Attachment 3_ CDRLs.pdf
PDF 3 MB Posted
- Attached to
- JRTC tower replacements/JMRC tech. refresh Federal contract opportunity
- Solicitation number
- W900KK-20-R-0058
About this file
This solicitation seeks to replace four communication towers and shelters at the Joint Readiness Training Center (JRTC) and perform technology refreshes at two tower sites at the Joint Multinational Readiness Center (JMRC). Offerors must provide all labor, materials, equipment, tools, supervision and other items and services necessary to replace the towers and shelters at JRTC and refresh the tower technologies at JMRC. The Army Materiel Command Contracting Command Orlando Contracting Center will award a firm-fixed-price contract with a period of performance from the award date through September 30, 2023. Proposals are due by April 10, 2020, with the award date anticipated on or around June 15, 2020.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W900KK-20-R-0058 Amendment 02.pdf | ||
| Attachment 5 PPQ_Amendment 02.pdf | ||
| Attachment 4 Cost Workbook_Amendment 02.xlsx | XLSX spreadsheet | |
| Responses to CTC Tower Efforts Questions_Jul2020_Amendment 02.xlsx | XLSX spreadsheet | |
| Attachment 2 Requriement Matrix_July2020_Amendment 02.xlsx | XLSX spreadsheet | |
| Attachment 1 JRTC and JRMC Tower PWS_25 JUN 20_Amendment 02.pdf | ||
| W900KK-20-R-0058 Amendment 02 Conformed Solicitation.pdf | ||
| Attachment 8_DBA_Wage_Determination_LA20200006.pdf | ||
| Attachment 4_ Cost Workbook.xlsx | XLSX spreadsheet | |
| Attachment 6 LT2 Instruction.docx | DOCX document | |
| Attachment 5_ PPQ.PDF | ||
| Attachment 7_Industry_Comment Form.doc | DOC document | |
| W900KK-20-R-0058 Amendment 01.pdf | ||
| Attachment 2 Requirement Matrix_20200610v1.xlsx | XLSX spreadsheet | |
| Attachment 1_ PWS_PWS_2019_031_CTC_Tower_ Replacement.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SFAE-STRI-PMST-CTIS
6. REQUIRING OFFICE
PWS Paragraph 3.1.1
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Design and Coverage AnalysisScientific and Technical Reports
2. TITLE OF THE DATA ITEM
A001
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
2TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Kahl, Randi
Block D: JRTC/JMRC Tower Replacement/Update
1. BLOCK 12 : THE CONTRACTOR SHALL BE PRESENTED AT THE
PRELIMINARY DESIGN REVIEW FOR EACH COMBAT TRAINING CENTER.
2. CONTRACTOR FORMAT IS ACCEPTABLE.
3. GOVERNMENT WILL HAVE FIVE DAYS TO REVIEW AND PROVIDE COMMENTS.
4. CONTRACTOR SHALL HAVE FIVE DAYS TO INCORPORATE COMMENTS.
5. FILE NAMING CONVENTION: THE FOLLOWING CHARACTERS SHALL NOT
TO BE USED WITHIN THE NAMES OF FOLDERS, LISTS, OR COLUMN NAMES. /
\ : * ? < > | # { } % ~ & AND UNDERSCORES. UNDERSCORE SHALL NOT BE
USED AT THE START OF ANY FOLDER OR FILE PERIOD SHALL NOT BE USED
CONSECUTIVELY IN THE MIDDLE, END OF A FOLDER OR FILE NAME
SHALL NOT BE LONGER THAN 128 CHARACTERS. FILE NAMES WILL BE
DESCRIPTIVE AND ABBREVIATIONS SHALL BE KEPT TO A MINIMUM.
METADATA WILL BE USED TO THE MAXIMUM EXTENT WHERE APPROPRIATE
FILE NAMES WILL USE AN UNDERSCORE VICE A SPACE WHERE APPROPRIATE.
6. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL,
SHALL BE COMPATIBLE WITH MICROSOFT WORD 2013. GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE
WITH MICROSOFT WORD 2013. REPRODUCIBLE SHALL BE DELIVERED VIA
ELECTRONIC MAIL TO RANDI.J.KAHL.CIV@MAIL.MIL,
CAFFEE.L.MEIER.CTR@MAIL.MIL AND THE CONTRACT SPECIALIST
FRANCIS.D.SIERRATORRES.CIV@MAIL.MIL.
7. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY
DUE TO ADMINISTRATIVE OR OPERATIONAL USE, EFFECTIVE 1 MARCH
2020. OTHER REQUESTS SHALL BE REFERRED TO U.S. ARMY PEO
SIMULATION, TRAINING, AND INSTRUMENTATION (STRI), AND U.S. ARMY
CONTRACTING COMMAND ORLANDO (ACC-ORL-OPA).
