ATTACHMENT 2 - Drawings 1 of 2.pdf
PDF 9 MB Posted
- Attached to
- Y1AZ--EHRM Training and Administrative Support Space Construction - St. Cloud Federal contract opportunity
- Solicitation number
- 36C77622B0026
About this file
This solicitation seeks a general contractor to renovate the EHRM Training Room and Administrative Support Space at the St. Cloud VAMC. Work includes general construction, alterations, removal of existing structures, millwork, permanently mounted equipment, interior finishes, and other items. The Department of Veterans Affairs Technology Acquisition Center Austin is the contracting agency. The solicitation does not specify pricing terms, response dates, set asides, or incumbents.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAUK RIVER
TRANSFER
SWITCH
CAPACITOR
BANK (3)
SWITCH
(2)
15KV
MAIN
SW
BATT
35 KV
TO
15 KV
TRANSFORMER
35KV
FUSED
SWITCH
METER 35KV
SWITCH
TRANSFER
SWITCH
CAPACITOR
BANK (3)
SWITCH
(2) 15KV
MAIN
SW
BATT 35 KV
TO
15 KV
TRANSFORMER
35KV
FUSED
SWITCH
METER 35KV
SWITCH
GRAVEL
GRAVEL
GRAVEL
EXISTING
ROAD
CHAIN LINK FENCE
CHAIN LINK FENCE
16' GATE
GRAVEL
NEW 6' CHAIN LINK FENCE
VESTIBULE
DN
C
16"
20"
12"
3"
8"
C
SIGNSIGN
TP TP
CT
T
RA
ILE
R
.3
.33
LINK TO
BUILDING 51
PASS
THROUGH
SOUTH
VESTIBULE
FB
FB
FB
FB
FB
FB
DN
FD
DN
DN
1A
CORRIDOR LINK
1B
ARCHITECT OF RECORD:
ST. CLOUD VA HEALTH CARE SYSTEM
PROJECT TITLE:
EHRM TRAINING +
ADMINISTRATIVE SPACE SUPPORT
BUILDING NUMBER:
BANCROFT ARCHITECTS + ENGINEERS
CONTRACT NUMBER: 36C263-19-D-0022
TASK ORDER NUMBER: 36C77621N1993
STATION PROJECT NUMBER: 656-21-236
BAE PROJECT NUMBER: 18-116
PROJECT NUMBERS:
V U.S. Department of Veterans AffairsA
PROJECT LOCATION:
MAIN CAMPUS, ST. CLOUD, MINNESOTA
CONSTRUCTION BID DOCUMENTS
SEPTEMBER 17, 2021
700 NICHOLAS BLVD. SUITE 300
ELK GROVE VILLAGE, ILLINOIS 60007
N
NTS
PROJECT LOCATION
CONSULTANTS:
ARCHITECTURE STRUCTURAL ELECTRICALMECHANICAL & PLUMBING
PROFESSIONAL SEALS:
DTBDA
GENERAL CONDITIONS:
1. ALL DIMENSIONS ON DRAWINGS ARE APPROXIMATE; DRAWINGS ARE NOT TO BE SCALED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL FIELD CONDITIONS AND PHYSICAL DIMENSIONS THAT
INFLUENCE THE CONSTRUCTION AREA.
2. IT IS RECOMMENDED THAT CONTRACTORS VISIT THE PROPOSED CONSTRUCTION SITE PRIOR TO
SUBMITTING THEIR BIDS AND THEY ARE ENCOURAGED TO DO SO.
3. CONTRACTOR SHALL ADHERE STRICTLY TO STATE AND FEDERAL OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION ( OSHA ) STANDARDS.
4. CONTRACTOR SHALL PARK ONLY IN THE DESIGNATED PARKING AREAS AND ARE NOT TO PARK ON THE
LAWN AREAS; THE ONLY EXCEPTION IS TO LOAD OR UNLOAD SUPPLIES OR EQUIPMENT.
5. CONTRACTOR IS RESPONSIBLE FOR THE SAFEGUARDING OF THEIR TOOLS AND EQUIPMENT. ALL TOOLS AND EQUIPMENT ARE NOT TO BE LEFT UNATTENDED AND ARE TO BE SECURED AT ALL TIMES WHEN THE CONTRACTOR IS NOT PRESENT, OR THE CONSTRUCTION SITE IS NOT SUPERVISED BY THE CONTRACTOR.
6. ALL VA PROPERTY IS TO BE SAFEGUARDED FROM DAMAGE. ANY DAMAGED VA PROPERTY IS TO BE RESTORED TO ORIGINAL CONDITION PRIOR TO DAMAGE OR REPLACED COMPLETELY. THIS INCLUDES
INSTALLATION, LABOR, AND PROCUREMENT EXPENSES.
7. ALL DEMOLISHED MATERIAL BECOMES THE PROPERTY AND THE RESPONSIBILITY OF THE CONTRACTOR WITH THE EXCEPTION OF SPECIFIED ITEMS DESIGNATED EITHER IN THE PLANS OR VERBALLY REQUESTED
BY THE COR TO BE RETAINED BY THE VA.
8. OFFSITE DISPOSAL OF THE DEMOLISHED ITEMS IS THE RESPONSIBILITY OF THE CONTRACTOR.
9. CONTRACTOR MUST CONTROL DEMOLITION AND CONSTRUCTION DUST FROM FACILITY BY ERECTING A DUST BARRIER AND VENTILATION WITH HEPA FILTERS. IF VENTING TO OUTSIDE, THE CONTRACTOR WILL INSURE NEGATIVE AIR PRESSURE IS MAINTAINED IN ENCAPSULATED WORK AREA. WHEN TRANSPORTING
DEBRIS, WET DOWN SUFFICIENTLY TO PREVENT DUST SPREADING.
10. IF SCAFFOLDING IS USED, IT MUST BE USED IN ACCORDANCE WITH (OSHA) REGULATIONS AND IS TO BE
ENCLOSED FOR THE FIRST EIGHT FEET ABOVE GROUND AT END OF EACH WORKING DAY, UNTIL
DISMANTLED. LADDERS MUST BE REMOVED AND LOCKED UP AT THE END OF EACH WORKING DAY TO
PREVENT UNAUTHORIZED PERSONS FROM HAVING ACCESS.
11. CLEAN ALL DEBRIS FROM CONSTRUCTION SITE TO THE SATISFACTION OF THE COR.
12. CONTRACTOR IS RESPONSIBLE FOR ERECTING A BARRIER AROUND WORK SITE TO PREVENT PATIENTS, STAFF AND VISITORS FROM ENTERING CONSTRUCTION SITE. THIS FENCE MAY BE A PLASTIC SNOW FENCE.
COORDINATE CONSTRUCTION MATERIALS AND LOCATION OF FENCE WITH COR.
13. CONTRACTOR IS RESPONSIBLE FOR REPAIRING AND REPLACING ANY DAMAGED LAWN. THE RESTORATION WILL BE PERFORMED BY A LANDSCAPE CONTRACTOR THAT REGULARLY DOES SODDING AS PART OF THEIR BUSINESS. ALL DAMAGED LAWN WILL BE OVERCUT BY 6" OR MORE TO ACCOMODATE FULL WIDTH ROLLS OF SOD. TOP SOIL TO BE TILLED AND GRADED TO A SMOOTH MATCHING GRADE OF UNDAMAGED LAWN. SOD TO BE THOROUGHLY SATURATED WITH WATER UPON PLACEMENT. THE CONTRACTOR IS RESPONSIBLE FOR
WATERING NEW SOD UNTIL PROJECT ACCEPTANCE BY THE COR.
14. ACCESS TO ALL BUILDINGS AND PARKING AREAS MUST BE MAINTAINED THROUGHOUT THE PROJECT.
15. CONTRACTORS ARE TO COORDINATE ALL WORK WITH THE CONTRACTING OFFICERS REPRESENTATIVE.
(C.O.R.)
656-21-236
09/17/2021EHRM TRAINING +
ADMINISTRATIVE SUPPORT
SPACE
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
1 ST. CLOUD VAHCS
ST. CLOUD, MN 56303
SCHEMATIC DESIGN (SD - 35%) 04/29/2021
2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021
3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021
4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021
5 CONSTRUCTION BID DOCUMENTS 09/17/2021
STRUCTURAL:
JOHNSON WILBUR ADAMS, INC.
330 S. NAPERVILLE ROAD, SUITE 300
WHEATON, ILLINOIS 60187
FIRE PROTECTION AND LIFE SAFETY CODE:
FP&C CONSULTANTS
1330 BURLINGTON STREET, SUITE 200
NORTH KANSAS CITY, MO 64116
ENVIRONMENTAL:
INSTITUTE FOR ENVIRONMENTAL ASSESSMENT
9201 W. BROADWAY, #600
BROOKLYN PARK, MN 55445
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TO 8TH ST WEST ONLY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TO 8TH ST EAST & WEST
AutoCAD SHX Text
AutoCAD SHX Text
NSP ELECTRICAL
AutoCAD SHX Text
FOR HWY DEPT
AutoCAD SHX Text
AutoCAD SHX Text
HOLDING POND
AutoCAD SHX Text 1A
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text
GP
AutoCAD SHX Text
AutoCAD SHX Text
AL LEHR
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
ELECTRICAL SUBSTATION
AutoCAD SHX Text
WIND TURBINE LOCATION
AutoCAD SHX Text
SMOKE BLDG
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
FUEL LINES
AutoCAD SHX Text
CONDUITS TO TUNNEL
AutoCAD SHX Text
MV DUCT BANK
AutoCAD SHX Text 112W
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LOOP 1
AutoCAD SHX Text
PHARMACY ADDITION
AutoCAD SHX Text 112E
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
TRAIL 1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WOOD DECK OVERLOOK
AutoCAD SHX Text
CONC. BLOCKS PATIO
AutoCAD SHX Text
SAUK RIVER WATERS EDGE 12/13/2012 ELEV. = 1027.6
AutoCAD SHX Text
CHAINLINK FENCED AREA WITH PUMPING EQUIPMENT
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
RECTANGULAR CONC. TUNNEL FOR IRRIGATION SUPPLY
AutoCAD SHX Text
IRRIGATION SUPPLY PIPES
AutoCAD SHX Text
WOOD DECK OVERLOOK
AutoCAD SHX Text
CONC. BLOCKS PATIO
AutoCAD SHX Text
SAUK RIVER WATERS EDGE 12/13/2012 ELEV. = 1027.6
AutoCAD SHX Text
CHAINLINK FENCED AREA WITH PUMPING EQUIPMENT
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
RECTANGULAR CONC. TUNNEL FOR IRRIGATION SUPPLY
AutoCAD SHX Text
IRRIGATION SUPPLY PIPES
AutoCAD SHX Text
WOOD DECK OVERLOOK
AutoCAD SHX Text
CONC. BLOCKS PATIO
AutoCAD SHX Text
SAUK RIVER WATERS EDGE 12/13/2012 ELEV. = 1027.6
AutoCAD SHX Text
CHAINLINK FENCED AREA WITH PUMPING EQUIPMENT
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
RECTANGULAR CONC. TUNNEL FOR IRRIGATION SUPPLY
AutoCAD SHX Text
IRRIGATION SUPPLY PIPES
AutoCAD SHX Text
WOOD DECK OVERLOOK
AutoCAD SHX Text
CONC. BLOCKS PATIO
AutoCAD SHX Text
SAUK RIVER WATERS EDGE 12/13/2012 ELEV. = 1027.6
AutoCAD SHX Text
CHAINLINK FENCED AREA WITH PUMPING EQUIPMENT
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
RECTANGULAR CONC. TUNNEL FOR IRRIGATION SUPPLY
AutoCAD SHX Text
IRRIGATION SUPPLY PIPES
AutoCAD SHX Text
WOOD DECK OVERLOOK
AutoCAD SHX Text
CONC. BLOCKS PATIO
AutoCAD SHX Text
SAUK RIVER WATERS EDGE 12/13/2012 ELEV. = 1027.6
AutoCAD SHX Text
CHAINLINK FENCED AREA WITH PUMPING EQUIPMENT
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
RECTANGULAR CONC. TUNNEL FOR IRRIGATION SUPPLY
AutoCAD SHX Text
IRRIGATION SUPPLY PIPES
AutoCAD SHX Text
WOOD DECK OVERLOOK
AutoCAD SHX Text
CONC. BLOCKS PATIO
AutoCAD SHX Text
SAUK RIVER WATERS EDGE 12/13/2012 ELEV. = 1027.6
AutoCAD SHX Text
CHAINLINK FENCED AREA WITH PUMPING EQUIPMENT
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
RECTANGULAR CONC. TUNNEL FOR IRRIGATION SUPPLY
AutoCAD SHX Text
IRRIGATION SUPPLY PIPES
AutoCAD SHX Text
WOOD DECK OVERLOOK
AutoCAD SHX Text
CONC. BLOCKS PATIO
AutoCAD SHX Text
SAUK RIVER WATERS EDGE 12/13/2012 ELEV. = 1027.6
AutoCAD SHX Text
CHAINLINK FENCED AREA WITH PUMPING EQUIPMENT
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
RECTANGULAR CONC. TUNNEL FOR IRRIGATION SUPPLY
AutoCAD SHX Text
IRRIGATION SUPPLY PIPES
AutoCAD SHX Text
WOOD DECK OVERLOOK
AutoCAD SHX Text
CONC. BLOCKS PATIO
AutoCAD SHX Text
SAUK RIVER WATERS EDGE 12/13/2012 ELEV. = 1027.6
AutoCAD SHX Text
CHAINLINK FENCED AREA WITH PUMPING EQUIPMENT
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
RECTANGULAR CONC. TUNNEL FOR IRRIGATION SUPPLY
AutoCAD SHX Text
IRRIGATION SUPPLY PIPES
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.7+/-
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.5+/-
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.7+/-
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.5+/-
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.7+/-
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.5+/-
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.7+/-
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.5+/-
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.7+/-
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.5+/-
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.7+/-
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.5+/-
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.7+/-
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.5+/-
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
TOP OF ROCK WALL
AutoCAD SHX Text
ELEV. = 1049.7+/-
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
3" STEEL RAILING
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.7+/-
AutoCAD SHX Text
TOP OF WALL ELEV. = 1040.5+/-
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
SHELF OR BENCH AREA
AutoCAD SHX Text
VA BENCHMARK
AutoCAD SHX Text
BRASS DISC IN TOP OF ROCK WALL
AutoCAD SHX Text
ELEVATION = 1050.24
AutoCAD SHX Text
CHAINLINK SECURITY
AutoCAD SHX Text
FENCE WITH GATE
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
TERRACED AREA
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
16 GRANITE BLOCK STEPS
AutoCAD SHX Text
5 GRANITE BLOCK STEPS
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV=1036.1+/-
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV = 1039.0+/-
AutoCAD SHX Text
VA BENCHMARK
AutoCAD SHX Text
BRASS DISC IN TOP OF ROCK WALL
AutoCAD SHX Text
ELEVATION = 1050.24
AutoCAD SHX Text
CHAINLINK SECURITY
AutoCAD SHX Text
FENCE WITH GATE
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
TERRACED AREA
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
16 GRANITE BLOCK STEPS
AutoCAD SHX Text
5 GRANITE BLOCK STEPS
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV=1036.1+/-
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV = 1039.0+/-
AutoCAD SHX Text
VA BENCHMARK
AutoCAD SHX Text
BRASS DISC IN TOP OF ROCK WALL
AutoCAD SHX Text
ELEVATION = 1050.24
AutoCAD SHX Text
CHAINLINK SECURITY
AutoCAD SHX Text
FENCE WITH GATE
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
TERRACED AREA
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
16 GRANITE BLOCK STEPS
AutoCAD SHX Text
5 GRANITE BLOCK STEPS
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV=1036.1+/-
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV = 1039.0+/-
AutoCAD SHX Text
VA BENCHMARK
AutoCAD SHX Text
BRASS DISC IN TOP OF ROCK WALL
AutoCAD SHX Text
ELEVATION = 1050.24
AutoCAD SHX Text
CHAINLINK SECURITY
AutoCAD SHX Text
FENCE WITH GATE
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
TERRACED AREA
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
16 GRANITE BLOCK STEPS
AutoCAD SHX Text
5 GRANITE BLOCK STEPS
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV=1036.1+/-
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV = 1039.0+/-
AutoCAD SHX Text
VA BENCHMARK
AutoCAD SHX Text
BRASS DISC IN TOP OF ROCK WALL
AutoCAD SHX Text
ELEVATION = 1050.24
AutoCAD SHX Text
CHAINLINK SECURITY
AutoCAD SHX Text
FENCE WITH GATE
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
TERRACED AREA
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
16 GRANITE BLOCK STEPS
AutoCAD SHX Text
5 GRANITE BLOCK STEPS
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV=1036.1+/-
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV = 1039.0+/-
AutoCAD SHX Text
VA BENCHMARK
AutoCAD SHX Text
BRASS DISC IN TOP OF ROCK WALL
AutoCAD SHX Text
ELEVATION = 1050.24
AutoCAD SHX Text
CHAINLINK SECURITY
AutoCAD SHX Text
FENCE WITH GATE
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
TERRACED AREA
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
16 GRANITE BLOCK STEPS
AutoCAD SHX Text
5 GRANITE BLOCK STEPS
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV=1036.1+/-
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV = 1039.0+/-
AutoCAD SHX Text
VA BENCHMARK
AutoCAD SHX Text
BRASS DISC IN TOP OF ROCK WALL
AutoCAD SHX Text
ELEVATION = 1050.24
AutoCAD SHX Text
CHAINLINK SECURITY
AutoCAD SHX Text
FENCE WITH GATE
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
TERRACED AREA
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
16 GRANITE BLOCK STEPS
AutoCAD SHX Text
5 GRANITE BLOCK STEPS
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV=1036.1+/-
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV = 1039.0+/-
AutoCAD SHX Text
VA BENCHMARK
AutoCAD SHX Text
BRASS DISC IN TOP OF ROCK WALL
AutoCAD SHX Text
ELEVATION = 1050.24
AutoCAD SHX Text
CHAINLINK SECURITY
AutoCAD SHX Text
FENCE WITH GATE
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
TERRACED AREA
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
SAUK RIVER
AutoCAD SHX Text
WATERS EDGE 12/13/2012
AutoCAD SHX Text
ELEV. = 1026.6
AutoCAD SHX Text
16 GRANITE BLOCK STEPS
AutoCAD SHX Text
5 GRANITE BLOCK STEPS
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV=1036.1+/-
AutoCAD SHX Text
GRANITE BLOCK
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
ELEV = 1039.0+/-
AutoCAD SHX Text
UNDERGROUND OIL TANK
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
BIRDCAGE
AutoCAD SHX Text
BIRDCAGE
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text Lindon Grove Apartments
AutoCAD SHX Text
EXIST.
AutoCAD SHX Text
BUS STOP
AutoCAD SHX Text
5154 SF
AutoCAD SHX Text 12"D
AutoCAD SHX Text 10"D
AutoCAD SHX Text 10"D
AutoCAD SHX Text
AutoCAD SHX Text
EXIST. BUILDING
AutoCAD SHX Text STORM MH TOC = 1044.76 INV = 1033.23 NE 12" INV = 1033.20 S 12" INV = 1033.36 SW 4"
AutoCAD SHX Text
POWER TRANSFORMER
AutoCAD SHX Text
APPROX. LOC. 4"PVC STORM
AutoCAD SHX Text
APPROX. LOC. 12"PVC STORM
AutoCAD SHX Text
BUILDING #91
AutoCAD SHX Text EXISTING GAS SUPPLY EQUIPMENT TO REMAIN OPERATIONAL DURING DEMOLITION AND NEW CONSTRUCTION. PROTECT EQUIPMENT AND PIPELINES IN ACCORDANCE WITH GAS SUPPLIER'S RECOMMENDATIONS
AutoCAD SHX Text
NEW GAS SUPPLY MAIN INTO BUILDING
AutoCAD SHX Text
PHONE LINE EXTENDS TO EXISTING PHONE IN BOILER ROOM PER PLAN.
AutoCAD SHX Text
PHONE LINE TO METER
AutoCAD SHX Text
TUNNEL EXTENDS ADDITIONAL 2'-0" UNDER BUILDING
AutoCAD SHX Text
NEW GAS SUPPLY (COORDINATE WITH SUPPLIER)
AutoCAD SHX Text
FRISBEE GOLF HOLE 1
AutoCAD SHX Text
GEO-THERMAL VALVES
AutoCAD SHX Text
FUEL LINE
AutoCAD SHX Text
VENT LINE
AutoCAD SHX Text T101
AutoCAD SHX Text I.T.
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text
NO
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
AutoCAD SHX Text
SITE LOCATION MAP
AutoCAD SHX Text
GI001
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text No
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
APPROVED: CHIEF OF STAFF
AutoCAD SHX Text
APPROVED: HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: CHIEF OF POLICE
AutoCAD SHX Text
APPROVED: DIRECTOR FMS
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: SAFETY MANAGER
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: GEMS PROJECT MANAGER
AutoCAD SHX Text
APPROVED: PROJECTS SECTION MANAGER
AutoCAD SHX Text
APPROVED: SERVICE LINE DIRECTOR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: INFECTION CONTROL NURSE
AutoCAD SHX Text
APPROVED: PATIENT SAFETY
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text BUILDING No
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DWG. OF
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
PLOT SCALE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: PROJECT COR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
656-21-236
09/17/2021EHRM TRAINING +
ADMINISTRATIVE SUPPORT
SPACE
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
1 ST. CLOUD VAHCS
ST. CLOUD, MN 56303
SCHEMATIC DESIGN (SD - 35%) 04/29/2021
2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021
3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021
4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021
5 CONSTRUCTION BID DOCUMENTS 09/17/2021
DTBDA
PDF Page Number Sheet Number Sheet Title SD DD CD BID
1 GI001 COVER SHEET
2 GI002 DRAWING INDEX
3 GI003 GENERAL PROJECT AND CODE DATA
4 GI004 GENERAL PROJECT NOTES
5 GI101 GENERAL LIFE SAFETY PLAN
6 GC100 GENERAL SITE STAGING PLAN
7 GC101 GENERAL PHASING PLANS
8 GC102 GENERAL INFECTION CONTROL RISK ASSESSMENT
9 GC103 GENERAL INFECTION CONTROL RISK ASSESMENT CLASS IV
HAZARDOUS MATERIALS
10 HA101 HAZARDOUS MATERIALS PLAN - ASBESTOS LEAD - FIRST LEVEL
STRUCTURAL
11 SF101 STRUCTURAL - OPERABLE PARTITION DETAILS
ARCHITECTURAL
12 A001 ARCHITECTURALABBREVIATIONS, SYMBOLS AND MOUNTING HEIGHTS
13 AD101 ARCHITECTURAL DEMOLITION FLOOR PLANS
14 ACD101 ARCHITECTURAL DEMOLITION REFLECTED CEILING PLAN
15 A101 ARCHITECTURAL FLOOR PLAN
16 A101.1 ARCHITECTURAL FLOOR PLAN - AREA 1
17 A101.2 ARCHITECTURAL FLOOR PLAN - AREA 2
18 AC101.1 ARCHITECTURAL REFLECTED CEILING PLAN - AREA 1
19 AC101.2 ARCHITECTURAL REFLECTED CEILING PLAN - AREA 2
20 A301 ARCHITECTURAL PARTITION TYPES + DETAILS
21 A401 ARCHITECTURAL INTERIOR ELEVATIONS
22 A402 ARCHITECTURAL INTERIOR ELEVATIONS
23 A501 ARCHITECTURAL DETAILS
24 A502 ARCHITECTURAL DETAILS
25 A601 ARCHITECTURAL DOOR SCHEDULE
26 AF101 ARCHITECTURAL FINISH PLAN
27 AF601 ARCHITECTURAL FINISH SCHEDULES
28 AW101 ARCHITECTURAL WAYFINDING (SIGNAGE) PLAN
29 AW601 WAYFINDING DETAILS
FIRE SUPPRESSION
30 FX101 FIRE SUPPRESSION PLAN
PLUMBING
31 P001 PLUMBING - GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
32 PD101 PLUMBING - DEMOLITION PLAN - FIRST FLOOR
33 P101 PLUMBING - DOMESTIC, SANITARY & VENT PLAN
34 P501 PLUMBING - DETAILS
35 P601 PLUMBING - SCHEDULES
MECHANICAL
36 M001 MECHANICAL - GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
37 MD101 MECHANICAL DEMOLITION PLAN - FIRST FLOOR
38 M101 MECHANICAL PLAN - FIRST FLOOR
39 M102 MECHANICAL - LOWER PENTHOUSE & ENLARGED MECH ROOM PLANS
40 M501 MECHANICAL - DETAILS
41 M502 MECHANICAL - DETAILS
42 M503 MECHANICAL - DETAILS
43 M601 MECHANICAL - SCHEDULES
44 M701 MECHANICAL - CONTROLS
45 M702 MECHANICAL - CONTROLS
ELECTRICAL
46 E001 ELECTRICAL- GENERAL NOTES
47 E002 ELECTRICAL- SYMBOLS AND ABBREVIATIONS
48 ELPD101 ELECTRICAL - LIGHTING AND POWER DEMO. PLAN-FIRST FLOOR
49 ETD101 ELECTRICAL - TECHNOLOGY DEMOLITION PLAN - FIRST FLOOR
50 EFD101 ELECTRICAL - FIRE ALARM AND FIRE PROTECTION DEMOLITION PLAN
51 ELP101 ELECTRICAL - LIGHTING AND POWER PLAN - FIRST FLOOR
52 ET101 ELECTRICAL - TECHNOLOGY PLAN - FIRST FLOOR
53 EF101 ELECTRICAL - FIRE ALARM AND FIRE PROTECTION PLAN
54 ED600 ELECTRICAL - PANEL DEMOLITION SCHEDULES
55 E600 ELECTRICAL - PANEL SCHEDULES
56 E601 ELECTRICAL - ELECTRICAL CLOSET ROOM 100A
57 E700 ELECTRICAL-ROOM LIGHTING SCHEMES
AutoCAD SHX Text No
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
APPROVED: CHIEF OF STAFF
AutoCAD SHX Text
APPROVED: HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: CHIEF OF POLICE
AutoCAD SHX Text
APPROVED: DIRECTOR FMS
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: SAFETY MANAGER
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: GEMS PROJECT MANAGER
AutoCAD SHX Text
APPROVED: PROJECTS SECTION MANAGER
AutoCAD SHX Text
APPROVED: SERVICE LINE DIRECTOR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: INFECTION CONTROL NURSE
AutoCAD SHX Text
APPROVED: PATIENT SAFETY
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text BUILDING No
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DWG. OF
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
PLOT SCALE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: PROJECT COR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
GI002
AutoCAD SHX Text
DRAWING INDEX
DRAWING INDEX
09/17/2021EHRM TRAINING +
ADMINISTRATIVE SUPPORT
SPACE
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
1 ST. CLOUD VAHCS
ST. CLOUD, MN 56303
SCHEMATIC DESIGN (SD - 35%) 04/29/2021
2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021
3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021
4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021
5 CONSTRUCTION BID DOCUMENTS 09/17/2021
ALL WORK SHALL COMPLY WITH THE MOST RECENTLY ADOPTED VERSIONS OF THE FOLLOWING CODES:
· VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (WWW.CFM.VA.GOV/TIL/).
· INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN
VA DESIGN DOCUMENTS, SEE NOTES BELOW)
· NFPA 101 LIFE SAFETY CODE
· NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
· OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
· VA SEISMIC DESIGN REQUIREMENTS, H-18-8
· NATIONAL ELECTRICAL CODE (NEC)
· INTERNATIONAL PLUMBING CODE (IPC)
· SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF
MECHANICAL ENGINEERS (ASME) A 17.1.
· ASME BOILER AND PRESSURE VESSEL CODE
· ASME CODE FOR PRESSURE PIPING
· ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING
VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
· BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN
CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
· MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF
STEEL CONSTRUCTION (AISC)
· ENERGY POLICY ACT OF 2005 (EPACT)
· DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW
FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS
AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
· FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:
MEMORANDUM OF UNDERSTANDING (MOU)
· EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY,
AND TRANSPORTATION MANAGEMENT.
· THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE
GENERAL REQUIREMENTS SECTION 01010 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
· VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1-
2004.
· SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 –
2007.
NAME: CONSTRUCT PACT CLINIC BUILDING 4 FIRST FLOOR
BUILDING NUMBER: 4
ADDRESS: 4801 VETERANS DRIVE
ST. CLOUD, MN 56303
PROJECT DESCRIPTION: THE SCOPE OF WORK OF THIS PROJECT INCLUDES, BUT IS NOT
LIMITED TO, THE RENOVATION OF EXISTING SPACE TO CREATE
FLEXIBLE OFFICE SPACE FOR NUTRITION AND FOOD SERVICE STAFF
OWNER: US DEPARTMENT OF VETERANS AFFAIRS
ADDRESS: 4801 VETERANS DRIVE
ST. CLOUD, MN 56303
DESIGN PROFESSIONAL: BANCROFT ARCHITECTS + ENGINEERS
700 NICHOLAS BLVD., SUITE 300
ELK GROVE VILLAGE, IL 60007
NORMAL WORK SHIFT HOURS FOR THE ST CLOUD VA HEALTH CARE SYSTEM IS 8:00 AM UNTIL 4:30 PM
DAILY, MONDAY THROUGH FRIDAY, EXCLUDING FEDERAL HOLIDAYS.
1. CERTAIN WORK ITEMS AND CONSTRUCTION ACTIVITIES THAT CREATE NOISE, DUST,
VIBRATIONS AND THAT WOULD CREATE DISTURBANCES TO THE MEDICAL CENTER AND/OR ANY
OF THE ADJACENT OCCUPIED AREAS WILL NEED TO BE PERFORMED DURING PERIODS OF
AFTER HOURS/OFF-HOURS WORK. ITEMS THAT WILL REQUIRE AFTER HOURS ACTIVITIES SHALL
BE FULLY COORDINATED WITH VA COR PRIOR TO START OF CONSTRUCTION.
2. AFTER HOURS/OFF-HOURS OF OPERATION SHALL BE SCHEDULED FOR THE FOLLOWING DAYS
AND TIMES AS COORDINATED, SCHEDULED AND AUTHORIZED BY THE COR:
2.a. MONDAY THROUGH FRIDAY - 4:30 PM UNTIL 8:00 AM
2.b. WEEKENDS (AS ALLOWED) - TIMES TO BE DETERMINED WITH THE COR
3. THE FOLLOWING CONSTRUCTION ACTIVITIES SHALL BE CONSIDERED AFTERHOURS/OFF-HOURS
OPERATIONS:
3.a. THE MOVING OF CONSTRUCTION MATERIALS, EQUIPMENT, TOOLS AND/OR DEMOLITION
MATERIALS TO/FROM THE EXTERIOR TO INTERNAL AREAS OF WORK
3.b. ALL WORK IN THE ADJACENT OCCUPIED SPACES TO THE CURRENT STAGE/AREA OF
WORK
3.c. ALL WORK THAT WILL REQUIRE SYSTEM SHUTDOWNS
3.d. ALL CONCRETE OR METAL DECKING CORING, CUTTING OR DRILLING
3.e. THE APPROVED USE OF POWER ACTUATED FASTENERS
3.f. ALL WORK (DEMOLITION OR NEW) THAT WILL CAUSE IMPACT NOISE AND VIBRATIONS
THAT CAN BE HEARD OR FELT IN THE SURROUNDING ADJACENT OCCUPIED
SPACES/AREAS
4. CONTRACTOR MUST PARK WITHIN APPROVED CONSTRUCTION AREA OR AT DESIGNATED
AREAS AT FAR PORTIONS OF EXISTING CAMPUS PARKING LOTS. CAMPUS PARKING IS LIMITED
AND PRIORITY IS GIVEN TO PATIENTS AND STAFF.
5. WEEKEND AND HOLIDAY HOURS SHALL BE FROM 8:00 A.M. TO 4:00 P.M. COORDINATE WITH VA
COR PRIOR TO START OF CONSTRUCTION.
1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS IN THE FIELD PRIOR TO
COMMENCING WORK.
2. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DIMENSIONS SHOWN ON THE
DRAWINGS. NOTIFY THE VA/COR OF ANY DISCREPANCY BEFORE STARTING WORK.
3. A SUCCESSFUL REVIEW OF SHOP DRAWINGS AND SUBMITTALS BY THE ARCHITECT/ENGINEER
DOES NOT RELIEVE CONTRACTOR OF THE RESPONSIBILITY TO REVIEW AND CHECK SHOP
DRAWINGS BEFORE SUBMITTAL TO VA/COR. THE CONTRACTOR REMAINS SOLELY RESPONSIBLE
FOR ERRORS AND OMISSIONS ASSOCIATED WITH THE PREPARATION OF SHOP DRAWINGS AS
THEY PERTAIN TO DETAILS AND GIVEN DIMENSIONS IN THE CONTRACT DOCUMENTS.
4. CONTRACTOR SHALL OBTAIN VA/COR WRITTEN APPROVAL PRIOR TO PROCEEDING WITH ANY
CHANGES FROM THE INFORMATION PROVIDED HEREIN.
PROJECT DATA
CONSTRUCTION CLASSIFICATION
OCCUPANCY CLASSIFICATION
TYPE III (200)
NEW BUSINESS OCCUPANCIES (NFPA 101)
SCOPE DESCRIPTION
AREA OF WORK
RENOVATION TO CREATE FLEXIBLE OFFICE SPACE FOR NUTRITION AND FOOD SERVICE STAFF.
PROJECT AREA APPROXIMATELY 4,778 SF.
EGRESS REQUIREMENTS
CORRIDORS REQUIRED FOR EXIT ACCESS
MINIMUM CLEAR WIDTH FOR DOORS IN THE
MEANS OF EGRESS
DEAD END CORRIDORS
COMMON PATH OF TRAVEL
36" (OCCUPANCIES LESS THAN 50)
44" (OCCUPANCIES MORE THAN 50)
32" NEW (28" EXISTING)
75' (NON-SPRINKLERED), 100' (SPRINKLERED)
7.3.3.1 38.2.3.2 7.2.1.2.3
38.2.6.2 38.2.5.3
TRAVEL DISTANCE BETWEEN ANY POINT IN A
ROOM AND EXIT
200', NON-SPRINKLERED
300', SPRINKLERED
38.2.6.2, 38.2.6.3
SECTIONNFPA 101, 2021
AREA SEPERATION REQUIREMENTS
SECTION 38.3.2NFPA 101, 2021
GENERAL STORAGE 1 HR FIRE BARRIER 8.7
MINIMUM CEILING HEIGHT 7'-6" 7.1.5.1
FIRE EXTINGUISHER REQUIREMENTS
TYPE A, ORDINARY HAZARD OCCUPANCYNFPA 10, 2021, TABLE 6.2.1.1
MINIMUM RATED SINGLE EXTINGUISHER 2-A, 2 1/2 GALLON
MAXIMUM FLOOR AREA PER UNIT OF A 1,500 SQ FT
MAXIMUM TRAVEL DISTANCE TO EXTINGUISHER 75 FT
EXTINGUISHERS REQUIRED
EXTINGUISHERS PROVIDED 3
4, 778 SF / 1500 SF = 3.18 = 3
BUILDING DATA
APPLICABLE CODE
USE AND OCCUPANCY CLASSIFICATION
NFPA 101, 2021
CHAPTER 38 NEW HEALTH BUSINESS OCCUPANCIES
OCCUPANT LOAD BUSINESS USE:
150 SF PER OCCUPANT
4,377 SF / 150 = 29 OCCUPANTS
TABLE 7.3.1.2
FIRE RESISTIVE RATINGS
AUTOMATIC FIRE SUPRESSION RENOVATED AREA IN ACCORDANCE WITH NFPA 13
NFPA 220, TABLE 4.1.1
EXISTING BEARING WALLS
SUPPORTING MORE THAN ONE FLOOR, COLUMNS, OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY, SUPPORTING A ROOF ONLY
INTERIOR BEARING WALLS
SUPPORTING MORE THAN ONE FLOOR, COLUMNS, OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY, SUPPORTING A ROOF ONLY
COLUMNS
SUPPORTING MORE THAN ONE FLOOR, COLUMNS, OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY, SUPPORTING A ROOF ONLY
BEAMS/GIRDERS/TRUSSES/ARCHES
SUPPORTING MORE THAN ONE FLOOR, COLUMNS, OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY, SUPPORTING A ROOF ONLY
FLOOR/CEILING ASSEMBLIES
ROOF/CEILING ASSEMBLIES
EXTERIOR NON-BEARING WALLS
INTERIOR NON-BEARING WALLS
2 HRS
0 HRS
0 HRS
0 HRS
0 HRS
0 HRS
0 HRS
0 HRS
0 HRS
0 HRS
0 HRS
2 HRS
EGRESS CAPACITY .2" PER PERSON (LEVEL COMPONENTS) 7.3.3.1
INTERIOR FINISH INTERIOR FINISHES SHALL BE IN
ACCORDANCE WITH 10.2
20' (NON-SPRINKLERED), 50' (SPRINKLERED)
HIGH HAZARD CONTENTS AREA 1 HR FIRE BARRIER 38.3.2
DTBDA
GENERAL NOTES FOR CONTRACTORS: SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS
INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED WITHIN THE GENERAL
DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT PART OF THIS SECTION
AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED HEREIN.
PROTECTION PROTOCOLS: VERIFY AND COORDINATE ALL PROTECTION REQUIREMENTS TO BE
PROVIDED FOR EACH SPECIFIC AREA OR LOCATION OF SCHEDULED WORK WITH THE VA/COR, BEFORE BEGINNING ANY WORK. WHEN PERFORMING DEMOLITION WORK IN ANY OCCUPIED SPACES FOLLOW THE “OCCUPIED AREAS PROTECTION PROTOCOLS” UNLESS MODIFIED IN WRITING BY THE VA/COR ON A
CASE BY CASE BASIS.
1. BEFORE BEGINNING ANY DEMOLITION WORK EACH CONTRACTOR AND DISCIPLINE SHALL PERFORM A FULL EXAMINATION OF ALL AREAS OF WORK AND FULLY VERIFY ALL EXISTING CONDITIONS ALONG WITH ALL OF THE AREAS OF WORK FOR ANY UNFORESEEN CONDITIONS OR DISCREPANCIES FROM
THE DOCUMENTATION THAT WOULD AFFECT THEIR WORK AND/OR THE WORK OF OTHERS. ANY
UNFORESEEN CONDITIONS OR DISCREPANCIES DISCOVERED ARE TO BE IMMEDIATELY IDENTIFIED
AND COORDINATED WITH THE GENERAL/PRIME CONTRACTOR WHO SHALL IN TURN DOCUMENT AND
PROMPTLY REPORT ANY SUCH CONDITIONS DIRECTLY TO THE VA/COR FOR DIRECTION ON HOW TO
PROCEED BEFORE ALLOWING ANY WORK TO BEGIN.
2. ALL REQUIRED DEMOLITION WORK IS NOT NECESSARY LIMITED TO WHAT IS ONLY SPECIFICALLY SHOWN OR DIRECTLY CALLED OUT ON THE DEMOLITION PLANS OR THAT IS ONLY SPECIFICALLY IDENTIFIED WITHIN THE DEMOLITION NOTES DESCRIPTIONS. THE INTENT OF THE DOCUMENTATION IS TO GENERALLY IDENTIFY THE MORE SPECIFIC MAJOR ELEMENTS OF WORK IN PLACE THAT SHALL
REQUIRE REMOVAL AND/OR REWORK IN ORDER TO ACCOMPLISH THE DESIGN INTENT OF THE
DOCUMENTS. THE FULL EXTENT OF DEMOLITION WORK COULD INCLUDE BUT NOT NECESSARILY BE LIMITED TO ALL AFFECTED LESSER ELEMENTS OF ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, MEDICAL GASES, FIRE PROTECTION SPRINKLER SYSTEMS AND ALL ELECTRICAL
SYSTEMS WORK INCLUDING HIGH AND LOW VOLTAGE POWER, COMMUNICATION SYSTEMS SUCH AS
CCTV, SECURITY, IT DATA, LIFE SAFETY, FIRE PROTECTION, NURSE CALL, PA, BAS CONTROLS
SYSTEMS, TEMPERATURE AND OTHERWISE, ETC.
3. ALL REQUIRED DEMOLITION WORK IS NECESSARY TO FACILITATE THE EXTENT OF BOTH THE NEW CONSTRUCTION WORK AS WELL AS TO FACILITATE THE REPLACEMENT, RELOCATION AND/OR THE
REWORKING OF THE EXISTING SYSTEMS. ANY REWORKING OF THE CURRENT ELEMENTS AND
COMPONENTS CURRENTLY NEEDING TO BE MODIFIED IN ORDER TO PROPERLY SUPPORT THE
COMPLETED PROJECT SHALL BE PROVIDED AS INTENDED TO CONFORM WITH THE ORIGINAL DESIGN INTENT WHETHER SPECIFICALLY CALLED FOR IN GREAT DETAIL WITH EVERY ANCILLARY ELEMENT FULLY NAMED AND IDENTIFIED OR AS CALLED OUT AS A GENERAL COMPONENT PORTION OF WORK
THAT NEEDS TO BE PROPERLY REMOVED IN ORDER TO COMPLETE THE SCOPE OF WORK AS
INTENDED TO COMPLY WITH ALL BASES OF DESIGN REQUIREMENTS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE DEMOLITION AND REMOVAL OF ALL EXISTING WALLS, CEILINGS, SUSPENSION SYSTEMS, FLOORING, ELECTRICAL, TELEPHONE AND PLUMBING CONSTRUCTION AS WELL AS ALL MATERIALS, FINISHES AND EQUIPMENT THAT IS NOT
SPECIFICALLY SHOWN OR CALLED FOR AS REQUIRED TO FACILITATE THE NEW CONSTRUCTION
WORK INSIDE THE CONTRACT AREA, THE ADJACENT SPACES AND THE SPACES ABOVE AND BELOW.
SOME ADDITIONAL ITEMS THAT MAY NOT BE SPECIFICALLY SHOWN IN GREAT DETAIL ON THE
DEMOLITION PLAN THAT ARE A PART OF THE DEMOLITION WORK, BUT NOT LIMITED TO, ARE
CASEWORK, SHELVING, BRACKETS, STANDARDS, DOOR HARDWARE, MISCELLANEOUS OTHER
HARDWARE, SIGNAGE, FLOORING MATERIALS, WALL BASE, WOOD GROUNDS, WALL COVERING
MATERIALS, BACKING LINERS OR BOARDS, ANY REMAINING MASTIC, GROUT, CAULKING AND
SEALANTS, EXPOSED ANCHORS AND FASTENERS, FRAMING MATERIALS, BACKER BOARDS OR
METAL PLATES, CHAIR RAILS, BRACKETS, HOOKS, SURFACE MOUNTED OR RECESSED
ACCESSORIES, PRIVACY CURTAINS AND TRACKS, ETC.
5. ALL DEMOLITION WORK SHALL BE PERFORMED IN A SYSTEMATICALLY SAFE FULLY SUPERVISED
COORDINATED AND PROPERLY MANAGED SEQUENCE OF WORK UNDER THE DIRECT SUPERVISION
OF THE GENERAL/PRIME CONTRACTOR'S SUPERINTENDENT AND/OR THEIR MANAGEMENT
PERSONNEL INCLUDING THE PERFORMANCE OF ANY ANCILLARY ELEMENTS OF SELECTIVE
DEMOLITION.
6. ALL DEMOLITION, THE HANDLING OF MATERIALS AND EQUIPMENT ALONG WITH THE MOVEMENT OF THESE ELEMENTS THROUGHOUT THE FACILITY SHALL BE PERFORMED SO AS TO PREVENT DAMAGE TO ADJACENT IMPROVEMENTS AND FACILITIES TO REMAIN AS WELL AS TO PROVIDE SAFETY FOR
ALL TRADESPEOPLE, STAFF, RESIDENTS/PATIENTS, VISITORS AND SERVICE PROVIDERS.
7. PROVIDE ALL PHYSICAL AND ENVIRONMENTAL PROTECTIVE MEASURES AS REQUIRED BY THE
PROJECT DOCUMENTS, VA FEDERAL AND LOCAL REQUIREMENTS, APPLICABLE OSHA REGULATIONS, THE STATION AND ALL LOCAL INFECTION CONTROL AUTHORITIES, NFPA REQUIREMENTS, THE
VA/COR AND ALL OTHER REGULATORY AGENCIES AND VA AUTHORITIES HAVING JURISDICTION
OVER THIS PROJECT.
8. PROVIDE ALL TEMPORARY PARTITIONS, PROTECTION, DOOR ACCESS UNITS, ENCLOSURES,
WALKWAYS, FENCING, RAILINGS, CANOPIES, AIR FILTRATION DEVICES, VESTIBULES, AIRLOCKS, ETC., WHERE REQUIRED BY THE CONTRACT DOCUMENTS, THE VA/COR AND ALL AUTHORITIES
HAVING JURISDICTION OVER THE PROJECT AND SHALL BE SURE TO MAINTAIN ADEQUATE AND SAFE
EMERGENCY MEANS OF EGRESS FROM ALL AREAS. ALL SUCH WORK NEEDING TO BE PROVIDED
WILL REQUIRE VA/COR REVIEW AND APPROVAL BEFORE BEGINNING ANY OF SUCH WORK.
9. GREAT CARE SHALL BE TAKEN WHEN PERFORMING SELECTIVE DEMOLITION IN THE UTILIZATION OF MORE SENSITIVE AND LESS EVASIVE METHODS OF DEMOLITION/REMOVAL, AS WELL AS PROVIDING
THE APPROPRIATE ENHANCED PROTECTIVE BARRIERS IN ORDER TO PROVIDE FOR THE LEAST
AMOUNT OF DAMAGE TO THE WORK THAT IS TO REMAIN IN PLACE. EXISTING FINISHED SURFACES, MATERIALS AND EXPOSED EQUIPMENT THAT WOULD RECEIVE SIGNIFICANT AMOUNTS OF SURFACE DAMAGE AND WOULD REQUIRE SIGNIFICANT AMOUNTS OF PATCHING, REPAIRS AND REFINISHING WORK SHALL BE DEEMED AS DAMAGED AND UNUSABLE AND WILL NEED TO BE REPLACED IN WHOLE
BY THE RESPONSIBLE CONTRACTOR AND ITS REPLACEMENT ONCE COMPLETED WILL NEED TO
RECEIVE VA/COR APPROVAL.
10. WHERE EXISTING FLOOR FINISHES ARE TO BE FULLY REMOVED TO ALLOW FOR THE INSTALLATION OF NEW, PROVIDE FOR THE COMPLETE REMOVAL OF THE EXISTING FLOOR FINISHES ALONG WITH
ALL ASSOCIATED ATTACHMENT SYSTEMS SUCH AS MASTICS, ADHESIVES, TACKLES STRIPS,
STAPLES, SETTING BEDS OF GROUT, MORTAR OR CONCRETE, CARPET PADDING, ATTACHED
SUBFLOORING MATERIALS, ETC. AS REQUIRED TO GET DOWN TO THE EXISTING STRUCTURAL
FLOOR SUBSTRATE THAT CAN BE PROPERLY PATCHED, REPAIRED, LEVELED AND MADE READY TO
RECEIVE THE NEW FLOOR FINISHES.
11. ITEMS INDICATED TO BE REMOVED AND SALVAGED FOR THE VA SHALL REMAIN THE VA'S PROPERTY
AND SHALL BE CAREFULLY REMOVED, CLEANED AND PROTECTED FROM DAMAGE BY THE
CONTRACTOR RESPONSIBLE AT ALL TIMES. ALL SUCH ITEMS INDICATED TO BE SALVAGED WILL BE
PACKAGED AND/OR CRATED AS REQUIRED BY THE VA/COR TO PROPERLY PROTECT THEM FROM
DAMAGE CAUSED BY THE HANDLING, MOVING AND/OR THE STORAGE OF THESE ITEMS. ALL
PACKAGES AND/OR CRATES OF ITEMS SHALL HAVE THEIR CONTENTS CLEARLY MARKED AND FULLY IDENTIFIED ON BOTH THE TOP AND ONE SIDE OF EACH CONTAINER TO BE COORDINATED WITH AND APPROVED BY THE VA/COR. DELIVER ALL SALVAGED MATERIALS TO THE LOCATIONS INDICATED IN
THE PROJECT DOCUMENTATION OR TO THE GOVERNMENTS DESIGNATED STORAGE FACILITY ON
THE STATIONS CAMPUS AS DIRECTED BY THE VA/COR.
12. UNLESS OTHERWISE INDICATED OR STATED TO BE SAVED, SALVAGED OR IDENTIFIED AS NEEDING
TO REMAIN OR BE RELOCATED AND/OR REUSED, ALL ITEMS IDENTIFIED TO BE REMOVED,
DEMOLISHED, SCRAPED, ETC. BECOMES THE PROPERTY AND RESPONSIBILITY OF THE
CONTRACTOR AND AS SUCH IT IS THEIR RESPONSIBILITY TO REMOVE ALL SUCH ITEMS FROM THE
SITE ON A DAILY BASIS UNLESS OTHERWISE APPROVED BY THE VA/COR.
13. DEMOLITION ITEMS OF VALUE TO THE CONTRACTOR(S) ARE NOT TO BE STORED ON SITE AND NEED
TO BE REMOVED ON A DAILY BASIS UNLESS OTHERWISE APPROVED BY THE VA/COR.
14. ALL ITEMS OF WORK THAT ARE IDENTIFIED AS EXISTING TO BE REMOVED AND
REUSED/REINSTALLED SHALL BE CAREFULLY DISCONNECTED, DETACHED, REMOVED AND
DISASSEMBLED AS REQUIRED FOR CONVENIENCE AND EASE OF HANDLING, MOVING, STORAGE AND
FOR THEIR PROTECTION FROM DAMAGE. ALL SUCH ITEMS ARE TO BE INDIVIDUALLY WRAPPED,
BOXED OR PLACED IN CARTONS FOR THE EASE OF HANDLING THE MATERIALS AND THEIR
PLACEMENT IN A VA/COR IDENTIFIED PROTECTED STORAGE AREA (TBD) LOCATED ON THE STATION
BUT NOT NECESSARILY CONVENIENT TO THE SITE OF THE WORK. EACH ITEM SHALL BE FULLY
CLEANED, FREE FROM DAMAGE, PREPARED FOR SERVICE AND FULLY TESTED TO VERIFY ITS
ABILITY FOR PROPER FUNCTIONAL REUSE PRIOR TO BEING PLACED IN STORAGE. THE
CONTRACTOR TAKES RESPONSIBILITY FOR AND CERTIFIES ITS PERFORMANCE CAPABILITIES AND
THE FACT THAT IT IS NOT DAMAGED AND FULLY CAPABLE FOR REUSE WHEN READY FOR ITS
REINSTALLATION. IN THE EVENTUALITY THAT AN ITEM IS ULTIMATELY FOUND TO BE DAMAGED OR INOPERABLE AT THE POINT OF REINSTALLATION THE CONTRACTOR SHALL BE RESPONSIBLE FOR
PROVIDING A NEW ITEM/DEVICE ALONG WITH ALL ANCILLARY SUPPORT WORK AND EQUIPMENT
NECESSARY TO FULLY REPLACE THE EXISTING.
15. WHERE EXISTING MATERIALS, ITEMS OR EQUIPMENT ARE TO BE REMOVED FOR THEIR
REPLACEMENT IN THE SAME LOCATION BY THE SAME OR SIMILAR NEW MATERIALS, ITEMS OR
EQUIPMENT, CAREFULLY DISCONNECT, DETACH, DISASSEMBLE IF REQUIRED, REMOVE AND
DISPOSE OF THE ITEMS INDICATED ALONG WITH ANY AND ALL ANCILLARY SYSTEM COMPONENTRY
OR SUPPORT ITEMS ADDITIONALLY IDENTIFIED OR REQUIRED TO BE REPLACED.
16. WHERE STRUCTURAL SUPPORT OF EXISTING CONSTRUCTION ELEMENTS OR PORTIONS OF
STRUCTURAL ELEMENTS TO REMAIN IS REQUIRED THE RESPONSIBLE CONTRACTOR PERFORMING
THE WORK SHALL PROVIDE AND MAINTAINING ALL NECESSARY STRUCTURAL SUPPORTS, SHORING, STIFFENERS, BRACING, BEAMS, COLUMNS, FOOTINGS AND SUPPORTS AS NECESSARY TO ENSURE
THE STABILITY OF THE ELEMENTS BEING SUPPORTED AND TO ADEQUATELY DISTRIBUTE ANY
TEMPORARY LOADING SO AS NOT TO OVER LOAD ANY OF THE EXISTING STRUCTURE AND THE
CONSTRUCTION BELOW. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL
STRUCTURAL ENGINEERING ANALYSIS, CALCULATIONS AND SOLUTIONS FOR PROVIDING ANY SUCH WORK AND WILL NEED TO PROVIDE ALL SUCH PROPER DOCUMENTATION PREPARED BY A LICENSED
STRUCTURAL ENGINEER TO THE VA/COR AS A SHOP DRAWING SUBMITTAL FOR PROPER REVIEW
AND APPROVAL BEFORE BEING ALLOWED TO BEGIN ANY SUCH WORK
17. ALL EXISTING CONSTRUCTION OR ITEMS INDICATED TO REMAIN IN PLACE AND OPERATION SHALL BE PROTECTED FROM DAMAGE BOTH DURING THE DEMOLITION OPERATIONS AS WELL AS THE NEW
CONSTRUCTION EFFORTS. WHERE PRACTICABLE, AND WITH THE VA/COR'S APPROVAL, THE
CONTRACTOR MAY ELECT TO REMOVE SUCH ITEMS TO A SUITABLE STORAGE LOCATION DURING
THE DEMOLITION PHASE AND THEN PROPERLY CLEAN AND REINSTALL THE ITEMS WHEN
APPLICABLE. IN NO CASE SHALL ANY LIFE SAFETY DEVICES, SYSTEMS OR MEASURES BE
COMPROMISED BY THE TEMPORARY REMOVAL OF ANY NECESSARY ELEMENTS OF WORK, FOR THE
CONVENIENCE OF THE CONTRACTOR, THAT WERE NOT PROPERLY REPLACED IN KIND WITH A
SIMILAR PROPERLY OPERATING TEMPORARY DEVICE.
18. DURING THE COURSE OF SELECTIVE DEMOLITION OR REMOVAL OPERATIONS AND THE EXISTING
SUBSTRATE MATERIALS/CONSTRUCTION IS DAMAGED BEYOND REASONABLE REPAIR, THE
CONTRACTOR SHALL BE RESPONSIBLE TO FULLY REPLACE THE ENTIRE DAMAGED SECTION AND/OR
SECTIONS. THIS DAMAGED AREA SHALL BE REMOVED AND REPLACED AS REQUIRED TO REPAIR
THE SUBSTRATE TO A LIKE NEW CONDITION THAT CONTAINS NO IRREGULAR JOINT CONNECTIONS, CONDITIONS, DEFECTS, WEAKNESS OR WILL CAUSE ADVERSE EFFECTS THAT WILL RESULT IN ANY DIFFERENTIAL FINISHED SURFACE CONDITIONS OR AREAS OF JOINT WEAKNESS THAT WILL RESULT IN SURFACE CRACKING AND BE APPARENT THAT THE CONDITION IS IN FACT A PATCH/REPAIR.
19. REFER TO ALL ENGINEERING DISCIPLINE DRAWINGS AND DOCUMENTATION FOR THE BASIC EXTENT
BEING REQUIRED FOR ALL INFRASTRUCTURE AND SYSTEMS DEMOLITION AS WELL AS FOR
IDENTIFYING ALL EXISTING EQUIPMENT, PIPING, CONDUITS, DUCTWORK, WIRING, CONTROLS, ETC.
THAT ARE INTENDED TO REMAIN WITHIN ANY OF THE AREAS OF DEMOLITION, THE AREAS OF
REWORKING OF EXISTING SYSTEMS AND THE AREAS OF NEW WORK.
20. UNLESS OTHERWISE NOTED ALL EXISTING PARTITION CONSTRUCTION WITHIN THE PROJECT AREA OF WORK SCHEDULED TO RECEIVE NEW FINISHES SHALL HAVE ALL EXISTING FINISHES REMOVED INCLUDING BUT NOT LIMITED TO ALL CERAMIC TILE, VINYL WALL COVERING, WOOD PANELING, WAINSCOT MATERIALS, GROUT, MASTIC, WALL COVERING BACKING, WALL BASE, ADHESIVE, STAPLES, EXPOSED FASTENERS, ETC. SUCH THAT THE SUB-STRAIGHT WALL/PARTITION SURFACES
REQUIRE NO FURTHER DEMOLITION AND ARE PREPARED TO RECEIVE ALL REQUIRED PATCHING,
REPAIRS, RESURFACING AND REFINISHING AS REQUIRED TO RECEIVE THE NEW FINISHES.
21. ALL FINISHED AREAS ADJACENT TO OR INCLUDED WITHIN THE AREA(S) OF CONSTRUCTION ALONG
WITH ALL PUBLIC PROJECT ACCESS ROUTES SHALL BE PROTECTED FROM DUST AND DIRT
THROUGH THE USE OF VA/COR APPROVED DUSTPROOF PROTECTION. SEE THE OCCUPIED AREA
PROTECTION PROTOCOLS PROVIDED IN THE "GENERAL" DRAWINGS SECTION AND COORDINATE ALL
SITE SPECIFIC CONDITIONS IMPACTS ENCOUNTERED WITH THE VA/COR.
22. ALL NEW WORK ALONG WITH ANY PORTIONS OF EXISTING EQUIPMENT, MATERIALS OR REWORKED ELEMENTS WHEN COMPLETED SHALL FULLY COMPLY WITH ALL BASES OF DESIGN REQUIREMENTS.
23. IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO ADEQUATELY PROTECT EXISTING
CONSTRUCTION AND FINISHES TO REMAIN IN PLACE DURING BOTH THE DEMOLITION AND
CONSTRUCTION SEQUENCES OF WORK. ANY DAMAGE TO SUCH AREAS SHALL BE RESTORED AND
REFINISHED TO A "LIKE-NEW" CONDITION PRIOR TO THE VA/COR'S ACCEPTANCE OF THAT WORK.
24. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE FOR THE PATCH, REPAIR, REFINISHING AND/OR REPLACEMENT OF ALL CONSTRUCTION, MATERIALS, ASSEMBLIES, EQUIPMENT, SIGNAGE
AND FINISHES DAMAGED BY THE PROJECT DEMOLITION, TEMPORARY CONSTRUCTION, NEW
CONSTRUCTION OR THE MOVEMENT OF PERSONNEL, TOOLS, EQUIPMENT, MATERIALS, ETC. BOTH
INSIDE AND OUTSIDE OF THE DESIGNATED AREAS OF WORK.
25. PROVIDE THE CUTTING AND PATCHING FOR ALL DEMOLITION WORK AND ALL NEW CONSTRUCTION
WORK BEING PERFORMED OUTSIDE OF THE PROJECT LIMIT LINES AS REQUIRED TO PROPERLY
COMPLETE THE PROJECT SCOPE OF WORK.
26. ALL CUTTING, CORING AND DRILLING OF EXISTING CONCRETE AND MASONRY CONSTRUCTION
SHALL NOT DAMAGE EXISTING REINFORCING STEEL, PIPING, CONDUITS OR OTHER CONCEALED
CONSTRUCTION WITHIN. PRIOR TO CORING, DRILLING, CUTTING OR PERFORMING ANY BREAKING EFFORTS, PROVIDE PENETRATING FIELD X-RAYING OF THE INTENDED AREAS AND DOCUMENT THE
EXACT SIZE AND LOCATIONS OF ALL SUCH INTERFERENCES. COORDINATE WITH AND OBTAIN
VA/COR APPROVAL BEFORE PROCEEDING WITH ANY SUCH REQUIRED PENETRATIONS WORK.
27. THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE TO PROVIDE THE REMOVAL OF ALL
CONSTRUCTION DEMOLITION DEBRIS, SPOIL AND MATERIALS FROM THE PROJECT SITE ON A DAILY BASIS UNLESS SPECIFICALLY REFERENCED OTHERWISE IN THE PROJECT SPECIFIC LOGISTICAL
SEQUENCING REQUIREMENTS OR AS APPROVED BY THE VA/COR.
ASSEMBLY USE (WAITING AND CONFERENCE):
7 SF PER OCCUPANT
401 SF / 7 = 57 OCCUPANTS
TOTAL OCCUPANTS = 86
AutoCAD SHX Text No
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
APPROVED: CHIEF OF STAFF
AutoCAD SHX Text
APPROVED: HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: CHIEF OF POLICE
AutoCAD SHX Text
APPROVED: DIRECTOR FMS
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: SAFETY MANAGER
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: GEMS PROJECT MANAGER
AutoCAD SHX Text
APPROVED: PROJECTS SECTION MANAGER
AutoCAD SHX Text
APPROVED: SERVICE LINE DIRECTOR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: INFECTION CONTROL NURSE
AutoCAD SHX Text
APPROVED: PATIENT SAFETY
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text BUILDING No
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DWG. OF
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
PLOT SCALE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: PROJECT COR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPLICABLE CODES
AutoCAD SHX Text
GENERAL PROJECT INFORMATION
AutoCAD SHX Text
GENERAL STAGING OF WORK NOTES
AutoCAD SHX Text
MISCELLANEOUS NOTES
AutoCAD SHX Text
GI003
AutoCAD SHX Text
GENERAL PROJECT AND CODE DATA
GENERAL DEMOLITION NOTES
09/17/2021EHRM TRAINING +
ADMINISTRATIVE SUPPORT
SPACE
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
1 ST. CLOUD VAHCS
ST. CLOUD, MN 56303
SCHEMATIC DESIGN (SD - 35%) 04/29/2021
2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021
3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021
4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021
5 CONSTRUCTION BID DOCUMENTS 09/17/2021
INTENT:
1. TO ORGANIZE AND IDENTIFY THE “EQUIVALENCY SUBSTITUTION PROCESS” IN ORDER TO
FORMALIZE THE PROCESS, CLARIFY RESPONSIBILITIES, PROACTIVELY MANAGE THE
PROCESS AND MINIMIZE COSTLY DELAYS IN THE EXECUTION OF THE WORK.
2. THERE ARE NO INTENDED RESTRICTIONS LIMITING COMPETITION ON THE EQUIVALENT
SUBSTITUTION OF MATERIALS, EQUIPMENT, HARDWARE, FINISHES, CONTROLS, SYSTEMS
AND THEIR INCLUSIVE PARTS, DETAILED ASSEMBLIES, RELATED DESIGN ELEMENTS AND
PERFORMANCE CHARACTERISTICS, UNLESS AS IDENTIFIED IN THE BID SOLICITATION.
SUMMARY DESCRIPTION:
1. THE BASIS OF DESIGN (BOD) INCORPORATES THE DESIGN INTENT AND PERFORMANCE
BASED CHARACTERISTICS FOR ALL MATERIALS, SYSTEMS AND WORKMANSHIP THAT IS
INCLUDED IN THE CONSTRUCTION DOCUMENTS AND REFERENCED BY SAME.
2. THE BOD COMPLIANCE PROTOCOLS ARE TO BE FOLLOWED FOR ALL PROPOSED
EQUIVALENT SUBSTITUTIONS, DEPARTURES OR ADJUSTMENTS FROM THE
CONSTRUCTION DOCUMENT DRAWINGS, DETAILING, AND SPECIFICATIONS PROVIDED THE
SUBSTITUTIONS, DEPARTURES, OR ADJUSTMENTS MEET THE DESIGN INTENT, SCOPE OF
WORK (SOW) CRITERIA REQUIREMENTS, AND PERFORMANCE BASED CHARACTERISTICS.
3. NO SUCH EQUIVALENT SUBSTITUTION, DEPARTURES OR ADJUSTMENTS WILL BE ALLOWED
WITHOUT FIRST GOING THROUGH THE BOD COMPLIANCE PROTOCOLS PROCESS AND
OBTAINING THE GOVERNMENT’S APPROVAL FROM THE CONTRACTING OFFICER (CO).
BOD COMPLIANCE PROTOCOLS:
1. THE BOD COMPLIANCE PROTOCOLS APPLY TO ALL MATERIALS, EQUIPMENT, HARDWARE,
FINISHES, CONTROLS, ENGINEERING SYSTEMS AND THEIR INCLUSIVE PARTS, DETAILED
ASSEMBLIES, IMPACTED ELEMENTS OF WORK PLUS ALL RELATED DESIGN CRITERIA
ELEMENTS AND SPECIFIED PARAMETERS THAT ARE CONTAINED WITHIN THE BID/ISSUED
FOR CONSTRUCTION DRAWINGS AND SPECIFICATIONS DOCUMENTATION, OR AS
SPECIFICALLY REFERENCED BY SAME.
2. SPECIFIC DESIGN INTENT AND PERFORMANCE CHARACTERISTICS REQUIRING BOD
COMPLIANCE ANALYSIS WILL VARY WITH EACH SPECIFIC ITEM BEING PROPOSED AS AN
EQUIVALENT SUBSTITUTION AND WILL NEED TO BE FULLY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .