attachment_3_RFB DMAVS 2026-01.pdf
PDF 85 KB Posted
- Solicitation number
- RFB DMAVS 2026-01
- Issued by
- Strafford County, New Hampshire
About this file
This document is an Exhibit B - Scope of Services from the State of New Hampshire's Department of Military Affairs and Veterans Services for the NHARNG Center Strafford Building 12 Interior Renovation project. The project involves upgrading an existing structure at the Training Site in Strafford to enable year-round Army fitness training and testing. The renovation includes constructing a mechanical room, an interior vestibule, installing a heating and cooling system, and adding turf flooring specifically required for fitness testing purposes.
The scope of work references two attachments: project specifications (Exhibit B-Attachment 1) and authorized construction drawings/documents and clarification sketches (Exhibit B-Attachment 2). While specific budget details are not provided in this document, the project appears to be focused on improving facility infrastructure to support military fitness and training capabilities at the Strafford Training Site.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 1 Initials: __________ Date: __________
STATE OF NEW HAMPSHIRE
DEPARTMENT OF MILITARY AFFAIRS AND VETERANS SERVICES
EXHIBIT B – SCOPE OF SERVICES
SUBJECT: NHARNG Center Strafford Building 12 Interior Renovation
The Exhibit B – (“ Scope of Services”) as stated in the contract (Form P-37) and related to the above referenced project, shall include all the information and requirements about the project that are derived from the project specifications (Exhibit B-Attachment 1), the authorized construction drawings/documents and clarification sketches (Exhibit B- Attachment 2) as well as any addendums.
PROJECT OVERVIEW:
This project involves upgrades to an existing structure at the Training Site in Strafford to allow for year-round Army fitness training and testing. The design includes constructing a mechanical room, an interior vestibule, a heating and cooling system and turf flooring that is required for testing.
| STATE OF NEW HAMPSHIRE |
| PROJECT OVERVIEW: |
File details come from the government source that posted it. Updated .