26 40 00.pdf

PDF 192 KB Posted

Attached to
Roof-top Solar Photovoltaic Project(s)
Solicitation number
BPM057680
Issued by
Maryland

About this file

This is a Design Criteria/Facility Standards Manual section from the University of Maryland, College Park, establishing specifications for the design and installation of lightning protection systems. The manual outlines comprehensive requirements for contractors furnishing and installing complete lightning protection systems, including all necessary labor, materials, equipment, and services. Key specifications address system design standards, material requirements, installation procedures, and quality assurance protocols to ensure compliance with applicable codes and standards.

The lightning protection system must be designed and installed by a firm regularly engaged in installing Master Labeled systems and listed with Underwriter's Laboratories, Inc., with UL compliance certification required. Contractors must submit shop drawings for approval bearing the seal of a licensed engineer and the Architect/Engineer of record prior to installation. Approved manufacturers include Bonded Lightning Protection, Inc. (Rockville, Maryland), Thompson Lightning Protection, Inc. (St. Paul, Minnesota), Independent Protection Co. (Goshen, Indiana), and Robbins Lightning Protection Co. (Maryville, Missouri). All materials and workmanship are guaranteed for two years from final acceptance, with contractors responsible for repairs or replacements at their own expense. Specific material requirements include aluminum bare stranded conductors (28 strands of 14 gauge), aluminum air terminals (1/2 inch diameter with minimum 10-inch extension), copper-clad steel ground rods (3/4 inch diameter by 10 feet length), and fasteners constructed to prevent electrolytic corrosion. Ground resistance testing must not exceed 10 ohms upon completion, with test wells required for each ground rod. Installation must coordinate with building grounding electrode systems, rooftop equipment, structural steel, and metallic piping in accordance with NFPA 780 and NEC Article 250, while avoiding roof penetrations where possible and coordinating with surge protective devices at electrical service entrances.

View the file

Other files

File Type Posted
Attachment 3 Page.pdf PDF
26 09 00.pdf PDF
Attachment 4.pdf PDF
26 32 00.pdf PDF
33 71 00.pdf PDF
Additional Drawings.zip ZIP file
26 56 00.pdf PDF
AMENDMENT 002- RFP 00042061.pdf PDF
Attachment 7.pdf PDF
Questions RFP No. 00042061.pdf PDF
AMENDMENT 001 - RFP 00042061.pdf PDF
26 05 01.pdf PDF
AMENDMENT 004- RFP 00042061.pdf PDF
AMENDMENT 003- RFP 00042061.pdf PDF
Attachment 5.pdf PDF
Attachment 6.pdf PDF
26 05 00.pdf PDF
26 29 23.pdf PDF
RFP No. 00042061 Rooftop solar PV v2.pdf PDF
Attachment 7- Proposer Submission Checklist (3).xlsx XLSX spreadsheet
33_00_00.pdf PDF
Attachment2.pdf PDF
26 01 00.pdf PDF
26 51 00.pdf PDF
Attachment 1.pdf PDF
26 56 00.pdf PDF
33 71 00.pdf PDF
33_00_00.pdf PDF
26 05 00.pdf PDF
26 01 00.pdf PDF
26 51 00.pdf PDF
26 05 01.pdf PDF
26 29 23.pdf PDF
26 40 00.pdf PDF
26 32 00.pdf PDF
26 09 00.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design Criteria/Facility Standards Manual Page 1 University of Maryland, College Park

Description:

The purpose of the section is to highlight the current applicable UMD Design Standards for the design and implementation of lightning protection systems.

Related Sections:

• TBD

Effective Date:

TBD

Applicable Standards:

• UL 96 – Lightning Protection Components

• UL96A – Installation Requirements for Lightning Protection systems, latest edition and the Master Label covering the existing buildings.

• NFPA 780 – Standard for the Installation of Lightning Protection Systems.

General Requirements:

The Contractor shall furnish all labor, materials, equipment and services necessary for the furnishing and installing of a complete Lightning Protection System.

• Quality Assurance

• The Lightning Protection System shall be designed and installed by a firm regularly engaged and experienced in installing Master Labeled Lightning Protection Systems and shall be listed with the Underwriter's Laboratories, Inc.

• The Lightning Protection Installer shall issue a UL compliance certification suitable to present and satisfy any and all requirements.

• Shop Drawings The contractor shall submit, for approval, shop drawings showing complete details with description of all air terminals, air terminal bases, conductors, conductor fasteners, splicers, bonding clasps, ground rods, etc., necessary for installation. All shop drawings require an approved seal/certification stamp of a licensed engineer. Only shop drawings bearing the “stamp of approval” of the Architect/Engineer of record shall be used by the Contractor.

• Workmanship The contractor shall guarantee all materials and workmanship furnished and installed under this section of the specifications two years from date of final acceptance of the work. The Contractor also agrees that he will, at his own expense, repair and/or replace all such defective materials or effective workmanship which becomes defective during the term of this guarantee.

• Products

• The system to be furnished under this specification shall be the standard product of a manufacturer regularly engaged in the production of Lightning Protection Systems and shall be the manufacturer's latest approved design.

• All material specified for this work shall be Underwriter's Laboratories, Inc. approved and shall be manufactured by Bonded Lightning Protection, Inc., Rockville, Maryland; Thompson Lightning Protection, Inc., St. Paul, Minnesota; Independent Protection Co., Goshen, Indiana; or Robbins Lightning Protection Co., Maryville, Missouri.

• Materials Materials used in connection with the installation of the lightning protection system shall be approved for this system by the Underwriter's Laboratories, Inc.

Design Criteria/Facility Standards Manual Page 2 University of Maryland, College Park

• Conductors All conductors shall aluminum be bare stranded cable, 28 strands of 14 gauge.

• Air Terminals Air terminals shall be aluminum, 1/2 inch in diameter with tapered points; they shall extend not less than 10" above the object they are to protect.

• Fasteners, Clamps, Etc.

All fasteners, clamps, and connectors shall be bolted pressure type and shall be substantial in construction, not subject to breakage, shall be of the same material as the conductor or of such nature that there will be no serious tendency toward electrolytic corrosion in the presence of moisture.

• Ground Rods

• Ground rods shall be 3/4 inches in diameter by 10 feet in length, made of copper-clad steel. The portion of copper on copper-clad rods shall be approximately 27% of the weight of the rod.

• All ground rods shall be equipped with Bonded Lightning Protection #107 ground reservoirs and shall be fully driven with the top of rod located minimum 36 inches below finished grade or floor unless installed within an accessible test well.

• Test Well

• Provide a 6 inches diameter by 24 inches terra cotta test well with steel covers for each ground rod.

• Test wells shall be installed flush with the finished first floor and/or finished grade. Tests wells shall be

Bonded Lightning #200. Ground resistance test shall be performed on the finished system and the results submitted to the University of Maryland.

• Grounds resistance shall not exceed 10 ohms on completion.

• Installation

• The installation of the Lightning Protection System shall avoid penetrations of existing building roofs.

• Bond the lightning protection grounding system to the building grounding electrode system in accordance with NFPA 780 and NEC article 250.

• Bond the rooftop equipment, structural steel, metallic piping, and other significant metal bodies to the lightning protection system where required by NFPA 780

• Coordination

• The Coordinate lightning protection systems with surge protective device (SPD) requirements at electrical service entrances and other system entry points.

Description:
Effective Date: