This is a Pricing Schedule Template for Architect-Engineer (A-E) services that will be used for Task Order pricing under the Edwards AFB IDIQ contract (FA4610-11-R-0034). The template establishes a negotiation worksheet format for proposed rates across multiple labor categories and cost elements, with columns for Base Hourly Rate, Overhead and Fringe percentages, Subtotal, General & Administrative (G&A) percentage, Total Cost, Profit percentage, and Total Firm-Fixed-Price (FFP) Rate.
The template encompasses extensive labor categories organized by discipline and seniority level, including Project Management, Architects, Community Planners, Landscape Architects, Structural Engineers, Civil Engineers, Mechanical Engineers, Electrical Engineers, Environmental Engineers, Fire Protection Engineers, and Geotechnical Engineers, along with specialized roles such as Title II Construction Representatives, Surveyors, Survey Crews, Cost Estimators, Specification Writers, CAD Drafters, and Clerks. The template also includes cost elements for per diem travel expenses (meals, lodging, mileage, hotel, and airfare) based on Joint Travel Regulations (JTR) rates, and reproduction costs for various drawing sizes and formats. A companion Task Order Rate Worksheet is included for specific task order pricing, with columns for quantity estimates across different phases (IA, IB, II) and corresponding FFP rates. The template provides for escalation rates across multiple contract years and allowance for subconsultants and other services on a lump sum basis, supporting the flexible nature of the multi-year IDIQ structure with a $25,000,000 ceiling.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSED RATES
| Negotiation Worksheet |
| ARCHITECT-ENGINEER |
<<Ktr XYZ>>
| (*) The same rates are used for Title I and Other Services Investigative | ||||||||
| LABOR CATEGORY CLASSIFICATION | BASE HOURLY RATE | OVERHEAD (+ FRINGE) % | SUBTOTAL | G&A % | TOTAL COST | PROFIT % | TOTAL FFP RATE | |
| Escalation Rate For Option Periods: | ||||||||
| PROJECT MANAGEMENT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SENIOR LEVEL ARCHITECT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| MID LEVEL ARCHITECT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| JUNIOR LEVEL ARCHITECT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SENIOR LEVEL COMMUNITY PLANNER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| MID LEVEL COMMUNITY PLANNER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| JUNIOR LEVEL COMMUNITY PLANNER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SENIOR LEVEL LANDSCAPE ARCHITECT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| MID LEVEL LANDSCAPE ARCHITECT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| JUNIOR LEVEL LANDSCAPE ARCHITECT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SENIOR LEVEL STRUCTURAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| MID LEVEL STRUCTURAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| JUNIOR LEVEL STRUCTURAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SENIOR LEVEL CIVIL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| MID LEVEL CIVIL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| JUNIOR LEVEL CIVIL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SENIOR LEVEL MECHANICAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| MID LEVEL MECHANICAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| JUNIOR LEVEL MECHANICAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Password | |
| SENIOR LEVEL ELECTRICAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | PZIOC | |
| MID LEVEL ELECTRICAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| JUNIOR LEVEL ELECTRICAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SENIOR LEVEL ENVIRONMENTAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| MID LEVEL ENVIRONMENTAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| JUNIOR LEVEL ENVIRONMENTAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SENIOR LEVEL FIRE PROT ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| MID LEVEL FIRE PROT ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| JUNIOR LEVEL FIRE PROT ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SENIOR LEVEL GEOTECHNICAL ENGR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| MID LEVEL GEOTECHNICAL ENGR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| JUNIOR LEVEL GEOTECHNICAL ENGR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TITLE II CONSTR REP | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SURVEYOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SURVEY CREW | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| COST ESTIMATING | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SPEC WRITING | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| AUTOCAD DRAFTING | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| CLERK | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
PER DIEM - TRAVEL
| MEALS AND LODGING >24 HOURS | JTR rate | (per day) |
| MEALS ONLY > 12 HOURS BUT < 24 HOURS | JTR rate | (per day) |
| MILEAGE (300 Miles/Car - 1 Car) | JTR rate | (per mile) |
| HOTEL (Includes 15.5% Lodging Tax) | JTR rate | (night) |
| AIRFARE | JTR rate | (round trip) |
REPRODUCTION
| FULL-SIZE DRAWING PHOTOCOPIES (24" x 36") | $ - 0 | (per sheet) |
| HALF-SIZE DRAWING PHOTOCOPIES (11" x 17") | $ - 0 | (per sheet) |
| LETTER-SIZE PHOTOCOPIES (8-1/2" x 11") | $ - 0 | (per sheet) |
| CD/DVD | $ - 0 | (per disk) |
| BINDERS | $ - 0 | (per each) |
| COLOR RENDERING PRINT | $ - 0 | (per sq ft) |
| DELIVERY | $ - 0 | (per each) |
FA4610-11-R-0034
Attachment 1
Page &P of &N
SUMMARY
| Negotiation Worksheet | |
| Summary | Password |
| PZIOC | |
| <<Ktr XYZ>> |
| Escalation | Overhead | Profit | ||||
| 0.00% | 0.00% | 0.00% | ||||
| (*) The same rates are used for Title I and Other Services Investigative | ||||||
| LABOR CATEGORY CLASSIFICATION | BASIC CONTRACT YEAR | YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | Comments |
| PROJECT MANAGEMENT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SENIOR LEVEL ARCHITECT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MID LEVEL ARCHITECT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| JUNIOR LEVEL ARCHITECT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SENIOR LEVEL COMMUNITY PLANNER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MID LEVEL COMMUNITY PLANNER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| JUNIOR LEVEL COMMUNITY PLANNER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SENIOR LEVEL LANDSCAPE ARCHITECT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MID LEVEL LANDSCAPE ARCHITECT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| JUNIOR LEVEL LANDSCAPE ARCHITECT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SENIOR LEVEL STRUCTURAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MID LEVEL STRUCTURAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| JUNIOR LEVEL STRUCTURAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SENIOR LEVEL CIVIL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MID LEVEL CIVIL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| JUNIOR LEVEL CIVIL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SENIOR LEVEL MECHANICAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MID LEVEL MECHANICAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| JUNIOR LEVEL MECHANICAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SENIOR LEVEL ELECTRICAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MID LEVEL ELECTRICAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| JUNIOR LEVEL ELECTRICAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SENIOR LEVEL ENVIRONMENTAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MID LEVEL ENVIRONMENTAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| JUNIOR LEVEL ENVIRONMENTAL ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SENIOR LEVEL FIRE PROT ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MID LEVEL FIRE PROT ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| JUNIOR LEVEL FIRE PROT ENGINEER | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SENIOR LEVEL GEOTECHNICAL ENGR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MID LEVEL GEOTECHNICAL ENGR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| JUNIOR LEVEL GEOTECHNICAL ENGR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TITLE II CONSTR REP | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SURVEYOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SURVEY CREW | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| COST ESTIMATING | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SPEC WRITING | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| AUTOCAD DRAFTING | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CLERK | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
PER DIEM - TRAVEL (All Years) **
| MEALS AND LODGING >24 HOURS | JTR rate | JTR rate | JTR rate | JTR rate | JTR rate | (per day) |
| MEALS ONLY > 12 HOURS BUT < 24 HOURS | JTR rate | JTR rate | JTR rate | JTR rate | JTR rate | (per day) |
| MILEAGE (300 Miles/Car - 1 Car) | JTR rate | JTR rate | JTR rate | JTR rate | JTR rate | (per mile) |
| HOTEL (Includes 15.5% Lodging Tax) | JTR rate | JTR rate | JTR rate | JTR rate | JTR rate | (night) |
| AIRFARE | JTR rate | JTR rate | JTR rate | JTR rate | JTR rate | (round trip) |
| ** In accordance with JTR |
REPRODUCTION (All Years)
| FULL-SIZE DRAWING PHOTOCOPIES (24" x 36") | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | (per sheet) |
| HALF-SIZE DRAWING PHOTOCOPIES (11" x 17") | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | (per sheet) |
| LETTER-SIZE PHOTOCOPIES (8-1/2" x 11") | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | (per sheet) |
| CD/DVD | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | (per disk) |
| BINDERS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | (per each) |
| COLOR RENDERING PRINT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | (per sq ft) |
| DELIVERY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | (per each) |
FA4610-11-R0029
TASK ORDER
A-E TASK ORDER RATE WORKSHEET
| <<KTR XYZ>> | ||||||
| DSN RENOVATE / CONVERT FEDERAL COURTHOUSE B2800 - FSPM25SL017 | ||||||
| Project Manager: | AF Project Manager TBD | |||||
| Date of Proposal: | ||||||
| Period of Performance: | 180 Calendar Days | |||||
| Year of Contract: | 0 | (0 - 4) | ||||
| QUANTITY | ||||||
| LABOR CATEGORY CLASSIFICATION | UNIT OF MEASURE | IA | IB | II | NEGOTIATED FFP RATE | SUB TOTAL |
| PROJECT MANAGEMENT | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SENIOR LEVEL ARCHITECT | HOUR | $ - 0 | $ - 0 | Password | $ - 0 | $ - 0 | $ - 0 |
| MID LEVEL ARCHITECT | HOUR | $ - 0 | $ - 0 | PZIOC | $ - 0 | $ - 0 | $ - 0 |
| JUNIOR LEVEL ARCHITECT | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SENIOR LEVEL COMMUNITY PLANNER | HOUR | $ - 0 | $ - 0 | ||||
| MID LEVEL COMMUNITY PLANNER | HOUR | $ - 0 | $ - 0 | ||||
| JUNIOR LEVEL COMMUNITY PLANNER | HOUR | $ - 0 | $ - 0 | ||||
| SENIOR LEVEL LANDSCAPE ARCHITECT | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| MID LEVEL LANDSCAPE ARCHITECT | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| JUNIOR LEVEL LANDSCAPE ARCHITECT | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SENIOR LEVEL STRUCTURAL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| MID LEVEL STRUCTURAL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| JUNIOR LEVEL STRUCTURAL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SENIOR LEVEL CIVIL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| MID LEVEL CIVIL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| JUNIOR LEVEL CIVIL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SENIOR LEVEL MECHANICAL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| MID LEVEL MECHANICAL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| JUNIOR LEVEL MECHANICAL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SENIOR LEVEL ELECTRICAL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| MID LEVEL ELECTRICAL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| JUNIOR LEVEL ELECTRICAL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SENIOR LEVEL ENVIRONMENTAL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| MID LEVEL ENVIRONMENTAL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| JUNIOR LEVEL ENVIRONMENTAL ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SENIOR LEVEL FIRE PROT ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| MID LEVEL FIRE PROT ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| JUNIOR LEVEL FIRE PROT ENGINEER | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SENIOR LEVEL GEOTECHNICAL ENGR | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| MID LEVEL GEOTECHNICAL ENGR | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| JUNIOR LEVEL GEOTECHNICAL ENGR | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TITLE II CONSTR REP | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SURVEYOR | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SURVEY CREW | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| COST ESTIMATING | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SPEC WRITING | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| AUTOCAD DRAFTING | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| CLERK | HOUR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | |||||||
| SUBCONSULTANTS / OTHER SERVICES |
| LUMP SUM | $ - 0 | |
| LUMP SUM | $ - 0 | |
| LUMP SUM | $ - 0 | |
| LUMP SUM | $ - 0 | |
| LUMP SUM | $ - 0 | |
| LUMP SUM | $ - 0 | |
| $ - 0 | ||
| PER DIEM - TRAVEL |
| MEALS AND LODGING >24 HOURS | PER DAY | (JTR RATE) | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! |
| MEALS ONLY > 12 HOURS BUT < 24 HOURS | PER DAY | (JTR RATE) | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! |
| MILEAGE (300 Miles/Car - 1 Car) | PER MILE | (JTR RATE) | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! |
| HOTEL (Includes 15.5% Lodging Tax) | PER NIGHT | (JTR RATE) | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! |
| AIRFARE | ROUND TRIP | (JTR RATE) | ERROR:#VALUE! | |||
| ERROR:#VALUE! | ||||||
| REPRODUCTION |
| FULL-SIZE DRAWING PHOTOCOPIES (24" x 36") | COPY | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| HALF-SIZE DRAWING PHOTOCOPIES (11" x 17") | COPY | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| LETTER-SIZE PHOTOCOPIES (8-1/2" x 11") | COPY | $ - 0 | |||
| CD/DVD | DISK | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| BINDERS | EACH | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| COLOR RENDERING PRINT | SQ FT | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| DELIVERY | EACH | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| REPRODUCTION SUBTOTAL | $ - 0 | ||||
| PER DIEM - TRAVEL SUBTOTAL | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | ERROR:#VALUE! | |
| SUBCONSULTANTS / OTHER SERVICES SUBTOTAL | $ - 0 | ||||
| TITLE I & II SUBTOTAL | $ - 0 | ||||
| TOTAL: | ERROR:#VALUE! |