Attachment 4 - 668-14-107_Plumbing Survey_Dead Leg Summary Total .pdf
PDF 232 KB Posted
- Solicitation number
- 36C26024R0038
About this file
This notice requests Standard Form 330 Architect-Engineer Qualifications packages for the design of a project to modify existing hot and cold potable water distribution systems in Buildings 1 and 12 at the Mann-Grandstaff VA Medical Center in Spokane, Washington. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The design contract to be awarded has an anticipated period of performance of 315 calendar days and a magnitude of construction between $1,000,000 and $2,000,000. Statements of Qualifications are due by April 15, 2024 and are limited to 20 pages. The top three scoring firms will participate in written discussions. Evaluation criteria include professional qualifications, specialized experience and technical competence, capacity, past performance, knowledge of the locality, and experience in construction period services. The selection will prioritize these criteria and consider information provided in the SF 330 submission and discussions.
The notice provides submission requirements and the evaluation process. Firms must be certified SDVOSBs and meet NAICS code 541330. Examples of five relevant design projects must be provided, including descriptions of scope, value, and owner references. Construction completion is required for three examples. Past performance will be evaluated through CPARS and Project Performance Questionnaires. The selection is for design services and construction administration for the specified domestic water system project at the medical center.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 2 Building
Building
Building
Building
Building
Utility Plant -
Laundry
Community
Living Center
Outpatient
Clinic Eye Clinic
Physical - O.T.
Prosthetics Dental Clinic Basement 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor 7th Floor 8th Floor 9th Floor 10th Floor
TOTALS BY TYPES OF
DEAD LEGS
Type Description
1 Pipe lengths greater than 10 feet terminating at a cap. 0 1 0 1 3 0 6 3 9 2 0 3 0 2 0 0 0 30
2 Pipe lengths greater than 10 feet terminating at a closed valve. 1 5 3 4 1 1 0 0 0 0 0 0 0 0 0 0 0 15
3 Pipe lengths greater than 10 feet terminating at a fitting. 0 0 0 0 0 0 4 0 1 0 0 0 0 0 1 2 0 8
Pipe lengths greater than 10 feet terminating at an infrequently used plumbing fixture. An infrequently used plumbing fixture is a fixture where the hot water line or cold water line is run less than once each day.
2 6 0 0 1 0 2 0 1 0 19 15 0 0 0 0 0 46
Pipe lengths greater than 25 feet terminating at a frequently used plumbing fixture.
A frequently used plumbing fixture is a fixture where both the hot water line and cold water line are run at least once each day.
1 1 4 1 1 3 6 2 5 3 6 6 3 4 1 1 0 48
TOTALS BY BUILDING/FLOOR 4 13 7 6 6 4 18 5 16 5 25 24 3 6 2 3 0 147
Building 1 - Main Hospital
DEAD LEG SUMMARY TOTAL FOR ALL BUILDINGS
VA Spokane Legionella Hot and Cold Water System As-Built
Project 668-14-107
April 30, 2016
File details come from the government source that posted it. Updated .