Attachment 3 - Mather Social Services RFI number 1.pdf

PDF 3 MB Posted

Attached to
Y1DB--612-163 Construct Social Work Consolidated Clinic Space (VA-21-00019843)
Solicitation number
36C77622B0016
Issued by

About this file

This package includes architectural drawings and specifications for a federal construction project to design social work and expand clinical space at the VA Northern California Health Care System in Mather, California. Key details include constructing a two-story 14,286 square foot building addition with first floor plans showing exam rooms, consultation rooms, waiting areas, offices, and support spaces and second floor plans depicting offices and conference rooms. Mechanical, electrical, plumbing, fire protection, and structural drawings are provided along with interior and exterior elevations, sections, and construction details. The project number is 612-163.

The related federal contract opportunity is a solicitation for the construction work on this project, designated number 36C77622B0016. The solicitation is for a small business set-aside with an anticipated award date in 2022. The required construction work includes all labor, materials, equipment, tools, supervision and services to complete the clinical space expansion at the Mather VA Medical Center as depicted in the architectural drawings and specifications provided.

View the file

Other files

File Type Posted
36C77622B0016 0003.docx DOCX document
Attachment 5 - REVISED DRAWING L-101 FOR UPSIZED SHRUBS AND TREES.pdf PDF
36C77622B0016 0002.docx DOCX document
Attachment 4 - SECTION 12 24 00 Window Shades.pdf PDF
Attachment 1 - 105126.18 SOLID PLASTIC LOCKERS.pdf PDF
Attachment 2 - AL13 Panel Submittal.pdf PDF
36C77622B0016 0001.docx DOCX document
Attachment 3 - Contractor Safety and Environmental Record Evaluation Form.docx DOCX document
Attachment 8 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 13- VHA Supplemental Contract Requirements for Ensuring Adeq COVID-19 Safety Protocols for Fed Contractors rev2.docx DOCX document
Attachment 9 - COVID-19 Safety Protocols 12-14-21.pdf PDF
36C77622B0016_1.docx DOCX document
Attachment 10 - 20220404_Mather Construction Combined drawings 3.15.21 VOLUME I.pdf PDF
Attachment 11 - 20220404_Mather Construction Combined drawings 3.15.21 VOLUME II.pdf PDF
Attachment 6 - 01 32 16 - Project Schedules Master Spec 20180330.docx DOCX document
Attachment 2 - Release of Claims.docx DOCX document
Attachment 1 - Site Visit - Map.docx DOCX document
Attachment 12 - 20220404_Mather Construction Combined drawings 3.15.21 VOLUME III.pdf PDF
Attachment 4 - 20220404_2020-1204 Mather (612-163) 100_ CD Specs - Volume 1 (04-04-2024).pdf PDF
Attachment 7 - DBA Wage Rate - Sacramento County - 2-4-22.pdf PDF
Attachment 5 - 20210401_2020-1204 Mather (612-163) 100_ CD Specs - Volume 2 (03-31-2021).pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING LIST

BUILDING SUMMARY

PROJECT INFORMATION

Project Name: Design Social Work and Expand Clinical Space

Project Number: 612-163

Project Location: VA Northern California Health Care System - Mather, CA

Project Purpose/Use: VA Social Services and Outpatient Care

BUILDING AREA:

FIRST FLOOR 7,555.74 GSF

SECOND FLOOR 6,732.62 GSF

TOTAL 14,286 GSF (INCLUDING OUTSIDE STORAGE)

GENERAL NOTES

1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION. THESE DRAWINGS ARE A COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE SEPARATED FOR DISTRIBUTION. THE GENERAL CONTRACTOR SHALL REVIEW ALL DRAWINGS AND PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR FOR INTERDISCIPLINARY COORDINATION.

2. THE GENERAL CONTRACTOR SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK BEING PERFORMED

BEFORE SUBMITTING COST QUOTATIONS FOR WORK.

3. NOTIFY THE ARCHITECT PROMPTLY OF ANY ERRORS, OMISSIONS, INCONSISTENCIES, DISCREPANCIES AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND ITS ASSOCIATED FIELD/PROJECT CONDITIONS SO THAT A RESOLUTION CAN BE PROVIDED PRIOR TO

CONTINUING WITH WORK.

4. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE ARCHITECT

5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING JURISDICTION. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND CERTIFICATES AND SHALL FURNISH COPIES OF

PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.

6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF ANY EXISTING TENANTS OR BUILDING OPERATIONS (IF ANY). THE GENERAL CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO ANY NEW CONSTRUCTION OR

EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

7. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE ON A DAILY BASIS.

8. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE VA COR IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH RESPECT TO DELIVERY

DATE, QUALITY, OR COST, AND IF IT MEETS THE DESIGN INTENT.

9. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE ARCHITECT DOES NOT ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S MEANS AND METHODS OR

FOR TEMPORARY STRUCTURES.

10. DEMOLITION OF EXISTING STRUCTURE(S) IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE CONTRACTOR SHALL

EMPLOY ENGINEERING EXPERTISE AS NEEDED TO ASSIST IN DEMOLITION.

11. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MEETING OSHA REGULATIONS DURING CONSTRUCTION.

12. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GENERAL CONTRACTOR SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE. CLEANING OF MOLD ON GYPSUM BOARD IS NOT

ACCEPTABLE. IF MOLD OCCURS, THE GYPSUM BOARD MUST BE REPLACED.

13. ALL WORK SHOWN ON THESE DRAWINGS IS TO BE CONSIDERED AS "BASE BID" SEE BID ALTERNATE INDEX BELOW AND THE

SPECIFICATIONS FOR FURTHER INFORMATION.

PROJECT TEAM

OWNER

Department of Veterans Affairs Network Contracting Office 21 (NCO 22) 855 M Street, Suite 1020 Fresno, CA 93721

ARCHITECT

Romanyk Consulting (RCC) 3308 Preston Road, Suite 350-164 Plano, TX 75093

Denise Groves, CO denise.groves@va.gov

559-228-6932

Rebecca Olson, AIA

STRUCTURAL ENGINEER

IMEG Corp.

300 North Lake Avenue, 14th Floor Pasadena, CA 91101

Sevan Benjanian, P.E.

PLUMBING ENGINEER

MECHANICAL ENGINEER

ELECTRICAL ENGINEER

CIVIL ENGINEER AND LANDSCAPE

IMEG Corp.

300 North Lake Avenue, 14th Floor Pasadena, CA 91101

IMEG Corp.

300 North Lake Avenue, 14th Floor Pasadena, CA 91101

IMEG Corp.

300 North Lake Avenue, 14th Floor Pasadena, CA 91101

CALIBRE ENGINEERING, INC.

9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129

Mike Iezza, P.E.

Ben Murphy

CONSULTANTS:

Scott Nelson, P.E.

Hanriet Abrahamian, P.E.

LOW VOLTAGE ENGINEER

IMEG Corp.

300 North Lake Avenue, 14th Floor Pasadena, CA 91101

Muhamed Aziz, P.E.

SHEET NUMBERING VICINITY MAPS

1. AREA MAP 2. SITE LOCATION A101

SHEET TYPE

DESIGNATOR

SHEET NUMBER

WITHIN SERIES

DISCIPLINE:

ARCHITECTURAL

GI - GENERAL INFORMATION

GC - GENERAL CONTRACT

AS- ARCHITECTURAL SITE

AD - DEMOLITION

AE- ARCHITECTURAL ELEMENTS

AI- ARCHITECTURAL INTERIORS

AF- ARCHITECTURAL FINISHES

C-CIVIL

CD - DEMOLITION & EROSION CONTROL

CE- EXISTING CONDITIONS

CG - GRADING

CS - CIVIL SITE

CU - CIVIL UTILITIES

L - LANDSCAPE

S- STRUCTURAL

SB - STRUCTURAL SUBSTRUCTURE

SF- STRUCTURAL FRAMING

SJ - STRUCTURAL DETAILS

SK - PERSPECTIVE

FA-FIRE PROTECTION DETECTION AND ALARM

FX- FIRE PROTECTION SUPPRESSION

P- PLUMBING

PS - PLUMBING SITE

PL- PLUMBING FIXTURES

M- MECHANICAL

MH- MECHANICAL HVAC

MJ- MECHANICAL DETAILS

E- ELECTRICAL

EL- ELECTRICAL LIGHTING

ELP-LIGHTNING PROTECTION

EP- ELECTRICAL POWER

ES- ELECTRICAL SITE

ET- ELECTRICAL TELECOMMUNICATIONS

TS- TELECOMMUNICATIONS SITE PLAN

BID ALTERNATE INDEX

BID ALTERNATE#1

BID ALTERNATE #2

BID ALTERNATE #3

BID ALTERNATE #4

BID ALTERNATE #5

BID ALTERNATE #6

SEE SHEETS: 1/AE102, 1/AE105, 1/AE201, 2/AE201,

6/AF101, & 2/AF102

SEE SHEETS: 1/AE101 & 3/AI103

SEE SHEETS: 2/AS101 & 3/AS101

SEE SHEET: 1/AS101

SEE SHEET: 1/AE101, 1/AE201, 2/AE201, 4/AI103, &

5/AI103

SEE SHEET: 1/AS101

*NOTE: ADD ALTERNATES WILL BE CLOUDED ON THE APPLICABLE SHEETS

PETER A. McCUEN BLVD.

F E

M O

Y E

R S

T

APPROVED BUILDING SITE

FUTURE EXTENSION OF MCCUEN

TWO

STORY BUILDING

FOOT PRINT

25' PSDM SETBACK

LINES

SITE

VA MEDICAL

CENTER

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

IMEG CORP. (M,E,P, & S)

300 NORTH LAKE AVENUE, 14TH FLOOR

PASADENA, CA 91101

CALIBRE ENGINEERING, INC. (CIVIL AND LANDSCAPE)

9090 SOUTH RIDGELINE BOULEVARD, SUITE 105

HIGHLANDS RANCH, CO 80129

KLEINFELDER (GEOTECH)

6700 KOLL CENTER PARKWAY

SUITE 120

PLEASANTON, CA 94566

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

B

IM

/V

IS

N

M a th e r

S o c ia l S e rv ic e s B u ild in g /M a th e r

S o c ia l S e rv ic e s

S

D

.r v t

/6

/2

:3

:3

P M

COVER SHEET

GC EM

CONSTRUCTION

DOCUMENT SUBMISSION

FULLY SPRINKLERED

612-163

GI101

DESIGN SOCIAL WORK AND

EXPAND CLINICAL SPACE

3551 Femoyer Street Mather, CA 95655

12/04/2020

DESIGN SOCIAL WORK

AND EXPAND CLINICAL SPACE

Department of Veterans Affairs Site Location

VA Northern California Health Care System

3551 Femoyer Street Mather, CA 95655

Project Number - 612-163 RCC Contract Number - VA261-17-C-0044

CONSTRUCTION DOCUMENT SUBMISSION #2 (RFI #1 - 5.6.22)

DECEMBER 4, 2020

SHEET

NUMBER SHEET TITLE

MH201 HVAC PIPING FIRST FLOOR PLAN

MH202 HVAC PIPING SECOND FLOOR PLAN

MH203 HVAC PIPING ROOF PLAN

MH301 AIR BALANCE SUMMARY

MH401 HVAC CONTROLS

MH402 HEATING WATER FLOW DIAGRAM

MH501 MECHANICAL SECTIONS

MJ601 MECHANICAL DETAILS

MJ602 MECHANICAL DETAILS

MJ603 MECHANICAL DETAILS

E-001 ELECTRICAL SYMBOLS, ABBREVIATIONS, AND

GENERAL NOTES

E-002 ELECTRICAL LIGHTING FIXTURE SCHEDULE

E-003 PANEL SCHEDULES

E-004 PANEL SCHEDULES

ES101 ELECTRICAL SITE PLAN

EL101 ELECTRICAL FIRST FLOOR LIGHTING PLAN

EL102 ELECTRICAL SECOND FLOOR LIGHTING PLAN

EL103 ELECTRICAL ROOF LIGHTING PLAN

ELP103 LIGHTING PROTECTION PLAN

EP101 ELECTRICAL FIRST FLOOR POWER PLAN

EP102 ELECTRICAL SECOND FLOOR POWER PLAN

EP103 ELECTRICAL ROOF POWER PLAN

E-201 ELECTRICAL FIRST FLOOR PHOTOMETRIC

CALCULATIONS

E-202 ELECTRICAL SECOND FLOOR PHOTOMETRIC

CALCULATIONS

E-203 ELECTRICAL FIRST FLOOR PHOTOMETRIC

CALCULATIONS-EMERGENCY

E-204 ELECTRICAL SECOND FLOOR PHOTOMETRIC

CALCULATIONS-EMERGENCY

E-205 ELECTRICAL SITE PLAN PHOTOMETRIC

CALCULATIONS

E-206 ELECTRICAL SITE PLAN PHOTOMETRIC

CALCULATIONS-EMERGENCY

E-210 ELECTRICAL CROSS SECTIONS

E-300 ELECTRICAL SINGLE LINE DIAGRAM

E-401 ELECTRICAL DETAILS

E-402 ELECTRICAL DETAILS

E-403 ELECTRICAL DETAILS

E-404 ELECTRICAL DETAILS

E-405 ELECTRICAL DETAILS

E-406 LIGHTNING PROTECTION DETAILS

E-407 LIGHTNING PROTECTION DETAILS

E-408 LIGHTNING PROTECTION DETAILS

ET001 TELECOMMUNICATION SYMBOLS, ABBREVIATIONS,

AND GENERAL NOTES

TS101 TELECOMMUNICATION SITE PLAN

ET101 TELECOMMUNICATION FIRST FLOOR PLAN

ET102 TELECOMMUNICATION SECOND FLOOR PLAN

ET401 TELECOMMUNICATION ENLARGED PLANS

ET402 TELECOMMUNICATION DETAILS

ET403 TELECOMMUNICATION DETAILS

ET404 TELECOMMUNICATION RISER DIAGRAM

ET501 TELECOMMUNICATIONS SCHEDULES

SHEET

NUMBER SHEET TITLE

AI118 SEISMIC DETAILS

AI119 MISCELLANEOUS DETAILS

AF101 MILLWORK ELEVATIONS

AF102 MILLWORK SECTIONS & ENLARGED PLAN

AF103 DOOR AND WINDOW SCHEDULE AND DETAILS

AF104 ROOM FINISH SCHEDULE

AF105A WALL TYPES

AF105B WALL TYPES

AF106 ALUMINUM FRAME TYPES

AF107 ALUMINUM FRAME TYPES

AF108 ALUMINUM FRAME TYPES

FA001 FIRE ALARM GENERAL NOTES AND EQUIPMENT

LIST

FA101 FIRE ALARM FIRST FLOOR PLAN

FA102 FIRE ALARM SECOND FLOOR PLAN

FA200 FIRE ALARM CALCULATIONS AND RISER DIAGRAM

FA301 FIRE ALARM DETAILS

FA302 FIRE ALARM DETAILS

FX001 FIRE PROTECTION SYMBOLS, ABBREVIATIONS, AND

GENERAL NOTES

FXS101 FIRE PROTECTION SITE PLAN

FX101 FIRE PROTECTION FIRST FLOOR PLAN

FX102 FIRE PROTECTION SECOND FLOOR PLAN

FX201 FIRE PROTECTION FIRST FLOOR REFLECTED

CEILING PLAN

FX202 FIRE PROTECTION SECOND FLOOR REFLECTED

CEILING PLAN

FX301 FIRE PROTECTION DETAILS

P-001 PLUMBING SYMBOLS, ABBREVIATIONS, AND

GENERAL NOTES

P-002 PLUMBING SCHEDULES

P-003 PLUMBING CALCULATIONS

PS101 PLUMBING SITE PLAN

PL101.2 PLUMBING FIRST FLOOR PLAN - UNDERGROUND

PL101A PLUMBING FIRST FLOOR PLAN - WATER

PL101B PLUMBING FIRST FLOOR PLAN - WASTE

PL102A PLUMBING SECOND FLOOR PLAN - WATER

PL102B PLUMBING SECOND FLOOR PLAN - WASTE

PL103 PLUMBING ROOF PLAN

PL201 PLUMBING DOMESTIC WATER RISER DIAGRAMS

PL202 PLUMBING DOMESTIC WATER RISER DIAGRAM

PL203 PLUMBING WASTE AND VENT RISER DIAGRAM

PL204 PLUMBING WASTE AND VENT RISER DIAGRAM

PL205 PLUMBING GAS RISER DIAGRAM

PL206 PLUMBING STORM RISER DIAGRAM

PL301 ENLARGED PLANS

PL401 PLUMBING DETAILS

M-001 MECHANICAL SYMBOLS, ABBREVIATION, AND

GENERAL NOTES

M-002 MECHANICAL SCHEDULES

M-003 MECHANICAL FIRST FLOOR ZONING PLAN

M-004 MECHANICAL SECOND FLOOR ZONING PLAN

MH101 MECHANICAL FIRST FLOOR PLAN

MH102 MECHANICAL SECOND FLOOR PLAN

MH103 MECHANICAL ROOF PLAN

SHEET

NUMBER SHEET TITLE

SJ302 MOMENT FRAME ELEVATIONS

SJ303 MOMENT FRAME ELEVATIONS

SJ304 ELEVATIONS AND BUILDING SECTIONS

SJ401 FOUNDATION DETAILS

SJ402 FOUNDATION DETAILS

SJ403 FOUNDATION DETAILS

SJ501 STEEL DETAILS

SJ502 STEEL DETAILS

SJ601 EXTERIOR STAIR PARTIAL FRAMING PLANS

SJ602 ENCLOSED STAIR PARTIAL FRAMING PLANS

SJ603 STAIR DETAILS

SK101 BUILDING PERSPECTIVES

AS101 ARCHITECTURAL SITE PLAN

AD101 DEMOLITION PLAN

AE101 FIRST FLOOR PLAN

AE102 SECOND FLOOR PLAN

AE103 FIRST FLOOR DIMENSION PLAN

AE104 SECOND FLOOR DIMENSION PLAN

AE105 ROOF PLAN

AE106 FIRST FLOOR REFLECTED CEILING PLAN

AE107 SECOND FLOOR REFLECTED CEILING PLAN

AE201 ELEVATIONS

AE202 ELEVATIONS

AE203 ELEVATIONS

AE204 BUILDING ELEVATION VIEWS

AE205 BUILDING CROSS SECTIONS

AE206 BUILDING LONGITUDINAL SECTIONS

AI101 WALL SECTIONS

AI102 WALL SECTIONS

AI103A WALL SECTIONS

AI103B WALL SECTIONS & GATE ELEVATION

AI104A ENLARGED TOILET PLANS AND ELEVATIONS

AI104B ENLARGED TOILET PLANS AND ELEVATIONS

AI105A ENLARGED STAIR PLANS

AI105B ENLARGED STAIR SECTIONS

AI106 ENLARGED ELEVATOR PLAN AND SECTIONS

AI107 STAIR DETAILS

AI108 STAIR DETAILS

AI109A WALL DETAILS

AI109B WALL DETAILS

AI109C FOUNDATION DETAILS

AI109D FOUNDATION DETAILS

AI110A COLUMN DETAILS

AI110B COLUMN DETAILS

AI110C COLUMN DETAILS

AI111 TYPICAL GYPSUM BOARDS- ELEVATORS - DETAILS

AI112 TYPICAL GYPSUM BOARD ELEVATOR DETAILS

AI113A CEILING DETAILS

AI114B CEILING DETAILS

AI114C CEILING DETAILS

AI115 ROOF DETAILS

AI116 CURVED ROOF AND SUN CONTROL DEVICE

DETAILS

AI117 SEISMIC DETAILS

SHEET

NUMBER SHEET TITLE

GI101 COVER SHEET

GI102 PROJECT DATA

GI103 GENERAL NOTES, ABBREVIATIONS

GC101 FIRST FLOOR LIFE SAFETY PLAN

GC102 SECOND FLOOR LIFE SAFETY PLAN

CE-100 EXISTING CONDITIONS PLAN

CD-100 DEMOLITION AND EROSION CONTROL PLAN

CG-100 GRADING PLAN

CS-100 SITE PLAN

CU-100 OVERALL UTILITY PLAN

L-101 LANDSCAPE PLANTING PLAN

L-201 LANDSCAPE IRRIGATION PLAN

L-301 LANDSCAPE IRRIGATION AND PLANTING DETAILS

S001 STRUCTURAL GENERAL NOTES, LEGEND AND

ABBREVIATIONS

S002 STRUCTURAL GENERAL NOTES

S003 TYPICAL CONCRETE DETAILS

S004 TYPICAL CONCRETE DETAILS

S005 TYPICAL STEEL DETAILS

S006 TYPICAL STEEL DETAILS

S007 TYPICAL STEEL DETAILS

S008 TYPICAL STEEL DETAILS

S009 TYPICAL STEEL DETAILS

S010 TYPICAL STEEL DETAILS

SB101 FOUNDATION PLAN

SF101 SECOND FLOOR FRAMING PLAN

SF102 ROOF FRAMING PLAN

SF103 PARTIAL FRAMING PLANS

SJ301 MOMENT FRAME ELEVATIONS

SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS

8/15/2017

9/15/2017

12/5/2017

SD-2 PACKAGE 5/15/2018

DD-1 NON REVIEW 8/02/2018

DD-1 SUBMISSION 8/23/2018

DD-2 SUBMISSION 10/27/2018

CD-1 SUBMISSION 02/10/2019

CD-1 RE-SUBMISSION 04/12/2019

CD-1 RE-SUBMISSION 01/31/2020

CD-2 SUBMISSION 04/30/2020

CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020

REVIEW SET FOR CONSTRUCTION DOCUMENT SUBMISSION #2 09/24/2020

12/04/2020 CONSTRUCTION DOCUMENT SUBMISSION #2

RFI #1 05/06/2022

RCP NOTES

RCP LEGEND

KEYNOTE LEGEND

1.0

2.0

3.0

4.0

B1 B3 B4 B5

0.1

B6

E L E

V A

T O

RSTAFF AREA

PROCEDURE

TLT.

10A

SOILED

111B

EXAM

EXAM

EXAM

EXAM

CORRIDOR

STORAGE

CONSULT RM.

BREAK RM.

GROUP RM.

EXAM

EXAM

EXAM

ISO. EXAM

CLEAN

111D

CORRIDOR

EXAM

HAC

RECEPTION

TOILET

105A

LAUNDRY

TOILET

1 111

B4.5

B4.9

1.1

B1.4

3.4

STAFF TLT

111A

ELECT.

111C

ELEV EQ

ELECT

CONSULT RM.

A.F.F.10' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

AI113A

A.F.F.8' - 2"

A.F.F.9' - 0"

AI113A

AI113A

AI113A

8 10

1 1 1 1 1 A.F.F.12' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.10' - 0"A.F.F.10' - 0"A.F.F.10' - 0"A.F.F.10' - 0"A.F.F.10' - 0"A.F.F.10' - 0"

A.F.F.9' - 8"

A.F.F.8' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0" A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.8' - 0"

A.F.F.8' - 2"

A.F.F.9' - 0"

A.F.F.9' - 0"

A.F.F.9' - 0"

A.F.F.9' - 0"

A.F.F.9' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 6"

A.F.F.9' - 6"

A.F.F.10' - 0"

A.F.F.8' - 0"A.F.F.8' - 0"A.F.F.8' - 0"A.F.F.8' - 0"

A.F.F.8' - 0"

TOILET

SHWR ROOM

104A

A.F.F.8' - 0" A.F.F.8' - 0" A.F.F.8' - 0" A.F.F.8' - 0" A.F.F.8' - 0"

A.F.F.10' - 0"

A.F.F.9' - 0"

3.6

0.08

C

C

C

C

C

C

C

C

C

B2

A.F.F.9' - 0"

STAIR

S1

OPEN AIR

EXTERIOR

STAIR

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

AI113A

A.F.F.9' - 6"

A.F.F.10' - 0"

AI114B

AI114B

A.F.F.9' - 0"

A.F.F.10' - 0"

AI114B

A.F.F.9' - 0"

AI114B

WHEEL

CHAIRS

100A

CORRIDOR

100B

WAITING

VESTIBULE

A.F.F.10' - 0"

/8

12' - 1"

/4

10' - 8"

B2.4

0.9

3.2

0.06

0.05

B4.1 B4.3B3.5B3.3B1.8

0.09

4.3

AI113A

Sim

20'-0" RADIUS

AI114C

8'

0" 8' - 0"

1' - 0"

6' - 0"

1' - 0"

10' - 0 3/8" 9

/2

GYPSUM BOARD

HEADER AT 7'-0"

GYPSUM BOARD

HEADER AT 7'-0"

GYPSUM BOARD

HEADER AT 7'-0"

GYPSUM BOARD

HEADER AT 7'-0"

OPEN TO ABOVE-

SEE SECOND FLOOR

RCP FOR MORE

INFORMATION

/4

/4

ALIGN SQUARE FURR DOWN

WITH SQUARE TILE PATTERN ON

FLOOR.

PROVIDE HEATED AIR CURTAIN

SEE MECHANICAL SHEETS2

MOUNT

@ 80" (MIN)

ABOVE LANDING

MOUNT

@ 9'-0" ABOVE

1ST FLR.

MOUNT

@ 11'-0" ABOVE

GROUND

MOUNT

@ 11'-0" ABOVE

GROUND

MOUNT

@ 11'-0" ABOVE

GROUND

MOUNT

@ 11'-0" ABOVE

GROUND

MOUNT

@ 11'-0" ABOVE

GROUND

MOUNT

@ 11'-0" ABOVE

GROUND

MOUNT

@ 11'-0" ABOVE

GROUND

MOUNT

@ 11'-0" ABOVE

GROUND

MOUNT

@ 9'-0" ABOVE

1ST FLR.

MOUNT

@ 9'-0" ABOVE

1ST FLR.

MOUNT

@ 8'-3" ABOVE

1ST FLR.

10 10 10 10

10 10

A.F.F.10' - 0"

13 13

1313131313

1. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT

OF ANY DIMENSIONAL DISCREPANCIES

DISCOVERED DURING CONSTRUCTION.

2. REFER TO ELECTRICAL DRAWINGS FOR LOCATION

OF EMERGENCY LIGHTING.

3. CENTER CEILING AND LIGHTS IN ALL SPACES

WHERE POSSIBLE, UNLESS OTHERWISE NOTED.

4. REFER TO ELECTRICAL DRAWINGS FOR

LOCATIONS OF UNDER-CABINET LIGHT FIXTURES.

5. GYP. BD. SOFFITS ABOVE UPPER CABINETS SHALL

EXTEND TO TOP OF CABINET (7'-0" UNLESS

OTHERWISE NOTED).

6. THIS SHEET IS FOR LAYOUT ONLY. SEE

ELECTRICAL AND MECHANICAL DRAWINGS FOR

EXACT FIXTURE QUANTITY. ALL SWITCHES,

OUTLETS, LIGHTS, DIFFUSERS, ETC. MUST BE

LOCATED PER ARCHITECTURAL DRAWINGS

WHERE APPLICABLE-COORDINATE WITH MEP

SHEETS AND NOTIFY ARCHITECT OF ANY

DISCREPANCIES.

7. PROVIDE ACCESS PANELS IN GYPSUM CEILINGS

WHERE REQUIRED TO ACCESS ABOVE CEILING

EQUIPMENT. (SEE SPECS)

8. ALL CEILINGS SHALL BE 9'-0" AFF UNLESS

OTHERWISE NOTED.

9. REFER TO FINISH DRAWINGS AF102 FOR CEILING

GRID AND PANEL TYPE AND SIZE.

10. BOTTOM OF GYP. BD. BULKHEADS SHALL BE 8'-0"

AFF UNLESS OTHERWISE NOTED.

11. ALL PARTITION WALLS SHALL EXTEND TO

UNDERSIDE OF DECK ABOVE UNLESS OTHERWISE

NOTED.

12. GYP. BD. CEILINGS SHALL BE CONSTRUCTED PER

DETAIL OR AT G.C. OPTION TO USE AN

APPROVED EQUAL SYSTEM (FOR EX. - USG

CROSS-TEE SUSPENSION SYSTEM) ALL FRAMING

MEMBERS SHALL BE ADEQUATELY SIZED FOR THE

REQUIRED SPAN/SPACING. REFER TO SPECS FOR

ADDITIONAL GYP. BD. INFORMATION. GYP. BD.

CEILINGS SHALL BE INSTALLED PER ASTM C840.

/4 AI117

SD

GWB CEILING/ MOISTURE

RESISTANT IN LAUNDRY, SHOWER

ROOMS AND TOILET ROOMS

SMOKE DETECTOR

(REFER TO FA DWGS)

EXIT SIGN LOCATION

(REFER TO FA DWGS)

DIFFUSER

RETURN

CEILING HEIGHT,

ABOVE FINISH FLOOR

2X2 TEGULAR LAY-IN CEILING

A.F.F.1'-0"

RECESSED CAN

LIGHTING FIXTURE

8' UP/DOWN LED PENDANT

2X4 LED FIXTURE

CHAIN HUNG UTILITY

LED FIXTURE

WALL MOUNTED

UP/DOWN LIGHT

2X2 TEGULAR VINYL COATED

GYP. BD. LAY-IN CEILING

RECESSED LINEAR LED LIGHT

FIXTURE IN GYPSUM BOARD CEILINGS

WALL MOUNTED LIGHT

FIXTURE (EXTERIOR)-

MOUNT AT 9'-0" AFF

DECORATIVE LED PENDANT

LIGHT FIXTURE (WAITING 100)

C CAMERA (EXTERIOR)-MOUNT AT 11'-0"

OFF THE GROUND

DECORATIVE LIGHT FIXTURE-

MOUNT AT 8'-3" AFF (EXTERIOR

FRONT ENTRANCE)

LINEAR DIFFUSER

FIRST AND SECOND FLOOR

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

IMEG CORP. (M,E,P, & S)

300 NORTH LAKE AVENUE, 14TH FLOOR

PASADENA, CA 91101

CALIBRE ENGINEERING, INC. (CIVIL AND LANDSCAPE)

9090 SOUTH RIDGELINE BOULEVARD, SUITE 105

HIGHLANDS RANCH, CO 80129

KLEINFELDER (GEOTECH)

6700 KOLL CENTER PARKWAY

SUITE 120

PLEASANTON, CA 94566

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

B

IM

/V

IS

N

M a th e r

S o c ia l S e rv ic e s B u ild in g /M a th e r

S o c ia l S e rv ic e

.r v t

/6

/2

:3

:2

P M

FIRST FLOOR REFLECTED CEILING

PLAN

GC EM

CONSTRUCTION

DOCUMENT SUBMISSION

FULLY SPRINKLERED

612-163

AE106

DESIGN SOCIAL WORK AND

EXPAND CLINICAL SPACE

3551 Femoyer Street Mather, CA 95655

12/04/2020

1/8" = 1'-0"1

FIRST FLOOR REFLECTED CEILING PLAN

Note Number Note 1 2x2 TEGULAR LAY-IN CEILING

2 MOISTURE RESISTANT GYPSUM BOARD CEILING

3 VINYL COATED GYPSUM BOARD LAY-IN CEILING W/ HOLD DOWN CLIPS

4 EXTERIOR WALL MOUNTED LIGHT FIXTURE

5 WALL MOUNTED LED LIGHT FIXTURE OVER SINK, TYP.

6 LED CAN LIGHTS, TYP.

7 DECORATIVE LED PENDANT LIGHTS, LUMIUM - YTTRIUM OR VA APP. EQ. - TYP.

8 LINEAR LED PENDANT LIGHTS, LUMIUM - RUBIDIUM (CSR) OR VA APPROVED EQ. -

TYP.

9 RECESSED LINEAR LED LIGHT FIXTURE, SELUX M60 OR VA APPROVED EQ. - TYP.

10 2X4 LED LIGHT FIXTURE IN LAY-IN CEILING, TYP.

11 LED CAN LIGHT IN SHOWER, TYP.

12 NO CEILING

13 INSTALL NEW WINDOW BLINDS AT ALL CURTAIN WALL LOCATIONS, TYP. SEE

DETAIL 6/AI119 WINDOW SHADE DETAIL.

SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS

8/15/2017

9/15/2017

12/5/2017

SD-2 PACKAGE 5/15/2018

DD-1 NON REVIEW 8/02/2018

-KEYNOTE SYMBOL#

DD-1 SUBMISSION 8/23/2018

DD-2 SUBMISSION 10/27/2018

CD-1 SUBMISSION 02/10/2019

CD-1 RE-SUBMISSION 04/12/2019

CD-1 RE-SUBMISSION 01/31/2020

CD-2 SUBMISSION 04/30/2020

CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020

REVIEW SET FOR CONSTRUCTION DOCUMENT SUBMISSION #2 09/24/2020

12/04/2020 CONSTRUCTION DOCUMENT SUBMISSION #2

RFI #1 05/06/2022

RCP NOTES

RCP LEGEND

KEYNOTE LEGEND

1.0

2.0

3.0

4.0

B1 B3 B4 B5

0.1

B6

OPEN OFFICE

OFFICE

OFFICE

HAC

TOILET

TOILET

STOR./PRINT

BREAK ROOM

ELEV.

1OFFICE

IT

STORAGE

B4.5

B4.9

1.1

ELECT

B1.4

3.4

AI114B

A.F.F.9' - 4"

A.F.F.10' - 2"

OFFICE

OFFICE

A.F.F.8' - 0" A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.8' - 0"

A.F.F.9' - 2"

A.F.F.10' - 2"

AI114B

A.F.F.9' - 4"

A.F.F.10' - 2"

A.F.F.8' - 0"

AI114BA.F.F.9' - 2"

A.F.F.10' - 2"

A.F.F.9' - 4"

AI114B

STAIR

S1

CONF.

OPEN OFFICE

3.6

0.08

A.F.F.10' - 2"

B2

HVAC

CHASE

AI114B

Sim

AI114B

Sim

AI114B

Sim

A.F.F.10' - 0"

A.F.F.10' - 0"

A.F.F.10' - 0"

AI114B

Sim

A.F.F.8' - 0"

A.F.F.10' - 2"

A.F.F.10' - 0"

A.F.F.8' - 0"

B2.4

0.9

3.2

0.06

0.05

B4.1 B4.3B3.5B3.3B1.8

0.09

4.3

/8

/8

78' - 0 3/8"

11 7/8"

/8

1' - 0 3/8"

AT LANDING

8 8

8 8

MOUNT @ 9'-0"

ABOVE 2ND FLR.

MOUNT @ 9'-0"

ABOVE 2ND FLR.

MOUNT @ 9'-0"

ABOVE 2ND FLR.

MOUNT @ 9'-0"

ABOVE 2ND FLR.

MOUNT @ 9'-0"

ABOVE 2ND FLR.

NO CEILING

13 13

131313

1. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT

OF ANY DIMENSIONAL DISCREPANCIES

DISCOVERED DURING CONSTRUCTION.

2. REFER TO ELECTRICAL DRAWINGS FOR LOCATION

OF EMERGENCY LIGHTING.

3. CENTER CEILING AND LIGHTS IN ALL SPACES

WHERE POSSIBLE, UNLESS OTHERWISE NOTED.

4. REFER TO ELECTRICAL DRAWINGS FOR

LOCATIONS OF UNDER-CABINET LIGHT FIXTURES.

5. GYP. BD. SOFFITS ABOVE UPPER CABINETS SHALL

EXTEND TO TOP OF CABINET (7'-0" UNLESS

OTHERWISE NOTED).

6. THIS SHEET IS FOR LAYOUT ONLY. SEE

ELECTRICAL AND MECHANICAL DRAWINGS FOR

EXACT FIXTURE QUANTITY. ALL SWITCHES,

OUTLETS, LIGHTS, DIFFUSERS, ETC. MUST BE

LOCATED PER ARCHITECTURAL DRAWINGS

WHERE APPLICABLE-COORDINATE WITH MEP

SHEETS AND NOTIFY ARCHITECT OF ANY

DISCREPANCIES.

7. PROVIDE ACCESS PANELS IN GYPSUM CEILINGS

WHERE REQUIRED TO ACCESS ABOVE CEILING

EQUIPMENT. (SEE SPECS)

8. ALL CEILINGS SHALL BE 9'-0" AFF UNLESS

OTHERWISE NOTED.

9. REFER TO FINISH DRAWINGS AF102 FOR CEILING

GRID AND PANEL TYPE AND SIZE.

10. BOTTOM OF GYP. BD. BULKHEADS SHALL BE 8'-0"

AFF UNLESS OTHERWISE NOTED.

11. ALL PARTITION WALLS SHALL EXTEND TO

UNDERSIDE OF DECK ABOVE UNLESS OTHERWISE

NOTED.

12. GYP. BD. CEILINGS SHALL BE CONSTRUCTED PER

DETAIL OR AT G.C. OPTION TO USE AN

APPROVED EQUAL SYSTEM (FOR EX. - USG

CROSS-TEE SUSPENSION SYSTEM) ALL FRAMING

MEMBERS SHALL BE ADEQUATELY SIZED FOR THE

REQUIRED SPAN/SPACING. REFER TO SPECS FOR

ADDITIONAL GYP. BD. INFORMATION. GYP. BD.

CEILINGS SHALL BE INSTALLED PER ASTM C840.

/4 AI117

SD

GWB CEILING/ MOISTURE

RESISTANT IN LAUNDRY, SHOWER

ROOMS AND TOILET ROOMS

SMOKE DETECTOR

(REFER TO FA DWGS)

EXIT SIGN LOCATION

(REFER TO FA DWGS)

DIFFUSER

RETURN

CEILING HEIGHT,

ABOVE FINISH FLOOR

2X2 TEGULAR LAY-IN CEILING

A.F.F.1'-0"

RECESSED CAN

LIGHTING FIXTURE

8' UP/DOWN LED PENDANT

2X4 LED FIXTURE

CHAIN HUNG UTILITY

LED FIXTURE

WALL MOUNTED

UP/DOWN LIGHT

2X2 TEGULAR VINYL COATED

GYP. BD. LAY-IN CEILING

RECESSED LINEAR LED LIGHT

FIXTURE IN GYPSUM BOARD CEILINGS

WALL MOUNTED LIGHT

FIXTURE (EXTERIOR)-

MOUNT AT 9'-0" AFF

DECORATIVE LED PENDANT

LIGHT FIXTURE (WAITING 100)

C CAMERA (EXTERIOR)-MOUNT AT 11'-0"

OFF THE GROUND

DECORATIVE LIGHT FIXTURE-

MOUNT AT 8'-3" AFF (EXTERIOR

FRONT ENTRANCE)

LINEAR DIFFUSER

FIRST AND SECOND FLOOR

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

IMEG CORP. (M,E,P, & S)

300 NORTH LAKE AVENUE, 14TH FLOOR

PASADENA, CA 91101

CALIBRE ENGINEERING, INC. (CIVIL AND LANDSCAPE)

9090 SOUTH RIDGELINE BOULEVARD, SUITE 105

HIGHLANDS RANCH, CO 80129

KLEINFELDER (GEOTECH)

6700 KOLL CENTER PARKWAY

SUITE 120

PLEASANTON, CA 94566

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

B

IM

/V

IS

N

M a th e r

S o c ia l S e rv ic e s B u ild in g /M a th e r

S o c ia l S e rv ic e

.r v t

/6

/2

:3

:2

P M

SECOND FLOOR REFLECTED

CEILING PLAN

GC EM

CONSTRUCTION

DOCUMENT SUBMISSION

FULLY SPRINKLERED

612-163

AE107

DESIGN SOCIAL WORK AND

EXPAND CLINICAL SPACE

3551 Femoyer Street Mather, CA 95655

12/04/2020

1/8" = 1'-0"1

SECOND FLOOR REFLECTED CEILING

PLAN

Note Number Note 1 2x2 TEGULAR LAY-IN CEILING

2 MOISTURE RESISTANT GYPSUM BOARD CEILING

3 VINYL COATED GYPSUM BOARD LAY-IN CEILING W/ HOLD DOWN CLIPS

4 EXTERIOR WALL MOUNTED LIGHT FIXTURE

5 WALL MOUNTED LED LIGHT FIXTURE OVER SINK, TYP.

6 LED CAN LIGHTS, TYP.

7 DECORATIVE LED PENDANT LIGHTS, LUMIUM - YTTRIUM OR VA APP. EQ. - TYP.

8 LINEAR LED PENDANT LIGHTS, LUMIUM - RUBIDIUM (CSR) OR VA APPROVED EQ. -

TYP.

9 RECESSED LINEAR LED LIGHT FIXTURE, SELUX M60 OR VA APPROVED EQ. - TYP.

10 2X4 LED LIGHT FIXTURE IN LAY-IN CEILING, TYP.

11 LED CAN LIGHT IN SHOWER, TYP.

12 NO CEILING

13 INSTALL NEW WINDOW BLINDS AT ALL CURTAIN WALL LOCATIONS, TYP. SEE

DETAIL 6/AI119 WINDOW SHADE DETAIL.

SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS

8/15/2017

9/15/2017

12/5/2017

SD-2 PACKAGE 5/15/2018

DD-1 NON REVIEW 8/02/2018

-KEYNOTE SYMBOL#

DD-1 SUBMISSION 8/23/2018

DD-2 SUBMISSION 10/27/2018

CD-1 SUBMISSION 02/10/2019

CD-1 RE-SUBMISSION 04/12/2019

ROOF

HATCH

CD-1 RE-SUBMISSION 01/31/2020

CD-2 SUBMISSION 04/30/2020

CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020

REVIEW SET FOR CONSTRUCTION DOCUMENT SUBMISSION #2 09/24/2020

12/04/2020 CONSTRUCTION DOCUMENT SUBMISSION #2

RFI #1 05/06/2022

C R

12" (304 mm)

36"

(914 mm)

8" (203 mm)

PLAN VIEW

2” x 4” framing

4” x 6” Posts

Face

6" (152 mm)

96" (2438 mm)

CL

48"

(1218 mm)

Face panel to be an exterior grade.

MDO sheet or an aluminum skin laminated to a wood or plastic core is preferred with edges physically sealed.

U.S. DEPARTMENT

OF VETERAN AFFAIRS

All visible surfaces to be primed and painted

Sign attached together with wood screws & lag bolts

48"(1218 mm)

4” x 6” Posts

Depth & type of footing determined by existing soil conditions

ELEVATION

END VIEW

VA

SOCIAL WORK & EXPAND CLINICAL SPACE

PROJECT #612-163

PARAPET

ROOF MANUFACTURE'S

APPROPRIATE FASTENER & SEAM

PLATE, 12" OC MAX

TPO BONDING ADHESIVE

TPO PARAPET FLASHING

2" WELDED SPLICE, TOP &

BOTTOM

M

IN4

TPO MEMBRANE AS COVER STRIP

NOTES:

MANUFACTURER'S POLYMER OR

METAL BATTEN STRIP MAY BE USED IN

LIEU OF SEAM PLATES. METAL BATTEN

MUST BE USED W/MASONRY

SUBSTRATE.

IF INTERMEDIATE ATTACHMENT STRIP

IS REQUIRED, COMPLETE AS

FOLLOWS:

- NONE REQUIRED TO 3' WALL

HEIGHT.

- ONE STRIP PLACED CENTER OF

WALL HEIGHT TO 6' WALL

HEIGHT.

- ABOVE 6', ONE STRIP EVERY 3'.

PROVIDE MANUFACTURER'S CUT EDGE

SEALANT AS REQUIRED.CUT EDGE SEALANT AS REQUIRED

MIN

2"

SLOPE

ROOF MANUF FASTENER &

SEAM PLATE (SIZE FASTENER

TO PENETRATE METAL DECK)

NOTE: WHEN TPO POLYESTER

REINFORCEMENT IS EXPOSED,

APPLY CUT EDGE TREATMENT TO

ENTIRE EXPOSED EDGE PER

MANUF

2"

6"

WELDED LAP SPLICE

TPO MEMBRANE,

MECHANICALLY ATTACHED

SYSTEM (MAS)

ENTRANCE MAT WITH

POLYAMIDE OR RETREAD INFILLS FOR

OPTIMUM DIRT AND MOISTURE REMOVAL

POLYMER FLEXIBLE JOINER

NATURAL ANODIZED FINISH

LOW PROFILE ALUMINUM

FRAME SCREWED TO FLOOR

FULL SECTION

51mm

SHOCK-ABSORBING CONTINUOUS

VINYL CUSHION FEET

EXTERIOR WALKING SURFACE

shall ALIGN WITH THE

TOP OF THE WALK OFF MAT

RECESS SLAB AS REQUIRED

BY MANUFACTURER TO ALLOW

FOR FLUSH TRANSITION FROM FLOORING

TO WALK OFF MAT

ACCESSIBLE

NOTE

DRINKING FOUNTAINS SHALL COMPLY WITH THE VA BARRIER FREE

DESIGN CRITERIA.

ABA 307 PROTRUDING OBJECTS AND 602

CONTRACTOR TO REFERENCE CURRENT

VA BARRIER FREE DESIGN CRITERIA.

M

IN

M

A X

"EWC

EWC

OASIS BI-LEVEL BARRIER

FREE DRINKING FOUNTAIN2

M

IN

C

L E

A R

M

A X

ACCESSIBLE

DRINKING

FOUNTAINS

LINE OF WALL

OASIS BI-LEVEL BARRIER

FREE DRINKING

FOUNTAIN

4' - 0" CLR. MIN. 6"

/8

/4

15" MIN.5" MAX

MIN.

8"

5" MAX15" MIN.

LINE OF WALL

M

A X

M

IN

C

L E

A R

8".

EQ EQ

NEW CURTAIN

WALL

NEW EXTERIOR WALL

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

IMEG CORP. (M,E,P, & S)

300 NORTH LAKE AVENUE, 14TH FLOOR

PASADENA, CA 91101

CALIBRE ENGINEERING, INC. (CIVIL AND LANDSCAPE)

9090 SOUTH RIDGELINE BOULEVARD, SUITE 105

HIGHLANDS RANCH, CO 80129

KLEINFELDER (GEOTECH)

6700 KOLL CENTER PARKWAY

SUITE 120

PLEASANTON, CA 94566

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

B

IM

/V

IS

N

M a th e r

S o c ia l S e rv ic e s B u ild in g /M a th e r

S o c ia l S e rv ic e

.r v t

/6

/2

:3

:3

P M

MISCELLANEOUS DETAILS

GC EM

CONSTRUCTION

DOCUMENT SUBMISSION

FULLY SPRINKLERED

612-163

AI119

DESIGN SOCIAL WORK AND

EXPAND CLINICAL SPACE

3551 Femoyer Street Mather, CA 95655

12/04/2020

SCALE: 12" = 1'-0"

1CONSTRUCTION SIGN

SCALE: 3" = 1'-0"

2ROOF TYP. TPO WALL SPLICE

SCALE: 3" = 1'-0"

3ROOF TYP. TPO FIELD SPLICE

SCALE: 3/4" = 1'-0"

4RECESSED WALK-OFF MAT SECTION

SCALE: 1/2" = 1'-0"

5HI-LOW DRINKING FOUNTAIN

SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS

8/15/2017

9/15/2017

12/5/2017

SD-2 PACKAGE 5/15/2018

DD-1 NON REVIEW 8/02/2018

DD-1 SUBMISSION 8/23/2018

DD-2 SUBMISSION 10/27/2018

CD-1 SUBMISSION 02/10/2019

CD-1 RE-SUBMISSION 04/12/2019

CD-1 RE-SUBMISSION 01/31/2020

CD-2 SUBMISSION 04/30/2020

CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020

REVIEW SET FOR CONSTRUCTION DOCUMENT SUBMISSION #2 09/24/2020

12/04/2020 CONSTRUCTION DOCUMENT SUBMISSION #2

RFI #1 05/06/2022

SCALE: 1 1/2" = 1'-0"

6.WINDOW SHADE DETAIL

Sheets
AE106 - FIRST FLOOR REFLECTED CEILING PLAN
AE107 - SECOND FLOOR REFLECTED CEILING PLAN
AI119 - MISCELLANEOUS DETAILS
GI101 - COVER SHEET

File details come from the government source that posted it. Updated .