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
PWS PARAGRAPH 3.1.9
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
SOIL BORING REPORTScientific and Technical Reports
2. TITLE OF THE DATA ITEM
A002
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
A
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Dubose, Mark
Block D: JRTC/JMRC Tower Replacement/Update
1. BLOCK 12: SHALL BE DUE AT 65% DESIGN REVIEW.
2. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF SUBMISSION.
3. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
4. FILE NAMING CONVENTION: THE FOLLOWING CHARACTERS SHALL NOT TO
BE USED WITHIN THE NAMES OF FOLDERS, LISTS, OR COLUMN NAMES. / \ :
* ? < > | # { } % ~ & AND UNDERSCORES ( _ )
UNDERSCORE SHALL NOT BE USED AT THE START OF ANY FOLDER OR FILE
PERIOD SHALL NOT BE USED CONSECUTIVELY IN THE MIDDLE, END OF A
FOLDER OR FILE NAME SHALL NOT BE LONGER THAN 128 CHARACTERS
FILE NAMES WILL BE DESCRIPTIVE AND ABBREVIATIONS SHALL BE KEPT
TO A MINIMUM METADATA WILL BE USED TO THE MAXIMUM EXTENT WHERE
APPROPRIATE FILE NAMES WILL USE AN UNDERSCORE VICE A SPACE
WHERE APPROPRIATE.
5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL,
SHALL BE COMPATIBLE WITH MICROSOFT WORD 2013. GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE
WITH MICROSOFT WORD 2013. REPRODUCIBLE SHALL BE DELIVERED VIA
ELECTRONIC MAIL TO RANDI.J.KAHL.CIV@MAIL.MIL,
CAFFEE.L.MEIER.CTR@MAIL.MIL, SHAUN.C.BYRD.CIV@MAIL.MIL AND THE
PEO STRI CONTRACT SPECIALIST FRANCIS.D.SIERRATORRES.CIV@MAIL.MIL.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS PARAGRAPH 3.3.2
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Foundation ReportScientific and Technical Reports
2. TITLE OF THE DATA ITEM
A003
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Dubose, Mark
Block D: JRTC/JMRC Tower Replacement/Update
1 BLOCK 12 SHALL BE DUE AT THE PRELIMINARY DESIGN REVIEW
2. THE GOVERNMENT SHALL HAVE 20 WORKING DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION.
3. THE CONTRACTOR SHALL HAVE 10 WORKING DAYS TO INCORPORATE
GOVERNMENT COMMENTS AND RESUBMIT.
4. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL
TO RANDI.J.KAHL.CIV@MAIL.MIL,
CHAD.J.THOMAS24.CIV@MAIL.MIL AND THE CONTRACT SPECIALIST,
COMPATIBLE WITH CURRENT PEO STRI VERSION OF MICROSOFT OFFICE
2013. GRAPHIC PACKAGES USED TO CREATE FIGURES, TABLES, AND CHARTS
SHALL BE COMPATIBLE WITH CURRENT PEO STRI VERSION OF MICROSOFT OFFICE 2013.
5. CONTRACTOR FORMAT IS ACCEPTABLE
6. FILE NAMING CONVENTION: THE FOLLOWING CHARACTERS SHALL NOT TO
BE USED WITHIN THE NAMES OF FOLDERS, LISTS, OR COLUMN NAMES. / \ :
* ? < > | # { } % ~ & AND UNDERSCORES. UNDERSCORE SHALL NOT BE
USED AT THE START OF ANY FOLDER OR FILE PERIOD SHALL NOT BE USED
CONSECUTIVELY IN THE MIDDLE, END OF A FOLDER OR FILE NAME SHALL
NOT BE LONGER THAN 128 CHARACTERS. FILE NAMES WILL BE
DESCRIPTIVE AND ABBREVIATIONS SHALL BE KEPT TO A MINIMUM.
METADATA WILL BE USED TO THE MAXIMUM EXTENT WHERE APPROPRIATE
FILE NAMES WILL USE AN UNDERSCORE VICE A SPACE WHERE APPROPRIATE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS PARAGRAPH 4.1
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Tower Structure ReportScientific and Technical Reports
2. TITLE OF THE DATA ITEM
A004
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 1`6
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Kahl, Randi
Block D: JRTC/JMRC Tower Replacement/Update
1 BLOCK 12 SHALL BE DUE AT THE PRELIMINARY DESIGN REVIEW
2. THE GOVERNMENT SHALL HAVE 20 WORKING DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION.
3. THE CONTRACTOR SHALL HAVE 10 WORKING DAYS TO INCORPORATE
GOVERNMENT COMMENTS AND RESUBMIT.
4. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL TO
RANDI.J.KAHL.CIV@MAIL.MIL,
CHAD.J.THOMAS24.CIV@MAIL.MIL AND THE CONTRACT SPECIALIST,
COMPATIBLE WITH CURRENT PEO STRI VERSION OF MICROSOFT OFFICE 2013.
