Response 43 - B-04 EHRM-HA101.pdf
PDF 685 KB Posted
- Attached to
- Y1AZ--EHRM Training and Administrative Support Space Construction - St. Cloud Federal contract opportunity
- Solicitation number
- 36C77622B0026
About this file
This document includes construction drawings and specifications for the renovation of an EHRM Training Room and Administrative Support Space at the St. Cloud VA Medical Center. Key details include:
-
Work involves general construction, alterations, removal of existing structures, millwork, permanently mounted equipment, and interior finishes. Hazardous materials abatement is also required, including removal of asbestos-containing pipe insulation, lead-containing ceramic block walls and glazed tiles, lead-based painted doors, ductwork, and a fire equipment cabinet.
-
The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin to furnish all labor, materials, and supervision for the renovation project. Responses are due by the date specified in the federal contract opportunity.
-
Construction drawings on sheet HA101 show the location and scope of hazardous materials that require abatement, such as asbestos and lead, to guide contractor response. Specifications and regulatory compliance requirements are also outlined.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NCVA
KITCHEN
CORRIDOR
CHIEF OFFICE
STORAGE
OFFICE
KITCHEN
OFFICE
126A
CORRIDOR
C1SW
DISH WASHING
123D
TOILET
124A
CORRIDOR
C1S
ENTRY
123A
TELEPHONE
CLOSET
123C
L3
L2
L1
L4
A1
A1
A1
A1
AREA NOT INCLUDED IN CONTRACT
A1
1. REFER TO SPECIFICATIONS 028213.13 AND 028333.13 FOR ASBESTOS AND LEAD
PAINT REMOVAL AND ABATEMENT REQUIREMENTS AND PROCEDURES.
2. REFER TO ASBESTOS INSPECTION REPORT 04-26-2017 AND CURRENT
ASBESTOS/LEAD CONSULTANT FINDINGS.
GLOVEBAG AND WHOLE COMPONENT REMOVAL OF ASBESTOS-CONTAINING PIPE INSULATION
WHICH IS ASSUMED TO BE CONCEALED BEHIND CHASE WALLS AND OR PLASTER/SEALED
CEILING SYSTEMS AT THIS LOCATION. PIPE INSULATION MAY BE EXPOSED AS A RESULT OF
CEILING AND WALL DEMOLITION.
THE SCOPE OF THE ASBESTOS RELATED WORK CONSISTS OF REMOVING ASBESTOS CONTAINING
PIPE AND FITTING INSULATION.
ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL
REGULATIONS AND THE CONTRACT SPECIFICATIONS.
THE ABATEMENT WORK SHALL BE CONDUCTED DURING REGULAR BUSINESS HOURS (8:00 AM - 4:30
PM) EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE COORDINATED WITH THE VA COR AND
VPIH FOR APPROVALS.
THE ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK PLAN AND ABATEMENT
SCHEDULE WITH THE REQUIRED SUBMITTALS. ANY CHANGES TO THE PROCEDURES,
CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO THE VA COR AND VPIH FOR
APPROVALS.
THE LOCATIONS AND QUANTITIES OF ALL ABATEMENT SHALL BE FIELD VERIFIED BY THE
ABATEMENT CONTRACTOR AND THE GENERAL CONTRACTOR. THE LIMITS OF REMOVAL AND
EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.
ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE VA COR AND VPIH.
1.
2.
3.
4.
5.
6.
7.
REMOVE LEAD-CONTAINING GLAZED CERAMIC
BLOCK WALL AS INDICATED IN THE KEYNOTES
REMOVE DOOR WITH LEAD-BASED PAINT AS WHOLE
COMPONENT AS INDICATED IN THE KEYNOTES
REMOVE LEAD GLAZED CERAMIC BLOCK WALL
WHOLE COMPONENT REMOVAL OF DOOR WITH LBP
REMOVE DUCTWORK WITH LEAD-BASED PAINT AS
WHOLE COMPONENT AS INDICATED IN THE KEY
NOTES
WHOLE COMPONENT REMOVAL OF DUCTWORK WITH LBP
WHOLE COMPONENT REMOVAL OF FIRE EQUIPMENT CABINET WITH LBP
656-21-236
09/17/2021EHRM TRAINING +
ADMINISTRATIVE SUPPORT
SPACE
www. bancroft-ae.com
BAE PROJECT NO. 18-116
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
ARCHITECT/ENGINEER OF RECORD
1 ST. CLOUD VAHCS
ST. CLOUD, MN 56303
SCHEMATIC DESIGN (SD - 35%) 04/29/2021
KEY PLAN
09/17/2021 IN-PROGRESS VA REVIEW ONLY - NOT FOR CONSTRUCTION
AREA 1 AREA 2
2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021
3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021
WD BV HA101
HAZARDOUS MATERIALS PLAN -
ASBESTOS/LEAD - FIRST LEVEL
0 2' 4' 8' 16'1/8"=1'-0"
NORTH
4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021
5 CONSTRUCTION BID DOCUMENTS 09/17/2021
AutoCAD SHX Text C
AutoCAD SHX Text F
AutoCAD SHX Text
CART
AutoCAD SHX Text
STM
AutoCAD SHX Text
GEN
AutoCAD SHX Text
STM
AutoCAD SHX Text
KTL
AutoCAD SHX Text
TBL
AutoCAD SHX Text
TABLE
AutoCAD SHX Text
STM
AutoCAD SHX Text
OVEN
AutoCAD SHX Text
STM
AutoCAD SHX Text
OVEN
AutoCAD SHX Text
KTL
AutoCAD SHX Text
STM
AutoCAD SHX Text
KTL
AutoCAD SHX Text
KTL
AutoCAD SHX Text
KTL
AutoCAD SHX Text
TABLE
AutoCAD SHX Text
TABLE
AutoCAD SHX Text
TBL
AutoCAD SHX Text
CART
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
CART
AutoCAD SHX Text
TABLE
AutoCAD SHX Text
CART
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ICE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text 30x48
AutoCAD SHX Text 30x48
AutoCAD SHX Text 30x48
AutoCAD SHX Text 30x48
AutoCAD SHX Text 30x48
AutoCAD SHX Text 30x48
AutoCAD SHX Text 30x48
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
HAZARDOUS PLAN NOTES
AutoCAD SHX Text
ABATEMENT GENERAL NOTES
AutoCAD SHX Text L1
AutoCAD SHX Text A1
AutoCAD SHX Text
LEAD ABATEMENT LEGEND
AutoCAD SHX Text L2
AutoCAD SHX Text
ASBESTOS/LEAD ABATEMENT
AutoCAD SHX Text L3
AutoCAD SHX Text L4
AutoCAD SHX Text No
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
APPROVED: CHIEF OF STAFF
AutoCAD SHX Text
APPROVED: HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: CHIEF OF POLICE
AutoCAD SHX Text
APPROVED: DIRECTOR FMS
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: SAFETY MANAGER
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: GEMS PROJECT MANAGER
AutoCAD SHX Text
APPROVED: PROJECTS SECTION MANAGER
AutoCAD SHX Text
APPROVED: SERVICE LINE DIRECTOR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: INFECTION CONTROL NURSE
AutoCAD SHX Text
APPROVED: PATIENT SAFETY
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text BUILDING No
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DWG. OF
AutoCAD SHX Text
PROJECT TITLE
AutoCAD SHX Text
PLOT SCALE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
AutoCAD SHX Text
APPROVED: PROJECT COR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
NTS
AutoCAD SHX Text
BUILDING 4
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
AutoCAD SHX Text
HAZARDOUS MATERIALS PLAN - ASBESTOS/LEAD - PARTIAL FIRST FLOOR
| Sheets and Views |
| HA101 |
File details come from the government source that posted it. Updated .