WALK-OFF MAT SECTION
SCALE: 1/2" = 1'-0"
5HI-LOW DRINKING FOUNTAIN
SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017
SD-1 PACKAGE - RESUBMITTAL
SD-1 PACKAGE - RESUBMITTAL
SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS
8/15/2017
9/15/2017
12/5/2017
SD-2 PACKAGE 5/15/2018
DD-1 NON REVIEW 8/02/2018
DD-1 SUBMISSION 8/23/2018
DD-2 SUBMISSION 10/27/2018
CD-1 SUBMISSION 02/10/2019
CD-1 RE-SUBMISSION 04/12/2019
CD-1 RE-SUBMISSION 01/31/2020
CD-2 SUBMISSION 04/30/2020
CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020
REVIEW SET FOR CONSTRUCTION DOCUMENT SUBMISSION #2 09/24/2020
12/04/2020 CONSTRUCTION DOCUMENT SUBMISSION #2
RFI #1 05/06/2022
SCALE: 1 1/2" = 1'-0"
6.WINDOW SHADE DETAIL
| Sheets |
| AE106 - FIRST FLOOR REFLECTED CEILING PLAN |
| AE107 - SECOND FLOOR REFLECTED CEILING PLAN |
| AI119 - MISCELLANEOUS DETAILS |
| GI101 - COVER SHEET |