GRAPHIC PACKAGES USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL
BE COMPATIBLE WITH CURRENT PEO STRI VERSION OF MICROSOFT OFFICE 2013.
5. CONTRACTOR FORMAT IS ACCEPTABLE
6. FILE NAMING CONVENTION: THE FOLLOWING CHARACTERS SHALL NOT TO BE
USED WITHIN THE NAMES OF FOLDERS, LISTS, OR COLUMN NAMES. / \ : * ? <
> | # { } % ~ & AND UNDERSCORES. UNDERSCORE SHALL NOT BE
USED AT THE START OF ANY FOLDER OR FILE PERIOD SHALL NOT BE USED
CONSECUTIVELY IN THE MIDDLE, END OF A FOLDER OR FILE NAME SHALL
NOT BE LONGER THAN 128 CHARACTERS. FILE NAMES WILL BE DESCRIPTIVE
AND ABBREVIATIONS SHALL BE KEPT TO A MINIMUM. METADATA WILL BE
USED TO THE MAXIMUM EXTENT WHERE APPROPRIATE FILE NAMES WILL USE
AN UNDERSCORE VICE A SPACE WHERE APPROPRIATE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS PARAGRAPH 5.1
5. CONTRACT REFERENCE
DI-MGMT-80227
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
CONTRACTORS PROGRESS REPORTSee Block 16
2. TITLE OF THE DATA ITEM
A005
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
A
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCk 16
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Dubose, Mark
Block D: JRTC/JMRC Tower Replacement/Update
Block 2: CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT
1. BLOCK 12: SHALL BE DUE 30 DAYS AFTER AWARD OF THE CONTRACT.
2. BLOCK 13: SHALL CONTINUE MONTHLY THROUGH LIFE OF THE CONTRACT.
3. REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL TO
RANDI.J.KAHL.CIV@MAIL.MIL AND ACC-ORLANDO CONTRACTING
SPECIALIST FRANCIS.D.SIERRATORRES.CIV@MAIL.MIL , COMPATIBLE
WITH CURRENT PEO STRI VERSION OF MICROSOFT OFFICE 2013. GRAPHIC
PACKAGES USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE
COMPATIBLE WITH CURRENT PEO STRI VERSION OF MICROSOFT OFFICE 2013.
4. THE GOVERNMENT SHALL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE
OR REJECTION OF EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
6. CONTRACTOR FORMAT IS ACCEPTABLE.
7. FILE NAMING CONVENTION: THE FOLLOWING CHARACTERS SHALL NOT
TO BE USED WITHIN THE NAMES OF FOLDERS, LISTS, OR COLUMN NAMES. /
\ : * ? < > | # { } % ~ & AND UNDERSCORES. UNDERSCORE SHALL NOT BE
USED AT THE START OF ANY FOLDER OR FILE PERIOD SHALL NOT BE USED
CONSECUTIVELY IN THE MIDDLE, END OF A FOLDER OR FILE NAME
SHALL NOT BE LONGER THAN 128 CHARACTERS. FILE NAMES WILL BE
DESCRIPTIVE AND ABBREVIATIONS SHALL BE KEPT TO A MINIMUM.
METADATA WILL BE USED TO THE MAXIMUM EXTENT WHERE APPROPRIATE
FILE NAMES WILL USE AN UNDERSCORE VICE A SPACE WHERE APPROPRIATE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
See Block 16
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
MinutesScientific and Technical Reports
2. TITLE OF THE DATA ITEM
A006
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BBLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Dubose, Mark
Block D: JRTC/JMRC Tower Replacement/Update
Block 5: PWS PARAGRAPH 5.2, 5.2.1, 5.2.2, 5.2.3, 5.2.4, 5.2.5, AND 5.4.1
1. BLOCK 12 : THE CONTRACTOR SHALL DELIVER THE MINUTES FOLLOWING
EACH MEETING.
2. CONTRACTOR FORMAT IS ACCEPTABLE.
3. BLOCK 10: CONTRACTOR SHALL DELIVER THE MEETING MINUTES WITHIN
FIVE DAYS OF EACH MEETING.
4. GOVERNMENT WILL HAVE FIVE DAYS TO REVIEW AND PROVIDE COMMENTS.
5. CONTRACTOR SHALL HAVE FIVE DAYS TO INCORPORATE COMMENTS.
6. CONTRACTOR SHALL MAINTAIN ARCHIVE OF MINUTES.
7. FILE NAMING CONVENTION: THE FOLLOWING CHARACTERS SHALL NOT
TO BE USED WITHIN THE NAMES OF FOLDERS, LISTS, OR COLUMN NAMES. /
\ : * ? < > | # { } % ~ & AND UNDERSCORES. UNDERSCORE SHALL NOT BE
USED AT THE START OF ANY FOLDER OR FILE PERIOD SHALL NOT BE USED
CONSECUTIVELY IN THE MIDDLE, END OF A FOLDER OR FILE NAME
SHALL NOT BE LONGER THAN 128 CHARACTERS. FILE NAMES WILL BE
DESCRIPTIVE AND ABBREVIATIONS SHALL BE KEPT TO A MINIMUM.
METADATA WILL BE USED TO THE MAXIMUM EXTENT WHERE APPROPRIATE
FILE NAMES WILL USE AN UNDERSCORE VICE A SPACE WHERE APPROPRIATE.
8. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL,
SHALL BE COMPATIBLE WITH MICROSOFT WORD 2013. GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE
WITH MICROSOFT WORD 2013. REPRODUCIBLE SHALL BE DELIVERED VIA
ELECTRONIC MAIL TO RANDI.J.KAHL.CIV@MAIL.MIL,AND THE CONTRACT
SPECIALIST FRANCIS.D.SIERRATORRES.CIV@MAIL.MIL.
9. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY
DUE TO ADMINISTRATIVE OR OPERATIONAL USE, EFFECTIVE 1 MARCH
2020. OTHER REQUESTS SHALL BE REFERRED TO U.S. ARMY PEO
SIMULATION, TRAINING, AND INSTRUMENTATION (STRI), AND U.S. ARMY
CONTRACTING COMMAND ORLANDO (ACC-ORL-OPA).
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
See Block 16
5. CONTRACT REFERENCE
DI-ADMN-81373
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Presentation Material
2. TITLE OF THE DATA ITEM
A007
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ADMN
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
A
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Dubose, Mark
Block D: JRTC/JMRC Tower Replacement/Update
Block 5: PWS PARAGRAPH 5.2, 5.2.1, 5.2.2, 5.2.3, 5.2.4, 5.2.5, AND 5.4.1
1. BLOCK 10: SHALL BE REQUIRED FOR POST AWARD CONFERENCE, ALL
DESIGN REVIEWS, INTEGRATED PRODUCT TEAM, TEST INTEGRATION
WORKING GROUPS, AND TEST READINESS REVIEW.
2. BLOCK 12 AND BLOCK 13: SHALL BE DUE 5 DAY PRIOR TO POST AWARD
CONFERENCE, IPTS, TIWGS, AND ALL DESIGN REVIEWS. SHALL BE DUE 7
DAYS PRIOR TO TEST READINESS REVIEW.
3. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL,
SHALL BE COMPATIBLE WITH MICROSOFT WORD 2013. GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE
WITH MICROSOFT WORD 2013. REPRODUCIBLE SHALL BE DELIVERED VIA
ELECTRONIC MAIL TO RANDI.J.KAHL.CIV@MAIL.MIL,
SHAUN.C.BYRD.CIV@MAIL.MIL,AND THE CONTRACT SPECIALIST
FRANCIS.D.SIERRATORRES.CIV@MAIL.MIL.
4. THE GOVERNMENT SHALL HAVE 3 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF THE SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 2 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
6. CONTRACTOR FORMAT IS ACCEPTABLE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
ne
PWS PARAGRAPH 5.3.3
5. CONTRACT REFERENCE
DI-CMAN-80639C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Engineering Change Proposal (ECP)
2. TITLE OF THE DATA ITEM
A008
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER CMAN
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Dubose, Mark
Block D: JRTC/JMRC Tower Replacement/Update
1. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY
DUE TO ADMINISTRATIVE OR OPERATIONAL USE, EFFECTIVE 1 MAR 2020.
OTHER REQUESTS SHALL BE REFERRED TO U.S. ARMY PEO SIMULATION,
TRAINING, AND INSTRUMENTATION (STRI), U.S. ARMY CONTRACTING
COMMAND ORLANDO (ACC-ORL-OPA).
2. BLOCK 12: AS REQUIRED THROUGHOUT THE PERIOD OF PERFORMANCE
FOR THE CONTRACT.
3. BLOCK 13: AS REQUIRED THROUGHOUT THE PERIOD OF PERFORMANCE
FOR THE CONTRACT.
4. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL TO
MARK.F.DUBOSE.CIV@MAIL.MIL AND THE CONTRACT SPECIALIST
FRANCIS.D.SIERRATORRES.CIV@MAIL.MIL, COMPATIBLE WITH CURRENT
PEO STRI VERSION OF MICROSOFT OFFICE 2013. GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE
WITH CURRENT PEO STRI VERSION OF MICROSOFT OFFICE 2013.
5. FILE NAMING CONVENTION: THE FOLLOWING CHARACTERS SHALL NOT
TO BE USED WITHIN THE NAMES OF FOLDERS, LISTS, OR COLUMN NAMES. /
\ : * ? < > | # { } % ~ & AND UNDERSCORES. UNDERSCORE SHALL NOT BE
USED AT THE START OF ANY FOLDER OR FILE PERIOD SHALL NOT BE USED
CONSECUTIVELY IN THE MIDDLE, END OF A FOLDER OR FILE NAME
SHALL NOT BE LONGER THAN 128 CHARACTERS. FILE NAMES WILL BE
DESCRIPTIVE AND ABBREVIATIONS SHALL BE KEPT TO A MINIMUM.
METADATA WILL BE USED TO THE MAXIMUM EXTENT WHERE APPROPRIATE
FILE NAMES WILL USE AN UNDERSCORE VICE A SPACE WHERE APPROPRIATE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS PARAGRAPH 5.3.3
5. CONTRACT REFERENCE
DI-SAFT-80103B
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A009
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SAFT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SSE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Dubose, Mark
Block D: JRTC/JMRC Tower Replacement/Update
Block 2: ENGINEERING CHANGE PROPOSAL SYSTEM SAFETY REPORT
1. BLOCK 9:DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY
DUE TO ADMINISTRATIVE OR OPERATIONAL USE, EFFECTIVE 1 MARCH
2020. OTHER REQUESTS SHALL BE REFERRED TO U.S. ARMY PEO
SIMULATION, TRAINING, AND INSTRUMENTATION (STRI), AND U.S. ARMY
CONTRACTING COMMAND ORLANDO (ACC-ORL-OPA).
2. BLOCKS 12 AND BLOCK 13: SHALL BE DUE 15 DAYS AFTER IDENTIFYING
A CHANGE TO ANY ESTABLISHED BASELINE.
3. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL TO
MARK.F.DUBOSE.CIV@MAIL.MIL AND THE CONTRACT SPECIALIST
FRANCIS.D.SIERRATORRES.CIV@MAIL.MIL, COMPATIBLE WITH CURRENT
PEO STRI VERSION OF MICROSOFT OFFICE 2013. GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE
WITH CURRENT PEO STRI VERSION OF MICROSOFT OFFICE 2013.
4. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND APPROVAL OF
EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
6. CONTRACTOR FORMAT IS ACCEPTABLE.
7.FILE NAMING CONVENTION: THE FOLLOWING CHARACTERS SHALL NOT TO
BE USED WITHIN THE NAMES OF FOLDERS, LISTS, OR COLUMN NAMES. / \ :
* ? < > | # { } % ~ & AND UNDERSCORES. UNDERSCORE SHALL NOT BE USED
AT THE START OF ANY FOLDER OR FILE PERIOD SHALL NOT BE USED
CONSECUTIVELY IN THE MIDDLE, END OF A FOLDER OR FILE NAME
SHALL NOT BE LONGER THAN 128 CHARACTERS. FILE NAMES WILL BE
DESCRIPTIVE AND ABBREVIATIONS SHALL BE KEPT TO A MINIMUM.
METADATA WILL BE USED TO THE MAXIMUM EXTENT WHERE APPROPRIATE
FILE NAMES WILL USE AN UNDERSCORE VICE A SPACE WHERE APPROPRIATE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS PARAGRAPH 5.3.3
5. CONTRACT REFERENCE
DI-CMAN-80463C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
ENGINEERING RELEASE RECORDEngineering Release Record (ERR)
2. TITLE OF THE DATA ITEM
A010
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER CMAN
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Dubose, Mark
Block D: JRTC/JMRC Tower Replacement/Update
1. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY
DUE TO ADMINISTRATIVE OR OPERATIONAL USE, EFFECTIVE 1 MARCH
2020. OTHER REQUESTS SHALL BE REFERRED TO U.S. ARMY PEO
SIMULATION, TRAINING, AND INSTRUMENTATION (STRI), U.S. ARMY
CONTRACTING COMMAND ORLANDO (ACC-ORL-OPA).
2. BLOCK 12: SHALL BE DUE 90 DAYS AFTER RECEIPT OF APPROVED ECP.
3. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL TO
MARK.F.DUBOSE.CIV@MAIL.MIL AND THE CONTRACT SPECIALIST
FRANCIS.D.SIERRATORRES.CIV@MAIL.MIL, COMPATIBLE WITH CURRENT
PEO STRI VERSION OF MICROSOFT OFFICE 2013. GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE
WITH CURRENT PEO STRI VERSION OF MICROSOFT OFFICE 2013.
4. THE GOVERNMENT WILL HAVE 30 DAYS FOR REVIEW AND APPROVAL OF
EACH SUBMISSION.
5. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
6. CONTRACTOR FORMAT IS ACCEPTABLE.
7. FILE NAMING CONVENTION: THE FOLLOWING CHARACTERS SHALL NOT
TO BE USED WITHIN THE NAMES OF FOLDERS, LISTS, OR COLUMN NAMES. /
\ : * ? < > | # { } % ~ & AND UNDERSCORES. UNDERSCORE SHALL NOT BE
USED AT THE START OF ANY FOLDER OR FILE PERIOD SHALL NOT BE USED
CONSECUTIVELY IN THE MIDDLE, END OF A FOLDER OR FILE NAME
SHALL NOT BE LONGER THAN 128 CHARACTERS. FILE NAMES WILL BE
DESCRIPTIVE AND ABBREVIATIONS SHALL BE KEPT TO A MINIMUM.
METADATA WILL BE USED TO THE MAXIMUM EXTENT WHERE APPROPRIATE
FILE NAMES WILL USE AN UNDERSCORE VICE A SPACE WHERE APPROPRIATE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS PARAGRAPH 5.3.6
5. CONTRACT REFERENCE
DI-MISC-81174
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
JF12/1494Frequency Allocation Data
2. TITLE OF THE DATA ITEM
A011
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
2TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Dubose, Mark
Block D: JRTC/JMRC Tower Replacement/Update
1. BLOCK 12: SHALL BE DUE 30 DAYS AFTER FINAL DESIGN REVIEW FOR
EACH COMBAT TRAINING CENTER.
2. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF SUBMISSION.
3. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
4. FILE NAMING CONVENTION: THE FOLLOWING CHARACTERS SHALL NOT
TO BE USED WITHIN THE NAMES OF FOLDERS, LISTS, OR COLUMN NAMES. /
\ : * ? < > | # { } % ~ & AND UNDERSCORES.
UNDERSCORE SHALL NOT BE USED AT THE START OF ANY FOLDER OR FILE
PERIOD SHALL NOT BE USED CONSECUTIVELY IN THE MIDDLE, END OF A
FOLDER OR FILE NAME SHALL NOT BE LONGER THAN 128 CHARACTERS FILE
NAMES WILL BE DESCRIPTIVE AND ABBREVIATIONS SHALL BE KEPT TO A
MINIMUM METADATA WILL BE USED TO THE MAXIMUM EXTENT WHERE
APPROPRIATE FILE NAMES WILL USE AN UNDERSCORE VICE A SPACE
WHERE APPROPRIATE.
5. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL,
SHALL BE COMPATIBLE WITH MICROSOFT WORD 2013. GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE
WITH MICROSOFT WORD 2013. REPRODUCIBLE SHALL BE DELIVERED VIA
ELECTRONIC MAIL TO
MARK.F.DUBOSE.CIV@MAIL.MIL AND THE PEO STRI CONTRACT SPECIALIST
FRANCIS.D.SIERRATORRES.CIV@MAIL.MIL.
6. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY
DUE TO ADMINISTRATIVE OR OPERATIONAL USE, EFFECTIVE 1 MARCH
2020. OTHER REQUESTS SHALL BE REFERRED TO U.S. ARMY PEO
SIMULATION, TRAINING, AND INSTRUMENTATION (STRI),AND U.S. ARMY
CONTRACTING COMMAND ORLANDO (ACC-ORL-OPA).
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS PARAGRAPH 5.4
5. CONTRACT REFERENCE
DI-NDTI-80603A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Test Procedure
2. TITLE OF THE DATA ITEM
A012
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER NDTI
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
2TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Dubose, Mark
Block D: JRTC/JMRC Tower Replacement/Update
1. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED PRIOR TO THE
START OF ANY TESTING FOR EACH COMBAT TRAINING CENTER.
2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY
DUE TO TEST AND EVALUATION USE, EFFECTIVE 1 MARCH 2020. OTHER
REQUESTS SHALL BE REFERRED TO U.S. ARMY PEO SIMULATION, TRAINING,
AND INSTRUMENTATION (STRI), AND U.S. ARMY CONTRACTING COMMAND
ORLANDO (ACC-ORL-OPA).
3. BLOCK 12: SHALL BE DUE 60 DAYS BEFORE BEGINNING OF ON-SITE
ACCEPTANCE TEST AT EACH COMBAT TRAINING CENTER.
4. BLOCK 14: REPRODUCIBLES SHALL BE DELIVERED VIA ELECTRONIC MAIL
IN MICROSOFT OFFICE 2013. GRAPHICS PACKAGES USED TO CREATE
FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT
OFFICE 2013. REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL TO
MARK.F.DUBOSE.CIV@MAIL.MIL AND CONTRACT SPECIALIST
FRANCIS.D.SIERRATORRES.CIV@MAIL.MIL.
5. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF SUBMISSION.
6. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
7. CONTRACTOR FORMAT IS ACCEPTABLE.
8. FILE NAMING CONVENTION: THE FOLLOWING CHARACTERS SHALL NOT
TO BE USED WITHIN THE NAMES OF FOLDERS, LISTS, OR COLUMN NAMES. /
\ : * ? < > | # { } % ~ & AND UNDERSCORES. UNDERSCORE SHALL NOT BE
USED AT THE START OF ANY FOLDER OR FILE PERIOD SHALL NOT BE USED
CONSECUTIVELY IN THE MIDDLE, END OF A FOLDER OR FILE NAME
SHALL NOT BE LONGER THAN 128 CHARACTERS. FILE NAMES WILL BE
DESCRIPTIVE AND ABBREVIATIONS SHALL BE KEPT TO A MINIMUM.
METADATA WILL BE USED TO THE MAXIMUM EXTENT WHERE APPROPRIATE
FILE NAMES WILL USE AN UNDERSCORE VICE A SPACE WHERE APPROPRIATE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS PARAGRAPH 5.4
5. CONTRACT REFERENCE
DI-NDTI-80809B
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Test/Inspection Report
2. TITLE OF THE DATA ITEM
A013
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER NDTI
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
2TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Dubose, Mark
Block D: JRTC/JMRC Tower Replacement/Update
1. BLOCK 12: SHALL BE DUE 20 DAYS AFTER THE COMPLETION OF ANY TEST
AT EACH OF THE COMBAT TRAINING CENTERS.
2. BLOCK 14: REPRODUCIBLES SHALL BE DELIVERED VIA ELECTRONIC MAIL
IN MICROSOFT OFFICE 2013. GRAPHICS PACKAGES USED TO CREATE
FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE WITH MICROSOFT
OFFICE 2013. REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC
MAIL TO MARK.F.DUBOSE.CIV@MAIL.MIL AND THE CONTRACT SPECIALIST
FRANCIS.D.SIERRATORRES.CIV@MAIL.MIL.
3. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
4. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
5. CONTRACTOR FORMAT IS ACCEPTABLE.
6. FILE NAMING CONVENTION: THE FOLLOWING CHARACTERS SHALL NOT TO
BE USED WITHIN THE NAMES OF FOLDERS, LISTS, OR COLUMN NAMES. / \ :
* ? < > | # { } % ~ & AND UNDERSCORES. UNDERSCORE SHALL NOT BE USED
AT THE START OF ANY FOLDER OR FILE PERIOD SHALL NOT BE USED
CONSECUTIVELY IN THE MIDDLE, END OF A FOLDER OR FILE NAME
SHALL NOT BE LONGER THAN 128 CHARACTERS FILE NAMES WILL BE
DESCRIPTIVE AND ABBREVIATIONS SHALL BE KEPT TO A MINIMUM
METADATA WILL BE USED TO THE MAXIMUM EXTENT WHERE APPROPRIATE
FILE NAMES WILL USE AN UNDERSCORE VICE A SPACE WHERE APPROPRIATE.
7. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY
DUE TO TEST AND EVALUATION, EFFECTIVE 1 MARCH 2020. OTHER
REQUESTS SHALL BE REFERRED TO U.S. ARMY PEO SIMULATION, TRAINING,
AND INSTRUMENTATION (STRI), AND U.S. ARMY CONTRACTING COMMAND
ORLANDO (ACC-ORL-OPA).
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS PARAGRAPH 5.7
5. CONTRACT REFERENCE
DI-SAFT-80106B
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
HHARHealth Hazard Assessment Report
2. TITLE OF THE DATA ITEM
A014
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SAFT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
2TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Dubose, Mark
Block D: JRTC/JMRC Tower Replacement/Update
1. BLOCK 8: APPROVAL IS REQUIRED PRIOR TO TESTING WITH GOVERNMENT
PERSONNEL OR FACILITIES.
2. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY
DUE TO ADMINISTRATIVE OR OPERATIONAL USE, EFFECTIVE 1 MARCH
2020. OTHER REQUESTS SHALL BE REFERRED TO U.S. ARMY PEO
SIMULATION, TRAINING, AND INSTRUMENTATION (STRI), AND U.S. ARMY
CONTRACTING COMMAND ORLANDO (ACC-ORL-OPA).
3. CONTRACTOR FORMAT IS ALLOWED IN ACCORDANCE WITH THE DID.
4. BLOCK 12: INITIAL SUBMITTAL 30 DAYS AFTER CRITICAL DESIGN
REVIEW (CDR) WITH FINAL DUE 60 PRIOR TO TEST READINESS REVIEW
(TRR) FOR EACH OF THE COMBAT TRAINING CENTERS.
5. THE GOVERNMENT SHALL HAVE 20 DAYS TO ACCEPT/REJECT AND PROVIDE COMMENTS.
6. THE CONTRACTOR WILL HAVE 10 DAYS TO INCORPORATE CHANGES.
7. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL TO
MARK.F.DUBOSE.CIV@MAIL.MIL AND THE CONTRACT SPECIALIST
FRANCIS.D.SIERRATORRES.CIV@MAIL.MIL, COMPATIBLE WITH CURRENT
PEO STRI VERSION OF MICROSOFT OFFICE 2013. GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE
WITH CURRENT PEO STRI VERSION OF MICROSOFT OFFICE 2013.
8. FILE NAMING CONVENTION: THE FOLLOWING CHARACTERS SHALL NOT TO
BE USED WITHIN THE NAMES OF FOLDERS, LISTS, OR COLUMN NAMES. / \ :
* ? < > | # { } % ~ & AND UNDERSCORES. UNDERSCORE SHALL NOT BE USED
AT THE START OF ANY FOLDER OR FILE PERIOD SHALL NOT BE USED
CONSECUTIVELY IN THE MIDDLE, END OF A FOLDER OR FILE NAME
SHALL NOT BE LONGER THAN 128 CHARACTERS. FILE NAMES WILL BE
DESCRIPTIVE AND ABBREVIATIONS SHALL BE KEPT TO A MINIMUM.
METADATA WILL BE USED TO THE MAXIMUM EXTENT WHERE APPROPRIATE
FILE NAMES WILL USE AN UNDERSCORE VICE A SPACE WHERE APPROPRIATE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS PARGRAPH 5.7
5. CONTRACT REFERENCE
DI-SAFT-80102B
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
SARSafety Assessment Report (SAR)
2. TITLE OF THE DATA ITEM
A015
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SAFT
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCKK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
2TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Dubose, Mark
Block D: JRTC/JMRC Tower Replacement/Update
1. BLOCK 4: CONTRACTOR FORMAT IS ACCEPTABLE AS ALLOWED BY THE DID.
2. BLOCK 8: GOVERNMENT APPROVAL WILL BE REQUIRED PRIOR TO TESTING
WITH GOVERNMENT PERSONNEL OR FACILITIES.
3. BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY
DUE TO ADMINISTRATIVE OR OPERATIONAL USE, EFFECTIVE 1 MARCH
2020. OTHER REQUESTS SHALL BE REFERRED TO U.S. ARMY PEO
SIMULATION, TRAINING, AND INSTRUMENTATION (STRI), AND U.S. ARMY
CONTRACTING COMMAND ORLANDO (ACC-ORL-OPA).
4. BLOCK 12: INITIAL SUBMITTAL 30 DAYS AFTER CRITICAL DESIGN
REVIEW (CDR) AND FINAL DUE 60 DAYS PRIOR TO TEST READINESS REVIEW
(TRR) FOR EACH OF THE COMBAT TRAINING CENTERS.
5. THE GOVERNMENT WILL HAVE 20 DAYS TO ACCEPT/REJECT AND PROVIDE COMMENTS.
6. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE CHANGES.
7. BLOCK 14: REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL TO
MARK.F.DUBOSE.CIV@MAIL.MIL AND THE CONTRACT SPECIALIST
FRANCIS.D.SIERRATORRES.CIV@MAIL.MIL, COMPATIBLE WITH CURRENT
PEO STRI VERSION OF MICROSOFT OFFICE 2013. GRAPHIC PACKAGES
USED TO CREATE FIGURES, TABLES, AND CHARTS SHALL BE COMPATIBLE
WITH CURRENT PEO STRI VERSION OF MICROSOFT OFFICE 2013.
8. FILE NAMING CONVENTION: THE FOLLOWING CHARACTERS SHALL NOT TO
BE USED WITHIN THE NAMES OF FOLDERS, LISTS, OR COLUMN NAMES. / \ :
* ? < > | # { } % ~ & AND UNDERSCORES. UNDERSCORE SHALL NOT BE USED
AT THE START OF ANY FOLDER OR FILE PERIOD SHALL NOT BE USED
CONSECUTIVELY IN THE MIDDLE, END OF A FOLDER OR FILE NAME
SHALL NOT BE LONGER THAN 128 CHARACTERS. FILE NAMES WILL BE
DESCRIPTIVE AND ABBREVIATIONS SHALL BE KEPT TO A MINIMUM.
METADATA WILL BE USED TO THE MAXIMUM EXTENT WHERE APPROPRIATE
FILE NAMES WILL USE AN UNDERSCORE VICE A SPACE WHERE APPROPRIATE.
16. REMARKS SEE BLOCK 16
000 15. TOTAL
18.ESTIMATED
TOTAL PRICE
PWS PARAGRAPH 5.8.1 AND 5.8.2
5. CONTRACT REFERENCE
DI-MISC-80711A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
RMF CYBERSECURITY CONTROL DOCUMENTSScientific and Technical Reports
2. TITLE OF THE DATA ITEM
A016
1. DATA ITEM NO.
F. CONTRACTOR
W900KK - CTC Tower Efforts
E. CONTRACT/PR NO.
See Block 16
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MISC
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
LT
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BY
16-MAR-2020
H. DATEG. PREPARED BY
Dubose, Mark
Block D: JRTC/JMRC Tower Replacement/Update
1. BLOCK 9: : DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED
TO THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY
DUE TO ADMINISTRATIVE OR OPERATIONAL USE, EFFECTIVE 1 MARCH
2020. OTHER REQUESTS SHALL BE REFERRED TO U.S. ARMY PEO
SIMULATION, TRAINING, AND INSTRUMENTATION (STRI), AND U.S. ARMY
CONTRACTING COMMAND ORLANDO (ACC-ORL-OPA).
2. BLOCK 12 AND BLOCK 13: SHALL BE DUE 30…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .