Statement of Work Summary
This Statement of Work (SOW) outlines the requirements for monthly recurring Individual Protective Equipment (IPE) gear laundry services at Pope Army Airfield, North Carolina, for the 43d Air Mobility Squadron, effective July 1, 2026. The contractor shall provide all labor, supervision, equipment, tools, supplies, materials, and transportation necessary to launder training equipment including Joint Service Lightweight Integrated Suit Technology coats and trousers, individual sleeping bags, and cotton glove inserts.
The contractor must complete the full cycle of inventory, packing, transportation, cleaning, and return of equipment to IPE Mobility Section at Building 560. Pick-up and drop-off shall occur during normal duty business hours (Monday-Friday, 7:30 a.m. to 4:30 p.m. EST) in coordination with the Chief of Material Management. The contractor must be capable of transporting 784 cubic feet of material in a single movement, with all work completed and equipment returned no later than 10 business days from the pickup date. All workers must be U.S. citizens with valid picture identification and security clearance access to the military installation; workers will be escorted at all times within the IPE Section, and no weapons, drugs, or illegal paraphernalia are authorized. Upon completion, IPE personnel will conduct inventory and inspection of each item prior to acceptance into stock. All work must comply with applicable OSHA standards, and any damages caused by the contractor shall be repaired at no additional cost to the government.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
43 AMS / LRF
INDIVIDUAL PROTECTIVE EQUIPMENT
GEAR LAUNDRY SERVICES
POPE ARMY AIRFIELD,
NORTH CAROLINA
1 Jul 2026
1. DESCRIPTION OF SERVICE: The contractor shall provide all labor, supervision, equipment, tools, supplies, materials, and transportation necessary to launder training equipment.
2. SCOPES OF WORK: 43d Air Mobility Squadron, Individual Protective Equipment
(IPE) Mobility Section requires a monthly recurring laundry service to wash and dry any/all used training equipment.
2.1 Laundry: All training equipment will be inventoried, packed, transported, cleaned and returned to the IPE Mobility Section, Pope AAF, NC, Bldg 560.
3. GENERAL NOTES:
3.1 Verify existing conditions, quantities, dimensions, and details prior to bidding on this project.
3.2 Coordinate with work-center prior to pick up and drop off.
3.3 Contractor shall use experienced professionals for all processes of this project.
3.4 All damages caused by the Contractor to existing conditions shall be repaired by the
Contractor at no additional cost.
3.5 Process the washing of the Joint Service Lightweight Integrated Suit Technology coat and trousers, individual sleeping bags, and cotton glove inserts.
3.6 Maintain all necessary project safety signs and devices as required.
3.7 All work accomplished under this contract order shall comply with applicable
OSHA standards.
4. WORK HOURS
4.1 Pick up and drop off will be performed during normal duty business hours: M-F
7:30am – 4:30pm EST.
4.2 Contractor must be capable of transporting 784 cubic ft. of material in one movement.
4.3 Work will be completed & equipment returned no later than 10 business days [pending quantity] from the pickup date.
4.4 The contractor will coordinate with the Chief of Material Management concerning this project.
5. SECURITY
5.1 All workers shall be legal U.S. Citizens with valid picture IDs who can gain clearance access into a federal military installation.
5.2 No guns, drugs, or illegal paraphernalia will be authorized on the military installation.
5.3 All vehicles, equipment, and containers may be subject to search at any time while on or seeking access to the military installation.
5.4 All workers will be escorted at all times within the IPE Section.
6. INSPECTION AND ACCEPTANCE: Upon completion of work, IPE personnel will inventory and inspect each item prior to receipt into stock.