ATTACHMENT 3 - Drawings 2 of 2.pdf
PDF 13 MB Posted
- Attached to
- Y1AZ--EHRM Training and Administrative Support Space Construction - St. Cloud Federal contract opportunity
- Solicitation number
- 36C77622B0026
About this file
This document provides details for a federal solicitation to renovate the EHRM Training Room and Administrative Support Space at the St. Cloud VA Medical Center. The solicitation number is 36C77622B0026 and is seeking a general contractor to provide all labor, tools, materials, equipment, and supervision required to complete renovations including general construction, alterations, removal of existing structures, millwork, permanently mounted equipment, interior finishes, and other items. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9"
3" 12345 Braille
9"
6"
12345 Braille
Abcdefgh Abcdefgh
9"
9"
DO NOT
ENTER
AUTHORIZED
PERSONNEL
ONLY
9"
6"
12345 Braille
Abcdefgh In Use
MOUNTING DETAIL 2
MOUNTING HEIGHT FOR SIGN TYPE IN-01.31.
MOUNTING DETAIL 1
MOUNTING HEIGHT FOR SIGN TYPES IN-03.01,
IN-04.02, IN-09.03, IN-09.06.
5'- 0"
2"
7'- 0"
FIRE
EQUIPMENT
CABINET
5'- 6"
MOUNTING DETAIL 4
INSTALLATION DETAIL FOR SIGN TYPE IN-14.05.
Abcdefgh Abcdefgh
1'- 0"
1'-8"
Abcdefgh
9"
9"
Fire Equipment
2"
0 2'1'1/2' 3'3/4"=1'-0"
656-21-236
09/17/2021EHRM TRAINING +
ADMINISTRATIVE SUPPORT
SPACE
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
1 ST. CLOUD VAHCS
ST. CLOUD, MN 56303
SCHEMATIC DESIGN (SD - 35%) 04/29/2021
2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021
3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021
4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021
5 CONSTRUCTION BID DOCUMENTS 09/17/2021
DTBDA
0 3"1" 2" 4"6"=1'-0" 0 3"1" 2" 4"6"=1'-0" 0 3"1" 2" 4"6"=1'-0" 0 3"1" 2" 4"6"=1'-0"
0 3"1" 2" 4"6"=1'-0" 0 3"1" 2" 4"6"=1'-0"
AutoCAD SHX Text L
AutoCAD SHX Text
AutoCAD SHX Text
SIGNAGE MOUNTING HEIGHTS ELEVATIONS
AutoCAD SHX Text No
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
APPROVED: CHIEF OF STAFF
AutoCAD SHX Text
APPROVED: HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: CHIEF OF POLICE
AutoCAD SHX Text
APPROVED: DIRECTOR FMS
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: SAFETY MANAGER
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: GEMS PROJECT MANAGER
AutoCAD SHX Text
APPROVED: PROJECTS SECTION MANAGER
AutoCAD SHX Text
APPROVED: SERVICE LINE DIRECTOR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: INFECTION CONTROL NURSE
AutoCAD SHX Text
APPROVED: PATIENT SAFETY
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text BUILDING No
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DWG. OF
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
PLOT SCALE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: PROJECT COR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
AW601
AutoCAD SHX Text
WAYFINDING DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
TYPE A ROOM ID SIGN IN-03.01
AutoCAD SHX Text
AutoCAD SHX Text
TYPE B ROOM ID SIGN IN-04.02
AutoCAD SHX Text
AutoCAD SHX Text
TYPE C RESTRICTED ACCESS SIGN IN-08.02C
AutoCAD SHX Text
AutoCAD SHX Text
TYPE D ROOM SIGN W/ INDICATOR IN-07.02
AutoCAD SHX Text
AutoCAD SHX Text
TYPE E FIRE EQUIPMENT ID SIGN IN-01.31
AutoCAD SHX Text
AutoCAD SHX Text
TYPE F WALL DIRECTION SIGN IN-14.05
09/17/2021
ALL PIPING SHALL BE SCHEDULE 40. PLASTIC PIPING IS NOT PERMITTED.
SYMBOL
A/E ARCHITECT / ENGINEER
DESCRIPTION
1. THE PLUMBING FIXTURE AND EQUIPMENT SCHEDULE, IN GENERAL, SPECIFIES THE PLUMBING FIXTURES, EQUIPMENT AND DEVICES: HOWEVER, UNLESS NOTED OTHERWISE, ALL FIXTURES SHALL BE PROVIDED WITH APPLICABLE ACCESSORIES (SUCH AS SUPPLY STOPS, WASTE TRAPS, FIXTURE
MOUNTING SUPPORTS, BOLT CAPS, WATER CLOSET SEATS, ETC., AS REQ'D TO COMPLETE THE
INSTALLATION.)
2. ALL ITEMS SPECIFIED HEREAFTER SHALL BE NEW, CLEANED AND ADJUSTED FOR THE SPECIFIED
DESIGN PURPOSE (UNLESS OTHERWISE SPECIFIED).
3. ALL EQUIPMENT AND DEVICES SHALL BEAR AGA, NSF, ASME, ANSI, CSA OR UL APPROVED LABELS
AND CERTIFICATIONS FOR THE SPECIFIED DESIGN PURPOSE.
4. PLUMBING CONTRACTOR SHALL VERIFY IN FIELD WITH VA/COR ALL FINAL FIXTURE AND EQUIPMENT
LOCATIONS AND MOUNTING HEIGHTS REQUIRED FOR THE DESIGN PURPOSE.
5. SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES OF EACH CATALOG CUT, FOR EACH
ITEM, TO BE APPROVED BY THE VA/COR AND SUCCESSFULLY REVIEWED BY THE
ARCHITECT/ENGINEER (PRIOR TO THE BEGINNING OF CONSTRUCTION) FOR ALL NEW ITEMS
SPECIFIED HEREAFTER.
6. THE CONTRACTOR SHALL SUBMIT EQUIPMENT CUTS FOR EACH PIECE OF EQUIPMENT PRIOR TO ORDERING. SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES FOR APPROVAL BY THE VA/COR AND SUCCESSFUL REVIEW BY THE ARCHITECT/ENGINEER. THIS CONTRACTOR SHALL ALSO
ASSEMBLE PRINTED INSTRUCTIONS FOR THE OPERATION AND MAINTENANCE OF EACH ITEM
INSTALLED AND BIND TOGETHER WITH EQUIPMENT CUTS AND CONTROL WIRING DIAGRAMS.
7. FIXTURES FURNISHED BY VA SHALL BE INSTALLED BY PLUMBING CONTRACTOR, ALL OTHER
FIXTURES SHALL BE PROVIDED BY PLUMBING CONTRACTOR.
1. DISINFECTION OF POTABLE WATER SYSTEM SHALL BE AS FOLLOWS:
GENERAL: NEW POTABLE WATER SYSTEMS SHALL BE PURGED OF DELETERIOUS MATTER AND DISINFECTED PRIOR TO UTILIZATION. THE METHOD TO BE FOLLOWED SHALL BE THAT PRESCRIBED BY THE HEALTH AUTHORITY HAVING JURISDICTION OR, IN THE ABSENCE OF A PRESCRIBED METHOD, THE PROCEDURE DESCRIBED IN EITHER AWWA C651 OR AWWA C652 LISTED IN CHAPTER 19, AND AS DESCRIBED IN THE VA SPECIFICATION SECTION. THIS REQUIREMENT SHALL APPLY TO "ONSITE" OR "IN-PLANT" FABRICATION OF A SYSTEM OR TO A MODULAR PORTION OF A SYSTEM.
A. THE PIPE SYSTEM SHALL BE FLUSHED WITH CLEAN, POTABLE WATER UNTIL DIRTY WATER DOES NOT APPEAR AT
THE POINTS OF OUTLET.
