Attachment 34 - 2020 GAO High Quality Project Estimate Characteristics .xlsx

XLSX spreadsheet 15 KB Posted

Attached to
C1DA--668-22-106 Correct Domestic Water System Deficiencies Buildings 1 and 12
Solicitation number
36C26024R0038
Issued by

About this file

This notice requests Standard Form 330 Architect-Engineer Qualifications packages for a design contract to modify the existing hot and cold potable water distribution systems in Buildings 1 and 12 at the Mann-Grandstaff VA Medical Center in Spokane, Washington. The design is required to correct deficiencies and is estimated to cost between $1 million and $2 million in construction value.

The solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. Responses are due by April 15, 2024 and the anticipated period of performance for design completion is 315 calendar days from award. Key positions required for the design include an architect, cost estimator, electrical, environmental, industrial hygiene, mechanical and plumbing engineers, and a project manager. The notice provides instructions for submitting qualifications and the evaluation criteria, which include professional qualifications, specialized experience, capacity, past performance, and knowledge of the project locality and construction administration. The most highly qualified firms will be invited to participate in written discussions and negotiations for award.

View the file

Other files

File Type Posted
Attachment 10 - 668-16-110_Cross-Connection Evaluation Plans 1of10 .pdf PDF
Attachment 31 - VHA DIRECTIVE 1061_2021-02-16 .pdf PDF
Attachment 1 - 668-22-106_SOW_Revision 3.pdf PDF
Attachment 25 - 668-16-110_Cross-Connection Inventory Report - APPENDIX D - 1of3 .pdf PDF
Attachment 2 - 668-14-107_Plumbing Survey_FINAL DRAWINGS.pdf PDF
Attachment 3 - 668-14-107_Plumbing Survey_FINAL INVENTORY .pdf PDF
Attachment 35 - Phigenics As-Built Drawings.pdf PDF
Attachment 6 - 668-16-110_Feasibility Study_Project Manual .pdf PDF
Attachment 14 - 668-16-110_Cross-Connection Evaluation Plans 5of10 .pdf PDF
36C26024R0038_1.docx DOCX document
Attachment 28 - 668-16-110_Cross-Connection Inventory Report - APPENDIX E-F .pdf PDF
Attachment 13 - 668-16-110_Cross-Connection Evaluation Plans 4of10 .pdf PDF
Attachment 4 - 668-14-107_Plumbing Survey_Dead Leg Summary Total .pdf PDF
Attachment 24 - 668-16-110_Cross-Connection Inventory Report - APPENDIX C .pdf PDF
Attachment 16 - 668-16-110_Cross-Connection Evaluation Plans 7of10 .pdf PDF
Attachment 18 - 668-16-110_Cross-Connection Evaluation Plans 9of10 .pdf PDF
Attachment 20 - 668-16-110_Cross-Connection Inventory Report .pdf PDF
Attachment 33 - 668-22-106_DESIGN REVIEW COMMENT SHEET.xlsx XLSX spreadsheet
Attachment 29 - 668-16-110_Cross-Connection Corrective Action Report .pdf PDF
Attachment 23 - 668-16-110_Cross-Connection Inventory Report - APPENDIX B2 .pdf PDF
Attachment 5 - 668-16-110_Feasibility Study_Drawings .pdf PDF
Attachment 7 - 668-16-110_Feasibility Study_Report .pdf PDF
Attachment 15 - 668-16-110_Cross-Connection Evaluation Plans 6of10 .pdf PDF
Attachment 8 - 668-16-110_Feasibility Study_Fixture Inventory and Tracking .pdf PDF
Attachment 19 - 668-16-110_Cross-Connection Evaluation Plans 10of10 .pdf PDF
Attachment 12 - 668-16-110_Cross-Connection Evaluation Plans 3of10 .pdf PDF
Attachment 17 - 668-16-110_Cross-Connection Evaluation Plans 8of10 .pdf PDF
Attachment 9 - 668-16-110_Feasibility Study_Cost Estimate .pdf PDF
Attachment 27 - 668-16-110_Cross-Connection Inventory Report - APPENDIX D - 3of3 .pdf PDF
Attachment 22 - 668-16-110_Cross-Connection Inventory Report - APPENDIX B1 .pdf PDF
Attachment 26 - 668-16-110_Cross-Connection Inventory Report - APPENDIX D - 2of3.pdf PDF
Attachment 11 - 668-16-110_Cross-Connection Evaluation Plans 2of10 .pdf PDF
Attachment 32 - MGVMAC_Design Amendments_May 2021 .pdf PDF
Attachment 36 - PPQ.docx DOCX document
Attachment 30 - 668-16-110_Cross-Connection Control Plan FINAL .pdf PDF
Attachment 21 - 668-16-110_Cross-Connection Inventory Report - APPENDIX A .pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Estimate review

KEY
VA provided evidence that satified the entire criterion =Met
VA provided ecividen that satifies a larger portion fo the ctiteion =Substantially Met
VA provided evidnce that satieid half of the criterion =Partially Met
VA provided evidence that5 satifies a small portion of the criterion =Minimally Met
VA provided no evidence that satifies any of the criterion =Not Met
GAO Cost Estimating and Assessment Guide (GAO-20-195G)35% Design Construction Cost Estimate95% Design Construction Cost Estimate
Characteristics of a high-quality and reliable cost estimateBest PracticeIndividual AssessmentIndividual Assessment
ComprehensiveThe cost estimate includes all costs
The cost estimate completely defines the program, reflects the current schedule, and is technically reasonable (Step 3, Chapter 6)
The cost estimate WBS is product-oriented, traceable to the statement of work/objective, and at an appropriate level of detail to ensure that cost elements are neither omitted nor double-counted. (Step 4, Chapter 7)
The estimate documents all cost-influencing ground rules and assumptions. (Step 5, Chapter 8)
Well documentedThe documentation should capture in writing the source data used, the reliability of the data, and how the data were normalized. (Step 6, Chapter 9)
The documentation describes in detail the calculations performed and the estimating methodology used to derive each WBS element’s cost. (Step 7, Chapter 10)
The documentation describes step by step how the estimate was developed so that a cost analyst unfamiliar with the program could understand what was done and replicate it. (Step 10, Chapter 13)
The documentation discusses the technical baseline description and the data in the technical baseline are consistent with the cost estimate (Step 3, Chapter 6 and Step 6, Chapter 9)
The documentation provides evidence that the cost estimate was reviewed and accepted by management. (Step 11, Chapter 14)
AccurateThe cost estimate results are unbiased, not overly conservative or optimistic and based on an assessment of most likely costs. (Chapter 16)
The estimate has been adjusted properly for inflation. (Step 6, Chapter 9)
The estimate contains few, if any, minor mistakes. (Chapter 16)
The cost estimate is regularly updated to reflect significant changes in the program, such as when schedules or other assumptions change, and actual costs so that it is always reflecting current status. (Step 12, Chapter 15)
Variances between planned and actual costs are documented, explained, and reviewed. (Step 12, Chapter 20)
The estimate is based on a historical record of cost estimating and actual experiences from other comparable programs. (Step 6, Chapter 9)
CredibleThe cost estimate includes a sensitivity analysis that identifies a range of possible costs based on varying major assumptions, parameters, and data inputs. (Step 8, Chapter 11)
A risk and uncertainty analysis was conducted that quantified the imperfectly understood risks and identified the effects of changing key cost driver assumptions and factors. (Step 9, Chapter 12)
Major cost elements were crossed checked to see whether results were similar. (Chapter 16)
An independent cost estimate was conducted by a group outside the acquiring organization to determine whether other estimating methods produce similar results. (Step 7, Chapter 10)

&F &A page &P of &N

File details come from the government source that posted it. Updated .