Attachment 11 - 20220404_Mather Construction Combined drawings 3.15.21 VOLUME II.pdf

PDF 24 MB Posted

Attached to
Y1DB--612-163 Construct Social Work Consolidated Clinic Space (VA-21-00019843)
Solicitation number
36C77622B0016
Issued by

About this file

This file attachment is related to a federal contract opportunity issued by the Department of Veterans Affairs Technology Acquisition Center Austin to construct social work consolidated clinic space.

The solicitation seeks to award a firm fixed-price construction contract to build out consolidated clinic space for social workers at a Veterans Affairs medical center. Offerors must submit proposals by April 4, 2022 addressing the statement of work in Volume II of the combined drawings package dated March 15, 2021. The contract is set aside for service-disabled veteran-owned small businesses. The period of performance is 365 calendar days from the notice to proceed with an expected award date in late spring 2022. The contractor will be responsible for all labor, materials, equipment, permits, fees, and other costs to complete the specified construction work.

View the file

Other files

File Type Posted
36C77622B0016 0003.docx DOCX document
Attachment 5 - REVISED DRAWING L-101 FOR UPSIZED SHRUBS AND TREES.pdf PDF
36C77622B0016 0002.docx DOCX document
Attachment 4 - SECTION 12 24 00 Window Shades.pdf PDF
Attachment 3 - Mather Social Services RFI number 1.pdf PDF
Attachment 1 - 105126.18 SOLID PLASTIC LOCKERS.pdf PDF
Attachment 2 - AL13 Panel Submittal.pdf PDF
36C77622B0016 0001.docx DOCX document
Attachment 3 - Contractor Safety and Environmental Record Evaluation Form.docx DOCX document
Attachment 8 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 13- VHA Supplemental Contract Requirements for Ensuring Adeq COVID-19 Safety Protocols for Fed Contractors rev2.docx DOCX document
Attachment 9 - COVID-19 Safety Protocols 12-14-21.pdf PDF
36C77622B0016_1.docx DOCX document
Attachment 10 - 20220404_Mather Construction Combined drawings 3.15.21 VOLUME I.pdf PDF
Attachment 6 - 01 32 16 - Project Schedules Master Spec 20180330.docx DOCX document
Attachment 2 - Release of Claims.docx DOCX document
Attachment 1 - Site Visit - Map.docx DOCX document
Attachment 12 - 20220404_Mather Construction Combined drawings 3.15.21 VOLUME III.pdf PDF
Attachment 4 - 20220404_2020-1204 Mather (612-163) 100_ CD Specs - Volume 1 (04-04-2024).pdf PDF
Attachment 7 - DBA Wage Rate - Sacramento County - 2-4-22.pdf PDF
Attachment 5 - 20210401_2020-1204 Mather (612-163) 100_ CD Specs - Volume 2 (03-31-2021).pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B2

4.3

B1.4

SJ304

SJ603

MC12x10.6

MC12x10.6

/2

UP

DN

UP L3x2x1/4 @

24" O.C. MAX

H S

S x x /8

C x

.2

C8x11.5 M C x

.6

C x

.5

MC12x10.6

MC12x10.6

MC12x10.6

MC12x10.6

SJ603

SJ603

SJ603

4.3

B1.4

H S

S x x /8

HSS12x6x1/2

C x

.5

C8x11.5

DN

SJ304

SJ603

MC12x10.6

MC12x10.6

SJ603

O.H

No.5145RE

GI

ST

ER

ED

ROFESSIONAL

NGINEER

P E

E

WI

( )N

ARI

S

T R U C T U RA L

S T

A T E

OF A L I FO R

N I A

C

VO A

D N

GE R

N

J

A

G

Exp. 09/30/20

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

of Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS

8/15/2017

9/15/2017

12/5/2017

SD-2 PACKAGE 5/15/2018

DD-1 NON REVIEW 8/02/2018

DD-1 SUBMISSION 8/23/2018

DD-2 SUBMISSION 10/27/2018

CD-1 SUBMISSION 02/10/2019

CD-1 RE-SUBMISSION 04/12/2019

CD-1 RE-SUBMISSION 01/31/2020

CD-2 SUBMISSION 04/30/2020

CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020

REVIEW SET FOR CONSTRUCTION DOCUMENT SUBMISSION #2 12/04/2020

C R e v it L o c a l F ile s \S

.0

V

IS

N

M a th e r

S o c ia l S e rv ic e s

C

N a re n d ra k u m a r.

S .V a d la m a n i.

rv t

/7

/2

:2

:1

P

M

ENCLOSED STAIR PARTIAL FRAMING PLANS

GC NV

CONSTRUCTION

DOCUMENT SUBMISSION

FULLY SPRINKLERED

612-163

SJ602

DESIGN SOCIAL WORK AND

EXPAND CLINICAL SPACE

3551 Femoyer Street Mather, CA 95655

9/24/20

1/2" = 1'-0"1

ENCLOSED STAIR FOUNDATION PLAN

1/2" = 1'-0"2

ENCLOSED STAIR INTERMEDIATE LANDING FRAMING PLAN

1/2" = 1'-0"3

ENCLOSED STAIR SECOND FLOOR FRAMING PLAN

NOTE: SEE SF102 FOR STAIR ENCLOSURE ROOF FRAMING PLAN SEE

2/SF103 FOR STAIR ENCLOSURE PARAPET FRAMIN PLAN

300 N. LAKE AVENUE 14TH FLOOR

PASADENA, CA 91101

626.463.2800 FAX: 626.463.2801

www.imegcorp.com # 02165361.00

No.5145RE

GI

ST

ER

ED

ROFESSIONAL

NGINEER

P E

E

WI

( )N

ARI

S

T R U C T U RA L

S T

A T E

OF A L I FO R

N I A

C

VO A

D N

GE R

N

J

A

G

Exp. 09/30/20

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

of Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS

8/15/2017

9/15/2017

12/5/2017

SD-2 PACKAGE 5/15/2018

DD-1 NON REVIEW 8/02/2018

DD-1 SUBMISSION 8/23/2018

DD-2 SUBMISSION 10/27/2018

CD-1 SUBMISSION 02/10/2019

CD-1 RE-SUBMISSION 04/12/2019

CD-1 RE-SUBMISSION 01/31/2020

CD-2 SUBMISSION 04/30/2020

CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020

REVIEW SET FOR CONSTRUCTION DOCUMENT SUBMISSION #2 12/04/2020

C R e v it L o c a l F ile s \S

.0

V

IS

N

M a th e r

S o c ia l S e rv ic e s

C

N a re n d ra k u m a r.

S .V a d la m a n i.

rv t

/7

/2

:2

:1

P

M

STAIR DETAILS

GC NV

CONSTRUCTION

DOCUMENT SUBMISSION

FULLY SPRINKLERED

612-163

SJ603

DESIGN SOCIAL WORK AND

EXPAND CLINICAL SPACE

3551 Femoyer Street Mather, CA 95655

9/24/20

300 N. LAKE AVENUE 14TH FLOOR

PASADENA, CA 91101

No.5145RE

GI

ST

ER

ED

ROFESSIONAL

NGINEER

P E

E

WI

( )N

ARI

S

T R U C T U RA L

S T

A T E

OF A L I FO R

N I A

C

VO A

D N

GE R

N

J

A

G

Exp. 09/30/20

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

of Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS

8/15/2017

9/15/2017

12/5/2017

SD-2 PACKAGE 5/15/2018

DD-1 NON REVIEW 8/02/2018

DD-1 SUBMISSION 8/23/2018

DD-2 SUBMISSION 10/27/2018

CD-1 SUBMISSION 02/10/2019

CD-1 RE-SUBMISSION 04/12/2019

CD-1 RE-SUBMISSION 01/31/2020

CD-2 SUBMISSION 04/30/2020

CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020

REVIEW SET FOR CONSTRUCTION DOCUMENT SUBMISSION #2 12/04/2020

C R e v it L o c a l F ile s \S

.0

V

IS

N

M a th e r

S o c ia l S e rv ic e s

C

N a re n d ra k u m a r.

S .V a d la m a n i.

rv t

/7

/2

:2

:1

P

M

BUILDING PERSPECTIVES

GC NV

CONSTRUCTION

DOCUMENT SUBMISSION

FULLY SPRINKLERED

612-163

SK101

DESIGN SOCIAL WORK AND

EXPAND CLINICAL SPACE

3551 Femoyer Street Mather, CA 95655

9/24/20

3D VIEW LOOKING SOUTH - WEST

3D VIEW LOOKING SOUTH - EAST

300 N. LAKE AVENUE 14TH FLOOR

PASADENA, CA 91101

FEMOYER STREETFEMOYER STREET

P E

T E

R A

M c C

U E

N B

L V

D

F U

T U

R E

E X

T E

N S

IO

N

O F

P E

T E

R A

M c C

U E

N B

L V

D

N

.I .C

EXISTING SIDEWALK

LANDSCAPE W/ BOULDERS AS RAMMING

DETERRENT -

SEE LANDSCAPE PLAN

E N

T R

Y /E

G R

E S

S

N .I .C

LANDSCAPE

(SEE LANDSCAPE PLAN)

P A

R K

IN

G

N

.I .C

S

E E

B

ID

A

L T

E R

N A

T E

S

IN

P E

C S

SIDEWALK

S

ID

E W

A

K

F U

T U

R E

S

ID

E W

A L K

N

.I .C

PARKING (N.I.C.)

ENTRY/EGRESS (N.I.C.)

ADA PARKING

SPACES BASE

BID, TYP.

CONCRETE & PAVEMENT AREA

PROPOSED IN CONTRACT

L A

N D

S C

A

EN

TR

Y

S

ID

E W

A

K

6' SIDEWALK

NEW 2 STORY

BUILDING

Address: 3551 Femoyer Street Mather, CA 95655

EXTERIOR STORAGE

AND LOCKERS

BOLLARDS

AT 4'-0"O.C., TYP. PROVIDE 8"

STAINLESS STEEL REMOVABLE

INTERNAL LOCKING BOLLARDS FROM

BLOCKAIDES (BLOCKAIDES.COM) OR

VA APPROVED EQUAL ON N-S AXIS IN

THE CONCRETE AREAS IN FRONT OF

H/C PARKING. PROVIDE STAINLESS

STEEL FIXED EMBEDDED BOLLARD TO

MATCH REMOVABLE BOLLARDS IN

LANDSCAPED AREAS AND AT OTHER

SIDEWALK LOCATIONS.

EXTERIOR MAIN

ELECTRICAL ROOM

EXTERIOR

ELEVATOR

EQUIPMENT

ROOM

PSDM SETBACK

25' - 0"

13' - 3 1/2"2

/2

171' - 1 1/2"

F U

T U

R E

S

ID

E W

A L K

N

.I .C

NEW CONCRETE

SIDEWALK WITH SCORED

CONTROL JOINTS

SPACED 5' APART,TYP.

NEW SIDEWALK

WITH SCORED

CONTROL JOINTS

SPACED 5' APART,TYP.

CONCRETE

CURB, GUTTER, AND

SIDEWALK

LANDSCAPE

LANDSCAPE

(SEE LANDSCAPE

PLAN)

FUTURE DUMPSTER

LOCATION (N.I.C.)

6' - 0"

5' - 0"

5' - 0"

6' - 0"

1' - 6"

T Y

P

/2

29' - 9 1/2"

" TAPER NEW CURB TO

BE FLUSH WITH PAVING

6" VERTICAL CURB

TYP.

9' - 0"

PROP. 6" WIDE

SIDEWALK CHASE P

S D

M S

E T

B A

C K

P S

D M

S E

T B

A C

K M

IN

IM

U M

NEW

PEDESTRIAN

CONNECTIONS

TO PETER A.

MCCUEN

EXPANSION

(N.I.C.)

PSDM SETBACK

25' - 0"

LANDSCAPE W/ BOULDERS AS RAMMING

DETERRENT -

SEE LANDSCAPE PLAN

ASPHALT

(REFER TO

CIVIL

DRAWINGS)

CONSTRUCTION ACCESS GATE

CONSTRUCTION FENCING

CONSTRUCTION AND SAFETY

SIGNAGE POSTED TO

CONSTRUCTION FENCING

9' - 0"

TYP.

5' - 0"

VAN SIGN H/C SIGNH/C SIGN

END OF CURB

& GUTTER

TAPER CURB TO

BE FLUSH WITH

SIDEWALK AND

H/C PARKING

PAVING

FUTURE MONUMENT

SIGN. VERIFY LOCATION

WITH VA COR. PROVIDE

(2) POWER CONDUITS TO

THIS LOCATION.

4' - 5 1/2"

PAVING AT

ADA SPACES

FLUSH WITH

SIDE WALK

FLUSH TRANSITION

FROM SIDEWALK TO

DRIVE

2'X3' TACTILE WARNING

SURFACE

2'-0" WIDE TACTILE WARNING

SURFACE

BID ALT #3:

8'-0" WIDE AND 6'-0" WIDE

CANTILEVERED ALUMINUM

WALK COVER SEE BID

ALTERNATES IN SPEC SECTION

010000 GENERAL REQUIREMENTS

PROVIDE SUBMITTAL FOR APPROVAL

EXISTING

POWER POLE

VERIFY DRIVE

WILL MISS

POLE. PROTECT

DURING CONSTRUCTION.

STOP CURB AND

GUTTER

FUTURE CURB

AND GUTTER

BID ALT #6:

FUTURE PARKING LOT

LIGHTING ON CONCRETE BASE.

VERIFY NUMBER

WITH SPACING REQUIREMENTS.

SEE BID ALTERNATES IN SPEC

SECTION 010000 GENERAL REQUIREMENTS

153' - 5 1/2"

24' - 6 1/4"

GENERAL CONTRACTOR

RESPONSIBLE FOR GETTING

CURB CUT PERMIT (IF REQUIRED)

FROM AHJ.

15' - 0"

TRANSFORMER

PAD WITH

BOLLARDS FOR

PROTECTION.

CONFORM TO

VA PSDM REQUIREMENTS

FOR BOLLARDS SPACING.

SEE ELECTRICAL

SITE PLAN

6'

1/

2"

6'

7"

R = 3' - 2 3/4"

R

AS101

BID ALT #6:

FUTURE PARKING LOT

LIGHTING ON CONCRETE BASE.

VERIFY NUMBER

WITH SPACING REQUIREMENTS.

SEE BID ALTERNATES IN SPEC

SECTION 010000 GENERAL REQUIREMENTS

NOTE: Parcel #: 0670010063-0000

Address: 10699 Femoyer Street Mather, CA 95655

FUTURE 2'x3'

TACTILE WARNING

SURFACE

WORK NOT IN CONTRACT

DEFINING LEGEND FOR

WORK IN CONTRACT

CONSTRUCTION FENCE

ASPHALT PAVING IN CONTRACT

BUILDING WORK IN CONTRACT

LANDSCAPE AREA IN CONTRACT

PSDM SETBACK (FACE OF CURB)

4" THICK CONCRETE PAVING IN CONTRACT

#12X1 1/4" TEKS

2 3/4" DECK

6" FASCIA

GUSSET

CONCEALED

CONNECTION

6" X 8" BEAM

6" X 8" COLUMN

(CLEAR

ANODIZED

ALUMINUM)

GROUT AND

FILL SLOPE

DRAINAGE OUTLET

FOAM BLOCKOUT

(PROVIDED BY

AVADEK/INSTALLED

BY GC)

CONCRETE

FOOTING

(BY GC) SEE

STRUCTURAL

SHEETS.

THIS SYSTEM IS BASED ON

AVADEK OR VA APPROVED

EQUAL. ALL COMPONENTS

shall BE CLEAR ANODIZED

ALUMINUM

PROVIDE 8'-0" WIDTH AT

FRONT ENTRANCE AND 6'-0"

WIDTH AT STORAGE AND LOCKERS

SLOPE TOP AT 20 DEGREES

20.00°

8'-0"

DISHCHARGE TO OPOSITE SIDE

AT LOCKERS

BID ALT #3:

6'-0" WIDE GROUND MOUNTED

CANTILEVERED ALUMINUM

WALK COVER SEE BID

ALTERNATES IN SPEC SECTION

010000 GENERAL REQUIREMENTS

BID ALT #3:

8'-0" WIDE GROUND MOUNTED

CANTILEVERED ALUMINUM

WALK COVER SEE BID

ALTERNATES IN SPEC SECTION

010000 GENERAL REQUIREMENTS

EN

TR

Y

LANDSCAPE

(SEE LANDSCAPE

PLAN)

29' - 9 5/8"

/8

5' - 0"

13' - 3 3/4"

CONCRETE & PAVEMENT AREA

PROPOSED IN CONTRACT

BOLLARDS

AT 4'-0"O.C., TYP. PROVIDE STAINLESS

STEEL REMOVABLE EXTERNAL

LOCKING BOLLARDS FROM

BLOCKADES OR VA APPROVED

EQUAL ON N-S AXIS IN THE

CONCRETE AREAS. PROVIDE

STAINLESS STEEL FIXED EMBEDDED

BOLLARD TO MATCH REMOVABLE

BOLLARDS IN LANDSCAPED AREAS.

NEW

PEDESTRIAN

CONNECTIONS

TO PETER A.

MCCUEN

EXPANSION

(N.I.C.)

8'

0"

12' - 11 1/2"

COLUMN FOOTINGS

SEE STRUCTURAL

SHEETS. SPACE

AT APPROX.

10'-0" O.C. OR

AS DIRECTED

BY CANOPY

MANUFACTURER

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

IMEG CORP. (M,E,P, & S)

300 NORTH LAKE AVENUE, 14TH FLOOR

PASADENA, CA 91101

CALIBRE ENGINEERING, INC. (CIVIL AND LANDSCAPE)

9090 SOUTH RIDGELINE BOULEVARD, SUITE 105

HIGHLANDS RANCH, CO 80129

KLEINFELDER (GEOTECH)

6700 KOLL CENTER PARKWAY

SUITE 120

PLEASANTON, CA 94566

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

B

IM

/V

IS

N

M a th e r

S o c ia l S e rv ic e s B u ild in g /M a th e r

S o c ia l S e rv ic e s

D

.r v t

/1

/2

:0

:5

P M

ARCHITECTURAL SITE PLAN

GC EM

CONSTRUCTION

DOCUMENT SUBMISSION

FULLY SPRINKLERED

612-163

AS101

DESIGN SOCIAL WORK AND

EXPAND CLINICAL SPACE

3551 Femoyer Street Mather, CA 95655

12/04/2020

1" = 20'-0"1

ARCHITECTURAL SITE PLAN 1/2" = 1'-0"2

L-BENT STYLE BASIC

WALKWAY SECTION (BID ALT #3)

BID ALT #4:

UPSIZE ALL LANDSCAPE MATERIALS. LARGER CALIPER TREES AND SHRUBS. PROVIDE LARGER

MOSS AND LICHEN COVERED BOULDERS. CHANGE GRAVEL LANDSCAPE AREAS TO ARTIFICIAL

GRASS. SEE BID ALTERNATES IN SPEC SECTION 010000 GENERAL REQUIREMENTS.

BID ALT #6:

PROVIDE PARKING AS INDICATED (DASHED FUTURE PARKING). SEE BID ALTERNATES IN

SPEC SECTION 010000 GENERAL REQUIREMENTS.

BID ALT #4

1" = 10'-0"3

ENLARGED SITE PLAN (BID ALT. #3)

SLOPE SIDEWALK 1/8" PER FOOT

TO LANDSCAPE

NOTE: CONTRACTOR SHALL PERFORM

UNDERGROUND SURVEY INCLUDING GROUND

PENETRATING RADAR AND MAGNETOMETER

SURVEY PRIOR TO UNDERGROUND WORK

ACTIVITY AS APPROVED BY THE VA COR.

NOTE: THIS SITE IS SUBJECT TO STRONG

WINDS. THE GC IS RESPONSIBLE FOR

SECURING ALL ITEMS AND DEBRIS FROM

WIND. GC TO PICK UP DEBRIS ON A DAILY

BASIS ON SITE, AND ANY THAT HAS BLOWN

OFF SITE.

NOTE: IF FABRIC IS USED ON ANY FENCING,

OTHER THAN EROSION CONTROL FENCING,

IT MAY BE CUT TO ALLOW WIND TO PASS

THRU WITHOUT BLOWING THE FENCE OVER.

THIS SITE IS SUBJECT TO STRONG WINDS.

SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS

8/15/2017

9/15/2017

12/5/2017

SD-2 PACKAGE 5/15/2018

DD-1 NON REVIEW 8/02/2018

DD-1 SUBMISSION 8/23/2018

DD-2 SUBMISSION 10/27/2018

CD-1 SUBMISSION 02/10/2019

CD-1 RE-SUBMISSION 04/12/2019

CD-1 RE-SUBMISSION 01/31/2020

CD-2 SUBMISSION 04/30/2020

CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020

REVIEW SET FOR CONSTRUCTION DOCUMENT SUBMISSION #2 09/24/2020

12/04/2020 CONSTRUCTION DOCUMENT SUBMISSION #2

KEYNOTE LEGEND

EXISTING

BUILDING

EXISTING SIDEWALK

EXISTING SIDEWALK

EXISTING SIDEWALK

STAGING AREA LIGHT POLE TO REMAIN

4 4

EX

IS

TI

N

G S

ID

EW

AL

K

EXISTING

BUILDING

11 11

3,552 SQUARE FOOT BUILDING

PETER A. McCUEN BLVD.

FE

M

O

YE

R S

T.

BUILDING 800

TO BE REMOVED

BL

EC

KL

EY

S T.

NEW SOCIAL

SERVICES BLDG.

SITE

MAIN VA HOSPITAL

BUILDING

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

IMEG CORP. (M,E,P, & S)

300 NORTH LAKE AVENUE, 14TH FLOOR

PASADENA, CA 91101

CALIBRE ENGINEERING, INC. (CIVIL AND LANDSCAPE)

9090 SOUTH RIDGELINE BOULEVARD, SUITE 105

HIGHLANDS RANCH, CO 80129

KLEINFELDER (GEOTECH)

6700 KOLL CENTER PARKWAY

SUITE 120

PLEASANTON, CA 94566

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

BI

M

VI

SN

- M at he r S oc ia l S er vi ce s

Bu ild in g/

M at he r S oc ia l S er vi ce s

SD

2.

rv t

/4

/2

2:

:3

PM

DEMOLITION PLAN

GC EM

CONSTRUCTION

DOCUMENT SUBMISSION

FULLY SPRINKLERED

612-163

AD101

DESIGN SOCIAL WORK AND

EXPAND CLINICAL SPACE

3551 Femoyer Street Mather, CA 95655

12/04/2020

1/8" = 1'-0"1 ARCHITECTURAL DEMOLITION PLAN

Note Number Note

1 REMOVE CONCRETE STOOP AND RAMP ENTIRELY, REPLACE WITH NEW SOIL TO MAKE

GRADE FLAT.

2 USE EXISTING PARKING AREA AS A STAGING AREA FOR DEMOLITION. COORDINATE WITH

VA COR PRIOR TO DEMO SCHEDULE AND STAGING.

3 REMOVE ROCKS BETWEEN BUILDINGS TO THE WEST.

4 REMOVE TREES TO FACILITATE DEMOLITION ONLY. COORDINATE WITH THE VA COR.

5 BUILDING TO BE DEMOLISHED DOWN TO TOP OF CONCRETE STEM WALLS AND 12" BELOW

GRADE.

6 CONCRETE STEM WALLS TO BE GROUND DOWN TO 1'-0" BELOW GRADE. INFILL BETWEEN

STEM WALLS WITH NEW SOIL AND GRASS. SOD, REFERENCE CIVIL DRAWINGS.

7 ALL UTILITIES TO BE CAPPED UNDER GRADE AT CONNECTION POINTS. COORDINATE WITH

COR.

8 BEWARE OF EXISTING LOW VOLT LINES UNDER BUILDING. DISCONNECT FIRE ALARM AND

OTHER UTILITIES. CONTACT VA COR TO COORDINATE DEMO TO NOT DISTURB SUCH LINES.

9 PLACE NEW SOILS INSIDE OF GROUND DOWN STEM WALLS TO COMPLETE GRADE THAT

SLOPES TOWARD THE EXISTING PARKING TO THE SOUTH.

10 LAY NEW SOD ATOP ENTIRE AREA AFFECTED BY DEMOLITION TO CREATE NATURAL

SETTING.

11 DO NOT DAMAGE ANY FLATWORKS, UTILITIES, OR OTHER BUILDINGS NOT TO BE

REMOVED.

12 PLACE BARRIERS TO AREA VS. ALL AUTO AND PEDESTRIAN TRAFFIC, WARNING OF

DEMOLITION AREA AND FORBIDDING ENTRY. PROVIDE CONSTRUCTION FENCE WITH

GATES AS NEEDED. CONTRACTOR TO LOCATE ALL UTILITES AROUND SITE PRIOR TO

DEMOLITION.

AERIAL SITE LOCATION MAP

SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS

8/15/2017

9/15/2017

12/5/2017

SD-2 PACKAGE 5/15/2018

DD-1 NON REVIEW 8/02/2018

DD-1 SUBMISSION 8/23/2018

DD-2 SUBMISSION 10/27/2018

CD-1 SUBMISSION 02/10/2019

CD-1 RE-SUBMISSION 04/12/2019

NOTES:

1. GENERAL CONTRACTOR TO FIELD VERIFY, LOCATE, AND

PROTECT ALL EXISTING UTILITIES PRIOR TO START OF DEMOLITION.

2. TRAFFIC ALONG BUILDING 800 DRIVE SHALL BE ALLOWED AT ALL

TIMES.

3. ANY ROAD CLOSURE SHALL BE COORDINATED WITH THE COR.

4. ANY ROAD CLOSURE SHALL REQUIRE 3 WEEK NOTICE AND SHALL

ONLY BE MINIMALLY CLOSED ON SATURDAYS.

5. EVERY EFFORT SHALL BE MADE TO ALLOW ONE WAY TRAFFIC AT A

MINIMUM.

6. CONTRACTOR SHALL PROVIDE APPROPRIATE SIGNAGE AND

BARRIERS WHEN THE ROAD IS CLOSED OR PARTIALLY CLOSED.

CD-1 RE-SUBMISSION 01/31/2020

CD-2 SUBMISSION 04/30/2020

GENERAL CONTRACTOR NOTE:

TO MINIMIZE INTERFERENCE OF CONSTRUCTION ACTIVITIES WITH THE FLOW

OF MEDICAL CENTER TRAFFIC, COMPLY WITH THE FOLLOWING:

1. KEEP ROADS, WALKS, AND ENTRANCES TO GROUNDS, PARKING, AND TO

OCCUPIED AREAS OF BUILDINGS CLEAR OF CONSTRUCTION (DEMOLITION)

MATERIALS, DEBRIS, AND STANDING CONSTRUCTION EQUIPMNET AND

VEHICLES.

2. WHENEVER EXCAVATION CROSSES EXISTING ROADS, AT LEAST ONE LANE

MUST BE OPEN TO TRAFFIC AT ALL TIMES.

CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020

UP

F E

C

F E

C

F E

C

GENERAL NOTES

KEYNOTE LEGEND

BARRIER LEGEND

1.0

2.0

3.0

4.0

B1

B1

B3 B4 B5

0.1

B6

126 SF126 SF

PROCEDURE

124 SF124 SF

EXAM

129 SF129 SF

CLEAN

111D

124 SF124 SF

ISO. EXAM

124 SF124 SF

EXAM

124 SF124 SF

EXAM

122 SF122 SF

EXAM

124 SF124 SF

EXAM

182 SF182 SF

BREAK RM.

92 SF92 SF

CONSULT RM.

188 SF188 SF

GROUP RM.

1126 SF1126 SF

STAFF AREA

CORRIDOR

P A

S S

E N

G E

R E

L E

V A

T O

R

125 SF125 SF

EXAM

124 SF124 SF

EXAM

STAFF TLT

111A

HAC

195 SF195 SF

RECEPTION

SOILED

111B

TLT.

10A

CORRIDOR

SHWR ROOM

104A

77 SF77 SF

TOILET

76 SF76 SF

LAUNDRY

EXTERIOR

STAIR

84 SF84 SF

STORAGE

ENCLOSED

STAIR

124 SF124 SF

EXAM

21 SF21 SF

ELECT.

111C

AE202

AE202

2 AE203

ELEV EQ

HT/WT

STATION

SECURITY

STATIONCHECK

OUT

CHECK

IN

R

R

O M

N I

O M

N I

OMNI

B4.5

B4.5

B4.9

1.1

OMNI

110 SF110 SF

ELECT

B1.4

3.4

AF101

AF101

AF101 5

AF101 12

AF101 9

AI104A

AI104B

AI104B

AF101 5

S im

AF101 5

S im

AF101 5

S im

AF101 5

S im

AF101 5

S im

AF101 5

S im

AF101 5

S im

AF101 5

S im

90 SF90 SF

CONSULT RM.

71 SF71 SF

TOILET

105A

AE205

AE205

AE205

AE206

AE206

AE206

AE205

AE206

AE206

AI105A

AI105A

AI106

E02

P06

P06P06

P07

P10 P07P06

P06

P06 P06

P10

P11

P12

P07

R01

R01

R01

E01

B

B

135B

135A

C 1

E

A

S1

111F

5A 111D

111A

111B

STAIR

S1

3 3

R02

P06

P06

P06 P06 P06

P06 P10

P06

P06

P10 P10

P10

P10

P06

P06

P06

P06

P06

P06

P06 P06P06 P06

P06 P06

P06

P06

E01

E01 E01

E01

E01 P06

P06

P06

P10

P10

P06

R05

SIM

76 SF76 SF

TOILET

A

TYP.

11 TYP.

/3 AE105

E01

P07

P07

P07

P02

P02 P02 P02

P06

P06

P02

6A

P02

7A

P02

8A

P02

9A 10A

P02

1A2A3A4A

TYP.

TYP.

AI103A

Sim

AE201

3.6

AF102

0.08

AI110A

AE20

P06

P12

P06

P06

P06 P06 P06P06

P07

P06

P06P06

P06 P06 P06

P01

TYP.

3 3

3 3

E01 E01

E01

E02

B2

B2

WHEEL CHAIRS

100A

E03

P06

E03

E03

E03

SHWR ROOM

102A

P01

E01

116A

CORRIDOR

100B

WAITING

VESTIBULE

110SF

5 4 3 2 1

6 7 9 10

R04

/4 AI119

/5 AI119

TYP.

15 15

AE103

E01

SIM

E01

SIM

P01

E01

SIM

P01P01

E01

SIM

P01

E01

SIM

E01

SIM

E01

SIM

E01

SIM

A

B2.4

0.9

3.2

0.06

0.05

B4.1 B4.3B3.5B3.3B1.8

0.09

4.3

R02

I

G

A

N O

U

F

F

H

G

P01

P01 P01 P01

P01

AI110A

AI110A

AI110A

AI110B

AI110A

AI110A

AI110A

AI110B

R05

S2

R

E04

S

F

IR

E R

IS

E

R

UP

E01

E01

P01

E01

P01

AI110C

AI110C

AI110C

AI110C

AF101

AI103A

BID ALT #5:

WALL SECTION

SEE BID

ALTERNATES IN SPEC

SECTION 010000

GENERAL

REQUIREMENTS

AI103A

BID ALT #5:

WALL SECTIONS

SEE BID

ALTERNATES IN SPEC

SECTION 010000

GENERAL

REQUIREMENTS

AI103A

/5 AI103A

/3 AI103A

/4 AI103A

R04 R01

R03

P11

BID ALT #2:

WALL SECTION

SEE BID

ALTERNATES IN SPEC

SECTION 010000

GENERAL

REQUIREMENTS

/4 AI103A

R05

R05

R05

SIM

TYP.

24 24

TYP.

E01

TYP.

TYP.

TYP.

TYP.

P01

TYP.

TYP.

TYP.

TYP. P01

TYP.

TYP.

P01

TYP.

P01

TYP.

P01

TYP.

P01

TYP.

TYP.

TYP.

P01

TYP.

P01

TYP.

P01

TYP.

P01

TYP.

P10

P10

R03

AI103B

AI103B1

AI103B

AI103B

AI103B

8"

SLOPE 1/4"/FTMIN.

E01

SLO

PE

1/4 "/F

T

M

IN

R

ID

G E

SLO

PE

1/4 "/F

T

M

IN

SLOPE 1/4"/FTMIN.

OUTDOOR AREA

1. REFER TO ENLARGED FLOOR PLANS, ELEVATION, SECTIONS AND

SCHEDULES ON OTHER DRAWINGS SHEETS FOR ADDITIONAL

DETAILS

2. REFER TO OTHER CONSULTANT/DISCIPLINE DRAWINGS FOR

ADDITIONAL DETAILS

3. ALL WALL ELEVATIONS (NORTH, SOUTH, WEST AND EAST) ARE

RELATIVE TO PLAN NORTH

4. GENERAL CONTRACTOR SHALL PROVIDE, COORDINATE AND

INSTALL 16 GA. SHEET METAL BLOCKING AND FIRE TREATED WOOD

BLOCKING AT ALL WALL PARTITIONS THAT HAVE EQUIPMENT AND

CASEWORK MOUNTED TO THEM. METAL STRAP BLOCKING IS

ACCEPTABLE FOR MILLWORK AND OTHER ITEMS, PROVIDED IT IS

OF THE PROPER GAUGE.

5. PROVIDE GYPSUM BOARD RETURNS AT ALL WINDOWS FOR HEAD

AND JAMB CONDITIONS

6. GENERAL CONTRACTOR SHALL VERIFY DIMENSIONS OF OWNER

FURNISHED EQUIPMENT AND COORDINATE INSTALLATION WITH ALL

TRADES WHERE REQUIRED

7. GENERAL CONTRACTOR SHALL PROVIDE UL APPROVED FIRE-

RESISTIVE PENETRATION SYSTEMS AT ALL PENETRATIONS IN A

FIRE-RATED PARTITION ASSEMBLY.

8. PAINT ALL COMPONENTS ON THE FIRE RISER IN STAIR S1 UNLESS

THEY ARE CHROME OR BRASS.

9. PROVIDE TYPE "X" GYPSUM BOARD IN ALL RATED WALLS AS

REQUIRED.

10. ALL INTERIOR WALLS ARE TO HAVE A MINIMUM STC RATING OF 40.

11. SEAL ALL FLOOR PENTRATIONS FOR CONDUIT FROM THE FIRST TO

THE SECOND FLOOR WITH FIRE RATED SEALANT.

FIRST AND SECOND FLOOR

RATED WALL LEGEND:

ONE HOUR RATED WALL

SYMBOL LEGEND:

EXTERIOR STORAGE AREA AND LOCKER ROOM ARE HATCHED

TO INDICATE IT IS IN CONTRAST TO THE CURRENT VA PHYSICAL

SECURITY DESIGN MANUAL AND MUST BE MONITORED,

LOCKED, AND ACCESS SEVERELY RESTRICTED UNLESS A

WAIVER IS CREATED.

NEW CONCRETE SIDEWALKS AND MAINTENANCE

STRIP-IN CONTRACT

AE206

AE206

135A

135B

AE20

VESTIBULE

110SF

E03

E03

P06

P01

P01

P01

E03

E03

P01

0.9

0.06

0.05

F

F

E01

E03

DASHED DOORS

INDICATE BREAK-

AWAY LEAVES OF

SLIDING DOOR.

PROVIDE HEATED AIR

CURTAIN - SEE MECHANICAL

SHEETS.

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

IMEG CORP. (M,E,P, & S)

300 NORTH LAKE AVENUE, 14TH FLOOR

PASADENA, CA 91101

CALIBRE ENGINEERING, INC. (CIVIL AND LANDSCAPE)

9090 SOUTH RIDGELINE BOULEVARD, SUITE 105

HIGHLANDS RANCH, CO 80129

KLEINFELDER (GEOTECH)

6700 KOLL CENTER PARKWAY

SUITE 120

PLEASANTON, CA 94566

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

B

IM

/V

IS

N

M a th e r

S o c ia l S e rv ic e s B u ild in g /M a th e r

S o c ia l S e rv ic e

.r v t

/1

/2

:0

:1

P M

FIRST FLOOR PLAN

GC EM

CONSTRUCTION

DOCUMENT SUBMISSION

FULLY SPRINKLERED

612-163

AE101

DESIGN SOCIAL WORK AND

EXPAND CLINICAL SPACE

3551 Femoyer Street Mather, CA 95655

12/04/2020

1/8" = 1'-0"1

FIRST FLOOR PLAN

SEE WALL TYPES SHEET ( AF 105 )

TYPE

MARK TYPE DESCRIPTION

E01 1" EXTERIOR STUCCO FINISH,1/8" METAL LATH, 1/8" AIR & MOISTURE BARRIER, 1" STYROFOAM INSULATION, 1" RIGID INSULATION, 5/8" DENSGLASS OR VA APPROVED EQUAL EXTERIOR SHEATHING, 6" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION (THERMAX OR EQUAL), 5/8" GYPSUM WALL BOARD ON INTERIOR SIDE.

E01 SIM 1" EXTERIOR STUCCO FINISH,1/8" METAL LATH, 1/8" AIR & MOISTURE BARRIER, 1" STYROFOAM INSULATION, 1" RIGID INSULATION, 5/8" DENSGLASS OR VA APPROVED EQUAL EXTERIOR SHEATHING, 6" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION (THERMAX OR EQUAL)

E02 1" EXTERIOR STUCCO FINISH, 1/8" METAL LATH, 1/8" AIR & MOISTURE BARRIER, 1" STYROFOAM INSULATION, 1" RIGID INSULATION, 5/8" DENSGLASS OR VA APPROVED EQUAL EXTERIOR SHEATHING, 6" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION (THERMAX OR EQUAL), 1/2" CEMENT BACKER BOARD, 60" HIGH WAINSCOT

TILE ON BATHROOM SIDE.

E03 2" EXTERIOR ALUMINUM PANEL SYSTEM, 3" METAL STUD, 1/8" FLUID APPLIED MEMBRANE AIR AND WEATHER BARRIER, 2" RIGID INSULATION, 5/8" DENSGLASS OR VA APPROVED EQUAL EXTERIOR SHEATHING, 6" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION (THERMAX OR EQUAL), 5/8" GYPSUM WALL BOARD.

E04 1" EXTERIOR STUCCO FINISH, 1/8" METAL LATH, 1/8" AIR & MOISTURE BARRIER, 1" STYROFOAM INSULATION, 1" RIGID INSULATION, 5/8" DENSGLASS OR VA APPROVED EQUAL EXTERIOR SHEATHING, 3 5/8" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION (THERMAX OR EQUAL), 5/8" GYPSUM WALL BOARD.

P01 5/8" GYPSUM WALL BOARD ON ONE SIDE, 2 1/2" METAL STUD. ACOUSTICAL BATT INSULATION ONLY AT EXTERIOR WALLS.

P01 SIM 5/8" GYPSUM WALL BOARD ON ONE SIDE, 2 1/2" METAL STUD. ACOUSTICAL BATT INSULATION ONLY AT EXTERIOR WALLS. 60" HIGH WAINSCOT TILE IN TOILET ROOM 105A BATHROOM SIDE ONLY.

P02 5/8" GYPSUM WALL BOARD ON BOTH SIDES, 3 5/8" METAL STUD WITH ACOUSTICAL BATT INSULATION.

P04 5/8" GYPSUM WALL BOARD, 3 5/8" METAL STUD WITH ACOUSTICAL BATT INSULATION, 1/2" CEMENT BOARD TILE BACKER, TRINITY TILE (FULL HEIGHT) ON SHOWER SIDE.

P05 60" HIGH WAINSCOT TILE, 5/8" GYPSUM WALL BOARD, 3 5/8" METAL STUD WITH ACOUSTICAL BATT INSULATION, 5/8" GYPSUM WALL BOARD, 60" HIGH WAINSCOT TILE.

P06 5/8" GYPSUM WALL BOARD, 6" METAL STUD WITH ACOUSTICAL BATT INSULATION, 5/8" GYPSUM WALL BOARD.

P07 5/8" GYPSUM WALL BOARD, 6" METAL STUD WITH ACOUSTICAL BATT INSULATION, 5/8" GYPSUM WALL BOARD, 60" HIGH WAINSCOT TILE.

P08 60" HIGH WAINSCOT TILE, 5/8" GYPSUM WALL BOARD, 6" METAL STUD WITH ACOUSTICAL BATT INSULATION, 5/8" GYPSUM WALL BOARD, 60" HIGH WAINSCOT TILE.

P09 60" HIGH WAINSCOT TILE, 5/8" GYPSUM WALL BOARD, 6" METAL STUD WITH ACOUSTICAL BATT INSULATION, 1/2" CEMENT BOARD TILE BACKER, TRINITY TILE (FULL HEIGHT) SHOWER SIDE.

P10 5/8" GYPSUM WALL BOARD, 6" CMU- CONCRETE FILLED, 5/8" GYPSUM WALL BOARD.

P11 5/8" GYPSUM WALL BOARD, 6" CONCRETE FILLED CMU W/7/16" BALLISTIC PANELS ON RECEPTION SIDE, 5/8" GYPSUM WALL BOARD.

P12 5/8" GYPSUM WALL BOARD, 6" CMU-CONCRETE FILLED, 5/8" GYPSUM WALL BOARD, 60" HIGH WAINSCOT TILE.

R01 1HR RATED - 5/8" TYPE "X" GYPSUM WALL BOARD, 6" METAL STUD WITH FIBERGLASS BATT INSULATION, 5/8" TYPE 'X' GYPSUM WALL BOARD.

R01 SIM 1HR RATED - 5/8" TYPE "X" GYPSUM WALL BOARD, 6" METAL STUD WITH FIBERGLASS BATT INSULATION,W/ 5/8" TYPE 'X' GYPSUM WALL BOARD, 60" WAINSCOT TILE ON THE BATHROOM SIDE.

R02 1HR RATED - 1" EXTERIOR STUCCO FINISH, 1/8" METAL LATH, 1/8" AIR AND MOISTURE BARRIER, 1" STYROFOAM INSULATION, 1" RIGID INSULATION, 5/8" DENSGLASS OR VA APPROVED EQUAL EXTERIOR SHEATHING, 6" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION, (2) LAYERS OF 5/8" TYPE 'X' GYPSUM WALL BOARD.

R03 1HR RATED -1" EXTERIOR STUCCO FINISH, 1/8" METAL LATH, 1/8" AIR AND MOISTURE BARRIER, 1" STYROFOAM INSULATION, 1" RIGID INSULATION, 5/8" DENSGLASS OR VA APPROVED EQUAL EXTERIOR SHEATHING, 6" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION, 5/8" TYPE "X" GYPSUM WALL BOARD.

R04 1HR RATED - 5/8" TYPE "X" GYPSUM WALL BOARD, 3 5/8" METAL STUD WITH ACOUSTICAL BATT INSULATION, 1/2" CEMENT BOARD TILE BACKER, TRINITY TILE (FULL HEIGHT) SHOWER SIDE.

R05 1HR RATED - 5/8" TYPE "X" GYPSUM WALL BOARD, 3 5/8" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION, 5/8" TYPE 'X' GYPSUM WALL BOARD.

R05 SIM 1HR RATED - 5/8" TYPE "X" GYPSUM WALL BOARD, 3 5/8" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION, 5/8" TYPE 'X' GYPSUM WALL BOARD, 60" WAINSCOT TILE ON THE BATHROOM SIDE.

NOTE

NUMBER NOTE

1 DRESSING BENCH, TYP.

2 LOCKERS, TYPICAL.

3 SLIDING PLASTIC LAMINATE DOOR, TYPICAL.

4 WHEEL CHAIR AND EQUIPMENT STORAGE

5 NEW 8'-10 1/4" WIDE X 6'-8" HIGH GATE. SEE DETAILS 1/AI103B & 2/AI103B

6 A-FRAME BIKE RACK 1" TUBING. MANUFACTURER: SITESCAPES INC.

7 AUTOMATIC SLIDING DOORS WITH BREAK AWAY PANELS (4 EACH SET). PROVIDE MAG

LOCKS TIED TO FIRE ALARM ON EACH PANEL.

8 BI-LEVEL EWC WITH BOTTLE FILLER. SEE DETAIL

9 PRIVACY CALL STATION (N.IC.)

10 PATIENT WAITING SEATING (N.I.C.)

11 WORK STATIONS SHOWN FOR LAYOUT PURPOSES (N.I.C.)

12 ABAAS HEIGHT RECEPTION DESK

13 ABAAS HEIGHT BREAKROOM COUNTER

14 WALL MOUNTED LADDER TO ROOF HATCH SEE DETAIL

15 METAL STUD AND 5/8" GYP.BD. COLUMN SURROUND, TYP. SEE SHEETS AI110A, B, C

16 18" CONCRETE MAINTENANCE STRIP

17 MILLWORK WORK STATION. SEE BID ALTERNATES IN SPEC SECTION 010000 GENERAL

REQUIREMENTS.

18 30"X30" 1 HR RATED ACCESS PANEL

19 PROVIDE MULLION MATE OR VA APPROVED EQUAL WITH CLEAR ANODIZED ALUMINUM

WALL END CAP.

20 PROVIDE FIRE TREATED 1/2" PLYWOOD ON ALL WALLS OF IT ROOM. MOUNT 2'-0" ABOVE

FINISHED FLOOR TO 8'-0" ABOVE FINISHED FLOOR. PAINT TO MATCH WALLS. DO NOT

PAINT OVER FIRE TREATED LABELS.

21 11'-8" x 6'-8" RECESSED ALUMINUM WALK OFF MAT INSET IN FLOOR. RECESS SLAB PER

SELECTED MANUFACTURER'S RECOMMENDATIONS.SEE DETAIL

22 SLOPE SIDEWALK AWAY FROM BUILDING. PROVIDE A SMOOTH TRANSITION AT

DOORWAYS, BUT KEEP THE REST OF THE SIDEWALK 1-2" BELOW FINISH FLOOR LEVEL.

23 PROVIDE INTUMESCENT PAINT ON ALL COLUMNS, TYP.

24 PROVIDE SOUND ATTENUATION INSULATION IN COLUMN SURROUND TO MAINTAIN

HIPPA REQUIREMENTS.

25 FILL WALL CAVITY ABOVE AND BELOW WINDOW FULL OF INSULATION 2'-0" EITHER SIDE

OF WALL TO WINDOW INTERSECTION-TYPICAL

26 PROVIDE 8"WIDE X 4" HIGH WALL OPENINGS AT THE BOTTOM OF THE WALL FOR WATER

DRAINAGE. SEE WALL SECTION 4/AI103B.

27 SLOPE CONCRETE FLOORS TO WALL OPENINGS AT 1/4"/FOOT FOR WATER DRAINAGE.

SEE STRUCTURAL DRAWINGS.

-KEYNOTE SYMBOL

SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS

8/15/2017

9/15/2017

12/5/2017

SD-2 PACKAGE 5/15/2018

DD-1 NON REVIEW 8/02/2018

DD-1 SUBMISSION 8/23/2018

IN

TOILET

DD-2 SUBMISSION 10/27/2018

1/4" = 1'-0"2

ENLARGED VESTIBULE PLAN

CD-1 SUBMISSION 02/10/2019

CD-1 RE-SUBMISSION 04/12/2019

CD-1 RE-SUBMISSION 01/31/2020

CD-2 SUBMISSION 04/30/2020

CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020

DN

FEC

F E

C

KEYNOTE LEGEND

GENERAL NOTES

BARRIER LEGEND

1.0

2.0

3.0

4.0

B1 B3 B4 B5

0.1

B6

88 SF88 SF

HAC

105 SF105 SF

OFFICE

105 SF105 SF

OFFICE

CURVED

STANDING

SEAM METAL

ROOF OVER

VESTIBULE

BELOW

ELEV.

ENCLOSED

STAIR

HUD VASH

MENTAL HEALTH

OPEN OFFICE

STOR./PRINT

TOILET

EXTERIOR

STAIR

HVAC

CHASE

AE202

AE202

AE201

AE203

256 SF256 SF

BREAK ROOM

TOILET

130 SF130 SF

IT

105 SF105 SF

OFFICE

ELEV

EQUIP

ROOF

96 SF96 SF

STORAGE

STAIR

S1

B4.5

B4.9

1.1

AE102

34 SF34 SF

ELECT

B1.4

3.4

243 SF243 SF

CONF.

105 SF105 SF

OFFICE

AF10111

AI104B

105 SF105 SF

OFFICE

AE205

AE205

AE205

AE206

AE206

AE206

AE205

AI114B

AI110A

P01

P01

P01

P06

R01

P06

P01

P06

R01

R01

P02

P02P02

P02

P02 P02P02

P02

P02

P02

P02P02 P02

E01

P06

E01E01

207B 207A 205 215

208B208A

S3

R

R02

E01

P06 P06

P06 P06

P06

P06

P06

P06

P01

E01

11 11

TYP.

TYP.

11 11

1111 11

E01

E01

E01

E03

P01 P01

P01

P01

P01

AI110A

AI110A

AI103A

15 15 15

15 15

3.6

0.08

AE20

E01E01

R01

R01

TYP.

TYP.

AF1016

B2

P01

P01

P01

AI114B

AI105A

AI105A

/3 AE105

209 210 211 213212

R03

/4 AI119

TYP.

TYP.

23 23

23 23

E01

SIM

E01

SIM

E01

SIM

E01

SIM

E01

SIM

E01

SIM

E03

E03

R03 E01

SIME01

SIM

E01

SIM

P01

E01

SIM

P01 P01

P01P01

P01

P02 P02

P02

P02

P02 P02

B2.4

0.9

3.2

0.06

0.05 B4.1 B4.3B3.5B3.3B1.8

0.09

4.3

M K L

E

J

B

A

P

AI110B

AI110B

AI110B

AI110B

AI110B

AI110B

AF103

BID ALT #1:

MILLWORK

WORK STATION

SEE BID

ALTERNATES IN SPEC

SECTION 010000

GENERAL

REQUIREMENTS

/5 AI119

AI103A

R01

R02

E04

T

R

D

FEC

23 23

TYP.

24 24 24

TYP.

P01

TYP.

TYP.

TYP.

TYP.

TYP.

P01

TYP.

TYP.

TYP.

TYP. TYP.

TYP.

TYP. TYP.

TYP.

TYP.

P01

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

P01

P01

TYP.

P01

TYP.

R03

E01

6' - 0"

2' - 1 1/4"3' - 10 3/4"

6' - 0"

FIRST AND SECOND FLOOR

1. REFER TO ENLARGED FLOOR PLANS, ELEVATION, SECTIONS AND

SCHEDULES ON OTHER DRAWINGS SHEETS FOR ADDITIONAL

DETAILS

2. REFER TO OTHER CONSULTANT/DISCIPLINE DRAWINGS FOR

ADDITIONAL DETAILS

3. ALL WALL ELEVATIONS (NORTH, SOUTH, WEST AND EAST) ARE

RELATIVE TO PLAN NORTH

4. GENERAL CONTRACTOR SHALL PROVIDE, COORDINATE AND

INSTALL 16 GA. SHEET METAL BLOCKING AND FIRE TREATED WOOD

BLOCKING AT ALL WALL PARTITIONS THAT HAVE EQUIPMENT AND

CASEWORK MOUNTED TO THEM. METAL STRAP BLOCKING IS

ACCEPTABLE FOR MILLWORK AND OTHER ITEMS, PROVIDED IT IS

OF THE PROPER GAUGE.

5. PROVIDE GYPSUM BOARD RETURNS AT ALL WINDOWS FOR HEAD

AND JAMB CONDITIONS

6. GENERAL CONTRACTOR SHALL VERIFY DIMENSIONS OF OWNER

FURNISHED EQUIPMENT AND COORDINATE INSTALLATION WITH ALL

TRADES WHERE REQUIRED

7. GENERAL CONTRACTOR SHALL PROVIDE UL APPROVED FIRE-

RESISTIVE PENETRATION SYSTEMS AT ALL PENETRATIONS IN A

FIRE-RATED PARTITION ASSEMBLY.

8. PAINT ALL COMPONENTS ON THE FIRE RISER IN STAIR S1 UNLESS

THEY ARE CHROME OR BRASS.

9. PROVIDE TYPE "X" GYPSUM BOARD IN ALL RATED WALLS AS

REQUIRED.

10. ALL INTERIOR WALLS ARE TO HAVE A MINIMUM STC RATING OF 40.

11. SEAL ALL FLOOR PENTRATIONS FOR CONDUIT FROM THE FIRST TO

THE SECOND FLOOR WITH FIRE RATED SEALANT.

RATED WALL LEGEND:

ONE HOUR RATED WALL

SYMBOL LEGEND:

EXTERIOR STORAGE AREA AND LOCKER ROOM ARE HATCHED

TO INDICATE IT IS IN CONTRAST TO THE CURRENT VA PHYSICAL

SECURITY DESIGN MANUAL AND MUST BE MONITORED,

LOCKED, AND ACCESS SEVERELY RESTRICTED UNLESS A

WAIVER IS CREATED.

NEW CONCRETE SIDEWALKS AND MAINTENANCE

STRIP-IN CONTRACT

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

IMEG CORP. (M,E,P, & S)

300 NORTH LAKE AVENUE, 14TH FLOOR

PASADENA, CA 91101

CALIBRE ENGINEERING, INC. (CIVIL AND LANDSCAPE)

9090 SOUTH RIDGELINE BOULEVARD, SUITE 105

HIGHLANDS RANCH, CO 80129

KLEINFELDER (GEOTECH)

6700 KOLL CENTER PARKWAY

SUITE 120

PLEASANTON, CA 94566

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

B

IM

/V

IS

N

M a th e r

S o c ia l S e rv ic e s B u ild in g /M a th e r

S o c ia l S e rv ic e

.r v t

/1

/2

:0

:2

P M

SECOND FLOOR PLAN

GC EM

CONSTRUCTION

DOCUMENT SUBMISSION

FULLY SPRINKLERED

612-163

AE102

DESIGN SOCIAL WORK AND

EXPAND CLINICAL SPACE

3551 Femoyer Street Mather, CA 95655

12/04/2020

1/8" = 1'-0"1

SECOND FLOOR PLAN 1/4" = 1'-0"2

BASIS OF DESIGN LAYOUT ENLARGED

WORKSTATION N.I.C.

OUTLINE OF 6X6

WORKSTATION

AREA

SHARED WORK

SURFACE

COMPUTER WORK

SURFACE

FURNITURE

PARTITION

SEE WALL TYPES SHEET ( AF 105 )

TYPE

MARK TYPE DESCRIPTION

E01 1" EXTERIOR STUCCO FINISH,1/8" METAL LATH, 1/8" AIR & MOISTURE BARRIER, 1" STYROFOAM INSULATION, 1" RIGID INSULATION, 5/8" DENSGLASS OR VA APPROVED EQUAL EXTERIOR SHEATHING, 6" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION (THERMAX OR EQUAL), 5/8" GYPSUM WALL BOARD ON INTERIOR SIDE.

E01 SIM 1" EXTERIOR STUCCO FINISH,1/8" METAL LATH, 1/8" AIR & MOISTURE BARRIER, 1" STYROFOAM INSULATION, 1" RIGID INSULATION, 5/8" DENSGLASS OR VA APPROVED EQUAL EXTERIOR SHEATHING, 6" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION (THERMAX OR EQUAL)

E02 1" EXTERIOR STUCCO FINISH, 1/8" METAL LATH, 1/8" AIR & MOISTURE BARRIER, 1" STYROFOAM INSULATION, 1" RIGID INSULATION, 5/8" DENSGLASS OR VA APPROVED EQUAL EXTERIOR SHEATHING, 6" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION (THERMAX OR EQUAL), 1/2" CEMENT BACKER BOARD, 60" HIGH WAINSCOT

TILE ON BATHROOM SIDE.

E03 2" EXTERIOR ALUMINUM PANEL SYSTEM, 3" METAL STUD, 1/8" FLUID APPLIED MEMBRANE AIR AND WEATHER BARRIER, 2" RIGID INSULATION, 5/8" DENSGLASS OR VA APPROVED EQUAL EXTERIOR SHEATHING, 6" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION (THERMAX OR EQUAL), 5/8" GYPSUM WALL BOARD.

E04 1" EXTERIOR STUCCO FINISH, 1/8" METAL LATH, 1/8" AIR & MOISTURE BARRIER, 1" STYROFOAM INSULATION, 1" RIGID INSULATION, 5/8" DENSGLASS OR VA APPROVED EQUAL EXTERIOR SHEATHING, 3 5/8" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION (THERMAX OR EQUAL), 5/8" GYPSUM WALL BOARD.

P01 5/8" GYPSUM WALL BOARD ON ONE SIDE, 2 1/2" METAL STUD. ACOUSTICAL BATT INSULATION ONLY AT EXTERIOR WALLS.

P01 SIM 5/8" GYPSUM WALL BOARD ON ONE SIDE, 2 1/2" METAL STUD. ACOUSTICAL BATT INSULATION ONLY AT EXTERIOR WALLS. 60" HIGH WAINSCOT TILE IN TOILET ROOM 105A BATHROOM SIDE ONLY.

P02 5/8" GYPSUM WALL BOARD ON BOTH SIDES, 3 5/8" METAL STUD WITH ACOUSTICAL BATT INSULATION.

P04 5/8" GYPSUM WALL BOARD, 3 5/8" METAL STUD WITH ACOUSTICAL BATT INSULATION, 1/2" CEMENT BOARD TILE BACKER, TRINITY TILE (FULL HEIGHT) ON SHOWER SIDE.

P05 60" HIGH WAINSCOT TILE, 5/8" GYPSUM WALL BOARD, 3 5/8" METAL STUD WITH ACOUSTICAL BATT INSULATION, 5/8" GYPSUM WALL BOARD, 60" HIGH WAINSCOT TILE.

P06 5/8" GYPSUM WALL BOARD, 6" METAL STUD WITH ACOUSTICAL BATT INSULATION, 5/8" GYPSUM WALL BOARD.

P07 5/8" GYPSUM WALL BOARD, 6" METAL STUD WITH ACOUSTICAL BATT INSULATION, 5/8" GYPSUM WALL BOARD, 60" HIGH WAINSCOT TILE.

P08 60" HIGH WAINSCOT TILE, 5/8" GYPSUM WALL BOARD, 6" METAL STUD WITH ACOUSTICAL BATT INSULATION, 5/8" GYPSUM WALL BOARD, 60" HIGH WAINSCOT TILE.

P09 60" HIGH WAINSCOT TILE, 5/8" GYPSUM WALL BOARD, 6" METAL STUD WITH ACOUSTICAL BATT INSULATION, 1/2" CEMENT BOARD TILE BACKER, TRINITY TILE (FULL HEIGHT) SHOWER SIDE.

P10 5/8" GYPSUM WALL BOARD, 6" CMU- CONCRETE FILLED, 5/8" GYPSUM WALL BOARD.

P11 5/8" GYPSUM WALL BOARD, 6" CONCRETE FILLED CMU W/7/16" BALLISTIC PANELS ON RECEPTION SIDE, 5/8" GYPSUM WALL BOARD.

P12 5/8" GYPSUM WALL BOARD, 6" CMU-CONCRETE FILLED, 5/8" GYPSUM WALL BOARD, 60" HIGH WAINSCOT TILE.

R01 1HR RATED - 5/8" TYPE "X" GYPSUM WALL BOARD, 6" METAL STUD WITH FIBERGLASS BATT INSULATION, 5/8" TYPE 'X' GYPSUM WALL BOARD.

R01 SIM 1HR RATED - 5/8" TYPE "X" GYPSUM WALL BOARD, 6" METAL STUD WITH FIBERGLASS BATT INSULATION,W/ 5/8" TYPE 'X' GYPSUM WALL BOARD, 60" WAINSCOT TILE ON THE BATHROOM SIDE.

R02 1HR RATED - 1" EXTERIOR STUCCO FINISH, 1/8" METAL LATH, 1/8" AIR AND MOISTURE BARRIER, 1" STYROFOAM INSULATION, 1" RIGID INSULATION, 5/8" DENSGLASS OR VA APPROVED EQUAL EXTERIOR SHEATHING, 6" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION, (2) LAYERS OF 5/8" TYPE 'X' GYPSUM WALL BOARD.

R03 1HR RATED -1" EXTERIOR STUCCO FINISH, 1/8" METAL LATH, 1/8" AIR AND MOISTURE BARRIER, 1" STYROFOAM INSULATION, 1" RIGID INSULATION, 5/8" DENSGLASS OR VA APPROVED EQUAL EXTERIOR SHEATHING, 6" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION, 5/8" TYPE "X" GYPSUM WALL BOARD.

R04 1HR RATED - 5/8" TYPE "X" GYPSUM WALL BOARD, 3 5/8" METAL STUD WITH ACOUSTICAL BATT INSULATION, 1/2" CEMENT BOARD TILE BACKER, TRINITY TILE (FULL HEIGHT) SHOWER SIDE.

R05 1HR RATED - 5/8" TYPE "X" GYPSUM WALL BOARD, 3 5/8" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION, 5/8" TYPE 'X' GYPSUM WALL BOARD.

R05 SIM 1HR RATED - 5/8" TYPE "X" GYPSUM WALL BOARD, 3 5/8" METAL STUD WITH CLOSED CELL SPRAY POLYURETHANE INSULATION, 5/8" TYPE 'X' GYPSUM WALL BOARD, 60" WAINSCOT TILE ON THE BATHROOM SIDE.

NOTE

NUMBER NOTE

1 DRESSING BENCH, TYP.

2 LOCKERS, TYPICAL.

3 SLIDING PLASTIC LAMINATE DOOR, TYPICAL.

4 WHEEL CHAIR AND EQUIPMENT STORAGE

5 NEW 8'-10 1/4" WIDE X 6'-8" HIGH GATE. SEE DETAILS 1/AI103B & 2/AI103B

6 A-FRAME BIKE RACK 1" TUBING. MANUFACTURER: SITESCAPES INC.

7 AUTOMATIC SLIDING DOORS WITH BREAK AWAY PANELS (4 EACH SET). PROVIDE MAG

LOCKS TIED TO FIRE ALARM ON EACH PANEL.

8 BI-LEVEL EWC WITH BOTTLE FILLER. SEE DETAIL

9 PRIVACY CALL STATION (N.IC.)

10 PATIENT WAITING SEATING (N.I.C.)

11 WORK STATIONS SHOWN FOR LAYOUT PURPOSES (N.I.C.)

12 ABAAS HEIGHT RECEPTION DESK

13 ABAAS HEIGHT BREAKROOM COUNTER

14 WALL MOUNTED LADDER TO ROOF HATCH SEE DETAIL

15 METAL STUD AND 5/8" GYP.BD. COLUMN SURROUND, TYP. SEE SHEETS AI110A, B, C

16 18" CONCRETE MAINTENANCE STRIP

17 MILLWORK WORK STATION. SEE BID ALTERNATES IN SPEC SECTION 010000 GENERAL

REQUIREMENTS.

18 30"X30" 1 HR RATED ACCESS PANEL

19 PROVIDE MULLION MATE OR VA APPROVED EQUAL WITH CLEAR ANODIZED ALUMINUM

WALL END CAP.

20 PROVIDE FIRE TREATED 1/2" PLYWOOD ON ALL WALLS OF IT ROOM. MOUNT 2'-0" ABOVE

FINISHED FLOOR TO 8'-0" ABOVE FINISHED FLOOR. PAINT TO MATCH WALLS. DO NOT

PAINT OVER FIRE TREATED LABELS.

21 11'-8" x 6'-8" RECESSED ALUMINUM WALK OFF MAT INSET IN FLOOR. RECESS SLAB PER

SELECTED MANUFACTURER'S RECOMMENDATIONS.SEE DETAIL

22 SLOPE SIDEWALK AWAY FROM BUILDING. PROVIDE A SMOOTH TRANSITION AT

DOORWAYS, BUT KEEP THE REST OF THE SIDEWALK 1-2" BELOW FINISH FLOOR LEVEL.

23 PROVIDE INTUMESCENT PAINT ON ALL COLUMNS, TYP.

24 PROVIDE SOUND ATTENUATION INSULATION IN COLUMN SURROUND TO MAINTAIN

HIPPA REQUIREMENTS.

25 FILL WALL CAVITY ABOVE AND BELOW WINDOW FULL OF INSULATION 2'-0" EITHER SIDE

OF WALL TO WINDOW INTERSECTION-TYPICAL

26 PROVIDE 8"WIDE X 4" HIGH WALL OPENINGS AT THE BOTTOM OF THE WALL FOR WATER

DRAINAGE. SEE WALL SECTION 4/AI103B.

27 SLOPE CONCRETE FLOORS TO WALL OPENINGS AT 1/4"/FOOT FOR WATER DRAINAGE.

SEE STRUCTURAL DRAWINGS.

SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS

8/15/2017

9/15/2017

12/5/2017

SD-2 PACKAGE 5/15/2018

DD-1 NON REVIEW 8/02/2018

-KEYNOTE SYMBOL

DD-1 SUBMISSION 8/23/2018

DD-2 SUBMISSION 10/27/2018

CD-1 SUBMISSION 02/10/2019

CD-1 RE-SUBMISSION 04/12/2019

CD-1 RE-SUBMISSION 01/31/2020

CD-2 SUBMISSION 04/30/2020

CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020

DIMENSION PLAN NOTES

1.0

2.0

3.0

4.0

B1

B1

B3 B4 B5

0.1

B6

B4.9

1.1

5'

/4

1'

5/

8" 1'

3/ 8"

/4

2'

3/

4" 7'

1/ 2"

5'

1/

2"

4'

1/

2"

10' - 1 5/8" 10' - 0" 10' - 0" 10' - 0" 10' - 1 5/8" 10' - 3 1/2"

10' - 0 3/4" 10' - 0" 10' - 0" 10' - 0" 10' - 0 1/8" 10' - 5"

9'

/8

/8

/2

7' - 1 5/8"

3' - 8 3/4"

CLEAR

4' - 6"

GROUP RM.

EXAM

5 EXAM

EXAM

EXAM

ISO. EXAM

CLEAN

111D

BREAK RM.

CONSULT RM.

EXAM

EXAM

EXAM

8 EXAM

PROCEDURE

ELEV EQ

STAFF AREA

STORAGE

CORRIDOR

CORRIDOR

HAC

117ELECT.

111C

SOILED

111B

TLT.

10A

RECEPTION

TOILET

SHWR ROOM

104A

TOILET

105A

LAUNDRY

VESTIBULE

7'

/2

1'

5/

8"

5'

1/

2" 5'

1/ 2"

8'

1/

8" 5'

3/ 8"

/8

6'

1/

2"

3' - 3"

3' - 7 5/8"

B1.4

3.4

CONSULT RM.

STAFF TLT

111A

STAIR

S1

STAIR

S2

TOILET

10' - 4" 7' - 11"

7'

7/

8"

1' - 9" 8' - 4 5/8" 2' - 0" 8' - 0" 2' - 0" 8' - 0" 1' - 7 1/8" 8' - 4 7/8" 2' - 3" 7' - 10 5/8" 1' - 11"

5'

3/

4"

/2

3'

3/ 4"

1' - 9" 8' - 4 5/8" 2' - 0" 8' - 0" 2' - 0" 8' - 0" 1' - 7 1/8" 8' - 4 7/8" 4' - 8" 7' - 8 1/8"

3.6

1' - 2"

9' - 3 1/4" 28' - 1 1/4"

7'

3/

8"

0.08

3'

1/

4"

1/ 4"

17' - 10 1/4" 5' - 8 1/8"

16' - 0" 5' - 10"

B2

B2

1' - 8 1/8" 8' - 4 5/8" 2' - 0" 8' - 0" 2' - 0" 8' - 0" 1' - 7 1/8" 8' - 4 7/8" 4' - 8"

5' - 4 3/8"

/8

5' - 0"

1' - 9"

8' - 4 5/8"

2' - 0"

8' - 0" 2' - 0" 8' - 0"

1' - 7 1/8"

8' - 4 7/8"

2' - 3"

7' - 10 5/8" 10' - 3 1/2"

9' - 3 1/4"

AI104A

AF102

AI104B

AI104B

AI105A

AI105A

ELECT

/8

/2

"SHWR ROOM

102A

1'

0"

CORRIDOR

100A

WAITING

WHEEL CHAIRS

100A

CASED OPNG.

4' - 0 1/2" TYP.

/8

1"

/8

6'

1/

2"

9'

2" 9'

9"

9'

5/

8"

/4

1/

2"

TYP.

4' - 0 1/2"

9'

3/

4"

18' - 10 1/2" 2' - 0" 18' - 5 3/4"

1' - 10 7/8"

74' - 2 1/2"

6' - 7 1/4" 26' - 8"

/8

8' - 6 1/4"

3' - 4 3/4"

22' - 8 1/2" 9 7/8"

15' - 10 1/8"

8'

/8

74' - 2 1/2"

1' - 3 3/4"

B2.4

0.9

3.2

0.06

0.05

B4.1 B4.3B3.5B3.3B1.8

0.09

4.3

111' - 7"

17' - 6 5/8" 10 5/8"

1' - 3 3/4" 21' - 8 1/4" 4' - 3 1/4" 31' - 6 3/4" 1' - 4 3/4"

8' - 6 1/2" 17' - 5" 9' - 8" 20' - 3 1/2" 20' - 6" 24' - 5" 8' - 3 1/4"

1' - 6" TYP. MAINT. STRIP

/8

1"

9'

7/

8" 1'

5/ 8"

/2

15' - 9"

4'

3/

4" 9'

1/ 8"

4'

/8

CLEAR

7' - 3 5/8"

2' - 8 1/8"

2' - 4"

7/

8"

1'

5/

8" 7'

3/ 8"

1'

7/

8"

AI110A

AI110A

AI110A

7 AI110A

AI110A

AI110A

AI110A

AI110B

FE

C

1'

1/

8"

3/

4" 1'

/8

/8

2'

1/ 2"

1/ 4"

2' - 4 3/8" 8' - 2"

1' - 1 5/8"

1'

7/

8"

1' - 8 1/2" 10 5/8"

6' - 9 3/8" 21' - 3 7/8"

2' - 2" 6' - 6 3/8"

AI110C

AI110C

AI110C

AI110C

8' - 6" 7' - 3"

18' - 7 5/8"

C

LE

AR

6'

0"

4' - 4"

CLEAR

6' - 0"

CLEAR

5' - 11 1/8"10' - 4"

AE103

10' - 4 3/4"

1'

1/

4"

35' - 0"

8' - 10"

38' - 2"

27' - 6"

1. UNLESS OTHERWISE NOTED, DIMENSIONING ON

PLANS IS AS FOLLOWS:

-TO FACE OF MASONRY

-TO FACE OF CONCRETE

-TO FACE OF STUD IN FRAMED PARTITIONS

-GRIDLINES: TO CENTER LINE OF COLUMNS

2. DOOR OPENINGS NOT LOCATED BY DIMENSIONS ARE EITHER

CENTERED IN THE WALL OR ARE LOCATED 5" FROM FINISH WALL TO

INSIDE FACE OF JAMB.

3. SEE ENLARGED PLAN DETAILS AND ELEVATIONS FOR

ADDITIONAL INFORMATION. ANY DISCREPANCIES MUST BE

COORDINATED WITH THE ARCHITECT BEFORE PROCEEDING.

4. ANGLED CONDITIONS ARE 45 DEGREES UNLESS NOTED

OTHERWISE.

5. DIMENSIONS WITH THE NOTE 'CLEAR' INDICATES DIMENSION IS

FROM FACE OF FINISH TO FACE OF FINISH.

6. REFER TO CIVIL PLANS TO VERIFY FOOTPRINT LOCATION.

AE206

AE206

135A

135B

9' - 11 1/2"

5"

VESTIBULE

110SF

8' - 0 5/8"

1' - 11 3/4"

5' - 8"

2' - 3 3/4"

0.9

0.06

0.05

6' - 7"

8 1 /2"

1'

/4

6 5 /8"

6"

1' - 4 3/8"

1' - 3 1/8"

1'

- 7

5/ 8"

1'

- 7

5/ 8"

1' - 11 1/4"

1'

7/

8"

4 5 /8"

6 1 /2"

1' - 8 3/8"

1'

1/

4"

1' - 3 1/8"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

IMEG CORP. (M,E,P, & S)

300 NORTH LAKE AVENUE, 14TH FLOOR

PASADENA, CA 91101

CALIBRE ENGINEERING, INC. (CIVIL AND LANDSCAPE)

9090 SOUTH RIDGELINE BOULEVARD, SUITE 105

HIGHLANDS RANCH, CO 80129

KLEINFELDER (GEOTECH)

6700 KOLL CENTER PARKWAY

SUITE 120

PLEASANTON, CA 94566

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

BI

M

VI

SN

- M at he r S oc ia l S er vi ce s

Bu ild in g/

M at he r S oc ia l S er vi ce s

SD

2.

rv t

/4

/2

2:

:3

PM

FIRST FLOOR DIMENSION PLAN

GC EM

CONSTRUCTION

DOCUMENT SUBMISSION

FULLY SPRINKLERED

612-163

AE103

DESIGN SOCIAL WORK AND

EXPAND CLINICAL SPACE

3551 Femoyer Street Mather, CA 95655

12/04/2020

1/8" = 1'-0"1 FIRST FLOOR DIMENSION PLAN

SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS

8/15/2017

9/15/2017

12/5/2017

SD-2 PACKAGE 5/15/2018

DD-1 NON REVIEW 8/02/2018

DD-1 SUBMISSION 8/23/2018

DD-2 SUBMISSION 10/27/2018

1/4" = 1'-0"2 ENLARGED VESTIBULE DIMENSION PLAN

CD-1 SUBMISSION 02/10/2019

CD-1 RE-SUBMISSION 04/12/2019

CD-1 RE-SUBMISSION 01/31/2020

CD-2 SUBMISSION 04/30/2020

CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020

DN

DIMENSION PLAN NOTES

ROOF

OPEN OFFICE

1.0

2.0

3.0

4.0

B1 B3 B4 B5

0.1

B6

B6

B4.5

B4.9

1.1

HAC

OFFICE

OFFICE

ELEV.

STOR./PRINT

TOILET

TOILET

BREAK ROOM

OFFICE

IT

STORAGE

STAIR

S1

ROOF

10' - 4 3/8" 3' - 6"

/4

3'

/4

23' - 9 3/4"

7' - 6 3/4" 9' - 10 1/2" 9' - 10 1/2" 9' - 10 1/2" 9' - 10 1/2" 9' - 10 1/2" 12' - 2 3/8" 8' - 8"

7/ 8"

9'

8" 5'

1/ 2"

7'

3/

8"

CURVED

ROOF

/4

CURVED

ROOF

B1.4

3.4

3'

1/

8"

1'

7/

8"

37' - 1 1/8"

OFFICE

OFFICE

STAIR

S2

/8

11' - 2 3/8" 5' - 6" 7' - 0 5/8"

3.6

0.08

74' - 2 1/2"

2'

5/

8"

/4

B2

B2

ELECT

AI104B

7'

8" 5'

1/ 2"

4'

3/

8"

6'

3/

4"OPEN OFFICE

/2

5" 1' - 4" 1' - 4" 5"

9' - 3 1/4" 28' - 1 1/4"

1' - 2"

1' - 3 3/4" 8' - 6 1/2" 17' - 5" 9' - 8" 20' - 3 1/2" 20' - 6" 7' - 6 5/8" 16' - 0 1/8" 10 1/4" 8' - 3 1/4"

5'

/4

1'

5/

8" 1'

3/ 8"

/4

2'

3/

4" 7'

1/ 2"

5'

1/

2" 7'

3/ 8"

3'

1/

4"

1/ 4"

/8

8' - 3 1/4"

3' - 8 5/8"

B2.4

0.9

3.2

0.06

0.05 B4.1 B4.3B3.5B3.3B1.8

0.09

4.3

111' - 7"

4' - 3 1/4" 31' - 6 3/4" 1' - 4 3/4" 17' - 10 1/4" 5' - 8 1/8" 17' - 6 5/8" 9' - 1 1/4"

AI105A

AI110A

AI110A

AI110A

AI110B

1'

/4

AI110B

/4

25' - 11 1/8"

AI105A

2' - 11 1/2"

2'

7/

8"

AI110B

AI110B

1'

5/

8"

2' - 4 3/8"

1'

1/

4"

3/

4" 2'

1/ 4"

2'

3/

8"

1/

4"

23' - 8 1/8" 30' - 2 7/8"

18' - 10 1/2"

2' - 0 1/8"

18' - 5 5/8"

2' - 1 3/4"

22' - 5"

1'

/2

1' - 3"

1' - 5"

1' - 2 3/8" 23' - 9 5/8"

1' - 6 3/8"

2' - 0 3/4" 2' - 7 3/8" 23' - 10 5/8"

1' - 7 1/4" 2' - 4 1/8"

7' - 11 3/8"

/8

7' - 2"

1. UNLESS OTHERWISE NOTED, DIMENSIONING ON

PLANS IS AS FOLLOWS:

-TO FACE OF MASONRY

-TO FACE OF CONCRETE

-TO FACE OF STUD IN FRAMED PARTITIONS

-GRIDLINES: TO CENTER LINE OF COLUMNS

2. DOOR OPENINGS NOT LOCATED BY DIMENSIONS ARE EITHER

CENTERED IN THE WALL OR ARE LOCATED 5" FROM FINISH WALL TO

INSIDE FACE OF JAMB.

3. SEE ENLARGED PLAN DETAILS AND ELEVATIONS FOR

ADDITIONAL INFORMATION. ANY DISCREPANCIES MUST BE

COORDINATED WITH THE ARCHITECT BEFORE PROCEEDING.

4. ANGLED CONDITIONS ARE 45 DEGREES UNLESS NOTED

OTHERWISE.

5. DIMENSIONS WITH THE NOTE 'CLEAR' INDICATES DIMENSION IS

FROM FACE OF FINISH TO FACE OF FINISH.

6. REFER TO CIVIL PLANS TO VERIFY FOOTPRINT LOCATION.

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

IMEG CORP. (M,E,P, & S)

300 NORTH LAKE AVENUE, 14TH FLOOR

PASADENA, CA 91101

CALIBRE ENGINEERING, INC. (CIVIL AND LANDSCAPE)

9090 SOUTH RIDGELINE BOULEVARD, SUITE 105

HIGHLANDS RANCH, CO 80129

KLEINFELDER (GEOTECH)

6700 KOLL CENTER PARKWAY

SUITE 120

PLEASANTON, CA 94566

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

BI

M

VI

SN

- M at he r S oc ia l S er vi ce s

Bu ild in g/

M at he r S oc ia l S er vi ce s

SD

2.

rv t

/4

/2

2:

:4

PM

SECOND FLOOR DIMENSION PLAN

GC EM

CONSTRUCTION

DOCUMENT SUBMISSION

FULLY SPRINKLERED

612-163

AE104

DESIGN SOCIAL WORK AND

EXPAND CLINICAL SPACE

3551 Femoyer Street Mather, CA 95655

12/04/2020

1/8" = 1'-0"1 SECOND FLOOR DIMENSION PLAN

SD-1 PACKAGE - ORIGINAL SUBMITTAL 5/24/2017

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL

SD-1 PACKAGE - RESUBMITTAL - SITE LOCATIONS

8/15/2017

9/15/2017

12/5/2017

SD-2 PACKAGE 5/15/2018

DD-1 NON REVIEW 8/02/2018

DD-1 SUBMISSION 8/23/2018

DD-2 SUBMISSION 10/27/2018

CD-1 SUBMISSION 02/10/2019

CD-1 RE-SUBMISSION 04/12/2019

CD-1 RE-SUBMISSION 01/31/2020

CD-2 SUBMISSION 04/30/2020

CONSTRUCTION DOCUMENT SUBMISSION 06/29/2020

GENERAL NOTES

9/16"

POSITION D

POSITION C

POSITION B

POSITION A

96 1/8"

15 9/16"RETRACT

27 9/16"EXTEND

68 13/16"

3D VIEW SHOWN FOR

REFERENCE ONLY

13 1/2"

12"

10"

10" 12"

51 13/16"

39 1/4"RETRACTED

63 1/4" EXTENDED

86 13/16"

74 1/4"

59 9/16"

1.0

2.0

3.0

4.0

B1 B3 B4 B5

0.1

B6

AE202

AE202

AE201

AE203

B4.5

B4.9

1.1

RD

OD

S L O

/4

F

T

M

IN

S L O

F

T

M

IN

SLOPE

1/4"/FT.

MIN.

S L O

F

T

M

IN

S L O

F

T

M

IN

SLOPE

1/4"/FT.

MIN.

SLOPE

1/4"/FT.

MIN.

SLOPE

1/4"/FT.

MIN.

SLOPE

1/4"/FT.

MIN.

SLOPE

1/4"/FT.

MIN.

S L O

F

T

M

IN

SLOPE

1/4"/FT.

MIN.

RD

OD

RD

OD

S L O

F

T

M

IN

B1.4

3.4

AE205

AE205

AE205

AE206

AE206

AE206

AE205

AE206

AI103A

3.6

0.08

B2

CURVED STANDING SEAM

METAL

ROOF - MATCH ALUMINUM

PANELS

AE105

AE20

AI115

TYP.

AE105

.7

+6.75"

.5

+3.75"

+3.0"

+5.0"

.5

.0

+3.0" +6.75"

RIDGE

+6.75"

.7

.7

.2

+6.75"

+1.37"

+3.0"

+.42"+.54"

B2.4

0.9

3.2

0.06

0.05

B4.1 B4.3B3.5B3.3B1.8

0.09

4.3

7' - 3 3/8"

/8

BID ALT #1:

DASHED LINE INDICATES AREA TO BE

ENCLOSED BY HVAC SCREENING AS

AN BID ALTERNATE. SEE

BID ALTERNATES IN

SPEC SECTION 010000 GENERAL

REQUIREMENTS.

LOCATE HVAC

SCREEN SUPPORTS

OVER EXISTING STRUCTUAL

ELEMENTS ONLY.

W12X50 BEAMS WILL BE REQUIRED

TO SUPPORT MECHANICAL ENCLOSURE

POST AND KICKERS.

R

ID

G E

RD

OD

RD

OD

RIDGE RIDGE

RD

OD

SLOPE

1/4"/FT.

MIN.

1. THIS ROOF PLAN IS FOR REFERENCE ONLY

2. REFER TO ENLARGED FLOOR PLANS, ELEVATION, SECTIONS AND

SCHEDULES ON OTHER DRAWINGS SHEETS FOR ADDITIONAL

DETAILS

3. REFER TO OTHER CONSULTANT/DISCIPLINE DRAWINGS FOR

ADDITIONAL DETAILS

4. PROTECT ROOF MEMBRANE DURING CONSTRUCTION.

DO NOT PLACE METAL BUCKETS DIRECTLY ON NEW

ROOFING. GENERAL CONTRACTOR RESPONSIBLE

FOR ROOF IF DAMAGED OR STAINED.

5. PROTECT ROOF MEMBRANE FROM ANY METAL

CUTTING OR WELDING.

RD - ROOF DRAIN

OD - OVER FLOW ROOF DRAIN - PROVIDE CHROME COWS

TONGUE AT DISCHARGE

TPO ROOF MEMBRANE MANUFACTURER'S RECOMMENDED FLASHING

DETAILS SHALL BE USED TO SEAL ALL ROOF PENETRATIONS AND

PROVIDE A WATERTIGHT ASSEMBLY.

NOTE: G.C. IS RESPONSIBLE FOR

PROTECTING TPO ROOF MEMBRANE

DURING CONSTRUCTION. USE

TARPS TO PROTECT ROOF MEMBRANE FROM METAL FILINGS FROM

CUTTING, DRILLING, ETC.

DO NOT PLACE BUCKETS OR OTHER FERROUS METAL OBJECTS

DIRECTLY ON ROOF SURFACE. REMOVE DEBRIS FROM ROOF ON A

DAILY BASIS. CLEAN (PRESSURE WASH) ROOF AT END OF PROJECT.

ROOF WALKPAD

NOTE:

PAINT ALL EXPOSED LADDER AND ROOF

HATCH SURFACES AT END OF JOB

2-1/2"x2-1/2"x3/8"x2-1/2" CLIP

ANGLE, WELD TOS STRINGER,

AND BOLT TO SLAB

3/4" DIA. BAR RUNGS WITH NON-SLIP

TOP SURFACE (TYPICAL), WELD TO

CENTER OF STRINGERS @ 12" o.c.

VERTICALLY MAX. - SPACE UNIFORMLY

3/8"x2-1/2" BAR BRACKETS @ 2'-0" o.c.

VERTICAL (TYPICAL) WELD TO

STRINGERS, ANCHOR TO WALL WITH

EXPANSION BOLTS (TYPICAL)

3/8"x2-1/2" BAR STRINGERS

PROVIDE FIRE-TREATED BLOCKING

OR 16 GA. METAL STUD FRAMING

WITHIN GYPSUM BOARD WALL FOR

ATTACHMENT OF BRACKETS

6"

COORDINATE WITH

HATCH MFGR'S

EXTENDABLE SAFETY

POST REQUIREMENTS

PROVIDE BLOCKING IN

WALL TO ANCHOR

LADDER SECURELY

CLEAR

1' - 6"

(2

M

A X

IF

G R

E A

T E

R T

H A

N

P

R O

V

ID

E A

N S

O S

H A

A P

P R

O V

E D

S A

F E

T Y

C A

G E

H E

IG

H

T A

S R

E Q

U

IR

E D

F

IE

L D

V E

R

IF

Y

EXTENDABLE

SAFETY POST

PREFABRICATED

ROOF HATCH

PROVIDE ACROVYN WALL

PANELS AND TRIM BEHIND

LADDER, TO 1'-0" EITHER SIDE

OF LADDER FULL HEIGHT.

HATCH MOUNTED

FALL PROTECTION

RAILING

1' - 0" 1' - 0"

OVERALL LENGTH

4' - 1 1/8"

FRAME OPENING LENGTH

3' - 8"

NOTE:

PAINT ALL EXPOSED FERROUS METAL

LADDER AND ROOF HATCH SURFACES

AT END OF JOB

NOTE:

PROVIDE OSHA FALL PROTECTION

AROUND ROOF HATCH

NOTE:

BILCO ROOF HATCH IS BASIS OF

DESIGN.