This document package includes plans and specifications for renovating the EHRM Training Room and Administrative Support Space at the St. Cloud VA Medical Center. Work includes general construction, alterations, necessary removal of existing structures and construction, millwork, permanently mounted equipment, interior finishes, and certain other items. The solicitation seeks a general contractor to furnish all labor, tools, materials, equipment, and supervision required to complete the project. The Department of Veterans Affairs Technology Acquisition Center Austin is the contracting agency. The response is due by the date specified in the solicitation number 36C77622B0026.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING FIBER - INSIDE
VFY EXIST
EXISTING FIBER - OUTSIDE
VFY EXIST
FIBER ROUTE - INSIDE
SEE TELECOM
FIBER ROUTE - OUTSIDE
SEE CIVIL
BUILDING OUTLINE
VFY EXIST
CORRIDOR OUTLINE
VFY EXIST
LEGEND
TO 8TH ST WEST ONLYTO 8TH ST EAST & WEST
44TH AVE.
TRAIL 1
TRAIL 2
TRANSFER
SWITCH
CAPACITOR
BANK (3)
SWITCH
(2)
15KV
MAIN
SW
BATT
35 KV
TO
15 KV
TRANSFORMER
35KV
FUSED
SWITCH
METER 35KV
SWITCH
GRAVEL
GRAVEL
GRAVEL
EXISTING
ROAD
CHAIN LINK FENCE
CHAIN LINK FENCE
16' GATE
GRAVEL
ELECTRICAL
SUBSTATION
G E N E R A T O R
FUEL LINES
CONDU ITS TO TU NNEL
M V
D U
C T
B A
N K
1 1 2 W
PHARMACY ADDIT ION
11 2 E
G E N E R A T O R
B
CORRIDOR LINK
A
C T
TR
A
IL
ER
174 s .f.
256 s .f.
185 s .f.
149 s ..f.
155 s .f.
104 s .f.
70 s. .f .
72 s .f.
110 s .f.
276 s .f.
112 s .f.
99 s .f.
57 s .f.
146 s .f.
434 s .f.
R A
MP
U P
1:
M A X
R A
MP
U P
1:
M A X
RA
M P
UP
1:2 0 M
AX
TRANSFER
SWITCH
CAPACITOR
BANK (3)
SWITCH
(2) 15KV
MAIN
SW
BATT
35 KV
TO
15 KV
TRANSFORMER
35KV
FUSED
SWITCH
METER 35KV
SWITCH
.3
TRANSFORMER
BUILD ING
#91
5,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
EXISTIN G G AS SU P P LY EQ U IP M EN T TO R EM AIN
O P ER ATIO N AL D U R IN G D EM O LITIO N AN D N EW
C O N STR U C TIO N. P R O TEC T EQU IP M EN T AN D
P IP ELIN ES IN AC C O R D AN C E W ITH G AS SU P P LIER 'S
R EC O M M EN D ATIO N S
N EW G AS SU P P LY M AIN
IN TO B U ILD IN G
SP AR E
P H O N E LIN E
EXTEN D S TO
E XISTIN G
P H O N E IN
B O ILER R O O M
P ER P LAN .
SP AR E
P H O N E
LIN E TO
M ETER
TU N N EL
E XTEN D S
A D D ITIO N AL
2'- 0" U N D ER
B U ILD IN G
FUEL LINE
VENT LINE
1,000 GAL.
UNDERGROUND
DIESEL FUEL
TANK
1,000/5,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
1,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
1,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
S 1
LIG H T
N EW G AS SU P P LY
(C O O R D IN ATE W ITH SU P P LIER )
12"D
10"D
"D
TP TP
EXIST. BUILDING
EXIST. BUILDING
EXIST.
BUS STOP
CC
L O
O P
16"
20"
12"
3"
8"
DN
BIRDCAGE
B
IR
D C
A G
E
NSP ELECTRICAL
FOR HWY DEPT
T101
I.T.
CHILLER
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
VESTIBULE
DN
DN
DN
FD
DN
F B
F
B
F B
F
B
F B
F
B
SOUTH
VESTIBULE
PASS
THROUGH
LINK TO
BUILDI NG 51
6 3. 32 56
1 13 5. 35 78
PARKING
NO
PARKING
93 49
37 6
109 5
1A
S M
O K
E B
L D
G
SMOKE
BLDG
SMOKE
BLDG
S M
O K
E B
L D
G
SMOKE
BLDG
M.H.
STOR.
SMOKE
BLDG
SMOKE
BLDG
SMOKE
BLDG
SMOKE
BLDG
SMOKE
BLDG
STOR.
BIO-
HAZ.
SAUK RIVER
GP
HOLDING POND
OWNER AND
CONSULTANTS:
CONTACT:
ADDRESS:
MIKE ENGMARK
ST CLOUD VA MEDICAL CENTER
4801 VETERANS DRIVE
ST. CLOUD, MN 56303
NAME:
ADDRESS:
CONTACT:
ADVANCED STRUCTURAL TECHNOLOGIES
7301 OHMS LANE; SUITE 215
EDINA, MN 55439
ZACHARY CRAIG
PHONE:
NAME:
ADDRESS:
CONTACT:
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIRCLE
OMAHA, NE 68134
KRIS BURNHAM
PHONE: 402-991-5520
NAME:
ADDRESS:
CONTACT:
PHONE:
NAME:
ADDRESS:
CONTACT:
PHONE:
NAME:
ADDRESS:
CONTACT:
PHONE:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
IAN WEBER
763-412-4000
ARCHITECT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
EDWARD MARKFORT
763-412-4000
952-854-9302
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIRCLE
OMAHA, NE 68134
KRIS BURNHAM
402-991-5520
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
COVER
DATE:
APPROVED: APPROVED: PROJECTS SECTION MANAGER
APPROVED: OIT MANAGER DATE: APPROVED: ASSISTANT CHIEF ENGINEER DATE:
APPROVED: SAFETY MANAGER
APPROVED: CHIEF OF POLICE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE: APPROVED: EMS MANAGER
APPROVED: M/O MANAGER
DATE:
DATE:
DATE:DATE:
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: PROJECT COR DATE:
APPROVED: INFECTION CONTROL NURSE DATE:
APPROVED: SERVICE LINE DIRECTOR
APPROVED: GEMS COORDINATOR DATE:
DATE:
APPROVED: NURSE EXECUTIVE
APPROVED: CHIEF OF STAFF DATE:
APPROVED: DIRECTOR FMS
APPROVED: ASSOCIATE DIRECTOR
DATE:
DATE:
DATE:
DATE:APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
Main Campus, St. Cloud, Minnesota St. Cloud VA Health Care System
N
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
VICINITY MAP:
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHONE: 320-252-1670
CIVIL ENGINEER:
VA COR:
TELECOMMUNICATIONS ENGINEER:
CONTACT:
ADDRESS:
JONATHAN WEST
ST CLOUD VA MEDICAL CENTER
4801 VETERANS DRIVE
ST. CLOUD, MN 56303
PHONE: 504-250-2699
PROGRAM MANAGER:
EMAIL: Jonathan.West@vciint.com
STRUCTURAL ENGINEER:
MECH/ELEC/PLUMB/FIRE ENGINEER:
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of
Minnesota.
Name:
Date: 03/30/2022 License Number: MN# 18157
Typed or Printed Name: Tom Olesak
C
U s e rs
\b w e a v e r\
D o c u m e n ts \1
-0
-C a m p u s -R b w e a v e rR
M
Q M
.r v t
/2
/2
:4
:3
P
M
GI000
COVER SHEET
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
TO EM, BW
16305
ST CLOUD EHRM INFRASTRUCTURE UPGRADES
CAMPUS
EXISTING CONDITIONS DIGITAL REPRESENTATION
PROPOSED ADDITIONS
BUILDING 5 TELECOM RM
BUILDING 1 TELECOM RM
GENERAL CONDITIONS
A. All dimensions on drawings are approximate; Drawings are not to be scaled. It is the responsibility of the contractor to verify all field conditions and physical dimensions that influence the construction area.
B. It is recommended that contractors visit the proposed construction site prior to submitting their bids and they are encouraged to do so.
C. Contractor shall adhere strictly to State and Federal Occupational Safety and Health Administration ( OSHA ) Standards.
D. Contractor shall park only in the designated parking areas and are not to park on the lawn areas; the only exception is to load or unload supplies or equipment in designated and approved areas and times.
E. Contractor is responsible for the safeguarding of tools, equipment, and materials for the project. All tools and equipment are not to be left unattended and are to be secured at all times when the contractor is not present, or the construction site is not supervised by the contractor.
F. All VA property is to be safeguarded from damage. Any damaged VA property is to be restored to original condition prior to damage or replaced completely. This includes installation, labor, and procurement expenses.
G. All demolished material becomes the property and the responsibility of the contractor with the exception of specified items designated either in the plans or verbally requested by the COR to be retained by the VA.
Offsite disposal of the demolished items is the responsibility of the contractor.
H. Contractor must control demolition and construction dust from facility by erecting a dust barrier and ventilation with HEPA filters. If venting to outside, the contractor will insure negative air pressure is maintained in encapsulated work area. When transporting debris, wet down sufficiently to prevent dust spreading.
I. If scaffolding is used, it must be used in accordance with (OSHA) regulations and is to be enclosed for the first eight feet above ground at end of each working day, until dismantled. Ladders must be removed and locked up at the end of each working day to prevent unauthorized persons from having access.
J. Clean all debris from construction site to the satisfaction of the COR.
K. Contractor is responsible for erecting a barrier around work site to prevent patients, staff and visitors from entering construction site. Coordinate construction materials and location of fence with COR.
L. Contractor is responsible for repairing and replacing any damaged lawn. The restoration will be performed by a landscape contractor that regularly does sodding as part of their business. All damaged lawn will be overcut by 6" or more to accommodate full width rolls of sod. Certified topsoil to be tilled and graded to a smooth matching grade of undamaged lawn. Sod to be thoroughly saturated with water upon placement.
The contractor is responsible for watering and maintaining new sod, to include but not limited to fertilizing and mowing, until project acceptance by the COR.
M. Access to all buildings and parking areas must be maintained throughout the project.
N. Contractors are to coordinate all work with the Contracting Officers Representative. (C.O.R.)
O. All carts, tool boxes / bags, and ladders are to be clearly labeled identifying the contractors and subcontractors name and project name.
P. RFI's to be submitted to COR through Submital Exchange or as specified by the VA.
Q.
jonathan.west Polygon jonathan.west Line jonathan.west Arc jonathan.west Line jonathan.west Arc jonathan.west Line jonathan.west Arc jonathan.west Line jonathan.west Length Measurement 178'-2" jonathan.west Text Box
PACT 4
jonathan.west Text Box
EHRM
jonathan.west Area Measurement 5,704 sf jonathan.west Line jonathan.west Text Box Training jonathan.west Text Box Infra