Attachment 4 - Price Sheet.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Baku Office Building Chancery Roof Replacement
Solicitation number
19AQMM26R0293_Baku_OBC_Roof_Replacement
Issued by

About this file

This is a Price Sheet attachment for the Baku Office Building Chancery (OBC) Roof Replacement project at the US Embassy in Baku, Azerbaijan. The price sheet outlines line items and cost structure for a base contract labor category with a cleared American post assignment. The project encompasses three main roof system types: OBC Hot Rubberized Roof covering approximately 8,000 square feet across multiple roof areas (A, D, E, F, G, H, J, K) with associated demolition, membrane installation, insulation, pavers, flashing, and drainage components; OBC Metal Panel Roof for Roof Area B covering 1,000 square feet including deck replacement and standing seam metal panels; and UTL (Generator) Hot Rubberized Roof System covering 2,000 square feet. Line items span materials, labor and equipment costs, penetration flashing, cementitious cant, metal edging, PMMA coating, sealant, and painting work.

The price sheet includes indirect cost categories for shipping, Domestic Business Act (DBA) compliance, taxes and insurance, overhead, profit, and contingency allocations. Travel expenses are itemized separately for a 10-person crew over 110 calendar days, including visas and immunizations, airfare, lodging at $158 per day, and meals and incidental expenses (M&IE) at $145 per day, with local transportation. The current submission shows a total evaluated price of $33,330.00, representing only travel expenses, indicating that material, labor, equipment, and indirect costs require contractor pricing input. This price sheet is designed to be completed by offerors responding to the RFP (19AQMM26R0293) with all cost details filled in for evaluation purposes.

View the file

Other files

File Type Posted
Attachment 4 - Price Sheet (Revised).xlsx XLSX spreadsheet
19AQMM26R0293 A007.pdf PDF
19AQMM26R0293 A006.pdf PDF
QandA 2.docx DOCX document
19AQMM26R0293 A005.pdf PDF
19AQMM26R0293 A004.pdf PDF
QandA 1.docx DOCX document
19AQMM26R0293 A003.pdf PDF
19AQMM26R0293 A002.pdf PDF
Attachment 8 - TDY Briefing.pdf PDF
Attachment 7 - Authorized Baku Hotels and Rates for 2026.pdf PDF
19AQMM26R0293 A001.pdf PDF
Attachment 3 - PPQ.docx DOCX document
19AQMM26R0293.pdf PDF
Attachment 5 - Bidders DD-254.pdf PDF
Attachment 6 - Public Release of Information 20250219.pdf PDF
Attachment 1 - OBC Roof Replacement Specifications.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE CONTRACT

LABOR TYPE: CLEARED AMERICAN
POST: BAKU, AZERBAIJAN
PROJECT NUMBER: FWP 75
PROJECT TITLE: OBC ROOF REPLACEMENT
ITEM OF WORKQUANTITYUNITSMATERIAL COSTLABOR & EQUIPMENT COSTTOTAL
PER UNITSUBTOTALPER UNITSUBTOTAL
OBC - Hot Rubberized (Roof Areas A, D, E, F, G, H, J, K)
Mobilization / Demobilization1Lump Sum$ - 0$ - 0$ - 0
Roof System Demolition/Disposal8,000Square Feet$ - 0$ - 0$ - 0
Hot Rubberized Membrane8,000Square Feet$ - 0$ - 0$ - 0
1/4" Gypsum Board (Roof Area A only)1,000Square Feet$ - 0$ - 0$ - 0
Drain Board / Fabric8,000Square Feet$ - 0$ - 0$ - 0
New Insulation8,000Square Feet$ - 0$ - 0$ - 0
New Composite Pavers8,000Square Feet$ - 0$ - 0$ - 0
Penetration Flashing20Each$ - 0$ - 0$ - 0
Cementitious Cant1,500Linear Feet$ - 0$ - 0$ - 0
Base Flashing and Counterflashing1,500Linear Feet$ - 0$ - 0$ - 0
Metal Edge1,500Linear Feet$ - 0$ - 0$ - 0
New Roof Railing (Roof Area A)1Lump Sum$ - 0$ - 0$ - 0
New LP System1Lump Sum$ - 0$ - 0$ - 0
Equipment / Curb Flashing1,000Linear Feet$ - 0$ - 0$ - 0
Miscellaneous HVAC/Electrical Work1Lump Sum$ - 0$ - 0$ - 0
Equipment / Piping Supports20Each$ - 0$ - 0$ - 0
Roof Drains/Parts9Each$ - 0$ - 0$ - 0
Overflow Scuppers / Drains9Each$ - 0$ - 0$ - 0
PMMA Coating1,800Square Feet$ - 0$ - 0$ - 0
Sealant1,000Linear Feet$ - 0$ - 0$ - 0
Painting1Lump Sum$ - 0$ - 0$ - 0
Subtotal - Materials and Labor$ - 0$ - 0$ - 0
OBC - METAL PANEL ROOF (Roof Area B)
Removals1,000Square Feet$ - 0$ - 0$ - 0
Replace Exisiting Wood Deck1,000Square Feet$ - 0$ - 0$ - 0
Self-Adhered Underlayment1,000Square Feet$ - 0$ - 0$ - 0
Standing Seam Metal Panels1,000Square Feet$ - 0$ - 0$ - 0
Sheetmetal Flashing (Edge Metal)250Linear Feet$ - 0$ - 0$ - 0
Downspouts/Drains4Each$ - 0$ - 0$ - 0
Wood Facia/Soffit Replace100Square Feet$ - 0$ - 0$ - 0
Painting1Lump Sum$ - 0$ - 0$ - 0
Subtotal - Materials and Labor$ - 0$ - 0$ - 0
UTL (Generator) - Hot Rubberized
Roof System Demolition/Disposal2,000Square Feet$ - 0$ - 0$ - 0
Hot Rubberized Membrane2,000Square Feet$ - 0$ - 0$ - 0
Drain Board / Fabric2,000Square Feet$ - 0$ - 0$ - 0
New Insulation2,000Square Feet$ - 0$ - 0$ - 0
New Composite Pavers2,000Square Feet$ - 0$ - 0$ - 0
Penetration Flashing10Each$ - 0$ - 0$ - 0
Cementitious Cant500Linear Feet$ - 0$ - 0$ - 0
Base Flashing and Counterflashing500Linear Feet$ - 0$ - 0$ - 0
Metal Edge500Linear Feet$ - 0$ - 0$ - 0
Equipment / Curb Flashing100Linear Feet$ - 0$ - 0$ - 0
Miscellaneous HVAC/Electrical Work1Lump Sum$ - 0$ - 0$ - 0
Equipment / Piping Supports10Each$ - 0$ - 0$ - 0
Roof Drains/Parts1Each$ - 0$ - 0$ - 0
Overflow Scuppers / Drains3Each$ - 0$ - 0$ - 0
Sealant500Linear Feet$ - 0$ - 0$ - 0
Subtotal - Materials and Labor$ - 0$ - 0$ - 0
Subtotal - Materials and Labor - ALL ROOF AREAS$ - 0$ - 0$ - 0
INDIRECT COSTS
Shipping1Lump Sum
DBA1Lump Sum
Taxes & Insurance %Labor$ - 0
Overhead %Subtotal - M&L$ - 0
Profit %ALL$ - 0
Contingency %ALL$ - 0
Subtotal - Indirect Costs$ - 0

SUBTOTAL - ESTIMATED PROJECT COST (M&L + IND.Costs) w/o Travel $ - 0

TRAVEL EXPENSES
Visas & Immunizations (10 Crew)10Each$ - 0
Airfare10Each$ - 0
Lodging (10 Crew x $158/Day)110Calendar Days$ 158.00$ 17,380.00
M&IE (10 Crew x $145/Day110Calendar Days$ 145.00$ 15,950.00
Local Transportation1Lump Sum$ - 0
Subtotal - Travel Expenses$ 33,330.00

TOTAL EVALUATED PRICE $ 33,330.00