ATTACHMENT 3 - Drawings 2 of 2.pdf

PDF 13 MB Posted

Attached to
Y1AZ--EHRM Training and Administrative Support Space Construction - St. Cloud Federal contract opportunity
Solicitation number
36C77622B0026
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details for a federal solicitation to renovate the EHRM Training Room and Administrative Support Space at the St. Cloud VA Medical Center. The solicitation number is 36C77622B0026 and is seeking a general contractor to provide all labor, tools, materials, equipment, and supervision required to complete renovations including general construction, alterations, removal of existing structures, millwork, permanently mounted equipment, interior finishes, and other items. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Training and Administrative Support Space Construction - St. Cloud, newest first.
File Type Posted
Response 15 - 23 09 23 Direct-Digital Control System for HVAC.pdf PDF
Response 43 - B-04 EHRM-HA101.pdf PDF
Response 43 - DSCF2239.pdf PDF
Response 45 - GC100 Supplement.pdf PDF
Response 17 - 01 45 29 Testing Laboratory Services Revised.pdf PDF
Technical Questions - FINAL - St. Cloud 5-23-22.pdf PDF
Response 29 - EF101A.pdf PDF
Response 46 - ELPD 101.pdf PDF
36C77622B0026 0003.pdf PDF
Response 2 - 21 08 00 Commissioning of Fire Suppression Systems.pdf PDF
Response 29 - 21 13 13 Wet-Pipe Sprinkler Systems Revised.pdf PDF
Response 29 - FX-101 Revised.pdf PDF
Response 45 - GI000 Supplement.pdf PDF
36C77622B0026 0002.pdf PDF
36C77622B0026 0001.pdf PDF
ATTACHMENT 8 - Construction Wage Rates - Stearns 4-1-22.pdf PDF
Site Visit Sign-In Sheet 4-19-22.pdf PDF
ATTACHMENT 1 - Specifications.pdf PDF
ATTACHMENT 7 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 8 - Construction Wage Rates - Stearns 2-25-22.pdf PDF
ATTACHMENT 10 - Site Visit Instructions.pdf PDF
ATTACHMENT 5 - Contractor Core Work Hours.pdf PDF
36C77622B0026 - 4-7-22.pdf PDF
ATTACHMENT 2 - Drawings 1 of 2.pdf PDF
ATTACHMENT 4 - Brand Name Justification - St. Cloud.pdf PDF
ATTACHMENT 6 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 9 - Contractor Safety - Environmental Form.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9"

3" 12345 Braille

9"

6"

12345 Braille

Abcdefgh Abcdefgh

9"

9"

DO NOT

ENTER

AUTHORIZED

PERSONNEL

ONLY

9"

6"

12345 Braille

Abcdefgh In Use

MOUNTING DETAIL 2

MOUNTING HEIGHT FOR SIGN TYPE IN-01.31.

MOUNTING DETAIL 1

MOUNTING HEIGHT FOR SIGN TYPES IN-03.01,

IN-04.02, IN-09.03, IN-09.06.

5'- 0"

2"

7'- 0"

FIRE

EQUIPMENT

CABINET

5'- 6"

MOUNTING DETAIL 4

INSTALLATION DETAIL FOR SIGN TYPE IN-14.05.

Abcdefgh Abcdefgh

1'- 0"

1'-8"

Abcdefgh

9"

9"

Fire Equipment

2"

0 2'1'1/2' 3'3/4"=1'-0"

656-21-236

09/17/2021EHRM TRAINING +

ADMINISTRATIVE SUPPORT

SPACE

www. bancroft-ae.com

BAE PROJECT NO. 18-116

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T: 847.952.9362

ARCHITECT/ENGINEER OF RECORD

1 ST. CLOUD VAHCS

ST. CLOUD, MN 56303

SCHEMATIC DESIGN (SD - 35%) 04/29/2021

2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021

3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021

4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021

5 CONSTRUCTION BID DOCUMENTS 09/17/2021

DTBDA

0 3"1" 2" 4"6"=1'-0" 0 3"1" 2" 4"6"=1'-0" 0 3"1" 2" 4"6"=1'-0" 0 3"1" 2" 4"6"=1'-0"

0 3"1" 2" 4"6"=1'-0" 0 3"1" 2" 4"6"=1'-0"

AutoCAD SHX Text L

AutoCAD SHX Text

AutoCAD SHX Text

SIGNAGE MOUNTING HEIGHTS ELEVATIONS

AutoCAD SHX Text No

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

APPROVED: CHIEF OF STAFF

AutoCAD SHX Text

APPROVED: HEALTH CARE SYSTEM DIRECTOR

AutoCAD SHX Text

APPROVED: CHIEF OF POLICE

AutoCAD SHX Text

APPROVED: DIRECTOR FMS

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: SAFETY MANAGER

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: GEMS PROJECT MANAGER

AutoCAD SHX Text

APPROVED: PROJECTS SECTION MANAGER

AutoCAD SHX Text

APPROVED: SERVICE LINE DIRECTOR

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: INFECTION CONTROL NURSE

AutoCAD SHX Text

APPROVED: PATIENT SAFETY

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text BUILDING No

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text

PROJECT TITLE

AutoCAD SHX Text

PLOT SCALE

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

AutoCAD SHX Text

APPROVED: PROJECT COR

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

AW601

AutoCAD SHX Text

WAYFINDING DETAILS

AutoCAD SHX Text

AutoCAD SHX Text

TYPE A ROOM ID SIGN IN-03.01

AutoCAD SHX Text

AutoCAD SHX Text

TYPE B ROOM ID SIGN IN-04.02

AutoCAD SHX Text

AutoCAD SHX Text

TYPE C RESTRICTED ACCESS SIGN IN-08.02C

AutoCAD SHX Text

AutoCAD SHX Text

TYPE D ROOM SIGN W/ INDICATOR IN-07.02

AutoCAD SHX Text

AutoCAD SHX Text

TYPE E FIRE EQUIPMENT ID SIGN IN-01.31

AutoCAD SHX Text

AutoCAD SHX Text

TYPE F WALL DIRECTION SIGN IN-14.05

09/17/2021

ALL PIPING SHALL BE SCHEDULE 40. PLASTIC PIPING IS NOT PERMITTED.

SYMBOL

A/E ARCHITECT / ENGINEER

DESCRIPTION

1. THE PLUMBING FIXTURE AND EQUIPMENT SCHEDULE, IN GENERAL, SPECIFIES THE PLUMBING FIXTURES, EQUIPMENT AND DEVICES: HOWEVER, UNLESS NOTED OTHERWISE, ALL FIXTURES SHALL BE PROVIDED WITH APPLICABLE ACCESSORIES (SUCH AS SUPPLY STOPS, WASTE TRAPS, FIXTURE

MOUNTING SUPPORTS, BOLT CAPS, WATER CLOSET SEATS, ETC., AS REQ'D TO COMPLETE THE

INSTALLATION.)

2. ALL ITEMS SPECIFIED HEREAFTER SHALL BE NEW, CLEANED AND ADJUSTED FOR THE SPECIFIED

DESIGN PURPOSE (UNLESS OTHERWISE SPECIFIED).

3. ALL EQUIPMENT AND DEVICES SHALL BEAR AGA, NSF, ASME, ANSI, CSA OR UL APPROVED LABELS

AND CERTIFICATIONS FOR THE SPECIFIED DESIGN PURPOSE.

4. PLUMBING CONTRACTOR SHALL VERIFY IN FIELD WITH VA/COR ALL FINAL FIXTURE AND EQUIPMENT

LOCATIONS AND MOUNTING HEIGHTS REQUIRED FOR THE DESIGN PURPOSE.

5. SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES OF EACH CATALOG CUT, FOR EACH

ITEM, TO BE APPROVED BY THE VA/COR AND SUCCESSFULLY REVIEWED BY THE

ARCHITECT/ENGINEER (PRIOR TO THE BEGINNING OF CONSTRUCTION) FOR ALL NEW ITEMS

SPECIFIED HEREAFTER.

6. THE CONTRACTOR SHALL SUBMIT EQUIPMENT CUTS FOR EACH PIECE OF EQUIPMENT PRIOR TO ORDERING. SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES FOR APPROVAL BY THE VA/COR AND SUCCESSFUL REVIEW BY THE ARCHITECT/ENGINEER. THIS CONTRACTOR SHALL ALSO

ASSEMBLE PRINTED INSTRUCTIONS FOR THE OPERATION AND MAINTENANCE OF EACH ITEM

INSTALLED AND BIND TOGETHER WITH EQUIPMENT CUTS AND CONTROL WIRING DIAGRAMS.

7. FIXTURES FURNISHED BY VA SHALL BE INSTALLED BY PLUMBING CONTRACTOR, ALL OTHER

FIXTURES SHALL BE PROVIDED BY PLUMBING CONTRACTOR.

1. DISINFECTION OF POTABLE WATER SYSTEM SHALL BE AS FOLLOWS:

GENERAL: NEW POTABLE WATER SYSTEMS SHALL BE PURGED OF DELETERIOUS MATTER AND DISINFECTED PRIOR TO UTILIZATION. THE METHOD TO BE FOLLOWED SHALL BE THAT PRESCRIBED BY THE HEALTH AUTHORITY HAVING JURISDICTION OR, IN THE ABSENCE OF A PRESCRIBED METHOD, THE PROCEDURE DESCRIBED IN EITHER AWWA C651 OR AWWA C652 LISTED IN CHAPTER 19, AND AS DESCRIBED IN THE VA SPECIFICATION SECTION. THIS REQUIREMENT SHALL APPLY TO "ONSITE" OR "IN-PLANT" FABRICATION OF A SYSTEM OR TO A MODULAR PORTION OF A SYSTEM.

A. THE PIPE SYSTEM SHALL BE FLUSHED WITH CLEAN, POTABLE WATER UNTIL DIRTY WATER DOES NOT APPEAR AT

THE POINTS OF OUTLET.

B. THE SYSTEM OR PART THEREOF SHALL BE FILLED WITH A WATER/CHLORINE SOLUTION AT LEAST 50 PARTS PER MILLION (50 mg/l) OF CHLORINE, AND THE SYSTEM OR PART THEREOF SHALL BE VALVED OFF AND ALLOWED TO STAND FOR 24 HOURS; OR THE SYSTEM OR PART THEREOF SHALL BE FILLED WITH A WATER CHLORINE SOLUTION AT LEAST 200 PARTS PER MILLION (200mg/l) OF CHLORINE AND ALLOWED TO STAND FOR 3 HOURS. FOLLOWING THE

REQUIRED STANDING TIME, THE SYSTEM SHALL BE FLUSHED.

C. THE SYSTEM SHALL BE FLUSHED WITH CLEAN POTABLE WATER UNTIL THE CHLORINE IS PURGED FROM THE

SYSTEM.

D. THE PROCEDURE SHALL BE REPEATED WHERE SHOWN BY A BACTERIOLOGICAL EXAMINATION THAT

CONTAMINATION REMAINS PRESENT IN THE SYSTEM.

2. PIPING SERVICE MARKING:

VINYL CLOTH PRESSURE SENSITIVE MARKERS BLACK LETTER ON WHITE BACKGROUND

A. PIPES 3" AND LARGER SPACING 30'-0" O.C. PIPES 2-1/2" AND SMALLER SPACING 20'-0" O.C.

B. INSTALL DIRECTIONAL ARROWS ON ALL PIPING AT SAME SPACING.

3. CONTRACTOR TO VERIFY IN FIELD AND PROVIDE EXTENSIONS REQUIRED TO ADJUST ALL FIXTURES TO GRADE LEVEL TO MAINTAIN INVERTS AS DETERMINED BY ALL FIXTURES RELATED (GREASE TRAPS, MAN HOLES, ETC.).

4. PROVIDE EXTERIOR ACCESS TO ISOLATION VALVES FOR HOT AND COLD WATER SUPPLY CUTOFF.

AFF ABOVE FINISH FLOOR

1. ALL SUSPENDED HORIZONTAL PIPING SHALL BE SUPPORTED BY HANGERS SPACED NO FURTHER THAN 8' - 0" APART (4' -0" APART FOR PVC PIPING). NO PIPING SHALL BE SELF-SUPPORTING NOR

BE SUPPORTED FROM EQUIPMENT CONNECTIONS.

2. ALL PARALLEL PIPES (TWO(2) OR MORE) SHALL BE SUPPORTED ON A CHANNEL TYPE TRAPEZE

HANGER.

3. SUPPORTS AND HANGERS SHALL BE INSTALLED TO PERMIT FREE EXPANSION AND

CONTRACTION IN PIPING SYSTEMS UNLESS PIPE REQUIRES FIRM ANCHOR CONTROL.

4. HORIZONTAL SOIL OR WASTE LINES SHALL BE AT A SLOPE OF NOT LESS THAN 1/8" PER FOOT

AND SHALL BE HELD CLOSE TO THE CONSTRUCTION TO MAINTAIN A MAXIMUM OF HEAD ROOM.

ALL CHANGES OF DIRECTION AND JUNCTIONS SHALL BE MADE WITH "Y" FITTINGS AND 1/8"

BENDS. NO LINES OF ANY KIND SHALL BE LOCATED BELOW FREEZERS. ALL DRAIN LINES SHALL

BE PROTECTED FROM FREEZING.

5. HOT AND COLD WATER PIPING SHALL BE PROPERLY PITCHED TO LOW POINTS IN THE SYSTEM

WHERE DRAINS SHALL BE INSTALLED.

6. CLEANOUTS SHALL BE PLACED AT ALL DEAD ENDS, AT 90° CHANGES OF DIRECTION, AT 50'-0"

INTERVALS ON HORIZONTAL RUNS, OUT OF HIGH TRAFFIC AREAS, (NOT UNDER CASES) ETC.

WHERE CLEANOUTS OCCUR IN CONCEALED SPACES, THEY SHALL BE PROVIDED WITH

EXTENSIONS TO FLOOR ABOVE OR TO WALLS. A HAND-HOLE TEST TEE SHALL BE PLACED AT THE

BASE OF EACH STACK.

7. VENT STACKS EXTENDING UP THROUGH THE ROOF SHALL BE FLASHED WITH SIX POUND SHEET LEAD. FLASHING SHALL EXTEND 12" IN ALL DIRECTIONS FROM THE VENT, CARRIED OVER AND

TURNED DOWN THE INSIDE OF THE VENT. ALL SEAMS AND JOINTS OF FLASHING SHALL BE

SOLDERED AND PROVEN WEATHERTIGHT. EXTEND VENTS A MIN. OF 12" ABOVE ROOF, AND 30"

AWAY FROM PARAPET.

8. ALL SUPPLY PIPING TO BE RUN OVERHEAD, UNLESS NOTED OTHERWISE.

9. ALL SUPPLY PIPING TO BE A MINIMUM OF 3/4" DIA.

10. EACH FIXTURE WILL HAVE A 1/2" X 12" AIR CHAMBER.

11. PROVIDE SERVICE VALVE AT BRANCHES AND AT ALL APPLIANCES.

12. ALL FIXTURES WILL BE FURNISHED WITH INTEGRAL STOPS.

13. BURIED SANITARY AND WASTE LINES WILL BE A MINIMUM OF 4" DIA.

14. ALL FLOOR DRAINS AND FIXTURES TO BE VENTED IN ACCORDANCE WITH ALL LOCAL, STATE AND

FEDERAL CODES AND REGULATIONS.

15. ALL HORIZONTAL VENT PIPING SHALL BE RUN ABOVE FINISHED CEILINGS AND SLOPED UP

TOWARD MAIN STACK.

16. THE PLUMBING CONTRACTOR WILL NOT INSTALL COMBUSTIBLE PIPING MATERIAL IN OR

THROUGH FIRE RATED ASSEMBLIES.

17. ALL EQUIPMENT DEVICES SHALL BE INSTALLED WITH UNIONS IN SUCH A MANNER TO FACILITATE

EASY REMOVAL AND MAINTENANCE OF EQUIPMENT WITHOUT DISRUPTING SERVICE AND

CAUSING MAJOR PIPING REVISIONS.

18. ALL CONNECTIONS BETWEEN DISSIMILAR METALS SHALL BE MADE WITH DIELECTRIC UNIONS OR

COUPLINGS.

GENERAL NOTES FOR CONTRACTORS: SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT PART OF THIS SECTION AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED

HEREIN.

EQUIVALENCY SUBSTITUTIONS: THE “BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS” ARE TO BE FOLLOWED FOR ALL MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SPECIFIED AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE BOD DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL DRAWINGS SECTION FOR THE SPECIFIC BOD COMPLIANCE REQUIREMENTS AND PROTOCOLS TO BE FOLLOWED.

1. THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT DOCUMENTS: INCLUDING BUT NOT NECESSARILY LIMITED TO ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL DRAWINGS AND ENTIRE PROJECT SPECIFICATIONS. THIS CONTRACTOR SHALL ACKNOWLEDGE AND INCLUDE IN THE SCOPE OF WORK (CONTRACT) ALL CONDITIONS PERTINENT TO THE COMPLETION OF HIS/HER WORK. THIS CONTRACTOR SHALL FULLY COORDINATE HIS/HER WORK WITH THE INSTALLATION OF WORK BY OTHER TRADES AND MAKE NECESSARY FIELD ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE INSTALLATION. ALL OF THE

ABOVE SHALL BE INCLUDED IN THE SCOPE OF WORK.

2. THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS, VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES AS TO ALL CONDITIONS AND MATTERS THAT CAN, IN ANY WAY, AFFECT THE WORK OR THE COST THEREOF. SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM THE DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS, OR BE IN DOUBT AS TO THEIR MEANING, NOTIFY THE VA/COR AT ONCE, IN WRITING, OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND NEW WORK, OR BETWEEN THEIR WORK AND THE WORK OF OTHER TRADES AND OBTAIN CLARIFICATION PRIOR TO SUBMITTING ANY BID. LACK OF SUCH NOTIFICATION SHALL BE CONSTRUED AS TO INDICATE NO DISCREPANCIES OR

CONFLICTS EXIST.

3. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE INTENT, GENERAL CHARACTER, REQUIREMENTS AND LOCATION OF THE WORK SHOWN AND INCLUDED. THE WORK INDICATED, BUT HAVING MINOR DETAILS OBVIOUSLY

OMITTED, SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE VA/GOVERNMENT.

4. THE CONTRACTOR IS REQUIRED TO BID, AS SPECIFIED, THE WORK SHOWN ON THE DRAWINGS AND PROVIDED IN THE SPECIFICATIONS WITHOUT DEVIATION, WITH THE EXCEPTION OF ANY BASIS OF DESIGN (BOD) EQUIVALENCY SUBSTITUTIONS. THESE REQUESTED SUBSTITUTIONS WILL NEED TO BE IDENTIFIED, SUBMITTED AND APPROVED BY THE VA/CO DURING THE BIDDING PHASE AND IF DURING CONSTRUCTION BY THE VA/COR AND THE VA/CO RESPECTIVELY. CONTRACTOR IS REQUIRED TO PREPARE A DETAILED LIST OF THE PROPOSED EQUIVALENCY SUBSTITUTION ITEMS ALONG WITH THE DOCUMENTED COMPARATIVE ANALYSIS AND THE LISTING OF ALL VARIANCE IMPACTS TO THE PROJECT FOR EACH REQUESTED ITEM OF WORK. EQUIVALENCY SUBSTITUTIONS REQUESTS FOR VA CONSIDERATION WILL FIRST NEED TO BE APPROVED BY THE VA BEFORE PROCEEDING WITH ANY BIDDING AND ANY OF THE WORK. ALL REQUESTED BOD EQUIVALENCY SUBSTITUTIONS WILL FIRST NEED TO BE FULLY REVIEWED, EVALUATED AND APPROVED BY THE VA/CO PRIOR TO BID SUBMISSION AND IF OCCURRING DURING CONSTRUCTION BY THE VA/COR AND IN TURN THE VA/CO BEFORE ANY WORK CAN BE PERFORMED.

5. THIS CONTRACTOR IS RESPONSIBLE TO FURNISH AND INSTALL ALL LABOR AND MATERIALS NECESSARY FOR A COMPLETE SYSTEM. WHERE THERE IS NO MENTION OF THE RESPONSIBLE PARTY FOR A SPECIFIC ITEM TO BE FURNISHED OR INSTALLED ON THE DRAWINGS, THE DRAWING'S TRADE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR ALL RELATED PURCHASES AND LABOR FOR PROVIDING A COMPLETE OPERATING SYSTEM FOR

THIS ITEM.

6. WHEN PERFORMING ANY CUTTING OR PATCHING (RESTORE TO ORIGINAL STATE) ALL BUILDING MATERIALS AND FINISHES AS REQUIRED TO PROVIDE A FINISHED PRODUCT THAT IS LIKE NEW AND DOESN'T STAND OUT AS BEING

DIFFERENT OR DISTINGUISHABLE AS A PATCH OR REPAIR.

7. THIS CONTRACTOR SHALL VERIFY AND COORDINATE ALL MOUNTING, ARRANGEMENTS, HEIGHTS AND LOCATIONS PRIOR TO ROUGH-IN AS REQUIRED BY THE VA DESIGN GUIDES/MANUALS ALONG WITH THE EXPRESSED DESIGN

INTENT PRESENTED WITHIN THESE DOCUMENTS.

8. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL SLEEVES THRU WALLS AND THROUGH FLOORS, INCLUDING

CORING IF REQUIRED.

9. PLUMBING CONTRACTOR SHALL VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SANITARY, STORM AND

WATER SUPPLY ON THE SITE PRIOR TO THE PERFORMANCE OF ANY WORK.

10. PROVIDE SERVICE VALVES AT ALL BRANCH SUPPLY PIPING. SUCH SERVICE VALVES SHALL BE AS PER THE

SPECIFICATIONS AND IN KEEPING WITH THE VA STANDARDS AND REQUIREMENTS.

11. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL CURRENT GOVERNING LOCAL, COUNTY, STATE, AND FEDERAL BUILDING CODE REQUIREMENTS AND REGULATIONS PLUS COMPLIANCE WITH LOCAL UTILITY COMPANY

REQUIREMENTS.

12. THIS CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND CAPABLE OF PERFORMING QUALITY

WORKMANSHIP.

13. THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE PROTECTION OF ALL PERSONNEL THRU ALL PHASES OF WORK, COMPLYING WITH ALL APPLICABLE PROVISIONS OF CITY, STATE, AND FEDERAL SAFETY LAWS (OSHA) AND AS RECOMMENDED IN THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" AS ISSUED BY THE ASSOCIATION OF GENERAL CONTRACTORS OF AMERICA, INC., 20TH AND E. STREETS, N.W.

WASHINGTON, D.C.

14. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE PURCHASE, DELIVERY, RECEIVING, UNLOADING, UNCRATING, STORING, SETTING IN PLACE, AND PROTECTING OF ALL NEW EQUIPMENT AND MATERIALS FURNISHED BY THIS CONTRACTOR ALONG WITH EQUIPMENT FURNISHED BY THE VA AND INSTALLED BY THIS CONTRACTOR. PROVIDE PROTECTION FROM DAMAGE BY THE CONSTRUCTION, HANDLING, VANDALISM AND

WEATHER DURING ALL PHASES OF CONSTRUCTION UNTIL COMPLETION OF THE WORK.

15. THIS CONTRACTOR SHALL SUBMIT SHOP DRAWINGS IN THE NUMBERS REQUIRED BY THE SPECIFICATIONS PRIOR

TO THE START OF INSTALLATION FOR VA/COR APPROVAL AND A SUCCESSFUL REVIEW BY THE

ARCHITECT/ENGINEER.

16. THIS CONTRACTOR SHALL FURNISH AS-BUILT CONTRACT DOCUMENTS TO THE VA/COR BEFORE FINAL PROJECT CLOSE-OUT CAN OCCUR. THE CONTRACT RECORD AS-BUILT DOCUMENTS SHALL BE PROVIDED IN ELECTRONIC

REPRODUCIBLE FORM.

17. BEFORE PLACING WATER SYSTEM IN OPERATION, CHLORINATE ENTIRE SYSTEM IN ACCORDANCE WITH THE REQUIREMENTS OF THE SPECIFICATIONS AND IN CONJUNCTION WITH ALL LOCAL, STATE AND FEDERAL PLUMBING CODES ALONG WITH ALL REQUIREMENTS OF THE VA, BOTH FEDERAL AND LOCAL. WHEN PROPERLY COMPLETED

AND APPROVED BY THE VA/COR PROVIDE THE SPECIFIED CERTIFICATION(S).

18. ALL NEW SANITARY PIPING SHALL BE GIVEN A FULL STATIC PRESSURE TEST. METHOD OF TEST AND REQUIREMENTS TO BE MET SHALL BE AS PER THE SPECIFICATIONS AND IN CONJUNCTION WITH ALL LOCAL, STATE AND FEDERAL CODE REQUIREMENTS ALONG WITH ALL REQUIREMENTS OF THE VA, BOTH FEDERAL AND

LOCAL.

19. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE PUMPING AND DRAINING OF TRENCHES OR PITS

NECESSARY FOR THE INSTALLATION OF THEIR WORK.

20. UPON COMPLETION OF THE WORK, THIS CONTRACTOR SHALL REVIEW AND CHECK THE ENTIRE PORTION OF THEIR WORK, CLEAN EQUIPMENT AND DEVICES, REMOVE SURPLUS MATERIALS AND RUBBISH FROM THE PROPERTY, LEAVE THE WORK IN NEAT AND CLEAN ORDER, AND PROVIDE A COMPLETED SYSTEM(S) THAT HAS BEEN FULLY TESTED AND IS IN GOOD WORKING CONDITION. EACH RESPECTIVE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY CARTONS, DEBRIS, EQUIPMENT, ETC., INSTALLED BY THIS

CONTRACTOR INCLUDING EQUIPMENT FURNISHED BY OTHERS.

21. THROUGH PENETRATIONS SHALL BE PROTECTED BY AN APPROVED PENETRATION FIRESTOP SYSTEM PER VA SPECIFICATION PLUMBING INSULATION 22 07 11 AND FIRE STOPPING SPECIFICATION 07 84 00.

22. ALL EQUIPMENT/DEVICES SHALL BE AND OF FIRST RATE QUALITY (UNLESS OTHERWISE SPECIFIED) AND IS TO BEAR THE APPROPRIATE AGA, CSA OR UL APPROVED LABELS, LISTINGS, AND CERTIFICATIONS FOR THE SPECIFIC

DESIGN PURPOSE.

23. THE DRAWINGS, SCHEDULES AND SPECIFICATIONS HAVE BEEN PREPARED USING ONE MANUFACTURER FOR EACH PIECE OF EQUIPMENT AS THE BASIS OF DESIGN. IF THE CONTRACTOR PURCHASES EQUIPMENT FROM A SPECIFIED ACCEPTABLE MANUFACTURER, BUT NOT THE SCHEDULED MANUFACTURER USED FOR THE BASE DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ALL THE DIMENSIONS OF THE EQUIPMENT TO VERIFY THAT IT WILL FIT IN THE SPACE SHOWN ON THE DRAWINGS. MINOR DEVIATIONS IN DIMENSIONS WILL BE PERMITTED, PROVIDED THE RATINGS MEET THOSE SHOWN ON THE DRAWINGS AND EQUIPMENT WILL PHYSICALLY FIT INTO THE SPACE ALLOCATED WITH SUITABLE ACCESS AROUND EQUIPMENT FOR OPERATION AND MAINTENANCE OF THE EQUIPMENT. WHEN EQUIPMENT SUBMITTED FOR REVIEW DOES NOT MEET THE PHYSICAL SIZE OR ARRANGEMENT OF THAT SCHEDULED AND SPECIFIED, CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL ALTERATIONS REQUIRED TO ACCOMMODATE SUCH EQUIPMENT AT NO ADDITIONAL COST TO THE VA.

CONTRACTOR WILL ALSO BE RESPONSIBLE FOR ALL COSTS FOR ADDITIONAL WORK REQUIRED BY OTHER CONTRACTORS AND/OR, THE VA, TO MAKE CHANGES WHICH WOULD ALLOW THE EQUIPMENT TO FIT IN THE SPACE

AND FUNCTION AS SPECIFIED.

24. GENERAL CONTRACTOR MUST FIELD VERIFY SIZES, CAPACITIES, WEIGHTS, ETC. ON ALL EQUIPMENT.

DISCREPANCIES ON DRAWINGS WILL NOT CONSTITUTE A BASIS FOR CHANGE ORDERS. VERIFY WITH THE VA/COR

IF ANY DISCREPANCIES EXIST.

25. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK, AS DETERMINED BY THE

GOVERNMENT/CO, SHALL BE PROVIDED.

BFP BACKFLOW PREVENTER

CI CAST IRON

CO CLEANOUT

CW DOMESTIC COLD WATER

DI DEIONIZATION

DN DOWN

DT DRAIN TILE

EL ELEVATION

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

HB HOSE BIBB

RD ROOF DRAIN

SAN SANITARY

ST STORM

SP SUMP PUMP

LAV LAVATORY

WC WATER CLOSET

ESE EMERGENCY SHOWER AND EYEWASH

MB MOP BASIN

EWC ELECTRIC WATER COOLER

WHA WATER HAMMER ARRESTOR

YCO YARD CLEANOUT

WCO WALL CLEANOUT

TYP TYPICAL

OFD OVERFLOW DRAIN

VTR VENT THRU ROOF

SOLENOID VALVE

S

NOT IN SCOPE (NIC)

AS AIR SEPERATOR

BOD BASIS OF DESIGN

CD CONDENSATE DRAIN

(D) DEMOLISH

DWH DOMESTIC WATER HEATER

(E) EXISTING TO REMAIN

FBO FURNISHED BY OTHERS, INSTALLED BY PLUMBING CONTRACTOR

GLY GLYCOL

HUM HUMIDIFIER

HW DOMESTIC HOT WATER

HWC HOT WATER RECIRCULATION

SK SINK

RO REVERSE OSMOSIS

VB VACUUM BREAKER (ATMOSPHERIC)

V VENT

CONNECT TO EXISTING (NEW CONNECTION)

UNION

BALL VALVE

BUTTERFLY VALVE

SHUT-OFF VALVE (OPEN)

CHECK VALVE (DIRECTION OF FLOW)

EQUIPMENT TAG

EXISTING RISER TAG

POINT OF DEMOLITION

HOSE BIBB

VACUUM BREAKER

DIRECTION OF FLOW

RISER DOWN

RISER UP

FFD FUNNEL FLOOR DRAIN

FS FLOOR SINK

GI GREASE INTERCEPTOR

SH SHOWER

WH WALL HYDRANT

WS WATER SOFTENER

BACKFLOW PREVENTER

FOOD SERVICE EQUIPMENT TAG

KSAN KITCHEN SANITARY

DOUBLE CHECK VALVE (DIRECTION OF FLOW)

BALANCING VALVE

CAPPED PIPE

N.C. NORMALLY CLOSED

SHUT-OFF VALVE (CLOSED)

WATER HAMMER ARRESTOR

FLEXIBLE CONNECTION

(A) ABANDON IN PLACE

RRDG

656-21-236

09/17/2021EHRM TRAINING +

ADMINISTRATIVE SUPPORT

SPACE

www. bancroft-ae.com

BAE PROJECT NO. 18-116

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T: 847.952.9362

ARCHITECT/ENGINEER OF RECORD

1 ST. CLOUD VAHCS

ST. CLOUD, MN 56303

SCHEMATIC DESIGN (SD - 35%) 04/29/2021

2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021

3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021

4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021

5 CONSTRUCTION BID DOCUMENTS 09/17/2021

AutoCAD SHX Text

PLUMBING FIXTURE SCHEDULE

AutoCAD SHX Text

PLUMBING GENERAL NOTES

AutoCAD SHX Text

PLUMBING MATERIALS AND PROCEDURES NOTES

AutoCAD SHX Text

PLUMBING SYMBOL LIST

AutoCAD SHX Text

PROCEDURES:

AutoCAD SHX Text

DISCIPLINE SPECIFIC

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text P001

AutoCAD SHX Text

PLUMBING - GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS

AutoCAD SHX Text No

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

APPROVED: CHIEF OF STAFF

AutoCAD SHX Text

APPROVED: HEALTH CARE SYSTEM DIRECTOR

AutoCAD SHX Text

APPROVED: CHIEF OF POLICE

AutoCAD SHX Text

APPROVED: DIRECTOR FMS

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: SAFETY MANAGER

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: GEMS PROJECT MANAGER

AutoCAD SHX Text

APPROVED: PROJECTS SECTION MANAGER

AutoCAD SHX Text

APPROVED: SERVICE LINE DIRECTOR

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: INFECTION CONTROL NURSE

AutoCAD SHX Text

APPROVED: PATIENT SAFETY

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text BUILDING No

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text

PROJECT TITLE

AutoCAD SHX Text

PLOT SCALE

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

AutoCAD SHX Text

APPROVED: PROJECT COR

AutoCAD SHX Text

DATE:

DATE:

(TYP.)

A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.

B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT

SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR

EXCEED FORMER CONDITIONS.

C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING

TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS.

D. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY

CONFLICTS BEFORE PROCEEDING.

E. AREA OF WORK WHERE EXISTING CEILINGS ARE TO BE REMOVED AND NEW FINISH CEILING TO BE INSTALLED; ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED AND REINSTALLED IN

SAME LOCATION.

F. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN SERVICE TO SECOND FLOOR FIXTURES

DURING CONSTRUCTION.

G. ABANDONED AND/OR DEAD LEG PIPING WILL NOT BE ALLOWED AND SHALL BE REMOVED EVEN IF

NOT SHOWN ON DRAWINGS.

H. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.

