Attachment 3 Page.pdf
PDF 125 KB Posted
- Attached to
- Roof-top Solar Photovoltaic Project(s)
- Solicitation number
- BPM057680
- Issued by
- Maryland
About this file
This is an attachment to a roof-top solar photovoltaic project contract opportunity in Maryland, specifically providing a template for expected hourly energy production documentation. The attachment presents a framework for a Shuttle Bus solar installation with designated capacity measured in kilowatts direct current (kWdc), requiring submission of monthly expected energy production data measured in megawatt-hours (MWh) for Year 1. The document is structured as a data collection table organized by hour of day (1:00 through 0:00) and by month (January through December), with a designated field for calculating total annual MWh production by summing monthly totals.
This attachment serves as a standardized reporting mechanism for solar energy production forecasting and does not specify pricing terms, contract duration, or other commercial conditions. The document appears designed to establish baseline energy production expectations for the solar installation, which would likely be used for performance monitoring, verification, and evaluation purposes throughout the project term. No specific capacity rating, production targets, or performance guarantees are detailed in this attachment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26 09 00.pdf | ||
| 26 40 00.pdf | ||
| Attachment 4.pdf | ||
| 26 32 00.pdf | ||
| 33 71 00.pdf | ||
| Additional Drawings.zip | ZIP file | |
| 26 56 00.pdf | ||
| AMENDMENT 002- RFP 00042061.pdf | ||
| Attachment 7.pdf | ||
| Questions RFP No. 00042061.pdf | ||
| AMENDMENT 001 - RFP 00042061.pdf | ||
| 26 05 01.pdf | ||
| AMENDMENT 004- RFP 00042061.pdf | ||
| AMENDMENT 003- RFP 00042061.pdf | ||
| Attachment 5.pdf | ||
| Attachment 6.pdf | ||
| 26 05 00.pdf | ||
| 26 29 23.pdf | ||
| RFP No. 00042061 Rooftop solar PV v2.pdf | ||
| Attachment 7- Proposer Submission Checklist (3).xlsx | XLSX spreadsheet | |
| 33_00_00.pdf | ||
| Attachment2.pdf | ||
| 26 01 00.pdf | ||
| 26 51 00.pdf | ||
| Attachment 1.pdf | ||
| 26 56 00.pdf | ||
| 33 71 00.pdf | ||
| 33_00_00.pdf | ||
| 26 05 00.pdf | ||
| 26 01 00.pdf | ||
| 26 51 00.pdf | ||
| 26 05 01.pdf | ||
| 26 29 23.pdf | ||
| 26 40 00.pdf | ||
| 26 32 00.pdf | ||
| 26 09 00.pdf |
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3 - EXPECTED HOURLY ENERGY
PRODUCTION
ATTACHMENT 3 - EXPECTED HOURLY ENERGY PRODUCTION
Shuttle Bus - Capacity (kWdc):
For All Hours YEAR 1 MONTHLY EXPECTED ENERGY PRODUCTION (MWh)
Ending Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00
10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00
Total Annual MWh: (sum of the monthly totals above)
| Attachment 3 - Expected Hourly Energy Production (3).pdf |
| Shuttle Bus |
File details come from the government source that posted it. Updated .