B. THE SYSTEM OR PART THEREOF SHALL BE FILLED WITH A WATER/CHLORINE SOLUTION AT LEAST 50 PARTS PER MILLION (50 mg/l) OF CHLORINE, AND THE SYSTEM OR PART THEREOF SHALL BE VALVED OFF AND ALLOWED TO STAND FOR 24 HOURS; OR THE SYSTEM OR PART THEREOF SHALL BE FILLED WITH A WATER CHLORINE SOLUTION AT LEAST 200 PARTS PER MILLION (200mg/l) OF CHLORINE AND ALLOWED TO STAND FOR 3 HOURS. FOLLOWING THE
REQUIRED STANDING TIME, THE SYSTEM SHALL BE FLUSHED.
C. THE SYSTEM SHALL BE FLUSHED WITH CLEAN POTABLE WATER UNTIL THE CHLORINE IS PURGED FROM THE
SYSTEM.
D. THE PROCEDURE SHALL BE REPEATED WHERE SHOWN BY A BACTERIOLOGICAL EXAMINATION THAT
CONTAMINATION REMAINS PRESENT IN THE SYSTEM.
2. PIPING SERVICE MARKING:
VINYL CLOTH PRESSURE SENSITIVE MARKERS BLACK LETTER ON WHITE BACKGROUND
A. PIPES 3" AND LARGER SPACING 30'-0" O.C. PIPES 2-1/2" AND SMALLER SPACING 20'-0" O.C.
B. INSTALL DIRECTIONAL ARROWS ON ALL PIPING AT SAME SPACING.
3. CONTRACTOR TO VERIFY IN FIELD AND PROVIDE EXTENSIONS REQUIRED TO ADJUST ALL FIXTURES TO GRADE LEVEL TO MAINTAIN INVERTS AS DETERMINED BY ALL FIXTURES RELATED (GREASE TRAPS, MAN HOLES, ETC.).
4. PROVIDE EXTERIOR ACCESS TO ISOLATION VALVES FOR HOT AND COLD WATER SUPPLY CUTOFF.
AFF ABOVE FINISH FLOOR
1. ALL SUSPENDED HORIZONTAL PIPING SHALL BE SUPPORTED BY HANGERS SPACED NO FURTHER THAN 8' - 0" APART (4' -0" APART FOR PVC PIPING). NO PIPING SHALL BE SELF-SUPPORTING NOR
BE SUPPORTED FROM EQUIPMENT CONNECTIONS.
2. ALL PARALLEL PIPES (TWO(2) OR MORE) SHALL BE SUPPORTED ON A CHANNEL TYPE TRAPEZE
HANGER.
3. SUPPORTS AND HANGERS SHALL BE INSTALLED TO PERMIT FREE EXPANSION AND
CONTRACTION IN PIPING SYSTEMS UNLESS PIPE REQUIRES FIRM ANCHOR CONTROL.
4. HORIZONTAL SOIL OR WASTE LINES SHALL BE AT A SLOPE OF NOT LESS THAN 1/8" PER FOOT
AND SHALL BE HELD CLOSE TO THE CONSTRUCTION TO MAINTAIN A MAXIMUM OF HEAD ROOM.
ALL CHANGES OF DIRECTION AND JUNCTIONS SHALL BE MADE WITH "Y" FITTINGS AND 1/8"
BENDS. NO LINES OF ANY KIND SHALL BE LOCATED BELOW FREEZERS. ALL DRAIN LINES SHALL
BE PROTECTED FROM FREEZING.
5. HOT AND COLD WATER PIPING SHALL BE PROPERLY PITCHED TO LOW POINTS IN THE SYSTEM
WHERE DRAINS SHALL BE INSTALLED.
6. CLEANOUTS SHALL BE PLACED AT ALL DEAD ENDS, AT 90° CHANGES OF DIRECTION, AT 50'-0"
INTERVALS ON HORIZONTAL RUNS, OUT OF HIGH TRAFFIC AREAS, (NOT UNDER CASES) ETC.
WHERE CLEANOUTS OCCUR IN CONCEALED SPACES, THEY SHALL BE PROVIDED WITH
EXTENSIONS TO FLOOR ABOVE OR TO WALLS. A HAND-HOLE TEST TEE SHALL BE PLACED AT THE
BASE OF EACH STACK.
7. VENT STACKS EXTENDING UP THROUGH THE ROOF SHALL BE FLASHED WITH SIX POUND SHEET LEAD. FLASHING SHALL EXTEND 12" IN ALL DIRECTIONS FROM THE VENT, CARRIED OVER AND
TURNED DOWN THE INSIDE OF THE VENT. ALL SEAMS AND JOINTS OF FLASHING SHALL BE
SOLDERED AND PROVEN WEATHERTIGHT. EXTEND VENTS A MIN. OF 12" ABOVE ROOF, AND 30"
AWAY FROM PARAPET.
8. ALL SUPPLY PIPING TO BE RUN OVERHEAD, UNLESS NOTED OTHERWISE.
9. ALL SUPPLY PIPING TO BE A MINIMUM OF 3/4" DIA.
10. EACH FIXTURE WILL HAVE A 1/2" X 12" AIR CHAMBER.
11. PROVIDE SERVICE VALVE AT BRANCHES AND AT ALL APPLIANCES.
12. ALL FIXTURES WILL BE FURNISHED WITH INTEGRAL STOPS.
13. BURIED SANITARY AND WASTE LINES WILL BE A MINIMUM OF 4" DIA.
14. ALL FLOOR DRAINS AND FIXTURES TO BE VENTED IN ACCORDANCE WITH ALL LOCAL, STATE AND
FEDERAL CODES AND REGULATIONS.
15. ALL HORIZONTAL VENT PIPING SHALL BE RUN ABOVE FINISHED CEILINGS AND SLOPED UP
TOWARD MAIN STACK.
16. THE PLUMBING CONTRACTOR WILL NOT INSTALL COMBUSTIBLE PIPING MATERIAL IN OR
THROUGH FIRE RATED ASSEMBLIES.
17. ALL EQUIPMENT DEVICES SHALL BE INSTALLED WITH UNIONS IN SUCH A MANNER TO FACILITATE
EASY REMOVAL AND MAINTENANCE OF EQUIPMENT WITHOUT DISRUPTING SERVICE AND
CAUSING MAJOR PIPING REVISIONS.
18. ALL CONNECTIONS BETWEEN DISSIMILAR METALS SHALL BE MADE WITH DIELECTRIC UNIONS OR
COUPLINGS.
GENERAL NOTES FOR CONTRACTORS: SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT PART OF THIS SECTION AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED
HEREIN.
EQUIVALENCY SUBSTITUTIONS: THE “BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS” ARE TO BE FOLLOWED FOR ALL MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SPECIFIED AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE BOD DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL DRAWINGS SECTION FOR THE SPECIFIC BOD COMPLIANCE REQUIREMENTS AND PROTOCOLS TO BE FOLLOWED.
1. THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT DOCUMENTS: INCLUDING BUT NOT NECESSARILY LIMITED TO ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL DRAWINGS AND ENTIRE PROJECT SPECIFICATIONS. THIS CONTRACTOR SHALL ACKNOWLEDGE AND INCLUDE IN THE SCOPE OF WORK (CONTRACT) ALL CONDITIONS PERTINENT TO THE COMPLETION OF HIS/HER WORK. THIS CONTRACTOR SHALL FULLY COORDINATE HIS/HER WORK WITH THE INSTALLATION OF WORK BY OTHER TRADES AND MAKE NECESSARY FIELD ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE INSTALLATION. ALL OF THE
ABOVE SHALL BE INCLUDED IN THE SCOPE OF WORK.
2. THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS, VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES AS TO ALL CONDITIONS AND MATTERS THAT CAN, IN ANY WAY, AFFECT THE WORK OR THE COST THEREOF. SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM THE DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS, OR BE IN DOUBT AS TO THEIR MEANING, NOTIFY THE VA/COR AT ONCE, IN WRITING, OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND NEW WORK, OR BETWEEN THEIR WORK AND THE WORK OF OTHER TRADES AND OBTAIN CLARIFICATION PRIOR TO SUBMITTING ANY BID. LACK OF SUCH NOTIFICATION SHALL BE CONSTRUED AS TO INDICATE NO DISCREPANCIES OR
CONFLICTS EXIST.
3. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE INTENT, GENERAL CHARACTER, REQUIREMENTS AND LOCATION OF THE WORK SHOWN AND INCLUDED. THE WORK INDICATED, BUT HAVING MINOR DETAILS OBVIOUSLY
OMITTED, SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE VA/GOVERNMENT.
4. THE CONTRACTOR IS REQUIRED TO BID, AS SPECIFIED, THE WORK SHOWN ON THE DRAWINGS AND PROVIDED IN THE SPECIFICATIONS WITHOUT DEVIATION, WITH THE EXCEPTION OF ANY BASIS OF DESIGN (BOD) EQUIVALENCY SUBSTITUTIONS. THESE REQUESTED SUBSTITUTIONS WILL NEED TO BE IDENTIFIED, SUBMITTED AND APPROVED BY THE VA/CO DURING THE BIDDING PHASE AND IF DURING CONSTRUCTION BY THE VA/COR AND THE VA/CO RESPECTIVELY. CONTRACTOR IS REQUIRED TO PREPARE A DETAILED LIST OF THE PROPOSED EQUIVALENCY SUBSTITUTION ITEMS ALONG WITH THE DOCUMENTED COMPARATIVE ANALYSIS AND THE LISTING OF ALL VARIANCE IMPACTS TO THE PROJECT FOR EACH REQUESTED ITEM OF WORK. EQUIVALENCY SUBSTITUTIONS REQUESTS FOR VA CONSIDERATION WILL FIRST NEED TO BE APPROVED BY THE VA BEFORE PROCEEDING WITH ANY BIDDING AND ANY OF THE WORK. ALL REQUESTED BOD EQUIVALENCY SUBSTITUTIONS WILL FIRST NEED TO BE FULLY REVIEWED, EVALUATED AND APPROVED BY THE VA/CO PRIOR TO BID SUBMISSION AND IF OCCURRING DURING CONSTRUCTION BY THE VA/COR AND IN TURN THE VA/CO BEFORE ANY WORK CAN BE PERFORMED.
5. THIS CONTRACTOR IS RESPONSIBLE TO FURNISH AND INSTALL ALL LABOR AND MATERIALS NECESSARY FOR A COMPLETE SYSTEM. WHERE THERE IS NO MENTION OF THE RESPONSIBLE PARTY FOR A SPECIFIC ITEM TO BE FURNISHED OR INSTALLED ON THE DRAWINGS, THE DRAWING'S TRADE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR ALL RELATED PURCHASES AND LABOR FOR PROVIDING A COMPLETE OPERATING SYSTEM FOR
THIS ITEM.
6. WHEN PERFORMING ANY CUTTING OR PATCHING (RESTORE TO ORIGINAL STATE) ALL BUILDING MATERIALS AND FINISHES AS REQUIRED TO PROVIDE A FINISHED PRODUCT THAT IS LIKE NEW AND DOESN'T STAND OUT AS BEING
DIFFERENT OR DISTINGUISHABLE AS A PATCH OR REPAIR.
7. THIS CONTRACTOR SHALL VERIFY AND COORDINATE ALL MOUNTING, ARRANGEMENTS, HEIGHTS AND LOCATIONS PRIOR TO ROUGH-IN AS REQUIRED BY THE VA DESIGN GUIDES/MANUALS ALONG WITH THE EXPRESSED DESIGN
INTENT PRESENTED WITHIN THESE DOCUMENTS.
8. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL SLEEVES THRU WALLS AND THROUGH FLOORS, INCLUDING
CORING IF REQUIRED.
9. PLUMBING CONTRACTOR SHALL VERIFY EXACT SIZE AND LOCATION OF ALL EXISTING SANITARY, STORM AND
WATER SUPPLY ON THE SITE PRIOR TO THE PERFORMANCE OF ANY WORK.
10. PROVIDE SERVICE VALVES AT ALL BRANCH SUPPLY PIPING. SUCH SERVICE VALVES SHALL BE AS PER THE
SPECIFICATIONS AND IN KEEPING WITH THE VA STANDARDS AND REQUIREMENTS.
11. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL CURRENT GOVERNING LOCAL, COUNTY, STATE, AND FEDERAL BUILDING CODE REQUIREMENTS AND REGULATIONS PLUS COMPLIANCE WITH LOCAL UTILITY COMPANY
REQUIREMENTS.
12. THIS CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND CAPABLE OF PERFORMING QUALITY
WORKMANSHIP.
13. THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE PROTECTION OF ALL PERSONNEL THRU ALL PHASES OF WORK, COMPLYING WITH ALL APPLICABLE PROVISIONS OF CITY, STATE, AND FEDERAL SAFETY LAWS (OSHA) AND AS RECOMMENDED IN THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" AS ISSUED BY THE ASSOCIATION OF GENERAL CONTRACTORS OF AMERICA, INC., 20TH AND E. STREETS, N.W.
WASHINGTON, D.C.
14. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE PURCHASE, DELIVERY, RECEIVING, UNLOADING, UNCRATING, STORING, SETTING IN PLACE, AND PROTECTING OF ALL NEW EQUIPMENT AND MATERIALS FURNISHED BY THIS CONTRACTOR ALONG WITH EQUIPMENT FURNISHED BY THE VA AND INSTALLED BY THIS CONTRACTOR. PROVIDE PROTECTION FROM DAMAGE BY THE CONSTRUCTION, HANDLING, VANDALISM AND
WEATHER DURING ALL PHASES OF CONSTRUCTION UNTIL COMPLETION OF THE WORK.
15. THIS CONTRACTOR SHALL SUBMIT SHOP DRAWINGS IN THE NUMBERS REQUIRED BY THE SPECIFICATIONS PRIOR
TO THE START OF INSTALLATION FOR VA/COR APPROVAL AND A SUCCESSFUL REVIEW BY THE
ARCHITECT/ENGINEER.
16. THIS CONTRACTOR SHALL FURNISH AS-BUILT CONTRACT DOCUMENTS TO THE VA/COR BEFORE FINAL PROJECT CLOSE-OUT CAN OCCUR. THE CONTRACT RECORD AS-BUILT DOCUMENTS SHALL BE PROVIDED IN ELECTRONIC
REPRODUCIBLE FORM.
17. BEFORE PLACING WATER SYSTEM IN OPERATION, CHLORINATE ENTIRE SYSTEM IN ACCORDANCE WITH THE REQUIREMENTS OF THE SPECIFICATIONS AND IN CONJUNCTION WITH ALL LOCAL, STATE AND FEDERAL PLUMBING CODES ALONG WITH ALL REQUIREMENTS OF THE VA, BOTH FEDERAL AND LOCAL. WHEN PROPERLY COMPLETED
AND APPROVED BY THE VA/COR PROVIDE THE SPECIFIED CERTIFICATION(S).
18. ALL NEW SANITARY PIPING SHALL BE GIVEN A FULL STATIC PRESSURE TEST. METHOD OF TEST AND REQUIREMENTS TO BE MET SHALL BE AS PER THE SPECIFICATIONS AND IN CONJUNCTION WITH ALL LOCAL, STATE AND FEDERAL CODE REQUIREMENTS ALONG WITH ALL REQUIREMENTS OF THE VA, BOTH FEDERAL AND
LOCAL.
19. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE PUMPING AND DRAINING OF TRENCHES OR PITS
NECESSARY FOR THE INSTALLATION OF THEIR WORK.
20. UPON COMPLETION OF THE WORK, THIS CONTRACTOR SHALL REVIEW AND CHECK THE ENTIRE PORTION OF THEIR WORK, CLEAN EQUIPMENT AND DEVICES, REMOVE SURPLUS MATERIALS AND RUBBISH FROM THE PROPERTY, LEAVE THE WORK IN NEAT AND CLEAN ORDER, AND PROVIDE A COMPLETED SYSTEM(S) THAT HAS BEEN FULLY TESTED AND IS IN GOOD WORKING CONDITION. EACH RESPECTIVE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY CARTONS, DEBRIS, EQUIPMENT, ETC., INSTALLED BY THIS
CONTRACTOR INCLUDING EQUIPMENT FURNISHED BY OTHERS.
21. THROUGH PENETRATIONS SHALL BE PROTECTED BY AN APPROVED PENETRATION FIRESTOP SYSTEM PER VA SPECIFICATION PLUMBING INSULATION 22 07 11 AND FIRE STOPPING SPECIFICATION 07 84 00.
22. ALL EQUIPMENT/DEVICES SHALL BE AND OF FIRST RATE QUALITY (UNLESS OTHERWISE SPECIFIED) AND IS TO BEAR THE APPROPRIATE AGA, CSA OR UL APPROVED LABELS, LISTINGS, AND CERTIFICATIONS FOR THE SPECIFIC
DESIGN PURPOSE.
23. THE DRAWINGS, SCHEDULES AND SPECIFICATIONS HAVE BEEN PREPARED USING ONE MANUFACTURER FOR EACH PIECE OF EQUIPMENT AS THE BASIS OF DESIGN. IF THE CONTRACTOR PURCHASES EQUIPMENT FROM A SPECIFIED ACCEPTABLE MANUFACTURER, BUT NOT THE SCHEDULED MANUFACTURER USED FOR THE BASE DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ALL THE DIMENSIONS OF THE EQUIPMENT TO VERIFY THAT IT WILL FIT IN THE SPACE SHOWN ON THE DRAWINGS. MINOR DEVIATIONS IN DIMENSIONS WILL BE PERMITTED, PROVIDED THE RATINGS MEET THOSE SHOWN ON THE DRAWINGS AND EQUIPMENT WILL PHYSICALLY FIT INTO THE SPACE ALLOCATED WITH SUITABLE ACCESS AROUND EQUIPMENT FOR OPERATION AND MAINTENANCE OF THE EQUIPMENT. WHEN EQUIPMENT SUBMITTED FOR REVIEW DOES NOT MEET THE PHYSICAL SIZE OR ARRANGEMENT OF THAT SCHEDULED AND SPECIFIED, CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL ALTERATIONS REQUIRED TO ACCOMMODATE SUCH EQUIPMENT AT NO ADDITIONAL COST TO THE VA.
CONTRACTOR WILL ALSO BE RESPONSIBLE FOR ALL COSTS FOR ADDITIONAL WORK REQUIRED BY OTHER CONTRACTORS AND/OR, THE VA, TO MAKE CHANGES WHICH WOULD ALLOW THE EQUIPMENT TO FIT IN THE SPACE
AND FUNCTION AS SPECIFIED.
24. GENERAL CONTRACTOR MUST FIELD VERIFY SIZES, CAPACITIES, WEIGHTS, ETC. ON ALL EQUIPMENT.
DISCREPANCIES ON DRAWINGS WILL NOT CONSTITUTE A BASIS FOR CHANGE ORDERS. VERIFY WITH THE VA/COR
IF ANY DISCREPANCIES EXIST.
25. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK, AS DETERMINED BY THE
GOVERNMENT/CO, SHALL BE PROVIDED.
BFP BACKFLOW PREVENTER
CI CAST IRON
CO CLEANOUT
CW DOMESTIC COLD WATER
DI DEIONIZATION
DN DOWN
DT DRAIN TILE
EL ELEVATION
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
HB HOSE BIBB
RD ROOF DRAIN
SAN SANITARY
ST STORM
SP SUMP PUMP
LAV LAVATORY
WC WATER CLOSET
ESE EMERGENCY SHOWER AND EYEWASH
MB MOP BASIN
EWC ELECTRIC WATER COOLER
WHA WATER HAMMER ARRESTOR
YCO YARD CLEANOUT
WCO WALL CLEANOUT
TYP TYPICAL
OFD OVERFLOW DRAIN
VTR VENT THRU ROOF
SOLENOID VALVE
S
NOT IN SCOPE (NIC)
AS AIR SEPERATOR
BOD BASIS OF DESIGN
CD CONDENSATE DRAIN
(D) DEMOLISH
DWH DOMESTIC WATER HEATER
(E) EXISTING TO REMAIN
FBO FURNISHED BY OTHERS, INSTALLED BY PLUMBING CONTRACTOR
GLY GLYCOL
HUM HUMIDIFIER
HW DOMESTIC HOT WATER
HWC HOT WATER RECIRCULATION
SK SINK
RO REVERSE OSMOSIS
VB VACUUM BREAKER (ATMOSPHERIC)
V VENT
CONNECT TO EXISTING (NEW CONNECTION)
UNION
BALL VALVE
BUTTERFLY VALVE
SHUT-OFF VALVE (OPEN)
CHECK VALVE (DIRECTION OF FLOW)
EQUIPMENT TAG
EXISTING RISER TAG
POINT OF DEMOLITION
HOSE BIBB
VACUUM BREAKER
DIRECTION OF FLOW
RISER DOWN
RISER UP
FFD FUNNEL FLOOR DRAIN
FS FLOOR SINK
GI GREASE INTERCEPTOR
SH SHOWER
WH WALL HYDRANT
WS WATER SOFTENER
BACKFLOW PREVENTER
FOOD SERVICE EQUIPMENT TAG
KSAN KITCHEN SANITARY
DOUBLE CHECK VALVE (DIRECTION OF FLOW)
BALANCING VALVE
CAPPED PIPE
N.C. NORMALLY CLOSED
SHUT-OFF VALVE (CLOSED)
WATER HAMMER ARRESTOR
FLEXIBLE CONNECTION
(A) ABANDON IN PLACE
RRDG
656-21-236
09/17/2021EHRM TRAINING +
ADMINISTRATIVE SUPPORT
SPACE
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
1 ST. CLOUD VAHCS
ST. CLOUD, MN 56303
SCHEMATIC DESIGN (SD - 35%) 04/29/2021
2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021
3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021
4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021
5 CONSTRUCTION BID DOCUMENTS 09/17/2021
AutoCAD SHX Text
PLUMBING FIXTURE SCHEDULE
AutoCAD SHX Text
PLUMBING GENERAL NOTES
AutoCAD SHX Text
PLUMBING MATERIALS AND PROCEDURES NOTES
AutoCAD SHX Text
PLUMBING SYMBOL LIST
AutoCAD SHX Text
PROCEDURES:
AutoCAD SHX Text
DISCIPLINE SPECIFIC
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text P001
AutoCAD SHX Text
PLUMBING - GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
AutoCAD SHX Text No
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
APPROVED: CHIEF OF STAFF
AutoCAD SHX Text
APPROVED: HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: CHIEF OF POLICE
AutoCAD SHX Text
APPROVED: DIRECTOR FMS
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: SAFETY MANAGER
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: GEMS PROJECT MANAGER
AutoCAD SHX Text
APPROVED: PROJECTS SECTION MANAGER
AutoCAD SHX Text
APPROVED: SERVICE LINE DIRECTOR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: INFECTION CONTROL NURSE
AutoCAD SHX Text
APPROVED: PATIENT SAFETY
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text BUILDING No
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DWG. OF
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
PLOT SCALE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: PROJECT COR
AutoCAD SHX Text
DATE:
DATE:
(TYP.)
A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR
EXCEED FORMER CONDITIONS.
C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING
TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS.
D. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY
CONFLICTS BEFORE PROCEEDING.
E. AREA OF WORK WHERE EXISTING CEILINGS ARE TO BE REMOVED AND NEW FINISH CEILING TO BE INSTALLED; ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED AND REINSTALLED IN
SAME LOCATION.
F. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN SERVICE TO SECOND FLOOR FIXTURES
DURING CONSTRUCTION.
G. ABANDONED AND/OR DEAD LEG PIPING WILL NOT BE ALLOWED AND SHALL BE REMOVED EVEN IF
NOT SHOWN ON DRAWINGS.
H. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
I. CONTRACTOR IS RESPONSIBLE FOR ALL COST ASSOCIATED WITH CEILING DISASSEMBLY AND
REASSEMBLY TO ACCOMMODATE THIS WORK. CONTRACTOR TO SALVAGE, STORE, AND
REINSTALL ALL CEILING MOUNTED DEVICES.
J. REMOVE ALL ASSOCIATED CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING
REMOVAL.
K. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
L. PATCH AND FILL CONCRETE SLAB WHERE PIPING HAS BEEN REMOVED.
M. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH
ARCHITECTURAL AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL
BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER
CURING TIME REQUIRED TO RECEIVE THE NEW FLOOR FINISHES.
N. CONTRACTOR TO PROVIDE "FREEZE SHUT DOWN". ANY PIPING THAT CANNOT BE VALVED OFF
MUST BE "FROZE".
O. ALL DOMESTIC PIPING BEING DEMOLISHED TO MAIN SHALL BE CAPPED AT 1.5X THE DIAMETER OF BRANCH PIPING. NO DEAD END OR STUBS ARE ALLOWED IN DOMESTIC WATER PIPING. ALL DEAD
END PIPING MUST BE CAPPED.
GENERAL NOTESPLUMBING DEMOLITION
KEY NOTES
X
1. DEMOLISH AND REMOVE BACK TO NEAREST MAIN OR WALL PIPING WHICH IS
NOT RELEVANT TO THE NEW DESIGN OR ANY OTHER ACTIVE BUILDING
SYSTEM. COORDINATE WITH VA/COR FOR EXTENT OF DEMOLITION
REQUIRED AT EACH LOCATION. COORDINATE WITH ARCHITECT FOR WALL
AND FLOOR REPAIR INSTRUCTIONS.
2. EXISTING SANITARY PIPING RUNNING IN BASEMENT CEILING. PROTECT
DURING CONSTRUCTION.
RRJK
656-21-236
09/17/2021EHRM TRAINING +
ADMINISTRATIVE SUPPORT
SPACE
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
1 ST. CLOUD VAHCS
ST. CLOUD, MN 56303
SCHEMATIC DESIGN (SD - 35%) 04/29/2021
KEY PLAN
AREA 1 AREA 2
2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021
3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021
4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021
5 CONSTRUCTION BID DOCUMENTS 09/17/2021
AutoCAD SHX Text C
AutoCAD SHX Text F
AutoCAD SHX Text
CART
AutoCAD SHX Text
STM
AutoCAD SHX Text
GEN
AutoCAD SHX Text
STM
AutoCAD SHX Text
KTL
AutoCAD SHX Text
TBL
AutoCAD SHX Text
TABLE
AutoCAD SHX Text
STM
AutoCAD SHX Text
OVEN
AutoCAD SHX Text
STM
AutoCAD SHX Text
OVEN
AutoCAD SHX Text
KTL
AutoCAD SHX Text
STM
AutoCAD SHX Text
KTL
AutoCAD SHX Text
KTL
AutoCAD SHX Text
KTL
AutoCAD SHX Text
TABLE
AutoCAD SHX Text
TABLE
AutoCAD SHX Text
TBL
AutoCAD SHX Text
CART
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
CART
AutoCAD SHX Text
TABLE
AutoCAD SHX Text
CART
AutoCAD SHX Text
ICE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text 30x48
AutoCAD SHX Text 30x48
AutoCAD SHX Text 30x48
AutoCAD SHX Text 30x48
AutoCAD SHX Text 30x48
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3.3
AutoCAD SHX Text 4.3
AutoCAD SHX Text A'
AutoCAD SHX Text B'
AutoCAD SHX Text C'
AutoCAD SHX Text D'
AutoCAD SHX Text E'
AutoCAD SHX Text F'
AutoCAD SHX Text G'
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text A'
AutoCAD SHX Text B'
AutoCAD SHX Text C'
AutoCAD SHX Text D'
AutoCAD SHX Text E'
AutoCAD SHX Text F'
AutoCAD SHX Text G'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3.3
AutoCAD SHX Text 4.3
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING - DEMOLITION PLAN - FIRST FLOOR
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PD101
AutoCAD SHX Text
PLUMBING - DEMOLITION PLAN - FIRST FLOOR
AutoCAD SHX Text No
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
APPROVED: CHIEF OF STAFF
AutoCAD SHX Text
APPROVED: HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: CHIEF OF POLICE
AutoCAD SHX Text
APPROVED: DIRECTOR FMS
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: SAFETY MANAGER
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: GEMS PROJECT MANAGER
AutoCAD SHX Text
APPROVED: PROJECTS SECTION MANAGER
AutoCAD SHX Text
APPROVED: SERVICE LINE DIRECTOR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: INFECTION CONTROL NURSE
AutoCAD SHX Text
APPROVED: PATIENT SAFETY
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text BUILDING No
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DWG. OF
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
PLOT SCALE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: PROJECT COR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
NTS
AutoCAD SHX Text
BUILDING 4
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING - DEMOLITION PLAN - BASEMENT
NORTH
EWC-101
3/4 " C
W 2"
V
4 SK-101 5
3/4 " H
W
(E )4
" S
AN
A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR
EXCEED FORMER CONDITIONS.
C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING
TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS.
D. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY
CONFLICTS BEFORE PROCEEDING.
E. AREA OF WORK WHERE EXISTING CEILINGS ARE TO BE REMOVED AND NEW FINISH CEILING TO BE INSTALLED; ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED AND REINSTALLED IN
SAME LOCATION.
F. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN SERVICE TO SECOND FLOOR FIXTURES
DURING CONSTRUCTION.
G. ABANDONED AND/OR DEAD LEG PIPING WILL NOT BE ALLOWED AND SHALL BE REMOVED EVEN IF
NOT SHOWN ON DRAWINGS.
H. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
I. CONTRACTOR IS RESPONSIBLE FOR ALL COST ASSOCIATED WITH CEILING DISASSEMBLY AND
REASSEMBLY TO ACCOMMODATE THIS WORK. CONTRACTOR TO SALVAGE, STORE, AND
REINSTALL ALL CEILING MOUNTED DEVICES.
J. REMOVE ALL ASSOCIATED CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING
REMOVAL.
K. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
L. PATCH AND FILL CONCRETE SLAB WHERE PIPING HAS BEEN REMOVED.
M. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH
ARCHITECTURAL AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL
BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER
CURING TIME REQUIRED TO RECEIVE THE NEW FLOOR FINISHES.
N. CONTRACTOR TO PROVIDE "FREEZE SHUT DOWN". ANY PIPING THAT CANNOT BE VALVED OFF
MUST BE "FROZE".
O. ALL DOMESTIC PIPING BEING DEMOLISHED TO MAIN SHALL BE CAPPED AT 1.5X THE DIAMETER OF BRANCH PIPING. NO DEAD END OR STUBS ARE ALLOWED IN DOMESTIC WATER PIPING. ALL DEAD
END PIPING MUST BE CAPPED.
GENERAL NOTESPLUMBING KEY NOTES
1. CONNECT 2" VENT TO EXISTING 2" VENT HEADER IN 1ST FLOOR CEILING.
2. CONNECT 2" WASTE PIPE TO EXISTING 4" SANITARY BUILDING DRAIN IN
BASEMENT CEILING.
3. CONNECT 3/4" COLD WATER TO EXISTING 3/4" DOMESTIC COLD WATER IN 1ST
FLOOR CEILING. PROVIDE SHUT OFF VALVE AT POINT OF CONNECTION.
4. PROVIDE AND INSTALL NEW ELECTRIC WATER COOLER WITH BOTTLE FILLER.
5. PROVIDE AND INSTALL NEW HAND WASHING SINK.
6. CONNECT 3/4" HOT WATER TO EXISTING 3/4" DOMESTIC HOT WATER IN 1ST
FLOOR CEILING. PROVIDE SHUT OFF VALVE AT POINT OF CONNECTION.
7. 2" SAN UP TO NEW FIXTURES ABOVE. REFER TO ARCHITECTURAL DRAWINGS
FOR CORING NOTES.
8. EXISTING FLOOR DRAIN TO REMAIN.
X
EWC-101 EWC-101
2" V
2" V
3/4 " C
W
3/4" CW
2" SAN
2" S
AN
3 1
3/4" HW
SK-101 SK-101
2" V
2" S
AN
RRJK
656-21-236
09/17/2021EHRM TRAINING +
ADMINISTRATIVE SUPPORT
SPACE
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
1 ST. CLOUD VAHCS
ST. CLOUD, MN 56303
SCHEMATIC DESIGN (SD - 35%) 04/29/2021
KEY PLAN
AREA 1 AREA 2
2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021
3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021
4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021
5 CONSTRUCTION BID DOCUMENTS 09/17/2021
AutoCAD SHX Text C
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3.3
AutoCAD SHX Text 4.3
AutoCAD SHX Text A'
AutoCAD SHX Text B'
AutoCAD SHX Text C'
AutoCAD SHX Text D'
AutoCAD SHX Text E'
AutoCAD SHX Text F'
AutoCAD SHX Text G'
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text A'
AutoCAD SHX Text B'
AutoCAD SHX Text C'
AutoCAD SHX Text D'
AutoCAD SHX Text E'
AutoCAD SHX Text F'
AutoCAD SHX Text G'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3.3
AutoCAD SHX Text 4.3
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING - DOMESTIC, SANITARY & VENT PLAN - FIRST FLOOR
AutoCAD SHX Text
NORTH
AutoCAD SHX Text P101
AutoCAD SHX Text
PLUMBING - DOMESTIC, SANITARY & VENT PLAN
AutoCAD SHX Text No
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
APPROVED: CHIEF OF STAFF
AutoCAD SHX Text
APPROVED: HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: CHIEF OF POLICE
AutoCAD SHX Text
APPROVED: DIRECTOR FMS
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: SAFETY MANAGER
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: GEMS PROJECT MANAGER
AutoCAD SHX Text
APPROVED: PROJECTS SECTION MANAGER
AutoCAD SHX Text
APPROVED: SERVICE LINE DIRECTOR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: INFECTION CONTROL NURSE
AutoCAD SHX Text
APPROVED: PATIENT SAFETY
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text BUILDING No
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DWG. OF
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
PLOT SCALE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: PROJECT COR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
NTS
AutoCAD SHX Text
BUILDING 4
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING - DOMESTIC, SANITARY & VENT PLAN - BASEMENT
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING - DOMESTIC WATER, SANITARY & VENT RISER DIAGRAMS
RRDG
656-21-236
09/17/2021EHRM TRAINING +
ADMINISTRATIVE SUPPORT
SPACE
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
1 ST. CLOUD VAHCS
ST. CLOUD, MN 56303
SCHEMATIC DESIGN (SD - 35%) 04/29/2021
2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021
3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021
4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021
5 CONSTRUCTION BID DOCUMENTS 09/17/2021
AutoCAD SHX Text
AutoCAD SHX Text
SUPPORT/ANCHOR FOR PIPE RISERS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NOTES: 1. 2.
AutoCAD SHX Text PROVIDE ANCHORS ONLY WHERE SHOWN ON DRAWINGS. EXTEND SLEEVE ABOVE FLOOR WHERE SPECIFIED.
AutoCAD SHX Text
INSULATION
AutoCAD SHX Text
BOLT (TYPICAL)
AutoCAD SHX Text
FLOOR SLAB
AutoCAD SHX Text
FIRE-STOPPING MATERIAL
AutoCAD SHX Text
BOLT
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
PIPE SLEEVE WHERE SPECIFIED
AutoCAD SHX Text
RISER CLAMP
AutoCAD SHX Text
RISER
AutoCAD SHX Text
PIPE SLEEVE WHERE SPECIFIED
AutoCAD SHX Text
RISER CLAMP. BOTTOM CLAMP REQUIRED AT ANCHOR POINTS ONLY.
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
RISER CLAMP
AutoCAD SHX Text
CONTINUOUS SEALANT
AutoCAD SHX Text
CONTINUOUS SEALANT
AutoCAD SHX Text SEALANT-MIN 1/2" THICKNESS OF FILL MATERIAL APPLIED WITHIN THE ANNULUS, FLUSH WITH THE TOP SURFACE OF FLOOR. AT THE POINT OF CONTACT LOCATION BETWEEN PIPE AND CONCRETE, A MIN 1/2" DIAM BEAD OF FILL MATERIAL SHALL BE APPLIED AT THE CONCRETE/PIPE INTERFACE ON THE TOP SURFACE OF FLOOR AND ON BOTH SURFACES OF WALL.
AutoCAD SHX Text THROUGH PENETRANTS-ONE METALLIC PIPE, CONDUIT OR TUBING TO BE INSTALLED WITHIN THE FIRESTOP SYSTEM. PIPE, CONDUIT OR TUBING TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY. OF WALL.
AutoCAD SHX Text PACK VOID BETWEEN PIPE OR INSULATION AND WALL WITH FIBERGLASS BATT, THEN SEAL WITH A SILICONE COMPOUND OR OTHER APPROVED SEALANTS. IF WALL IS FIRE RATED, FILL VOID BETWEEN PIPE OR INSULATION AND WALL WITH FIRE BARRIER CAULK.
AutoCAD SHX Text CHROME PLATED OR STAINLESS STEEL ESCUTCHEON PLATES BOTH SIDES OF WALL IN EXPOSED AREAS. PLATE SHALL BE SECURED WITH WALL CLIPS OR MOUNTING SPRINGS.
AutoCAD SHX Text
PROVIDE A MINIMUM OF 1/2" CLEARANCE BETWEEN WALL AND PIPE OR INSULATION.
AutoCAD SHX Text
PIPE INSULATION.
AutoCAD SHX Text
SEE DRAWINGS FOR PIPE SIZE AND MATERIAL.
AutoCAD SHX Text
FACE OF WALL.
AutoCAD SHX Text NOTES: 1. I.D. OF WALL OPENING TO BE A MIN. OF 1/2" LARGER THAN O.D. OF PIPE I.D. OF WALL OPENING TO BE A MIN. OF 1/2" LARGER THAN O.D. OF PIPE OR INSULATION PASSING THROUGH WALL. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THEIR CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THEIR WALL OPENINGS WITH OTHER TRADES AND/OR CONTRACTORS. 3. PIPE PENETRATIONS OF SMOKE OR FIRE WALLS SHALL BE IN COMPLIANCE PIPE PENETRATIONS OF SMOKE OR FIRE WALLS SHALL BE IN COMPLIANCE WITH NFPA-90A.
AutoCAD SHX Text
PIPE PENETRATION OF INTERIOR WALL DETAIL
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
5 FT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2 1/2
AutoCAD SHX Text 1 1/2
AutoCAD SHX Text
AutoCAD SHX Text 1 1/4
AutoCAD SHX Text
THRU 3/4
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB. UNIFORM LOAD
AutoCAD SHX Text
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS
AutoCAD SHX Text
ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS
AutoCAD SHX Text
PROVIDE INSULATION SHIELD & INSERT FOR ALL PIPING (8" MIN.)
AutoCAD SHX Text
BAND
AutoCAD SHX Text 1-5/8" 12 GAUGE CHANNEL OR 2"x2"x1/4" ANGLE
AutoCAD SHX Text
1/2" DIA. HANGER RODS WITH 36" MAX.SPACING ON EACH CHANNEL
AutoCAD SHX Text
WELD
AutoCAD SHX Text
SADDLE
AutoCAD SHX Text
INSULATION SHIELD AT HANGER
AutoCAD SHX Text PROVIDE HIGH COMPRESSIVE STRENGTH INSULATION (9 PSF MIN. DENSITY) UNDER INSULATION SHIELD
AutoCAD SHX Text
INSULATION (VAPOR BARRIER TYPE IS REQUIRED FOR LOW TEMPERATURE PIPE)
AutoCAD SHX Text
MAXIMUM PIPE/TUBING SUPPORT SPACING
AutoCAD SHX Text
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
AutoCAD SHX Text
NOM. SIZE
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
TUBING
AutoCAD SHX Text
IN.
AutoCAD SHX Text
FT.
AutoCAD SHX Text
FT.
AutoCAD SHX Text
PIPE HANGERS
AutoCAD SHX Text
1" MAX.
AutoCAD SHX Text
NOTES: SEE SPECIFER FOR DETAILED HANGER REQUIREMENTS
AutoCAD SHX Text
HANGER ROD
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
LAVATORY MIXING VALVE DETAIL
AutoCAD SHX Text
NOTE: 1. 2. 3. 4.
AutoCAD SHX Text SEE ARCHITECTURAL DRAWINGS FOR LAVATORY MOUNTING HEIGHTS. P-TRAP, TAIL PIECE, AND WASTE ARM NOT SHOWN FOR CLARITY. FOR HANDICAP LAVATORY INSTALLATION ALL WASTE PIPING UNDER SINK SHALL BE WRAPPED WITH PROTECTIVE PIPE COVERS. FOR HANDICAP LAVATORY INSTALLATION ANGLE STOP VALVES AND SUPPLY RISERS SHALL BE WRAPPED WITH PROTECTIVE PIPE COVERS. SUPPLY RISERS SHALL BE WRAPPED FROM STOP VALVES TO MIXING VALVE. ENDS OF PROTECTIVE WRAP SHALL BE CUT SQUARE AND TIE WRAPPED CLOSED.
AutoCAD SHX Text WALL HUNG LAVATORY REFER TO PLANS AND SPECIFICATIONS FOR TYPE OF FIXTURE AND FAUCET.
AutoCAD SHX Text FOUR PORT POINT-OF-USE THERMOSTATIC MIXING VALVE MOUNTED AS HIGH AS POSSIBLE. MIXING SET TO DISCHARGE 105°F
AutoCAD SHX Text
CHROME PLATED RIGID SUPPLY RISER (TYPICAL)
AutoCAD SHX Text CHROME PLATED ALL BRASS CONSTRUCTION ANGLE STOP WITH FULL TURN BRASS STEM AND LOOSE KEY HANDLE. (TYP.2)
AutoCAD SHX Text
SANITARY ROUGH-IN
AutoCAD SHX Text
TMV-1
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
SUSPENDED DRAINAGE CLEANOUT DETAIL
AutoCAD SHX Text
GAS TIGHT BRASS CLEANOUT PLUG
AutoCAD SHX Text
COMBINATION WYE OR 18" BEND.
AutoCAD SHX Text
CAST IRON STORM, SANITARY OR WASTE PIPE.
AutoCAD SHX Text
CAULK INSIDE CONNECTION.
AutoCAD SHX Text
18 GAUGE ROUND GALVANIZED STEEL PIPE SLEEVE
AutoCAD SHX Text
STEEL RISER CLAMP
AutoCAD SHX Text PROVIDE A SECTION OF HIGH COMPRESSION STRENGTH INSULATION AT EACH HANGER POINT, INSULATION MAY BE HALF FULL ROUND OR FULL ROUND & EXTENDED 2" BEYOND GALVANIZED SHIELD EACH WAY.
AutoCAD SHX Text
SUPPORT HANGER STEEL ANCHOR
AutoCAD SHX Text
SUPPORT HANGER STEEL ROD
AutoCAD SHX Text
ADJUSTABLE MALLEABLE IRON SPLIT SWIVEL RING
AutoCAD SHX Text
PIPE SADDLE
AutoCAD SHX Text
MINIMIZE DIMENTION
AutoCAD SHX Text
FIRE STOPPING MATERIAL. TYPICAL AT ALL PENETRATIONS.
AutoCAD SHX Text P501
AutoCAD SHX Text
PLUMBING - DETAILS
AutoCAD SHX Text No
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
APPROVED: CHIEF OF STAFF
AutoCAD SHX Text
APPROVED: HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: CHIEF OF POLICE
AutoCAD SHX Text
APPROVED: DIRECTOR FMS
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: SAFETY MANAGER
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: GEMS PROJECT MANAGER
AutoCAD SHX Text
APPROVED: PROJECTS SECTION MANAGER
AutoCAD SHX Text
APPROVED: SERVICE LINE DIRECTOR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: INFECTION CONTROL NURSE
AutoCAD SHX Text
APPROVED: PATIENT SAFETY
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text BUILDING No
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DWG. OF
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
PLOT SCALE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: PROJECT COR
AutoCAD SHX Text
DATE:
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION MANUFACTURER MODEL
DOMESTIC
COLD
WATER
DOMESTIC
HOT
WATER
SANITARY VENT REMARKS
EWC-1
ELECTRIC
WATER
COOLER
ELKAY EMABF8WSLK 1/2" - 1 1/2" 1 1/2"
SINGLE STATION WALL MOUNTED WATER COOLERS BOTTLE FILLING
STATION BARRIER-FREE ACCESS, CONSTRUCTION GALVANIZED
STEEL CHASIS SUPPORT WITH A STAINLESS STEEL BASIN. EASY
TOUCH CONTROL ON FRONT, BUILT-IN REGULATOR AND DRAIN AND
ENCLOSED ADJUSTABLE THERMOSTAT, BOTTLE FILLER SHALL
PROVIDE 1.1 GPM FLOW RATE WITH LAMINAR FLOW, COMPRESSOR
HERMETICALLY-SEALED, RECIPROCATING TYPE, REFRIGERANT
R-134a, SINGLE PHASE 115V, 370 WATTS. APPROVED ANSI AND UL.
ADA COMPLIANT.
SK-1 SINK
ELKAY
AMERICAN
STANDARD
LRAD222255
1/2" 1/2" 1 1/2" 1 1/2"
SINGLE BOWL SINK, #18 GAUGE, TYPE 304 NICKEL EARING STAINLESS
STEEL, OVERALL DIMENSIONS 22" x 22", INSIDE EACH BOWL 19" x 16" x
5 1/2" DRAIN OPENING 3 1/2" CENTER REAR LOCATION. 1 1/2" 17 GAUGE
CHROME-PLATED BRASS TAILPIECE AND P-TRAP, QUARTER-TURN 3/8"
CHROME-PLATED HEAVY BRASS ANGLE SUPPLIES WITH STOPS,
CHROME PLATED SOFT COPPER SUPPLY LIES. MANUAL DECK
MOUNTED FAUCET, 8" FIXED CENTERS, 10" CONVENTIONAL SPOUT,
2.2 GPM AERATOR, 4" VANDAL PROOF WRISTBLADE HANDLE.
APPROVED ASME AND NSF/ANSI. ADA COMPLAINT.
NOTES:
1. SIZES LISTED ARE MINIMUM CONNECTIONS REQUIRED TO FIXTURES.
RRDG
656-21-236
09/17/2021EHRM TRAINING +
ADMINISTRATIVE SUPPORT
SPACE
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
1 ST. CLOUD VAHCS
ST. CLOUD, MN 56303
SCHEMATIC DESIGN (SD - 35%) 04/29/2021
2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021
3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021
4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021
5 CONSTRUCTION BID DOCUMENTS 09/17/2021
AutoCAD SHX Text P601
AutoCAD SHX Text
PLUMBING - SCHEDULES
AutoCAD SHX Text No
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
APPROVED: CHIEF OF STAFF
AutoCAD SHX Text
APPROVED: HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: CHIEF OF POLICE
AutoCAD SHX Text
APPROVED: DIRECTOR FMS
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: SAFETY MANAGER
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: GEMS PROJECT MANAGER
AutoCAD SHX Text
APPROVED: PROJECTS SECTION MANAGER
AutoCAD SHX Text
APPROVED: SERVICE LINE DIRECTOR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: INFECTION CONTROL NURSE
AutoCAD SHX Text
APPROVED: PATIENT SAFETY
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text BUILDING No
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DWG. OF
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
PLOT SCALE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: PROJECT COR
AutoCAD SHX Text
DATE:
T
RRDG
656-21-236
09/17/2021EHRM TRAINING +
ADMINISTRATIVE SUPPORT
SPACE
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
1 ST. CLOUD VAHCS
ST. CLOUD, MN 56303
SCHEMATIC DESIGN (SD - 35%) 04/29/2021
2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021
3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021
4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021
5 CONSTRUCTION BID DOCUMENTS 09/17/2021
AutoCAD SHX Text
1. THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT DOCUMENTS: THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT DOCUMENTS: INCLUDING BUT NOT NECESSARILY LIMITED TO ALL ARCHITECTURAL, ALL STRUCTURAL, ALL MECHANICAL, ALL ELECTRICAL DRAWINGS AND ENTIRE PROJECT MANUAL. THIS CONTRACTOR SHALL ACKNOWLEDGE AND INCLUDE IN THE SCOPE OF WORK (CONTRACT) ALL CONDITIONS PERTINENT TO THE COMPLETION OF HIS WORK. THIS CONTRACTOR SHALL FULLY COORDINATE HIS WORK WITH THE INSTALLATION OF WORK BY OTHER TRADES AND MAKE NECESSARY FIELD ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE INSTALLATION. ALL OF THE ABOVE SHALL BE INCLUDED IN THE SCOPE OF WORK AT NO ADDITIONAL CHARGE TO THE VA. 2. THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS, VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES AS TO ALL CONDITIONS AND MATTERS THAT CAN, IN ANY WAY, AFFECT THE WORK OR THE COST THEREOF. SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM THE DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS, OR BE IN DOUBT AS TO THEIR MEANING, NOTIFY THE VA/CO AT ONCE, IN WRITING, OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND WORK, OR BETWEEN THEIR WORK AND THE WORK OF THEIR TRADES AND OBTAIN CLARIFICATION PRIOR TO SUBMITTING ANY BID. LACK OF SUCH NOTIFICATION SHALL BE CONSTRUED AS TO INDICATE NO DISCREPANCIES OR CONFLICTING CONDITIONS EXIST. ADDITIONAL COMPENSATION WILL NOT BE GRANTED AFTER AWARD OF CONTRACT FOR ANY WORK REQUIRED TO COMPLY WITH THESE REQUIREMENTS. 3. DRAWINGS ARE GENERALLY DIAGRAMMATIC. ROUTING OF PIPING, CONDUITS, DRAWINGS ARE GENERALLY DIAGRAMMATIC. ROUTING OF PIPING, CONDUITS, RACEWAYS, ETC., AS SHOWN ON DRAWINGS, DOES NOT INTEND TO SHOW EVERY RISE, DROP, OFFSET, FITTING NOR EVERY STRUCTURAL ELEMENT THAT MAY BE ENCOUNTERED DURING THE INSTALLATION OF THIS WORK. EACH CONTRACTOR SHALL MAKE ANY REQUIRED CHANGES FROM THE GENERAL ROUTING SHOWN ON THESE DRAWINGS, SUCH AS OFFSETS, BENDS OR CHANGES IN ELEVATION DUE TO COORDINATION WITH THE WORK OF OTHER TRADES AND BUILDING CONSTRUCTION. ALL CHANGES SHALL BE MADE WITHOUT ADDITIONAL COST TO THE VA OR DELAY IN COMPLETION DATE OF THE PROJECT. 4. IT IS THE INTENT OF THESE DOCUMENTS THAT THE MECHANICAL CONTRACTOR IT IS THE INTENT OF THESE DOCUMENTS THAT THE MECHANICAL CONTRACTOR PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND TOOLS FOR THE COMPLETE INSTALLATION OF ALL WORK SHOWN ON THE PLANS AND/OR DESCRIBED HEREIN, INCLUDING ALL DEVICES, CONTROLS AND APPURTENANCES REQUIRED TO SET SYSTEMS INTO OPERATION. 5. SHOULD CONDITIONS NECESSITATE ANY REARRANGEMENTS, OR IF PIPING CAN SHOULD CONDITIONS NECESSITATE ANY REARRANGEMENTS, OR IF PIPING CAN BE RUN TO BETTER ADVANTAGE, PREPARE AND SUBMIT SHOP DRAWINGS SHOWING THE CHANGES BEFORE PROCEEDING WITH THE WORK. IF SUCH CHANGES ARE APPROVED BY THE VA/COR, THEY SHALL BECOME A PART OF THE CONTRACT AFTER THEIR APPROVAL. 6. THIS CONTRACTOR SHALL VERIFY ALL MOUNTING, ALL ARRANGEMENTS, HEIGHTS THIS CONTRACTOR SHALL VERIFY ALL MOUNTING, ALL ARRANGEMENTS, HEIGHTS AND LOCATIONS PRIOR TO ROUGH-IN. ANY MENTION OF A SPECIFIC MOUNTING ARRANGEMENT, WEIGHT OR LOCATION SHALL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO VERIFY THE SPECIFIC REQUIREMENT FURNISHED OR THE OTHER TRADES WORKING IN THE SAME AREA. NO ADDITIONS TO THE CONTRACT SUM WILL BE PERMITTED FOR ITEMS INSTALLED IMPROPERLY, IN WRONG LOCATIONS, IN CONFLICT WITH OTHER WORK, ETC. 7. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL CURRENT FEDERAL ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL CURRENT FEDERAL BUILDING CODES, REGULATIONS, AND REQUIREMENTS, LOCAL UTILITY COMPANY REQUIREMENTS, AND ASHRAE STANDARDS. 8. THIS CONTRACTOR SHALL PAY ALL PERMIT FEES, PLAN REVIEW FEES, LICENSE THIS CONTRACTOR SHALL PAY ALL PERMIT FEES, PLAN REVIEW FEES, LICENSE FEES, INSPECTIONS, AND TAXES APPLICABLE TO THEIR DIVISION AND SHALL BE INCLUDED IN THE BASE BID AS PART OF THEIR CONTRACT. 9. THIS CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND CAPABLE OF THIS CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND CAPABLE OF PERFORMING QUALITY WORKMANSHIP. THIS CONTRACTOR GUARANTEES ALL OF HIS WORK AND MATERIALS FOR THE PERIOD AS REQUIRED IN THE SPECIFICATIONS. FROM FINAL ACCEPTANCE BY THE VA/COR. 10. THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE PROTECTION OF THE WORKMEN IN ALL PHASES OF WORK, COMPLYING WITH ALL APPLICABLE PROVISIONS OF CITY, STATE, AND FEDERAL SAFETY LAWS (OSHA) AND AS RECOMMENDED IN THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" AS ISSUED BY THE ASSOCIATION OF GENERAL CONTRACTORS OF AMERICA, IN., 20TH AND E. STREETS, N.W. WASHINGTON, D.C. 11. CONTRACTOR SHALL CHECK DRAWINGS OF OTHER TRADES TO VERIFY THAT CONTRACTOR SHALL CHECK DRAWINGS OF OTHER TRADES TO VERIFY THAT SPACES IN WHICH THEIR WORK WILL BE INSTALLED ARE CLEAR OF OBSTRUCTIONS. WORK SHALL BE INSTALLED TO MAINTAIN MAXIMUM HEADROOM AND SPACE CONDITIONS AT ALL POINTS IN THE BUILDING. WHERE HEADROOM OR SPACE CONDITIONS APPEAR INADEQUATE, CONTRACTOR SHALL NOTIFY VA/COR BEFORE PROCEEDING WITH THE INSTALLATION OF THEIR WORK. 12. THE SEQUENCE FOR THE INSTALLATION OF ALL WORK SHALL BE COORDINATED THE SEQUENCE FOR THE INSTALLATION OF ALL WORK SHALL BE COORDINATED BETWEEN ALL CONTRACTORS ON THE PROJECT AND IN STRICT ACCORDANCE WITH VA STIPULATIONS AS DIRECTED BY SAME. 13. CONTRACTOR SHALL BE RESPONSIBLE AND PAY FOR ALL CORING, CUTTING, CONTRACTOR SHALL BE RESPONSIBLE AND PAY FOR ALL CORING, CUTTING, PATCHING, REPAIRING, REFINISHING AND REMOVAL/REPLACEMENT OF NEW OR EXISTING BUILDING CONSTRUCTION REQUIRED TO ACCOMMODATE THE INSTALLATION OR REMOVAL OF THEIR WORK. CONTRACTOR SHALL XRAY ALL SLABS PRIOR TO CORING.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .