Attachment 4 - Price Sheet.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Baku Office Building Chancery Roof Replacement
- Solicitation number
- 19AQMM26R0293_Baku_OBC_Roof_Replacement
About this file
This is a Price Sheet attachment for the Baku Office Building Chancery (OBC) Roof Replacement project at the US Embassy in Baku, Azerbaijan. The price sheet outlines line items and cost structure for a base contract labor category with a cleared American post assignment. The project encompasses three main roof system types: OBC Hot Rubberized Roof covering approximately 8,000 square feet across multiple roof areas (A, D, E, F, G, H, J, K) with associated demolition, membrane installation, insulation, pavers, flashing, and drainage components; OBC Metal Panel Roof for Roof Area B covering 1,000 square feet including deck replacement and standing seam metal panels; and UTL (Generator) Hot Rubberized Roof System covering 2,000 square feet. Line items span materials, labor and equipment costs, penetration flashing, cementitious cant, metal edging, PMMA coating, sealant, and painting work.
The price sheet includes indirect cost categories for shipping, Domestic Business Act (DBA) compliance, taxes and insurance, overhead, profit, and contingency allocations. Travel expenses are itemized separately for a 10-person crew over 110 calendar days, including visas and immunizations, airfare, lodging at $158 per day, and meals and incidental expenses (M&IE) at $145 per day, with local transportation. The current submission shows a total evaluated price of $33,330.00, representing only travel expenses, indicating that material, labor, equipment, and indirect costs require contractor pricing input. This price sheet is designed to be completed by offerors responding to the RFP (19AQMM26R0293) with all cost details filled in for evaluation purposes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 4 - Price Sheet (Revised).xlsx | XLSX spreadsheet | |
| 19AQMM26R0293 A007.pdf | ||
| 19AQMM26R0293 A006.pdf | ||
| QandA 2.docx | DOCX document | |
| 19AQMM26R0293 A005.pdf | ||
| 19AQMM26R0293 A004.pdf | ||
| QandA 1.docx | DOCX document | |
| 19AQMM26R0293 A003.pdf | ||
| 19AQMM26R0293 A002.pdf | ||
| Attachment 8 - TDY Briefing.pdf | ||
| Attachment 7 - Authorized Baku Hotels and Rates for 2026.pdf | ||
| 19AQMM26R0293 A001.pdf | ||
| Attachment 3 - PPQ.docx | DOCX document | |
| 19AQMM26R0293.pdf | ||
| Attachment 5 - Bidders DD-254.pdf | ||
| Attachment 6 - Public Release of Information 20250219.pdf | ||
| Attachment 1 - OBC Roof Replacement Specifications.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE CONTRACT
| LABOR TYPE: CLEARED AMERICAN | |||||||
| POST: BAKU, AZERBAIJAN | |||||||
| PROJECT NUMBER: FWP 75 | |||||||
| PROJECT TITLE: OBC ROOF REPLACEMENT | |||||||
| ITEM OF WORK | QUANTITY | UNITS | MATERIAL COST | LABOR & EQUIPMENT COST | TOTAL | ||
| PER UNIT | SUBTOTAL | PER UNIT | SUBTOTAL | ||||
| OBC - Hot Rubberized (Roof Areas A, D, E, F, G, H, J, K) | |||||||
| Mobilization / Demobilization | 1 | Lump Sum | $ - 0 | $ - 0 | $ - 0 | ||
| Roof System Demolition/Disposal | 8,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Hot Rubberized Membrane | 8,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| 1/4" Gypsum Board (Roof Area A only) | 1,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Drain Board / Fabric | 8,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| New Insulation | 8,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| New Composite Pavers | 8,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Penetration Flashing | 20 | Each | $ - 0 | $ - 0 | $ - 0 | ||
| Cementitious Cant | 1,500 | Linear Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Base Flashing and Counterflashing | 1,500 | Linear Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Metal Edge | 1,500 | Linear Feet | $ - 0 | $ - 0 | $ - 0 | ||
| New Roof Railing (Roof Area A) | 1 | Lump Sum | $ - 0 | $ - 0 | $ - 0 | ||
| New LP System | 1 | Lump Sum | $ - 0 | $ - 0 | $ - 0 | ||
| Equipment / Curb Flashing | 1,000 | Linear Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Miscellaneous HVAC/Electrical Work | 1 | Lump Sum | $ - 0 | $ - 0 | $ - 0 | ||
| Equipment / Piping Supports | 20 | Each | $ - 0 | $ - 0 | $ - 0 | ||
| Roof Drains/Parts | 9 | Each | $ - 0 | $ - 0 | $ - 0 | ||
| Overflow Scuppers / Drains | 9 | Each | $ - 0 | $ - 0 | $ - 0 | ||
| PMMA Coating | 1,800 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Sealant | 1,000 | Linear Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Painting | 1 | Lump Sum | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal - Materials and Labor | $ - 0 | $ - 0 | $ - 0 | ||||
| OBC - METAL PANEL ROOF (Roof Area B) | |||||||
| Removals | 1,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Replace Exisiting Wood Deck | 1,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Self-Adhered Underlayment | 1,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Standing Seam Metal Panels | 1,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Sheetmetal Flashing (Edge Metal) | 250 | Linear Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Downspouts/Drains | 4 | Each | $ - 0 | $ - 0 | $ - 0 | ||
| Wood Facia/Soffit Replace | 100 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Painting | 1 | Lump Sum | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal - Materials and Labor | $ - 0 | $ - 0 | $ - 0 | ||||
| UTL (Generator) - Hot Rubberized | |||||||
| Roof System Demolition/Disposal | 2,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Hot Rubberized Membrane | 2,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Drain Board / Fabric | 2,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| New Insulation | 2,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| New Composite Pavers | 2,000 | Square Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Penetration Flashing | 10 | Each | $ - 0 | $ - 0 | $ - 0 | ||
| Cementitious Cant | 500 | Linear Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Base Flashing and Counterflashing | 500 | Linear Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Metal Edge | 500 | Linear Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Equipment / Curb Flashing | 100 | Linear Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Miscellaneous HVAC/Electrical Work | 1 | Lump Sum | $ - 0 | $ - 0 | $ - 0 | ||
| Equipment / Piping Supports | 10 | Each | $ - 0 | $ - 0 | $ - 0 | ||
| Roof Drains/Parts | 1 | Each | $ - 0 | $ - 0 | $ - 0 | ||
| Overflow Scuppers / Drains | 3 | Each | $ - 0 | $ - 0 | $ - 0 | ||
| Sealant | 500 | Linear Feet | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal - Materials and Labor | $ - 0 | $ - 0 | $ - 0 |
| Subtotal - Materials and Labor - ALL ROOF AREAS | $ - 0 | $ - 0 | $ - 0 | ||
| INDIRECT COSTS | |||||
| Shipping | 1 | Lump Sum | |||
| DBA | 1 | Lump Sum | |||
| Taxes & Insurance % | Labor | $ - 0 | |||
| Overhead % | Subtotal - M&L | $ - 0 | |||
| Profit % | ALL | $ - 0 | |||
| Contingency % | ALL | $ - 0 | |||
| Subtotal - Indirect Costs | $ - 0 |
SUBTOTAL - ESTIMATED PROJECT COST (M&L + IND.Costs) w/o Travel $ - 0
| TRAVEL EXPENSES | ||||
| Visas & Immunizations (10 Crew) | 10 | Each | $ - 0 | |
| Airfare | 10 | Each | $ - 0 | |
| Lodging (10 Crew x $158/Day) | 110 | Calendar Days | $ 158.00 | $ 17,380.00 |
| M&IE (10 Crew x $145/Day | 110 | Calendar Days | $ 145.00 | $ 15,950.00 |
| Local Transportation | 1 | Lump Sum | $ - 0 | |
| Subtotal - Travel Expenses | $ 33,330.00 |
TOTAL EVALUATED PRICE $ 33,330.00
File details come from the government source that posted it. Updated .