Attachment 3_Contract_Data_Requirements_List_(CDRLs)_22Oct2024.pdf
PDF 3 MB Posted
- Attached to
- Request for Proposal - Special Operations Forces Training, Engineering and Maintenance Support IV (SOF TEAMS IV) Federal contract opportunity
- Solicitation number
- W900KK25RA004
About this file
This document is a Contract Data Requirements List (CDRL) that details the data items required to be delivered under the "SOF TEAMS IV" contract. The CDRL covers a wide range of contractual requirements including management reports, property management, training equipment, safety, engineering changes, and information assurance documentation. Key details include:
The contract is for the Special Operations Forces Training, Engineering and Maintenance Support IV (SOF TEAMS IV) effort, which provides hardware and software maintenance, logistics, administration, and minor engineering enhancements to the Training Aids, Devices, Simulators, and Simulations (TADSS) that support the 160th Special Operations Aviation Regiment (Airborne) at Fort Campbell, KY. The contract has a 12-month base period with four 12-month option periods. Deliverables such as progress reports, equipment inventories, and engineering change proposals have defined delivery schedules, review periods, and distribution requirements. The contract also has information assurance and cybersecurity documentation requirements.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SFAE-STR-CTT
6. REQUIRING OFFICE
PWS 3.1.3
5. CONTRACT REFERENCE
DI-ADMN-81249C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Meeting Agenda
2. TITLE OF THE DATA ITEM
A001
1. DATA ITEM NO.
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ADMNA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
22-OCT-2024
J. DATE
raquel.e.duran
I. APPROVED BYH. DATEG. PREPARED BY
john.g.farrell
BLOCK 9:
Distribution authorized to department of defense and U.S. DOD contractors only due to administrative or operational use effective 06/15/2023. Other requests for this document shall be referred to requiring office.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive
5230.25 reference)).
BLOCK 12 AND 13: SUBMISSION SHALL BE DUE 10 CALENDAR DAYS BEFORE EACH
PROGRAM REVIEW, CONFERENCE, AUDIT OR DESIGNATED MEETING. THE
CONTRACTOR SHALL SUBMIT UPDATES AS REQUIRED.
BLOCK 14:
Reproducible shall be delivered electronically per the PWS to the COR and CO as stated in contract section F. The delivery shall be in electronic format compatible with Microsoft Office Suite and PDF. Graphics packages used to create figures, tables, and charts shall be Compatible with Microsoft Office applications. Files over 5mb shall be Delivered via DOD SAFE concurrent with the notification letter to USG.
Files that cannot be transmitted electronically shall be mailed to the Following address:
PM CT2
ATTN: SFAE-STRI-CTT
12211 SCIENCE DRIVE
Orlando, FL 32826-3276
16. REMARKS 101BLOCK 16
101 15. TOTAL
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
PWS 3.1.3
5. CONTRACT REFERENCE
DI-ADMN-81250C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
MEETING MINUTES
2. TITLE OF THE DATA ITEM
A002
1. DATA ITEM NO.
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ADMN
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
22-OCT-2024
J. DATE
raquel.e.duran
I. APPROVED BYH. DATEG. PREPARED BY
john.g.farrell
BLOCK 8:
A. THE GOVERNMENT WILL HAVE 7 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
B. IF DISAPPROVED THE CONTRACTOR SHALL REVISE IAW COMMENTS AND
RESUBMIT NLT 7 CALENDAR DAYS AFTER RECEIPT OF COMMENTS.
BLOCK 9:
Distribution authorized to department of defense and U.S. DOD contractors only due to administrative or operational use effective 06/15/2023. Other requests for this document shall be referred to requiring office.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive
5230.25 reference)).
Block 10,12, 13:
The Contractor shall deliver minutes through the IPT process NLT 10 calendar days after the corresponding event. USG comments on the briefing package content will be made through the IPT within 7 calendar days of receipt. The Contractor shall deliver the final presentation updated IAW the review event NLT 14 calendar days after the conclusion of the event.
BLOCK 14:
Reproducible shall be delivered electronically per the PWS to the COR and PCO as stated in contract section F. The delivery shall be in electronic format compatible with Microsoft Office Suite and PDF. Graphics packages used to create figures, tables, and charts shall be Compatible with Microsoft Office applications. Files over 5mb shall be Delivered via DOD SAFE concurrent with the notification letter to USG.
Files that cannot be transmitted electronically shall be mailed to the Following address:
PM CT2
ATTN: SFAE-STR-CTT
12211 SCIENCE DRIVE
Orlando, FL 32826-3276
16. REMARKS 101BLOCK 16
101 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS 3.1.3
5. CONTRACT REFERENCE
DI-ADMN-81373
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Presentation Material
2. TITLE OF THE DATA ITEM
A003
1. DATA ITEM NO.
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ADMN
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
BLOCK 16
11. AS OF DATE
N/A
BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
22-OCT-2024
J. DATE
raquel.e.duran
I. APPROVED BYH. DATEG. PREPARED BY
john.g.farrell
BLOCK 9:
Distribution authorized to department of defense and U.S. DOD contractors only due to administrative or operational use effective 06/15/2023. Other requests for this document shall be referred to requiring office.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive
5230.25 reference)).
Block 10,12, 13 The Contractor shall deliver draft material NLT 10 calendar days prior to the corresponding event. USG comments on the briefing package content will be made through the IPT within 7 calendar days of receipt. The Contractor shall deliver the final presentation updated IAW the review event NLT 10 calendar days after the conclusion of the event. The USG will review and approve or disapprove with comments NLT seven (7) calendar days after submittal. If disapproved the Contractor shall revise IAW comments and resubmit NLT seven (7) calendar days after receipt of comments.
BLOCK 14:
Reproducible shall be delivered electronically per the PWS to the COR and PCO as stated in contract section F. The delivery shall be in electronic format compatible with Microsoft Office Suite and PDF. Graphics packages used to create figures, tables, and charts shall be Compatible with Microsoft Office applications. Files over 5mb shall be Delivered via DOD SAFE concurrent with the notification letter to USG.
Files that cannot be transmitted electronically shall be mailed to the Following address:
PM CT2
ATTN: SFAE-STR-CTT
12211 SCIENCE DRIVE
Orlando, FL 32826-3276
16. REMARKS 101BLOCK 16
101 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS 3.5.2.2
5. CONTRACT REFERENCE
DI-AVCS-80700A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
COMPUTER SOFTWARE PRODUCT END ITEMS
2. TITLE OF THE DATA ITEM
A004
1. DATA ITEM NO.
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER AVCSA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
BLOCK 16
11. AS OF DATE
N/A
BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
22-OCT-2024
J. DATE
raquel.e.duran
I. APPROVED BYH. DATEG. PREPARED BY
john.g.farrell
BLOCK 8:
A. THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND APPROVE
OR REJECTION OF EACH SUBMISSION.
B. IF DISAPPROVED THE CONTRACTOR SHALL REVISE IAW COMMENTS AND
RESUBMIT NLT 10 CALENDAR DAYS AFTER RECEIPT OF COMMENTS.
BLOCK 9:
Distribution authorized to department of defense and U.S. DOD contractors only due to administrative or operational use effective 06/15/2023. Other requests for this document shall be referred to SFAE-STR-CTT.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive
5230.25 reference)).
BLOCK 12: SUBMISSIONS DUE 30 DAYS PRIOR TO FINAL ACCEPTANCE TESTING.
BLOCK 14:
Reproducible shall be delivered electronically per the PWS to the COR and PCO as stated in contract section F. The delivery shall be in electronic format compatible with Microsoft Office Suite and PDF. Graphics packages used to create figures, tables, and charts shall be Compatible with Microsoft Office applications. Files over 5mb shall be Delivered via DOD SAFE concurrent with the notification letter to USG.
Files that cannot be transmitted electronically shall be mailed to the Following address:
PM CT2
ATTN: SFAE-STR-CTT
12211 SCIENCE DRIVE
Orlando, FL 32826-3276
ALL COMMERCIAL DOCUMENTATION, MANUALS AND SOFTWARE SHALL BE
DELIVERED AS PROVIDED BY THE COMMERCIAL VENDOR.
ALL DEVELOPED SOFTWARE AND GOVERNMENT PROVIDED SOFTWARE SHALL BE
DELIVERED ON
MEDIA COMPATIBLE WITH THE DELIVERED PRODUCT. DELIVERY SHALL
INCLUDE ALL SOFTWARE AND LICENSING REQUIRED TO USE, MAINTAIN THIS
PRODUCT, ALL VENDOR DOCUMENTATION AND MANUALS.
ALL COMMERCIAL SOFTWARE SHALL BE DELIVERED, INCLUDING EXECUTABLES,
FIRMWARE, LIBRARIES, AND SOURCE CODE, IF PROVIDED BY THE VENDOR.
DEVELOPED SOFTWARE SHALL INCLUDE ALL SOURCE CODE LIBRARIES, PDF
FILES, SCRIPTS, EXECUTABLE CODE, DATABASES, MODELS, SCENARIOS, ETC.
16. REMARKS 101BLOCK 16
101 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS 3.3.6
5. CONTRACT REFERENCE
DI-FACR-80966A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Training Facilities Report (TFR)
2. TITLE OF THE DATA ITEM
A005
1. DATA ITEM NO.
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER FACRA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
22-OCT-2024
J. DATE
raquel.e.duran
I. APPROVED BYH. DATEG. PREPARED BY
john.g.farrell
BLOCK 8:
A. THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
B. IF DISAPPROVED THE CONTRACTOR SHALL REVISE IAW COMMENTS AND
RESUBMIT NLT 10 CALENDAR DAYS AFTER RECEIPT OF COMMENTS.
BLOCK 9:
Distribution authorized to department of defense and U.S. DOD contractors only due to administrative or operational use effective 06/15/2023. Other requests for this document shall be referred to requiring office.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive
5230.25 reference)).
BLOCKS 12 AND 13: SUBMISSION SHALL BE DUE WHEN DIRECTED BY
GOVERNMENT THROUGH A CONTRACT MINOR MODIFICATION REQUIREMENT OR ECP.
BLOCK 14:
Reproducible shall be delivered electronically per the PWS to the COR and PCO as stated in contract section F. The delivery shall be in electronic format compatible with Microsoft Office Suite and PDF. Graphics packages used to create figures, tables, and charts shall be Compatible with Microsoft Office applications. Files over 5mb shall be Delivered via DOD SAFE concurrent with the notification letter to USG.
Files that cannot be transmitted electronically shall be mailed to the Following address:
PM CT2
ATTN: SFAE-STR-CTT
12211 SCIENCE DRIVE
Orlando, FL 32826-3276
CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS 101SEE BLOCK 16
101 15. TOTAL
18.ESTIMATED
TOTAL PRICE
See Block 16
5. CONTRACT REFERENCE
DI-ILSS-80191D
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Contractor Device Performance Report
2. TITLE OF THE DATA ITEM
A006
1. DATA ITEM NO.
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ILSSA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
22-OCT-2024
J. DATE
raquel.e.duran
I. APPROVED BYH. DATEG. PREPARED BY
john.g.farrell
Block 5: PWS 3.3.1, 3.4.7, 3.4.8, 3.4.11, 3.6, 3.6.2
BLOCK 4: DATA ITEMS DI-ILSS-80191D/T is TAILORED
AS FOLLOWS:
1. DI-ILSS-80191D/T
a. PARA(s). 10.2.1.r., 10.2.1.t. DELETE.
b. PARA. 10.2.1.u. CHANGE Navy to Army.
c. PARA. 10.2.2.d. DELETE
d. PARA. 10.2.2.j. REPLACE WITH NUMBER OF RESTARTS/REBOOTS. NUMBER
OF INCIDENCES TRAINING IS INTERRUPTED DUE TO COMPUTER (HOST OR
SUBSYSTEM) RE-STARTS/REBOOTS (EXAMPLE: 0/5). RESTARTS (RESETS)
INVOLVE SIMPLE RE-SETTING DEVICE BACK TO ORIGINAL MISSION
CONDITIONS AT THE INSTRUCTOR OPERATING STATION (IOS); WHEREAS, A
REBOOT REQUIRES COMPUTER SYSTEM/SUBSYSTEM RE-INITIALIZATION OF THE SOFTWARE.
e. PARA(s). 10.2.2.k., 10.2.2.l., 10.2.2.m. DELETE
f. PARA. 10.2.2.r. REPLACE WITH CUMULATIVE RESTARTS/REBOOTS. The total cumulative sum of all restarts/reboots, data element 10.2.2.j. for the contract year.
g. PARA. 10.2.2.s DELETE
h. PARA. 10.2.2.u. CHANGE "Government fiscal" to "contract".
i. PARA. 10.2.3 Part II DELETE
j. PARA. 10.2.4.b. REPLACE with "Activity Location"
k. PARA. 10.2.4.g. REPLACE with "In Repair as Start of Month" to record number of parts in repair as the start of the month.
l. PARA. 10.2.4.h. REPLACE with "New Induction" for number of new inductions for the month.
m. PARA. 10.2.4.i. REPLACE with "Repair Completed" for number of part repairs completed for the month.
n. PARA. 10.2.4.j. REPLACE with "In Repair at End of Month"
BLOCK 8:
A. THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
B. IF DISAPPROVED THE CONTRACTOR SHALL REVISE IAW COMMENTS AND
RESUBMIT NLT 10 CALENDAR DAYS AFTER RECEIPT OF COMMENTS.
BLOCK 9:
Distribution authorized to department of defense and U.S. DOD contractors only due to administrative or operational use effective 06/15/2023. Other requests for this document shall be referred to the requiring office.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive
5230.25 reference)).
BLOCK 12: SHALL BE DUE 45 DAYS AFTER THE FIRST DAY OF THE BASIC CONTRACT.
16. REMARKS 101SEE BLOCK 16
101 15. TOTALSee continuation sheet...
18.ESTIMATED
TOTAL PRICE
Page 1 of 2 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
16. REMARKS (Continued)
BLOCK 13: SHALL BE DUE THE 15TH OF EACH MONTH AND CONTINUE THROUGH
LIFE OF THE CONTRACT.
BLOCK 14:
Reproducible shall be delivered electronically per the PWS to the COR and PCO as stated in contract section F. The delivery shall be in electronic format compatible with Microsoft Office Suite and PDF. Graphics packages used to create figures, tables, and charts shall be Compatible with Microsoft Office applications. Files over 5mb shall be Delivered via DOD SAFE concurrent with the notification letter to USG.
Files that cannot be transmitted electronically shall be mailed to the Following address:
PM CT2
ATTN: SFAE-STR-CTT
12211 SCIENCE DRIVE
Orlando, FL 32826-3276
CONTRACTOR FORMAT IS ACCEPTABLE.
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ILSSA
B. EXHIBITA. CONTRACT LINE ITEM NO.
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Page 2 of 2 PagesDD FORM 1423-1, FEB 2001
PWS 3.1.2, 3.5.1.1
5. CONTRACT REFERENCE
DI-MGMT-80227
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A007
1. DATA ITEM NO.
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
22-OCT-2024
J. DATE
raquel.e.duran
I. APPROVED BYH. DATEG. PREPARED BY
john.g.farrell
Block 2: Contractors Progress, Status and Management Report
BLOCK 4: DATA ITEM DI-MGMT-80227/T IS TAILORED AS FOLLOWS:
A. PARA(s). 10.3.g., 10.3.i. DELETE B. PARA. 10.3.l. CHANGE TO SUMMARY OF ENGINEERING CHANGE PROPSAL (ECP), WORK ORDERS (WOs), PURCHASE REQUESTS (PRs), ENGINEERING PACKAGES (EPs) STATUS INDLUCING IDENTIFICATION OF PROPOSED ECPs, WOs, PRs, EPs, APPROVED ECPs, WOs, PRs, EPs, AND IMPLEMENTED ECPs, WOs, PRs, EPs.
BLOCK 8:
A. THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE OR REJECTION OF EACH SUBMISSION.
B. IF DISAPPROVED, THE CONTRACTOR SHALL REVISE IAW COMMENTS AND
RESUBMIT NLT 10 CALENDAR DAYS AFTER RECEIPT OF COMMENTS.
BLOCK 9:
Distribution authorized to department of defense and U.S. DOD contractors only due to administrative or operational use effective 06/15/2023. Other requests for this document shall be referred to requiring office.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive
5230.25 reference)).
BLOCK 12: Initial submission will be 45 days after the end of the initial transition period.
BLOCK 13: SHALL BE DUE ON THE 15TH OF EACH MONTH AND SHALL
CONTINUE MONTHLY THROUGH LIFE OF THE CONTRACT.
BLOCK 14:
Reproducible shall be delivered electronically per the PWS to the COR and PCO as stated in contract section F. The delivery shall be in electronic format compatible with Microsoft Office Suite and PDF. Graphics packages used to create figures, tables, and charts shall be Compatible with Microsoft Office applications. Files over 5mb shall be Delivered via DOD SAFE concurrent with the notification letter to USG.
Files that cannot be transmitted electronically shall be mailed to the Following address:
PM CT2
ATTN: SFAE-STR-CTT
12211 SCIENCE DRIVE
Orlando, FL 32826-3276
CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS 101BLOCK 16
101 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS 3.1.3
5. CONTRACT REFERENCE
DI-MGMT-81605
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Briefing Material
2. TITLE OF THE DATA ITEM
A008
1. DATA ITEM NO.
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
22-OCT-2024
J. DATE
raquel.e.duran
I. APPROVED BYH. DATEG. PREPARED BY
john.g.farrell
BLOCK 8: USG comments on the briefing package content will be made through the IPT within 7 calendar days of receipt. The Contractor shall deliver the final presentation updated IAW the review event NLT 10 calendar days after the conclusion of the event. The USG will review and approve or disapprove with comments NLT seven (7) calendar days after submittal. If disapproved the Contractor shall revise IAW comments and resubmit NLT seven (7) calendar days after receipt of comments.
BLOCK 9:
Distribution authorized to department of defense and U.S. DOD contractors only due to administrative or operational use effective 06/15/2023. Other requests for this document shall be referred to requiring office.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive
5230.25 reference)).
Block 10,12, 13 The Contractor shall deliver draft material NLT 14 calendar days prior to the corresponding event.
BLOCK 14:
Reproducible shall be delivered electronically per the PWS to the COR and PCO as stated in contract section F. The delivery shall be in electronic format compatible with Microsoft Office Suite and PDF. Graphics packages used to create figures, tables, and charts shall be Compatible with Microsoft Office applications. Files over 5mb shall be Delivered via DOD SAFE concurrent with the notification letter to USG.
Files that cannot be transmitted electronically shall be mailed to the Following address:
PM CT2
ATTN: SFAE-STR-CTT
12211 SCIENCE DRIVE
Orlando, FL 32826-3276
CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS 101SEE BLOCK 16
101 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS 3.1.3, 3.9.2
5. CONTRACT REFERENCE
DI-MGMT-81861C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Integrated Master Schedule (IMS)See Block 16
2. TITLE OF THE DATA ITEM
A009
1. DATA ITEM NO.
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
See Block 16
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
22-OCT-2024
J. DATE
raquel.e.duran
I. APPROVED BYH. DATEG. PREPARED BY
john.g.farrell
Block 2: Integrated Program Management Data and Analysis Report (IPMDAR)
Block 12: 30 DACA (Days After Contract Award)
BLOCK 8:
A. The government will have 7 calendar days for review and acceptance or rejection of each submission.
B. If disapproved, the contractor shall revise IAW comments and Resubmit NLT 10 calendar days after receipt of comments.
The Contractor shall not re-baseline any IMS activities without concurrence from the USG. As required, the Contractor shall deliver revised IMS baseline data anytime the data is revised NLT 30 calendar days of revisions for USG approval. The Contractor shall deliver status against the approved IMS baseline monthly. Revisions shall be identified in each submittal by use of Change Bars in MS office, or by similar means to make revisions easily identifiable.
BLOCK 9:
Distribution authorized to department of defense and U.S. DOD contractors only due to administrative or operational use effective 06/15/2023. Other requests for this document shall be referred to the requiring office.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive
5230.25 reference)).
Block 12: The Contractor shall submit the initial IMS NLT 30 days after contract award.
Block 13: Shall be due the 15th of each month and continue through the life of the contract or until directed otherwise by USG.
BLOCK 14:
Reproducible shall be delivered electronically per the PWS to the COR and PCO as stated in contract section F. The delivery shall be in electronic format compatible with Microsoft Office Suite and PDF. Graphics packages used to create figures, tables, and charts shall be Compatible with Microsoft Office applications. Files over 5mb shall be Delivered via DOD SAFE concurrent with the notification letter to USG.
Files that cannot be transmitted electronically shall be mailed to the Following address:
PM CT2
ATTN: SFAE-STR-CTT
12211 SCIENCE DRIVE
Orlando, FL 32826-3276
16. REMARKS 101SEE BLOCK 16
101 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS 3.1.5.1, 3.1.5.3, 3.4.4,
5. CONTRACT REFERENCE
DI-MGMT-81947B
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Property Management SystemSee Block 16
2. TITLE OF THE DATA ITEM
A010
1. DATA ITEM NO.
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
See Block 16
12.DATE OF FIRST
SUBMISSION
Block 16
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
22-OCT-2024
J. DATE
raquel.e.duran
I. APPROVED BYH. DATEG. PREPARED BY
john.g.farrell
Block 2: GOVERNMENT FURNISHED PROPERTY INVENTORY AND FORECASTING REPORT
Block 12: 60 DACA (Days After Contract Award)
The Contractor shall maintain a Property Management System (PMS) for Government Furnished Property and Contractor Acquired Property CAP in accordance with Federal Acquisition Regulation (FAR) 52.245-1. The Contractor shall develop a PMS that will address all aspects in detail if applicable to the contract. The Contractor will have 45 days to compile and submit the PMS to the Contracting Officer for review. The PMS shall entail written procedures and official property record of system shall contain procedures for acquisition, receiving, identification, records, reports, storage, movement, audits, physical inventories, consumption, utilization, maintenance, subcontractor control, self audits, disposition, and contract closeout of GFP in accordance with sound business practices and applicable provisions and other contractually imposed requirements. The PMS will be provided by Contractors management and reviewed by the Property Administrator and approved by the Contracting Officer (in writing) and during the life of this contract. Any and all changes to the PMS must be approved by the Contracting Officer in writing, prior to implementation.
The Contractor procedures shall address (if applicable) to the contract and scope of work. The PMS will be used in a Property Management System Analysis. Contractor shall also use USG Procurement Integrated Enterprise Environment if required.
The Government Furnished Property Master Report (MR) will be a combined multi-part Excel spreadsheet report. Government Furnished Property (GFP) to include purchase of all Contractor Acquired Property (CAP). Each report will have it owns book in Excel that tracks all Purchase Orders of each type of Government Furnished Property (GFP) detailed by Government Property classification (i.e., Equipment, Material, Special Test Equipment and Special Tooling), Track monthly physical inventories of GFP, Consumption Report of Materials, Gains of GFP, Losses of GFP, yearly GFP Utilization Report and PCARSS Cases. Contractor shall also use USG Procurement Integrated Enterprise Environment if required.
BLOCK 8:
A. The government will have 30 calendar days for review and acceptance or rejection of each submission.
B. If disapproved, the contractor shall revise IAW comments and Resubmit NLT 14 calendar days after receipt of comments.
BLOCK 9:
Distribution authorized to department of defense and U.S. DOD contractors only due to administrative or operational use effective 06/15/2023. Other requests for this document shall be referred to the requiring office.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal
16. REMARKS 101SEE BLOCK 16
101 15. TOTALSee continuation sheet...
18.ESTIMATED
TOTAL PRICE
penalties. Disseminate in accordance with provisions of DoD Directive
5230.25 reference)).
BLOCK 10. Submit as GFP after initial inventory (within 60 days of contract acceptance).
BLOCK 12: Initial submission will be 60 days after the end of the initial transition period.
BLOCKS 13: Subsequent submissions will be as required by other effected CDRLs or as requested by the Contracting Officer/CS/ACO/COR to include supporting a 10% joint inventory “spot check” upon 30-day notice. Final submission will be within 90 days of contract completion/termination and shall include reutilization/disposition recommendations.
BLOCK 14:
Reproducible shall be delivered electronically per the PWS to the COR and PCO as stated in contract section F. The delivery shall be in electronic format compatible with Microsoft Office Suite and PDF. Graphics packages used to create figures, tables, and charts shall be Compatible with Microsoft Office applications. Files over 5mb shall be Delivered via DOD SAFE concurrent with the notification letter to USG.
Files that cannot be transmitted electronically shall be mailed to the Following address:
PM CT2
ATTN: SFAE-STR-CTT
12211 SCIENCE DRIVE
Orlando, FL 32826-3276
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
CONTRACT DATA REQUIREMENTS LIST
PWS 3.2.3
5. CONTRACT REFERENCE
DI-MGMT-82000
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A011
1. DATA ITEM NO.
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
22-OCT-2024
J. DATE
raquel.e.duran
I. APPROVED BYH. DATEG. PREPARED BY
john.g.farrell
Block 2: DOD Information Assurance Certification and Accreditation Process (DIACAP) and Risk Management Framework (RMF) Deliverable Data
1. BLOCK 2: DOD Information Assurance Certification and Accreditation Process (DIACAP) and Risk Management Framework (RMF) Deliverable Data
2. BLOCK 4: DI-MGMT-82000A. The DIACAP and/or RMF artifacts shall be delivered in a format approved by the Governments Designated Accrediting Authority (DAA), Authorizing Official (AO), or Information Systems Security Manager (ISSM).
3. BLOCK 8:
A. The government will have 30 calendar days for review and acceptance or rejection of each submission.
B. If disapproved, the contractor shall revise IAW comments and Resubmit NLT 15 calendar days after receipt of comments.
4. BLOCK 9:
Distribution authorized to department of defense and U.S. DOD contractors only due to administrative or operational use effective 06/15/2023. Other requests for this document shall be referred to requiring office.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive
5230.25 reference)).
5. BLOCK 12: Initial submission will be 45 days after the end of the initial transition period.
6. BLOCK 13: Subsequent submissions will be annually or as required by other effected CDRLs or as requested by the Contracting Officer/CS/ACO/COR/ISSO/ISSM. Final submission will be within 60 days of contract completion/termination
7. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED PER SYSTEMS CLASSIFICATION
LEVEL TO THE VIA ELECTRONIC MAIL SOFTWARE, CD OR DVD MEDIA TO [CHIEF
ENGINEER].CIV@ARMY.MIL, [COR].CIV@ARMY.MIL, [APM].CIV@ARMY.MIL AND
[PC].CTR@ARMY.MIL; AND SHALL BE COMPATIBLE WITH MICROSOFT OFFICE
2016 AND 365.
8. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS 101SEE BLOCK 16
101 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS 3.2.3
5. CONTRACT REFERENCE
DI-MGMT-82001A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A012
1. DATA ITEM NO.
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
22-OCT-2024
J. DATE
raquel.e.duran
I. APPROVED BYH. DATEG. PREPARED BY
john.g.farrell
Block 2: DOD Risk Management Framework (RMF) Package Deliverables
BLOCK 8:
A.THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
B. IF DISAPPROVED THE CONTRACTOR SHALL REVISE IAW COMMENTS AND RESUBMIT NLT
10 CALENDAR DAYS AFTER RECEIPT OF COMMENTS.
BLOCK 9:
Distribution authorized to department of defense and U.S. DOD contractors only due to administrative or operational use effective 06/15/2023. Other requests for this document shall be referred to requiring office.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25
Block 12: 90 DACA (Days After Contract Award)
BLOCK 13: COMPLETE CDRL SHALL BE DUE 30 DAYS AFTER THE FIRST DAY OF EACH
OPTION YEAR OR WHEN REQUESTED BY THE USG. VULNERABILITY SCANS AND ANY
SYSTEM POA&M CHANGES SHALL BE DUE ON THE 15TH OF EACH MONTH AND SHALL
CONTINUE MONTHLY THROUGH THE LIFE OF THE CONTRACT.
A.THE CONTRACTOR SHALL DELIVER THE COMPLETE CDRL NLT 60 DAYS PRIOR TO THE ATO
EXPIRATION DATE.
B.THE CONTRACTOR SHALL CREATE/UPDATE THE DOCUMENTATION IAW SYSTEMS
CHANGES.
C. THE CONTRACTOR WILL REVIEW CONTROLS ANNUALLY AND PROVIDE TEST
RESULTS TO THE COR, ISSO, ISSE.
BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED PER SYSTEMS CLASSIFICATION
LEVEL TO THE COR, ISSO, ISSE AND AS STATED IN CONTRACT SECTION F
IF APPLICABLE.
NOTE: THESE DOCUMENTS ARE CLASSIFIED SECRET.
USING APPROVED FORMATS, THE CONTRACTOR SHALL DELIVER THE INITIAL
SUBMITTAL BY SYSTEM AS FOLLOWS:
SECURITY TECHNICAL IMPLEMENTATION GUIDES (STIGs), SECURITY READINESS GUIDES (SRGs), AND SECURE CONTENT AUTOMATION PROTOCOL (SCAP) BENCHMARKS
NLT 90 DAYS PRIOR TO ATO SUBMISSION SCHEDULE AND/OR AS AGREED TO BY THE
GOVERNMENT.
16. REMARKS 101SEE BLOCK 16
101 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS 3.1.5.1, 3.1.5.3, 3.4.4
5. CONTRACT REFERENCE
DI-MGMT-82173
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A013
1. DATA ITEM NO.
F. CONTRACTOR
TBD
E. CONTRACT/PR NO.
SOF TEAMS IV
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
See Block 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
22-OCT-2024
J. DATE
raquel.e.duran
I. APPROVED BYH. DATEG. PREPARED BY
john.g.farrell
Block 2: Government Furnished Equipment (GFE) Inventory Report
Block 12: 120 DACA (Days After Contract Award)
BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING REPORT
IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER SUBMITTING THE DATA
IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS REQUIRED
FOR EVERY DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)
TO THE GOVERNMENT.
BLOCK 8:
A. The government will have 30 calendar days for review and acceptance or rejection of each submission. B. If disapproved, the contractor shall revise IAW comments and Resubmit NLT 10 calendar days after receipt of comments.
BLOCK 9:
Distribution authorized to department of defense and U.S. DOD contractors only due to administrative or operational use effective 06/15/2023. Other requests for this document shall be referred to the requiring office.
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., Sec App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive
5230.25 reference)).
BLOCK 10 and 12: Shall be due 30 calendar days after receipt of Government Furnished Equipment (GFE).
BLOCK 13: Complete CDRL shall be due 30 calendar days after the first day of each option year or when requested by the USG.
BLOCK 14: The CDRL deliverable and its Receiving Report shall be submitted via the Wide Area Workflow (WAWF) module, which is located within the Procurement Integrated Enterprise Environment (PIEE), IAW contract clauses set forth in Section "G" Contract Administration Data. The deliverables shall also be sent via encrypted email to the Contracting Officer Representatives (COR)/ Alternate Contracting Officer Representative (ACOR), Procuring Contracting Officer and the Contract Specialist designated in Section F of the contract.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .