Response 43 - B-04 EHRM-HA101.pdf

PDF 685 KB Posted

Attached to
Y1AZ--EHRM Training and Administrative Support Space Construction - St. Cloud Federal contract opportunity
Solicitation number
36C77622B0026
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document includes construction drawings and specifications for the renovation of an EHRM Training Room and Administrative Support Space at the St. Cloud VA Medical Center. Key details include:

  • Work involves general construction, alterations, removal of existing structures, millwork, permanently mounted equipment, and interior finishes. Hazardous materials abatement is also required, including removal of asbestos-containing pipe insulation, lead-containing ceramic block walls and glazed tiles, lead-based painted doors, ductwork, and a fire equipment cabinet.

  • The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin to furnish all labor, materials, and supervision for the renovation project. Responses are due by the date specified in the federal contract opportunity.

  • Construction drawings on sheet HA101 show the location and scope of hazardous materials that require abatement, such as asbestos and lead, to guide contractor response. Specifications and regulatory compliance requirements are also outlined.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Training and Administrative Support Space Construction - St. Cloud, newest first.
File Type Posted
Technical Questions - FINAL - St. Cloud 5-23-22.pdf PDF
Response 29 - EF101A.pdf PDF
Response 46 - ELPD 101.pdf PDF
36C77622B0026 0003.pdf PDF
Response 2 - 21 08 00 Commissioning of Fire Suppression Systems.pdf PDF
Response 29 - 21 13 13 Wet-Pipe Sprinkler Systems Revised.pdf PDF
Response 29 - FX-101 Revised.pdf PDF
Response 45 - GI000 Supplement.pdf PDF
Response 17 - 01 45 29 Testing Laboratory Services Revised.pdf PDF
Response 15 - 23 09 23 Direct-Digital Control System for HVAC.pdf PDF
Response 43 - DSCF2239.pdf PDF
Response 45 - GC100 Supplement.pdf PDF
36C77622B0026 0002.pdf PDF
ATTACHMENT 8 - Construction Wage Rates - Stearns 4-1-22.pdf PDF
Site Visit Sign-In Sheet 4-19-22.pdf PDF
36C77622B0026 0001.pdf PDF
ATTACHMENT 3 - Drawings 2 of 2.pdf PDF
36C77622B0026 - 4-7-22.pdf PDF
ATTACHMENT 2 - Drawings 1 of 2.pdf PDF
ATTACHMENT 4 - Brand Name Justification - St. Cloud.pdf PDF
ATTACHMENT 6 - COVID-19 Safety Protocols 12-14-21.pdf PDF
ATTACHMENT 9 - Contractor Safety - Environmental Form.docx DOCX document
ATTACHMENT 5 - Contractor Core Work Hours.pdf PDF
ATTACHMENT 1 - Specifications.pdf PDF
ATTACHMENT 7 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 8 - Construction Wage Rates - Stearns 2-25-22.pdf PDF
ATTACHMENT 10 - Site Visit Instructions.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NCVA

KITCHEN

CORRIDOR

CHIEF OFFICE

STORAGE

OFFICE

KITCHEN

OFFICE

126A

CORRIDOR

C1SW

DISH WASHING

123D

TOILET

124A

CORRIDOR

C1S

ENTRY

123A

TELEPHONE

CLOSET

123C

L3

L2

L1

L4

A1

A1

A1

A1

AREA NOT INCLUDED IN CONTRACT

A1

1. REFER TO SPECIFICATIONS 028213.13 AND 028333.13 FOR ASBESTOS AND LEAD

PAINT REMOVAL AND ABATEMENT REQUIREMENTS AND PROCEDURES.

2. REFER TO ASBESTOS INSPECTION REPORT 04-26-2017 AND CURRENT

ASBESTOS/LEAD CONSULTANT FINDINGS.

GLOVEBAG AND WHOLE COMPONENT REMOVAL OF ASBESTOS-CONTAINING PIPE INSULATION

WHICH IS ASSUMED TO BE CONCEALED BEHIND CHASE WALLS AND OR PLASTER/SEALED

CEILING SYSTEMS AT THIS LOCATION. PIPE INSULATION MAY BE EXPOSED AS A RESULT OF

CEILING AND WALL DEMOLITION.

THE SCOPE OF THE ASBESTOS RELATED WORK CONSISTS OF REMOVING ASBESTOS CONTAINING

PIPE AND FITTING INSULATION.

ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL

REGULATIONS AND THE CONTRACT SPECIFICATIONS.

THE ABATEMENT WORK SHALL BE CONDUCTED DURING REGULAR BUSINESS HOURS (8:00 AM - 4:30

PM) EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE COORDINATED WITH THE VA COR AND

VPIH FOR APPROVALS.

THE ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK PLAN AND ABATEMENT

SCHEDULE WITH THE REQUIRED SUBMITTALS. ANY CHANGES TO THE PROCEDURES,

CONTAINMENT LIMITS AND PHASING SHALL BE SUBMITTED TO THE VA COR AND VPIH FOR

APPROVALS.

THE LOCATIONS AND QUANTITIES OF ALL ABATEMENT SHALL BE FIELD VERIFIED BY THE

ABATEMENT CONTRACTOR AND THE GENERAL CONTRACTOR. THE LIMITS OF REMOVAL AND

EXTENT OF THE CONTAINMENTS SHALL BE VERIFIED WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.

ALL LOADOUT PROCEDURES SHALL BE COORDINATED WITH THE VA COR AND VPIH.

1.

2.

3.

4.

5.

6.

7.

REMOVE LEAD-CONTAINING GLAZED CERAMIC

BLOCK WALL AS INDICATED IN THE KEYNOTES

REMOVE DOOR WITH LEAD-BASED PAINT AS WHOLE

COMPONENT AS INDICATED IN THE KEYNOTES

REMOVE LEAD GLAZED CERAMIC BLOCK WALL

WHOLE COMPONENT REMOVAL OF DOOR WITH LBP

REMOVE DUCTWORK WITH LEAD-BASED PAINT AS

WHOLE COMPONENT AS INDICATED IN THE KEY

NOTES

WHOLE COMPONENT REMOVAL OF DUCTWORK WITH LBP

WHOLE COMPONENT REMOVAL OF FIRE EQUIPMENT CABINET WITH LBP

656-21-236

09/17/2021EHRM TRAINING +

ADMINISTRATIVE SUPPORT

SPACE

www. bancroft-ae.com

BAE PROJECT NO. 18-116

700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007

T: 847.952.9362

ARCHITECT/ENGINEER OF RECORD

1 ST. CLOUD VAHCS

ST. CLOUD, MN 56303

SCHEMATIC DESIGN (SD - 35%) 04/29/2021

KEY PLAN

09/17/2021 IN-PROGRESS VA REVIEW ONLY - NOT FOR CONSTRUCTION

AREA 1 AREA 2

2 DESIGN DEVELOPMENT (DD - 65%) 05/11/2021

3 CONSTRUCTION DOCUMENTS (CD - 95%) 05/24/2021

WD BV HA101

HAZARDOUS MATERIALS PLAN -

ASBESTOS/LEAD - FIRST LEVEL

0 2' 4' 8' 16'1/8"=1'-0"

NORTH

4 CONSTRUCTION DOCUMENTS (CD - 100%) 06/03/2021

5 CONSTRUCTION BID DOCUMENTS 09/17/2021

AutoCAD SHX Text C

AutoCAD SHX Text F

AutoCAD SHX Text

CART

AutoCAD SHX Text

STM

AutoCAD SHX Text

GEN

AutoCAD SHX Text

STM

AutoCAD SHX Text

KTL

AutoCAD SHX Text

TBL

AutoCAD SHX Text

TABLE

AutoCAD SHX Text

STM

AutoCAD SHX Text

OVEN

AutoCAD SHX Text

STM

AutoCAD SHX Text

OVEN

AutoCAD SHX Text

KTL

AutoCAD SHX Text

STM

AutoCAD SHX Text

KTL

AutoCAD SHX Text

KTL

AutoCAD SHX Text

KTL

AutoCAD SHX Text

TABLE

AutoCAD SHX Text

TABLE

AutoCAD SHX Text

TBL

AutoCAD SHX Text

CART

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

CART

AutoCAD SHX Text

TABLE

AutoCAD SHX Text

CART

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ICE

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 30x48

AutoCAD SHX Text 30x48

AutoCAD SHX Text 30x48

AutoCAD SHX Text 30x48

AutoCAD SHX Text 30x48

AutoCAD SHX Text 30x48

AutoCAD SHX Text 30x48

AutoCAD SHX Text

KEY NOTES

AutoCAD SHX Text

HAZARDOUS PLAN NOTES

AutoCAD SHX Text

ABATEMENT GENERAL NOTES

AutoCAD SHX Text L1

AutoCAD SHX Text A1

AutoCAD SHX Text

LEAD ABATEMENT LEGEND

AutoCAD SHX Text L2

AutoCAD SHX Text

ASBESTOS/LEAD ABATEMENT

AutoCAD SHX Text L3

AutoCAD SHX Text L4

AutoCAD SHX Text No

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

APPROVED: CHIEF OF STAFF

AutoCAD SHX Text

APPROVED: HEALTH CARE SYSTEM DIRECTOR

AutoCAD SHX Text

APPROVED: CHIEF OF POLICE

AutoCAD SHX Text

APPROVED: DIRECTOR FMS

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: SAFETY MANAGER

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: GEMS PROJECT MANAGER

AutoCAD SHX Text

APPROVED: PROJECTS SECTION MANAGER

AutoCAD SHX Text

APPROVED: SERVICE LINE DIRECTOR

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: INFECTION CONTROL NURSE

AutoCAD SHX Text

APPROVED: PATIENT SAFETY

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text BUILDING No

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text

PROJECT TITLE

AutoCAD SHX Text

PLOT SCALE

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

AutoCAD SHX Text

APPROVED: PROJECT COR

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NTS

AutoCAD SHX Text

BUILDING 4

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text

HAZARDOUS MATERIALS PLAN - ASBESTOS/LEAD - PARTIAL FIRST FLOOR

Sheets and Views
HA101