I. CONTRACTOR IS RESPONSIBLE FOR ALL COST ASSOCIATED WITH CEILING DISASSEMBLY AND

REASSEMBLY TO ACCOMMODATE THIS WORK. CONTRACTOR TO SALVAGE, STORE, AND

REINSTALL ALL CEILING MOUNTED DEVICES.

J. REMOVE ALL ASSOCIATED CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING

REMOVAL.

K. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO

PERMIT THE INSTALLATION OF NEW WORK.

L. PATCH AND FILL CONCRETE SLAB WHERE PIPING HAS BEEN REMOVED.

M. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH

ARCHITECTURAL AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL

BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER

CURING TIME REQUIRED TO RECEIVE THE NEW FLOOR FINISHES.

N. CONTRACTOR TO PROVIDE "FREEZE SHUT DOWN". ANY PIPING THAT CANNOT BE VALVED OFF

MUST BE "FROZE".

O. ALL DOMESTIC PIPING BEING DEMOLISHED TO MAIN SHALL BE CAPPED AT 1.5X THE DIAMETER OF BRANCH PIPING. NO DEAD END OR STUBS ARE ALLOWED IN DOMESTIC WATER PIPING. ALL DEAD

END PIPING MUST BE CAPPED.

GENERAL NOTESPLUMBING DEMOLITION

KEY NOTES

X

1. DEMOLISH AND REMOVE BACK TO NEAREST MAIN OR WALL PIPING WHICH IS

NOT RELEVANT TO THE NEW DESIGN OR ANY OTHER ACTIVE BUILDING

SYSTEM. COORDINATE WITH VA/COR FOR EXTENT OF DEMOLITION

REQUIRED AT EACH LOCATION. COORDINATE WITH ARCHITECT FOR WALL

AND FLOOR REPAIR INSTRUCTIONS.

2. EXISTING SANITARY PIPING RUNNING IN BASEMENT CEILING. PROTECT

DURING CONSTRUCTION.

RRJK

656-21-236

09/17/2021EHRM TRAINING +

ADMINISTRATIVE SUPPORT

SPACE

www. bancroft-ae.com

BAE PROJECT NO. 18-116

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T: 847.952.9362

ARCHITECT/ENGINEER OF RECORD

1 ST. CLOUD VAHCS

ST. CLOUD, MN 56303

SCHEMATIC DESIGN (SD - 35%) 04/29/2021

KEY PLAN

AREA 1 AREA 2

2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021

3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021

4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021

5 CONSTRUCTION BID DOCUMENTS 09/17/2021

AutoCAD SHX Text C

AutoCAD SHX Text F

AutoCAD SHX Text

CART

AutoCAD SHX Text

STM

AutoCAD SHX Text

GEN

AutoCAD SHX Text

STM

AutoCAD SHX Text

KTL

AutoCAD SHX Text

TBL

AutoCAD SHX Text

TABLE

AutoCAD SHX Text

STM

AutoCAD SHX Text

OVEN

AutoCAD SHX Text

STM

AutoCAD SHX Text

OVEN

AutoCAD SHX Text

KTL

AutoCAD SHX Text

STM

AutoCAD SHX Text

KTL

AutoCAD SHX Text

KTL

AutoCAD SHX Text

KTL

AutoCAD SHX Text

TABLE

AutoCAD SHX Text

TABLE

AutoCAD SHX Text

TBL

AutoCAD SHX Text

CART

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

CART

AutoCAD SHX Text

TABLE

AutoCAD SHX Text

CART

AutoCAD SHX Text

ICE

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 30x48

AutoCAD SHX Text 30x48

AutoCAD SHX Text 30x48

AutoCAD SHX Text 30x48

AutoCAD SHX Text 30x48

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3.3

AutoCAD SHX Text 4.3

AutoCAD SHX Text A'

AutoCAD SHX Text B'

AutoCAD SHX Text C'

AutoCAD SHX Text D'

AutoCAD SHX Text E'

AutoCAD SHX Text F'

AutoCAD SHX Text G'

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text A'

AutoCAD SHX Text B'

AutoCAD SHX Text C'

AutoCAD SHX Text D'

AutoCAD SHX Text E'

AutoCAD SHX Text F'

AutoCAD SHX Text G'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3.3

AutoCAD SHX Text 4.3

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

PLUMBING - DEMOLITION PLAN - FIRST FLOOR

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

PD101

AutoCAD SHX Text

PLUMBING - DEMOLITION PLAN - FIRST FLOOR

AutoCAD SHX Text No

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

APPROVED: CHIEF OF STAFF

AutoCAD SHX Text

APPROVED: HEALTH CARE SYSTEM DIRECTOR

AutoCAD SHX Text

APPROVED: CHIEF OF POLICE

AutoCAD SHX Text

APPROVED: DIRECTOR FMS

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: SAFETY MANAGER

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: GEMS PROJECT MANAGER

AutoCAD SHX Text

APPROVED: PROJECTS SECTION MANAGER

AutoCAD SHX Text

APPROVED: SERVICE LINE DIRECTOR

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: INFECTION CONTROL NURSE

AutoCAD SHX Text

APPROVED: PATIENT SAFETY

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text BUILDING No

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text

PROJECT TITLE

AutoCAD SHX Text

PLOT SCALE

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

AutoCAD SHX Text

APPROVED: PROJECT COR

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NTS

AutoCAD SHX Text

BUILDING 4

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

PLUMBING - DEMOLITION PLAN - BASEMENT

NORTH

EWC-101

3/4 " C

W 2"

V

4 SK-101 5

3/4 " H

W

(E )4

" S

AN

A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.

B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT

SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR

EXCEED FORMER CONDITIONS.

C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING

TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS.

D. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY

CONFLICTS BEFORE PROCEEDING.

E. AREA OF WORK WHERE EXISTING CEILINGS ARE TO BE REMOVED AND NEW FINISH CEILING TO BE INSTALLED; ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED AND REINSTALLED IN

SAME LOCATION.

F. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN SERVICE TO SECOND FLOOR FIXTURES

DURING CONSTRUCTION.

G. ABANDONED AND/OR DEAD LEG PIPING WILL NOT BE ALLOWED AND SHALL BE REMOVED EVEN IF

NOT SHOWN ON DRAWINGS.

H. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.

I. CONTRACTOR IS RESPONSIBLE FOR ALL COST ASSOCIATED WITH CEILING DISASSEMBLY AND

REASSEMBLY TO ACCOMMODATE THIS WORK. CONTRACTOR TO SALVAGE, STORE, AND

REINSTALL ALL CEILING MOUNTED DEVICES.

J. REMOVE ALL ASSOCIATED CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING

REMOVAL.

K. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO

PERMIT THE INSTALLATION OF NEW WORK.

L. PATCH AND FILL CONCRETE SLAB WHERE PIPING HAS BEEN REMOVED.

M. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH

ARCHITECTURAL AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL

BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER

CURING TIME REQUIRED TO RECEIVE THE NEW FLOOR FINISHES.

N. CONTRACTOR TO PROVIDE "FREEZE SHUT DOWN". ANY PIPING THAT CANNOT BE VALVED OFF

MUST BE "FROZE".

O. ALL DOMESTIC PIPING BEING DEMOLISHED TO MAIN SHALL BE CAPPED AT 1.5X THE DIAMETER OF BRANCH PIPING. NO DEAD END OR STUBS ARE ALLOWED IN DOMESTIC WATER PIPING. ALL DEAD

END PIPING MUST BE CAPPED.

GENERAL NOTESPLUMBING KEY NOTES

1. CONNECT 2" VENT TO EXISTING 2" VENT HEADER IN 1ST FLOOR CEILING.

2. CONNECT 2" WASTE PIPE TO EXISTING 4" SANITARY BUILDING DRAIN IN

BASEMENT CEILING.

3. CONNECT 3/4" COLD WATER TO EXISTING 3/4" DOMESTIC COLD WATER IN 1ST

FLOOR CEILING. PROVIDE SHUT OFF VALVE AT POINT OF CONNECTION.

4. PROVIDE AND INSTALL NEW ELECTRIC WATER COOLER WITH BOTTLE FILLER.

5. PROVIDE AND INSTALL NEW HAND WASHING SINK.

6. CONNECT 3/4" HOT WATER TO EXISTING 3/4" DOMESTIC HOT WATER IN 1ST

FLOOR CEILING. PROVIDE SHUT OFF VALVE AT POINT OF CONNECTION.

7. 2" SAN UP TO NEW FIXTURES ABOVE. REFER TO ARCHITECTURAL DRAWINGS

FOR CORING NOTES.

8. EXISTING FLOOR DRAIN TO REMAIN.

X

EWC-101 EWC-101

2" V

2" V

3/4 " C

W

3/4" CW

2" SAN

2" S

AN

3 1

3/4" HW

SK-101 SK-101

2" V

2" S

AN

RRJK

656-21-236

09/17/2021EHRM TRAINING +

ADMINISTRATIVE SUPPORT

SPACE

www. bancroft-ae.com

BAE PROJECT NO. 18-116

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T: 847.952.9362

ARCHITECT/ENGINEER OF RECORD

1 ST. CLOUD VAHCS

ST. CLOUD, MN 56303

SCHEMATIC DESIGN (SD - 35%) 04/29/2021

KEY PLAN

AREA 1 AREA 2

2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021

3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021

4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021

5 CONSTRUCTION BID DOCUMENTS 09/17/2021

AutoCAD SHX Text C

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3.3

AutoCAD SHX Text 4.3

AutoCAD SHX Text A'

AutoCAD SHX Text B'

AutoCAD SHX Text C'

AutoCAD SHX Text D'

AutoCAD SHX Text E'

AutoCAD SHX Text F'

AutoCAD SHX Text G'

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text A'

AutoCAD SHX Text B'

AutoCAD SHX Text C'

AutoCAD SHX Text D'

AutoCAD SHX Text E'

AutoCAD SHX Text F'

AutoCAD SHX Text G'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3.3

AutoCAD SHX Text 4.3

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

PLUMBING - DOMESTIC, SANITARY & VENT PLAN - FIRST FLOOR

AutoCAD SHX Text

NORTH

AutoCAD SHX Text P101

AutoCAD SHX Text

PLUMBING - DOMESTIC, SANITARY & VENT PLAN

AutoCAD SHX Text No

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

APPROVED: CHIEF OF STAFF

AutoCAD SHX Text

APPROVED: HEALTH CARE SYSTEM DIRECTOR

AutoCAD SHX Text

APPROVED: CHIEF OF POLICE

AutoCAD SHX Text

APPROVED: DIRECTOR FMS

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: SAFETY MANAGER

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: GEMS PROJECT MANAGER

AutoCAD SHX Text

APPROVED: PROJECTS SECTION MANAGER

AutoCAD SHX Text

APPROVED: SERVICE LINE DIRECTOR

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: INFECTION CONTROL NURSE

AutoCAD SHX Text

APPROVED: PATIENT SAFETY

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text BUILDING No

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text

PROJECT TITLE

AutoCAD SHX Text

PLOT SCALE

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

AutoCAD SHX Text

APPROVED: PROJECT COR

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NTS

AutoCAD SHX Text

BUILDING 4

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

PLUMBING - DOMESTIC, SANITARY & VENT PLAN - BASEMENT

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 16'

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

PLUMBING - DOMESTIC WATER, SANITARY & VENT RISER DIAGRAMS

RRDG

656-21-236

09/17/2021EHRM TRAINING +

ADMINISTRATIVE SUPPORT

SPACE

www. bancroft-ae.com

BAE PROJECT NO. 18-116

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T: 847.952.9362

ARCHITECT/ENGINEER OF RECORD

1 ST. CLOUD VAHCS

ST. CLOUD, MN 56303

SCHEMATIC DESIGN (SD - 35%) 04/29/2021

2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021

3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021

4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021

5 CONSTRUCTION BID DOCUMENTS 09/17/2021

AutoCAD SHX Text

AutoCAD SHX Text

SUPPORT/ANCHOR FOR PIPE RISERS

AutoCAD SHX Text

NTS

AutoCAD SHX Text

NOTES: 1. 2.

AutoCAD SHX Text PROVIDE ANCHORS ONLY WHERE SHOWN ON DRAWINGS. EXTEND SLEEVE ABOVE FLOOR WHERE SPECIFIED.

AutoCAD SHX Text

INSULATION

AutoCAD SHX Text

BOLT (TYPICAL)

AutoCAD SHX Text

FLOOR SLAB

AutoCAD SHX Text

FIRE-STOPPING MATERIAL

AutoCAD SHX Text

BOLT

AutoCAD SHX Text

PIPE

AutoCAD SHX Text

PIPE SLEEVE WHERE SPECIFIED

AutoCAD SHX Text

RISER CLAMP

AutoCAD SHX Text

RISER

AutoCAD SHX Text

PIPE SLEEVE WHERE SPECIFIED

AutoCAD SHX Text

RISER CLAMP. BOTTOM CLAMP REQUIRED AT ANCHOR POINTS ONLY.

AutoCAD SHX Text

ELEVATION

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

RISER CLAMP

AutoCAD SHX Text

CONTINUOUS SEALANT

AutoCAD SHX Text

CONTINUOUS SEALANT

AutoCAD SHX Text SEALANT-MIN 1/2" THICKNESS OF FILL MATERIAL APPLIED WITHIN THE ANNULUS, FLUSH WITH THE TOP SURFACE OF FLOOR. AT THE POINT OF CONTACT LOCATION BETWEEN PIPE AND CONCRETE, A MIN 1/2" DIAM BEAD OF FILL MATERIAL SHALL BE APPLIED AT THE CONCRETE/PIPE INTERFACE ON THE TOP SURFACE OF FLOOR AND ON BOTH SURFACES OF WALL.

AutoCAD SHX Text THROUGH PENETRANTS-ONE METALLIC PIPE, CONDUIT OR TUBING TO BE INSTALLED WITHIN THE FIRESTOP SYSTEM. PIPE, CONDUIT OR TUBING TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY. OF WALL.

AutoCAD SHX Text PACK VOID BETWEEN PIPE OR INSULATION AND WALL WITH FIBERGLASS BATT, THEN SEAL WITH A SILICONE COMPOUND OR OTHER APPROVED SEALANTS. IF WALL IS FIRE RATED, FILL VOID BETWEEN PIPE OR INSULATION AND WALL WITH FIRE BARRIER CAULK.

AutoCAD SHX Text CHROME PLATED OR STAINLESS STEEL ESCUTCHEON PLATES BOTH SIDES OF WALL IN EXPOSED AREAS. PLATE SHALL BE SECURED WITH WALL CLIPS OR MOUNTING SPRINGS.

AutoCAD SHX Text

PROVIDE A MINIMUM OF 1/2" CLEARANCE BETWEEN WALL AND PIPE OR INSULATION.

AutoCAD SHX Text

PIPE INSULATION.

AutoCAD SHX Text

SEE DRAWINGS FOR PIPE SIZE AND MATERIAL.

AutoCAD SHX Text

FACE OF WALL.

AutoCAD SHX Text NOTES: 1. I.D. OF WALL OPENING TO BE A MIN. OF 1/2" LARGER THAN O.D. OF PIPE I.D. OF WALL OPENING TO BE A MIN. OF 1/2" LARGER THAN O.D. OF PIPE OR INSULATION PASSING THROUGH WALL. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THEIR CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THEIR WALL OPENINGS WITH OTHER TRADES AND/OR CONTRACTORS. 3. PIPE PENETRATIONS OF SMOKE OR FIRE WALLS SHALL BE IN COMPLIANCE PIPE PENETRATIONS OF SMOKE OR FIRE WALLS SHALL BE IN COMPLIANCE WITH NFPA-90A.

AutoCAD SHX Text

PIPE PENETRATION OF INTERIOR WALL DETAIL

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text

5 FT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 2 1/2

AutoCAD SHX Text 1 1/2

AutoCAD SHX Text

AutoCAD SHX Text 1 1/4

AutoCAD SHX Text

THRU 3/4

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text

SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB. UNIFORM LOAD

AutoCAD SHX Text

ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS

AutoCAD SHX Text

ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS

AutoCAD SHX Text

PROVIDE INSULATION SHIELD & INSERT FOR ALL PIPING (8" MIN.)

AutoCAD SHX Text

BAND

AutoCAD SHX Text 1-5/8" 12 GAUGE CHANNEL OR 2"x2"x1/4" ANGLE

AutoCAD SHX Text

1/2" DIA. HANGER RODS WITH 36" MAX.SPACING ON EACH CHANNEL

AutoCAD SHX Text

WELD

AutoCAD SHX Text

SADDLE

AutoCAD SHX Text

INSULATION SHIELD AT HANGER

AutoCAD SHX Text PROVIDE HIGH COMPRESSIVE STRENGTH INSULATION (9 PSF MIN. DENSITY) UNDER INSULATION SHIELD

AutoCAD SHX Text

INSULATION (VAPOR BARRIER TYPE IS REQUIRED FOR LOW TEMPERATURE PIPE)

AutoCAD SHX Text

MAXIMUM PIPE/TUBING SUPPORT SPACING

AutoCAD SHX Text

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

AutoCAD SHX Text

NOM. SIZE

AutoCAD SHX Text

PIPE

AutoCAD SHX Text

TUBING

AutoCAD SHX Text

IN.

AutoCAD SHX Text

FT.

AutoCAD SHX Text

FT.

AutoCAD SHX Text

PIPE HANGERS

AutoCAD SHX Text

1" MAX.

AutoCAD SHX Text

NOTES: SEE SPECIFER FOR DETAILED HANGER REQUIREMENTS

AutoCAD SHX Text

HANGER ROD

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text

LAVATORY MIXING VALVE DETAIL

AutoCAD SHX Text

NOTE: 1. 2. 3. 4.

AutoCAD SHX Text SEE ARCHITECTURAL DRAWINGS FOR LAVATORY MOUNTING HEIGHTS. P-TRAP, TAIL PIECE, AND WASTE ARM NOT SHOWN FOR CLARITY. FOR HANDICAP LAVATORY INSTALLATION ALL WASTE PIPING UNDER SINK SHALL BE WRAPPED WITH PROTECTIVE PIPE COVERS. FOR HANDICAP LAVATORY INSTALLATION ANGLE STOP VALVES AND SUPPLY RISERS SHALL BE WRAPPED WITH PROTECTIVE PIPE COVERS. SUPPLY RISERS SHALL BE WRAPPED FROM STOP VALVES TO MIXING VALVE. ENDS OF PROTECTIVE WRAP SHALL BE CUT SQUARE AND TIE WRAPPED CLOSED.

AutoCAD SHX Text WALL HUNG LAVATORY REFER TO PLANS AND SPECIFICATIONS FOR TYPE OF FIXTURE AND FAUCET.

AutoCAD SHX Text FOUR PORT POINT-OF-USE THERMOSTATIC MIXING VALVE MOUNTED AS HIGH AS POSSIBLE. MIXING SET TO DISCHARGE 105°F

AutoCAD SHX Text

CHROME PLATED RIGID SUPPLY RISER (TYPICAL)

AutoCAD SHX Text CHROME PLATED ALL BRASS CONSTRUCTION ANGLE STOP WITH FULL TURN BRASS STEM AND LOOSE KEY HANDLE. (TYP.2)

AutoCAD SHX Text

SANITARY ROUGH-IN

AutoCAD SHX Text

TMV-1

AutoCAD SHX Text

AutoCAD SHX Text

NTS

AutoCAD SHX Text

SUSPENDED DRAINAGE CLEANOUT DETAIL

AutoCAD SHX Text

GAS TIGHT BRASS CLEANOUT PLUG

AutoCAD SHX Text

COMBINATION WYE OR 18" BEND.

AutoCAD SHX Text

CAST IRON STORM, SANITARY OR WASTE PIPE.

AutoCAD SHX Text

CAULK INSIDE CONNECTION.

AutoCAD SHX Text

18 GAUGE ROUND GALVANIZED STEEL PIPE SLEEVE

AutoCAD SHX Text

STEEL RISER CLAMP

AutoCAD SHX Text PROVIDE A SECTION OF HIGH COMPRESSION STRENGTH INSULATION AT EACH HANGER POINT, INSULATION MAY BE HALF FULL ROUND OR FULL ROUND & EXTENDED 2" BEYOND GALVANIZED SHIELD EACH WAY.

AutoCAD SHX Text

SUPPORT HANGER STEEL ANCHOR

AutoCAD SHX Text

SUPPORT HANGER STEEL ROD

AutoCAD SHX Text

ADJUSTABLE MALLEABLE IRON SPLIT SWIVEL RING

AutoCAD SHX Text

PIPE SADDLE

AutoCAD SHX Text

MINIMIZE DIMENTION

AutoCAD SHX Text

FIRE STOPPING MATERIAL. TYPICAL AT ALL PENETRATIONS.

AutoCAD SHX Text P501

AutoCAD SHX Text

PLUMBING - DETAILS

AutoCAD SHX Text No

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

APPROVED: CHIEF OF STAFF

AutoCAD SHX Text

APPROVED: HEALTH CARE SYSTEM DIRECTOR

AutoCAD SHX Text

APPROVED: CHIEF OF POLICE

AutoCAD SHX Text

APPROVED: DIRECTOR FMS

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: SAFETY MANAGER

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: GEMS PROJECT MANAGER

AutoCAD SHX Text

APPROVED: PROJECTS SECTION MANAGER

AutoCAD SHX Text

APPROVED: SERVICE LINE DIRECTOR

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: INFECTION CONTROL NURSE

AutoCAD SHX Text

APPROVED: PATIENT SAFETY

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text BUILDING No

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text

PROJECT TITLE

AutoCAD SHX Text

PLOT SCALE

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

AutoCAD SHX Text

APPROVED: PROJECT COR

AutoCAD SHX Text

DATE:

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION MANUFACTURER MODEL

DOMESTIC

COLD

WATER

DOMESTIC

HOT

WATER

SANITARY VENT REMARKS

EWC-1

ELECTRIC

WATER

COOLER

ELKAY EMABF8WSLK 1/2" - 1 1/2" 1 1/2"

SINGLE STATION WALL MOUNTED WATER COOLERS BOTTLE FILLING

STATION BARRIER-FREE ACCESS, CONSTRUCTION GALVANIZED

STEEL CHASIS SUPPORT WITH A STAINLESS STEEL BASIN. EASY

TOUCH CONTROL ON FRONT, BUILT-IN REGULATOR AND DRAIN AND

ENCLOSED ADJUSTABLE THERMOSTAT, BOTTLE FILLER SHALL

PROVIDE 1.1 GPM FLOW RATE WITH LAMINAR FLOW, COMPRESSOR

HERMETICALLY-SEALED, RECIPROCATING TYPE, REFRIGERANT

R-134a, SINGLE PHASE 115V, 370 WATTS. APPROVED ANSI AND UL.

ADA COMPLIANT.

SK-1 SINK

ELKAY

AMERICAN

STANDARD

LRAD222255

1/2" 1/2" 1 1/2" 1 1/2"

SINGLE BOWL SINK, #18 GAUGE, TYPE 304 NICKEL EARING STAINLESS

STEEL, OVERALL DIMENSIONS 22" x 22", INSIDE EACH BOWL 19" x 16" x

5 1/2" DRAIN OPENING 3 1/2" CENTER REAR LOCATION. 1 1/2" 17 GAUGE

CHROME-PLATED BRASS TAILPIECE AND P-TRAP, QUARTER-TURN 3/8"

CHROME-PLATED HEAVY BRASS ANGLE SUPPLIES WITH STOPS,

CHROME PLATED SOFT COPPER SUPPLY LIES. MANUAL DECK

MOUNTED FAUCET, 8" FIXED CENTERS, 10" CONVENTIONAL SPOUT,

2.2 GPM AERATOR, 4" VANDAL PROOF WRISTBLADE HANDLE.

APPROVED ASME AND NSF/ANSI. ADA COMPLAINT.

NOTES:

1. SIZES LISTED ARE MINIMUM CONNECTIONS REQUIRED TO FIXTURES.

RRDG

656-21-236

09/17/2021EHRM TRAINING +

ADMINISTRATIVE SUPPORT

SPACE

www. bancroft-ae.com

BAE PROJECT NO. 18-116

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T: 847.952.9362

ARCHITECT/ENGINEER OF RECORD

1 ST. CLOUD VAHCS

ST. CLOUD, MN 56303

SCHEMATIC DESIGN (SD - 35%) 04/29/2021

2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021

3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021

4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021

5 CONSTRUCTION BID DOCUMENTS 09/17/2021

AutoCAD SHX Text P601

AutoCAD SHX Text

PLUMBING - SCHEDULES

AutoCAD SHX Text No

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

APPROVED: CHIEF OF STAFF

AutoCAD SHX Text

APPROVED: HEALTH CARE SYSTEM DIRECTOR

AutoCAD SHX Text

APPROVED: CHIEF OF POLICE

AutoCAD SHX Text

APPROVED: DIRECTOR FMS

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: SAFETY MANAGER

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: GEMS PROJECT MANAGER

AutoCAD SHX Text

APPROVED: PROJECTS SECTION MANAGER

AutoCAD SHX Text

APPROVED: SERVICE LINE DIRECTOR

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: INFECTION CONTROL NURSE

AutoCAD SHX Text

APPROVED: PATIENT SAFETY

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text BUILDING No

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text

PROJECT TITLE

AutoCAD SHX Text

PLOT SCALE

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

AutoCAD SHX Text

APPROVED: PROJECT COR

AutoCAD SHX Text

DATE:

T

RRDG

656-21-236

09/17/2021EHRM TRAINING +

ADMINISTRATIVE SUPPORT

SPACE

www. bancroft-ae.com

BAE PROJECT NO. 18-116

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T: 847.952.9362

ARCHITECT/ENGINEER OF RECORD

1 ST. CLOUD VAHCS

ST. CLOUD, MN 56303

SCHEMATIC DESIGN (SD - 35%) 04/29/2021

2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021

3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021

4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021

5 CONSTRUCTION BID DOCUMENTS 09/17/2021

AutoCAD SHX Text

1. THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT DOCUMENTS: THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT DOCUMENTS: INCLUDING BUT NOT NECESSARILY LIMITED TO ALL ARCHITECTURAL, ALL STRUCTURAL, ALL MECHANICAL, ALL ELECTRICAL DRAWINGS AND ENTIRE PROJECT MANUAL. THIS CONTRACTOR SHALL ACKNOWLEDGE AND INCLUDE IN THE SCOPE OF WORK (CONTRACT) ALL CONDITIONS PERTINENT TO THE COMPLETION OF HIS WORK. THIS CONTRACTOR SHALL FULLY COORDINATE HIS WORK WITH THE INSTALLATION OF WORK BY OTHER TRADES AND MAKE NECESSARY FIELD ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE INSTALLATION. ALL OF THE ABOVE SHALL BE INCLUDED IN THE SCOPE OF WORK AT NO ADDITIONAL CHARGE TO THE VA. 2. THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS, VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES AS TO ALL CONDITIONS AND MATTERS THAT CAN, IN ANY WAY, AFFECT THE WORK OR THE COST THEREOF. SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM THE DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS, OR BE IN DOUBT AS TO THEIR MEANING, NOTIFY THE VA/CO AT ONCE, IN WRITING, OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND WORK, OR BETWEEN THEIR WORK AND THE WORK OF THEIR TRADES AND OBTAIN CLARIFICATION PRIOR TO SUBMITTING ANY BID. LACK OF SUCH NOTIFICATION SHALL BE CONSTRUED AS TO INDICATE NO DISCREPANCIES OR CONFLICTING CONDITIONS EXIST. ADDITIONAL COMPENSATION WILL NOT BE GRANTED AFTER AWARD OF CONTRACT FOR ANY WORK REQUIRED TO COMPLY WITH THESE REQUIREMENTS. 3. DRAWINGS ARE GENERALLY DIAGRAMMATIC. ROUTING OF PIPING, CONDUITS, DRAWINGS ARE GENERALLY DIAGRAMMATIC. ROUTING OF PIPING, CONDUITS, RACEWAYS, ETC., AS SHOWN ON DRAWINGS, DOES NOT INTEND TO SHOW EVERY RISE, DROP, OFFSET, FITTING NOR EVERY STRUCTURAL ELEMENT THAT MAY BE ENCOUNTERED DURING THE INSTALLATION OF THIS WORK. EACH CONTRACTOR SHALL MAKE ANY REQUIRED CHANGES FROM THE GENERAL ROUTING SHOWN ON THESE DRAWINGS, SUCH AS OFFSETS, BENDS OR CHANGES IN ELEVATION DUE TO COORDINATION WITH THE WORK OF OTHER TRADES AND BUILDING CONSTRUCTION. ALL CHANGES SHALL BE MADE WITHOUT ADDITIONAL COST TO THE VA OR DELAY IN COMPLETION DATE OF THE PROJECT. 4. IT IS THE INTENT OF THESE DOCUMENTS THAT THE MECHANICAL CONTRACTOR IT IS THE INTENT OF THESE DOCUMENTS THAT THE MECHANICAL CONTRACTOR PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND TOOLS FOR THE COMPLETE INSTALLATION OF ALL WORK SHOWN ON THE PLANS AND/OR DESCRIBED HEREIN, INCLUDING ALL DEVICES, CONTROLS AND APPURTENANCES REQUIRED TO SET SYSTEMS INTO OPERATION. 5. SHOULD CONDITIONS NECESSITATE ANY REARRANGEMENTS, OR IF PIPING CAN SHOULD CONDITIONS NECESSITATE ANY REARRANGEMENTS, OR IF PIPING CAN BE RUN TO BETTER ADVANTAGE, PREPARE AND SUBMIT SHOP DRAWINGS SHOWING THE CHANGES BEFORE PROCEEDING WITH THE WORK. IF SUCH CHANGES ARE APPROVED BY THE VA/COR, THEY SHALL BECOME A PART OF THE CONTRACT AFTER THEIR APPROVAL. 6. THIS CONTRACTOR SHALL VERIFY ALL MOUNTING, ALL ARRANGEMENTS, HEIGHTS THIS CONTRACTOR SHALL VERIFY ALL MOUNTING, ALL ARRANGEMENTS, HEIGHTS AND LOCATIONS PRIOR TO ROUGH-IN. ANY MENTION OF A SPECIFIC MOUNTING ARRANGEMENT, WEIGHT OR LOCATION SHALL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO VERIFY THE SPECIFIC REQUIREMENT FURNISHED OR THE OTHER TRADES WORKING IN THE SAME AREA. NO ADDITIONS TO THE CONTRACT SUM WILL BE PERMITTED FOR ITEMS INSTALLED IMPROPERLY, IN WRONG LOCATIONS, IN CONFLICT WITH OTHER WORK, ETC. 7. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL CURRENT FEDERAL ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL CURRENT FEDERAL BUILDING CODES, REGULATIONS, AND REQUIREMENTS, LOCAL UTILITY COMPANY REQUIREMENTS, AND ASHRAE STANDARDS. 8. THIS CONTRACTOR SHALL PAY ALL PERMIT FEES, PLAN REVIEW FEES, LICENSE THIS CONTRACTOR SHALL PAY ALL PERMIT FEES, PLAN REVIEW FEES, LICENSE FEES, INSPECTIONS, AND TAXES APPLICABLE TO THEIR DIVISION AND SHALL BE INCLUDED IN THE BASE BID AS PART OF THEIR CONTRACT. 9. THIS CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND CAPABLE OF THIS CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND CAPABLE OF PERFORMING QUALITY WORKMANSHIP. THIS CONTRACTOR GUARANTEES ALL OF HIS WORK AND MATERIALS FOR THE PERIOD AS REQUIRED IN THE SPECIFICATIONS. FROM FINAL ACCEPTANCE BY THE VA/COR. 10. THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE PROTECTION OF THE WORKMEN IN ALL PHASES OF WORK, COMPLYING WITH ALL APPLICABLE PROVISIONS OF CITY, STATE, AND FEDERAL SAFETY LAWS (OSHA) AND AS RECOMMENDED IN THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" AS ISSUED BY THE ASSOCIATION OF GENERAL CONTRACTORS OF AMERICA, IN., 20TH AND E. STREETS, N.W. WASHINGTON, D.C. 11. CONTRACTOR SHALL CHECK DRAWINGS OF OTHER TRADES TO VERIFY THAT CONTRACTOR SHALL CHECK DRAWINGS OF OTHER TRADES TO VERIFY THAT SPACES IN WHICH THEIR WORK WILL BE INSTALLED ARE CLEAR OF OBSTRUCTIONS. WORK SHALL BE INSTALLED TO MAINTAIN MAXIMUM HEADROOM AND SPACE CONDITIONS AT ALL POINTS IN THE BUILDING. WHERE HEADROOM OR SPACE CONDITIONS APPEAR INADEQUATE, CONTRACTOR SHALL NOTIFY VA/COR BEFORE PROCEEDING WITH THE INSTALLATION OF THEIR WORK. 12. THE SEQUENCE FOR THE INSTALLATION OF ALL WORK SHALL BE COORDINATED THE SEQUENCE FOR THE INSTALLATION OF ALL WORK SHALL BE COORDINATED BETWEEN ALL CONTRACTORS ON THE PROJECT AND IN STRICT ACCORDANCE WITH VA STIPULATIONS AS DIRECTED BY SAME. 13. CONTRACTOR SHALL BE RESPONSIBLE AND PAY FOR ALL CORING, CUTTING, CONTRACTOR SHALL BE RESPONSIBLE AND PAY FOR ALL CORING, CUTTING, PATCHING, REPAIRING, REFINISHING AND REMOVAL/REPLACEMENT OF NEW OR EXISTING BUILDING CONSTRUCTION REQUIRED TO ACCOMMODATE THE INSTALLATION OR REMOVAL OF THEIR WORK. CONTRACTOR SHALL XRAY ALL SLABS PRIOR TO CORING.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .