Attachment 1_ PWS_PWS_2019_031_CTC_Tower_ Replacement.pdf

PDF 803 KB Posted

Attached to
JRTC tower replacements/JMRC tech. refresh Federal contract opportunity
Solicitation number
W900KK-20-R-0058
Issued by
Department of the Army Materiel Command Contracting Command Orlando Contracting Center

About this file

This is a solicitation for replacement of four tactical communication towers and shelters at the Joint Readiness Training Center (JRTC), performance of a tower technology refresh at one JRTC tower, and performance of technology refreshment at two tower sites located at the Joint Multinational Readiness Center (JMRC). Products and services required include construction of new towers and shelters, installation of communication hardware and fiber optic cables, performance of earthwork activities, provision of supporting utilities, and deconstruction of existing towers upon acceptance of new towers. The due date for past performance was different than the date specified in this first posting of the solicitation. The solicitation number is W900KK-20-R-0058 and was issued by the Department of the Army Materiel Command Contracting Command Orlando Contracting Center.

View the file

Other files for this federal contract opportunity

Other files attached to JRTC tower replacements/JMRC tech. refresh, newest first.
File Type Posted
Attachment 1 JRTC and JRMC Tower PWS_25 JUN 20_Amendment 02.pdf PDF
W900KK-20-R-0058 Amendment 02 Conformed Solicitation.pdf PDF
W900KK-20-R-0058 Amendment 02.pdf PDF
Attachment 2 Requriement Matrix_July2020_Amendment 02.xlsx XLSX spreadsheet
Attachment 5 PPQ_Amendment 02.pdf PDF
Attachment 4 Cost Workbook_Amendment 02.xlsx XLSX spreadsheet
Responses to CTC Tower Efforts Questions_Jul2020_Amendment 02.xlsx XLSX spreadsheet
Attachment 8_DBA_Wage_Determination_LA20200006.pdf PDF
Attachment 4_ Cost Workbook.xlsx XLSX spreadsheet
Attachment 6 LT2 Instruction.docx DOCX document
Attachment 5_ PPQ.PDF PDF
Attachment 7_Industry_Comment Form.doc DOC document
W900KK-20-R-0058 Amendment 01.pdf PDF
Attachment 2 Requirement Matrix_20200610v1.xlsx XLSX spreadsheet
Attachment 3_ CDRLs.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS-2019-031

9 Mar 2020

Performance Work Statement for

Tactical Communication Tower Replacement at the Joint Readiness Training Center (JRTC) and Technology Refresh at Joint Multinational Readiness Center (JMRC)

U.S. Army Program Executive Office for Simulation, Training, and Instrumentation (PEO STRI)

12350 Research Parkway Orlando, FL 32826-3276

Engineering

Prepared By: ____________________ Concurrence: ____________________ Mark DuBose Derek Vick Systems Engineer, JRTC IS Chief Engineer, PM CTIS

Acquisition Logistics

Prepared By: ____________________ Concurrence: __________________ Mike Fahnestock Robert Capote Lead Acquisition Logistician, JRTC IS Product Support Mgr., PM TRADE

Program Management

Submitted By: ____________________ Approved By: ____________________ Randi Kahl LTC Edward Halstead Assistant Program Manager, JRTC IS Product Manager, CTIS

DUBOSE.MARK.

F.1060421494

Digitally signed by

DUBOSE.MARK.F.1060421494

Date: 2020.03.12 14:56:55 -04'00'

FAHNESTOCK.MICHA

EL.WILLI.1033833586

Digitally signed by

FAHNESTOCK.MICHAEL.WILLI.103383358

Date: 2020.03.12 15:05:29 -04'00'

KAHL.RANDI.J.1

229818410

Digitally signed by

KAHL.RANDI.J.1229818410

Date: 2020.03.12 15:34:47 -04'00'

CAPOTE.ROBE

RTO.10315586

Digitally signed by

CAPOTE.ROBERTO.1031

558618 Date: 2020.03.13 14:38:23 -04'00'

HALSTEAD.EDWA

RD.ANDREW.1013

857721

Digitally signed by

HALSTEAD.EDWARD.ANDREW.

1013857721 Date: 2020.03.13 16:08:57 -04'00'

VICK.DEREK.S.13

84303699

Digitally signed by

VICK.DEREK.S.1384303699

Date: 2020.03.16 16:09:58 -04'00' i

Table of Contents

1.0 SCOPE

1.1 JRTC, Ft. Polk, LA

1.2 JMRC, Hohenfels, FRG

2.0 APPLICABLE DOCUMENTS

2.1 Department of Defense Standards

2.2 Department of Defense Directives

2.3 Other Government Documents, Drawings and Publications

2.4 Availability of Government Documents, Drawings and Publications

2.5 Order of Precedence

3.0 REQUIREMENTS FOR TACTICAL COMMUNICATION TOWER REPLACEMENT AT JRTC 6

3.1 BASE OPTION: TOWER INSTALLATION AND DECONSTRUCTION PLAN

3.2 TOWERS -PEASON WEST, PEASON EAST, MILL CREEK, AND CEMETERY 13

3.3 SOUTHERN TOWER REHABILITATION

3.4 DISPOSITION OF TACTICAL COMMUNICATION TOWERS (Peason East, Peason West, Mill Creek, and Cemetery 13)

3.5 COORDINATION

4.0 REQUIREMENTS FOR TACTICAL COMMUNICATION TOWER TECHNOLOGY REFRESH

AT JMRC

4.1 KLEINELBERG AND NUSSBERG TOWERS TECHNOLOGY REFRESH

4.2 COORDINATION

5.0 GENERAL REQUIREMENTS

5.1 PROGRAM MANAGEMENT

5.2 MEETINGS AND REVIEWS

5.3 SYSTEMS ENGINEERING (SE)

5.4 TEST AND EVALUATION

5.5 FINAL ACCEPTANCE

5.6 QUALITY ASSURANCE (QA)

5.7 SAFETY ASSESSMENT AND HEALTH HAZARD ANALYSIS

5.8 RISK MANAGEMENT FRAMEWORK /CYBERSECURITY

ii

5.9 LOGISTICS

5.10 INTERIM LIFE CYCLE CONTRACTOR SUPPORT

5.11 CONTRACTOR PERSONNEL REQUIREMENTS/ANTITERRORISM (AT)/OPERATIONS

SECURITY (OPSEC)

5.12 CONTRACTOR MANPOWER REPORTING APPLICATION (CMRA)

5.13 COMPUTER HARDWARE, ENTERPRISE SOFTWARE SOLUTIONS (CHESS) PROGRAM . 30

Appendix A – JRTC, Fort Polk, LA Requirements ................................................................................... A-1

Appendix B – Site Locations ..................................................................................................................... B-1

Appendix C – JRTC Standard Tower Site Hardware .................................................................................C-1

Appendix D – JMRC Equipment Hardware ...............................................................................................D-1

Performance Work Statement for

Tactical Communication Tower Replacement at the Joint Readiness Training Center (JRTC) and Technology Refresh at Joint Multinational Readiness Center (JMRC)

1.0 SCOPE

1.1 JRTC, Ft. Polk, LA

This Performance Work Statement (PWS) defines the efforts required to build four (4) new tactical communication towers and shelters to fully function at Mills Creek, Cemetery 13, Peason East and Peason West Towers before replacing their predecessor towers at these locations. Also, to perform a tower technology refresh at Southern Tower and validate the new capability to fully function before removal of the existing tower communications equipment. The current towers are located at:

• Site 34 - Mill Creek Tower, coordinate 31°5’1.03”N, 93°8’27.3”W.

• Site 15 - Cemetery 13 Tower, coordinate 31°5’46.10”N, 92°58’38.40”W.

• Site 33 - Southern Tower, coordinate 31°2’10.40”N, 93°0’45.30”W.

• Site 1 - Peason East Tower, coordinate 31°21’1.33”N, 93°10’17.79”W.

• Site 32 - Peason West Tower, coordinate 31°21’6.17”N, 93°19’41.095”W.

This effort involves the below categories:

• Concrete pouring for new tower and shelter foundation.

• Construction of new towers and shelter buildings including all equipment for full functionality.

• Installation of electrical support equipment including metal clad cable and 3-phase transformers.

• Installation of new (Tech Refresh) communication hardware including fiber optic cables, TV systems and antennas onto the towers and into the shelters. This requires a new tower loads analysis at site 33, for the tower equipment additions.

• Perform earthwork activities which include excavation, trenching and continuous footing.

• Provisions for exterior improvement which includes concrete pouring for sidewalks/patios and installation of chain link fences/security gates.

• Installation of supporting utilities which include electrical underground ducts and manholes, PVCs, and conduits.

• All Ft. Polk, surrounding cities, surrounding parishes, state of Louisiana and FAA regulations and certifications shall be met.

• Deconstruction/demolition of existing pre-stressed piles, radio towers, communications equipment, electrical and fiber optic cables, antennas, etc. and the pertinent shelters including hauling and dumping.

1.2 JMRC, Hohenfels, FRG

This Performance Work Statement (PWS) defines the efforts required to perform a tower technology refresh at the Kleinelberg and Nussberg tower sites and to validate the new capability to fully function before removal of the existing redundant tower communications equipment.

The current towers are located at:

• Kleinelberg Tower, coordinate 49°16’10.0”N, 11°47’51.0”E.

• Nussberg Tower, coordinate 49°18’48.1”N, 11°44’24.9”E.

This effort involves the below categories:

• If needed, deconstruction of existing communications equipment, electrical and fiber optic cables, antennas, etc. from the tower and shelter, including hauling and dumping.

• Installation of additional new (Technology Refresh) communication hardware including fiber optic cables, electrical cables, TV systems and antennas. This requires a new tower loads analysis for the tower equipment additions.

• Installation of additional new (Technology Refresh) communications equipment in the tower shelter buildings including all equipment for full functionality.

• All JMRC, Hohenfels, Nuemarkt, Bavaria and LBA regulations and certifications shall be met.

1.3 BACKGROUND

Joint Readiness Training Center (JRTC - Ft. Polk, LA) Tactical Communication Subsystem effort uses Commercial off the Shelf (COTS) Information Technology equipment to properly operate, display, and protect the JRTC Instrumented Systems (JRTC-IS) while supporting training rotations. This tactical data communication is transmitted digitally throughout the training area, collected at 35 different tower locations and re-transmitted via the JRTC Tactical Network to the JRTC-IS application servers and data collection/storage components located in the Joint Operations Center (JOC), Building 1560.

The four JRTC, Ft. Polk, LA Tactical Communication Subsystem Towers (Peason East, Peason West, Mills Creek, and Cemetery 13), have been determined to be unsuitable. The survey findings conducted by the US Army Corps of Engineers, Tulsa District in Aug of 2017, conclude that the current tactical communication towers fail to meet the standards in accordance with Telecommunication Industry Association (TIA)-222-H Structural Standard for Antenna Supporting Structures and Antennas.

The Joint Multinational Readiness Center (JMRC) is a forward-deployed, European-based Maneuver Combat Training Center (MCTC) conducting realistic, distributed training for U.S.

Army and Allied military units fighting Overseas Contingency Operations (OCO) and conducting peacekeeping operations. The JMRC-IS supports the U.S. Army training mission by capturing electronic maneuver and engagement event data in near real-time for the purposes of providing the Soldiers immediate feedback by means of an After Action Review (AAR) and providing reference and additional training reinforcement through the Take Home Packages (THP). The JMRC-IS is composed of three compatible Instrumentation Systems that interoperate with each other to support JMRC training requirements. The JMRC Live Fire-IS is located on the range complex at Grafenwoehr, Germany, and supports live fire collective training exercises. The Mobile Instrumentation System (MIS) is based at Hohenfels, Germany, and supports mobile training requirements both in the Hohenfels and Grafenwoehr Training Areas, and for deployments to allied countries throughout Europe. The MIS plays a key role in supporting these distributed training requirements. The third part of the JMRC-IS is the permanently-housed, fixed-site Instrumentation System which is also located at Hohenfels, Germany. These three IS’s are collectively known as the JMRC-IS.

The two JMRC Tactical Communication Subsystem towers (Kleinelberg Tower and Nussberg Tower) in Hohenfels, will require a technology refresh to provide additional communication capability to meet the new requirements of the JMRC training mission.

2.0 APPLICABLE DOCUMENTS

The following documents form a part of this PWS to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the latest issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplement thereto.

2.1 Department of Defense Standards

MIL-STD-40051-2B Preparation of Digital Technical Information for Page-Based Technical Manuals (TMs)

MIL-STD-31000A Technical Data Packages

MIL-STD-130N Identification Marking of U.S. Military Property GEIA-STD-0007 Logistics Products Data

Copies are available on the WWW at URL: http://assistdocs.com/search/results.cfm

2.2 Department of Defense Directives

DoDD 8570.1 Information Assurance Training, Certification and Workforce Management

DoD 8570.01-M Information Assurance Workforce Improvement Program

DoDI 8500.1 Cybersecurity

DoDI 8510.01 Risk Management Framework (RMF) for DoD Information Technology (IT)

DoDI 8582.01 Security of Unclassified DoD Information on Non-DoD Information Systems

Copies are available on the WWW at URL: http://www.dtic.mil/whs/directives/

2.3 Other Government Documents, Drawings and Publications

CNSSI 1253 Committee on National Security Systems Instruction (CNSSI)

NIST SP 800-53 National Institute of Standards and Technology (NIST) Special Publication (SP) 800-53: Security and Privacy Controls for Federal Information Systems and Organizations

AR 25-2 Information Assurance

MIL-PRF-29612B Training Data Products Specification

GEIA STD-0007-B Logistics Products Data

GEIA HB-0007-B Handbook and Guide for Logistics Product Data

TA-HB-0007-1 Logistics Product Data Reports Handbook

ACI 318 American Concrete Institute Building Code Requirements for Structural Concrete and Commentary. (Can be procured from multiple vendors)

AISC-LRFD American Institute of Steel Construction Load and Resistance Factor Design Specification for Structural Steel Buildings.

(Can be procured from multiple vendors)

ASTM A123 American Society for Testing and Materials Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products for channel shapes.

(Can be procured from multiple vendors)

ASTM A153 American Society for Testing and Materials Standard Specification for Zinc Coating (Hot-Dip) Coatings on Iron and Steel Hardware.

(Can be procured from multiple vendors)

IEEE 142 Institute of Electrical and Electronics Engineers Recommended Practice for Grounding of Industrial and Commercial Power Systems.

(Can be procured from multiple vendors)

AC150/5345-43 FAA Advisory Circular Specification for Obstruction Lighting Equipment (Available on LT2 Portal Collaboration Site – JRTC T-Tower Replacement)

AC70/7460-1 FAA Advisory Circular Specification for Obstruction Marking and Lighting.

(Available on LT2 Portal Collaboration Site – JRTC T-Tower Replacement)

FAA Title 47 FCC’s antenna structure registration, marking and lighting rules are located in Part 17 of the FCC's rules.

https://www.fcc.gov/general/rules-regulations-title-47

GEIA-STD-0007 Government Electronics and Information Technology Association Logistics Product Data Handbook. (Can be procured from multiple vendors)

NFPA 780 National Fire Protection Association (NFPA) Standard for the Installation of Lightning Protection Systems. (Available on www.nfpa.org )

TIA-222-H Telecommunication Industry Association Structural Standard for Antenna Supporting Structures and Antennas. (Can be procured from multiple vendors)

UFGS-09 97 13.25 Unified Facilities Guide Specification Maintenance, Repair, and Coating of Tall Antenna Towers. (Available on LT2 Portal Collaboration Site – JRTC T-Tower Replacement)

US Army Technical Guide for Installation Information Infrastructure Architecture. (Available on LT2 Portal Collaboration Site – JRTC T-Tower Replacement)

Athena-Tek Voice Tactical Monitoring report (GFI).

US Army Corp of Engineers (St. Louis) Fort Polk Telecommunication Tower Evaluation Report, South Tower Self-Supported: 300 Ft. (Draft April 2017).

2.4 Availability of Government Documents, Drawings and Publications

Copies of the documents are available from PEO STRI, ACC-ORL-OPA, 12211 Science Drive, Orlando, FL 32826, or may be available at: https://www.lt2portal.mil/ and http://quicksearch.dla.mil/qsSearch.aspx

2.5 Order of Precedence

In the event of a conflict between the text of this PWS and the reference cited herein, the text of this PWS shall take precedence. The contractor shall notify the Government of any conflict so they may address the discrepancy. Nothing in this PWS, however, supersedes applicable laws and regulations.

3.0 REQUIREMENTS FOR TACTICAL COMMUNICATION TOWER

REPLACEMENT at JRTC

The contractor shall procure, implement, integrate, test, and document the components and architecture in accordance with requirements of the Tactical Communication Towers Replacement PWS. In addition, the contractor shall perform tasks to remove the existing lattice towers upon acceptance of the new towers. Deconstruct/demolish the existing tower site, excluding the existing monopole towers and its associated shelter and excluding non-tower associated equipment and their associated shelters, erect the new towers, install all equipment, integrate all communication equipment and test. For the Southern Tower, the contractor shall inspect the concrete foundation, create a plan for rehabilitation, and then rehabilitate the Southern Tower’s foundation. The end result will be a new structurally sound tower with the same (or better) telecommunication performance characteristics. The contractor shall conduct the work efforts in accordance with the Fort Polk requirements outlined in Appendix A.

Base -Tower installation and deconstruction plan Site 32 - Peason West Site 1 - Peason East Site 34 - Mill Creek Site 15 - Cemetery 13 Site 33 - Southern Tower rehabilitation/refurbishment Each Site will have its own Government Acceptance Test (GAT).

3.1 BASE - TOWER INSTALLATION AND DECONSTRUCTION PLAN

3.1.1 The contractor shall conduct a site survey and provide to the Government a complete Architectural and Engineering (A&E) plan for the removal and replacement of the four (4) tactical lattice towers (Site 1-Peason East, Site 32-Peason West, Site 15-Cemetery 13, and Site 34-Mill Creek), the integration of all communication systems onto the new towers and into the new shelters, and a complete schedule.

A001: (DI-MISC-80711A) Scientific and Technical Reports

3.1.2 The contractor shall take into account the geography of Fort Polk, JRTC CTC operational schedule, Ft. Polk and County/State regulations, current tower locations, and current existing fiber optic network (FON) ring when designing the new towers and locations (see Appendix A).

3.1.3 The contractor shall survey each tower location and determine an adjacent area within 500 meters to build the replacement tower and shelter. The contractor shall also determine:

a) An area for demolition of tower sections and pertinent shelter buildings.

b) Demolition of tower sections and pertinent shelter buildings without disturbing operation and/or maintenance of: The existing monopole tower and its associated shelter, the existing non-tower associated equipment and their associated shelters, and the newly constructed towers and shelters.

c) The plan to remove all construction debris from the training area.

3.1.4 The contractor shall evaluate the JRTC training area to determine the location required to provide 98% overall network (LTE and P25 radio/new lattice tower and existing monopole tower) coverage of the maneuver area under the full load of a training rotation. The analysis shall be substantiated/supported by the use of certified coverage modeling tools. The model results shall be iteratively updated with the proposed final analysis presented at the Final Design Review. As part of the analysis, the contractor shall conduct a site survey/site walk of candidate locations to address environmental; accessibility; or other constraints, making necessary adjustments. The final analysis shall have proposed locations based on all of the constraints having been considered (to include coordination for commercial power; road access and FON spurs). The coverage analysis shall be part of the A&E plan.

3.1.5 The contractor shall follow the same architecture used in construction of the newest towers at JRTC (North Fort / Land Expansion) when designing the new towers.

3.1.6 The contractor shall maintain or provide for an additional capability to handle 75% more equipment antenna space on the towers and 50% more shelter rack space, for potential future tower enhanced capability projects and future rack space requirements within the shelters.

3.1.7 The contractor shall follow and/or incorporate the following FAA regulations and requirements:

a) Contractor to perform a “determination for need to file” using the FAA’s Notice Criteria Tool for all new towers.

b) Contractor shall adhere to FAA Regulatory Policy Title 14 CFR Part 77 for all new Towers.

c) Contractor shall file an Obstruction Evaluation through FAA’s website for all towers that the FAA Notice Criteria Tool determines is necessary.

d) Contractor shall obtain an FAA Form 7460-1 for all towers requiring Obstruction Evaluation.

e) All new towers shall be painted aviation orange and white and lighted per the latest revision of Advisory Circular 70/7460-1L - Obstruction Marking and Lighting.

f) Contractor shall submit all required Supplemental Notice Forms 7460-2.

3.1.8 The contractor shall follow and/or incorporate the following FCC requirements:

a) Contractor shall follow the FCC Antenna Structure Registration (ASR) process for new tower’s requiring FAA Obstruction Evaluation and for all new towers with the highest appurtenance in excess of 200 ft. Above Ground Level (AGL).

b) Contractor shall follow FCC rules for site marking after an ASR Number is received.

3.1.9 The contractor shall provide the hardware/equipment and installation for the tactical communication structure subsystem to support the tactical communication subsystem. The design shall be in accordance with ACI 318 and AISC-LRFD. The contractor shall conduct a sub-surface soil investigation/testing. The contractor shall submit a Soil Boring Report.

A002: (DI-MISC-80711A) Scientific and Technical Reports (Soil Boring Report)

3.2 TOWERS -PEASON WEST, PEASON EAST, MILL CREEK, AND CEMETERY 13

3.2.1 The contractor shall provide a new self-supporting galvanized (no guy wires) structure and all mounts with structural components. The structure shall be considered Class III as defined by TIA-222-H and the design shall include the use of UFGS 09 97 13.25 Part 2. Tower design should be based off of the new North Fort and Land Expansion areas, for commonality. The design shall provide a minimum of three (3) platforms.

3.2.2 The design of the tactical communication tower structure and site shall:

a) Sustain environmental conditions of 95mph winds, and 30 mph winds with ½ inch of ice as defined by TIA-222-H (Vernon Parish, LA).

b) Provide appropriate climbing provisions as specified in TIA-222-H complete with anchorages and platforms for regular periodic maintenance or trouble shooting of antenna systems.

c) Provide primary grounds for the structure. All electrically active equipment and appurtenances supported by the structure shall be connected to the structure by a secondary ground. Total resistance of the structure’s connected primary grounds as referenced to remote earth shall not exceed 10 ohms. The total resistance shall be measured or calculated in accordance with the IEEE Standard 142.

d) Provide a lightning arresting system in accordance with NFPA 780: Standard for the Installation of Lightning Protection Systems.

e) Provide obstruction marking and/or lighting in accordance with Federal Communication Commission (FCC), Federal Aviation Authority (FAA) and/or local aviation authority requirements. Provide an FAA Advisory Circular AC 150/5345-43 compliant obstruction light system for night-time operation installed in accordance with Chapter 5 of FAA Advisory Circular AC 70/7460-1. If the tower is over 105 ft., the tower must be painted in accordance with Chapter 5 of FAA Advisory Circular AC 70/7460-1 and ASTM A123 and A153.

f) Provide all electrical infrastructure.

g) Provide a four (4)-sided perimeter FE-6 security fence around the tower with one key control entrance that provides code measurement layout of facilities and access capability within. The four-sided perimeter security fence shall provide barrier access to restricted parking in and around the access entrance.

h) Provide a Transient Voltage Surge Suppressor (TVSS). The TVSS external module panel shall be installed at each electrical panel. The TVSS shall be sized to the amperage and/or voltage of each panel with required enclosure. The system shall be grounded, wired to the panel, and also connected to the grounding system.

i) Provide a Back-up Power Generator. When power fails or there is a loss of power, the back-up power generator system shall seamlessly convert and operate to provide power to the tower site for 48 hours of uninterrupted operations.

j) Provide an Uninterruptible Power Supply (UPS). The UPS system shall provide continuous power to all communication equipment during the time interval between the loss of commercial power source, detection, and start of back-up generators. The UPS system shall also provide line surge and over voltage protection for all core equipment. The UPS shall provide full load operations for a minimum of 1 hour until equipment can be safely brought down or power restored. The UPS system shall be designed to provide sufficient capacity to power any alarms, modems, multi-coupler, amplifier, and/or other ancillary equipment for 1 hour, at a maximum design load plus twenty-five (25 %) future growth.

k) Provide an alarm/monitoring system (temperature, UPS/loss of power/shelter access at a minimum) with communication to Building 1560.

l) Provide a shelter to house and protect electrical and electronic equipment installed in meeting the PWS requirements. The shelter design shall maximize commonality with the newly established JOC Tower and Land Expansion Towers. The shelters shall be concrete pre-cast with stone aggregate exterior, installed on a reinforced poured concrete slab secured with metal tie-down plates. The shelter shall contain an integrated grounding system that meets the guidelines of Motorola R56. A Main Ground Bus Bar (MGB) shall be the single point ground for all equipment and systems within the shelter. Each rack shall have a sub-system ground bar (SSG), providing a location for racked equipment to be properly grounded. The shelter shall be sized to accommodate all equipment with additional square footage to accommodate an additional 50% more racks.

m) The contractor shall provide and install the following site signage at all new tower sites with the following as a minimum:

(1) JRTC Facility ID and Emergency Point of Contact.

(2) RF Radiation Hazard.

(3) Fall Protection Required.

(4) Hazardous Material Warnings.

(5) FCC Antenna Structure Registration (ASR).

(6) No Smoking and Open Flames (As Required).

3.2.3 The contractor shall provide for an additional capability to handle 50% more cabling and antennas for potential future projects.

3.2.4 The contractor shall provide, install, integrate and test all equipment required to make the new tower’s subsystems match the old tower’s capability. This includes a 100% equipment replacement on the new towers. Systems on the current towers include:

VTM-SINCGARS Voice Tactical Monitoring (VTM) Subsystem

Microwave network for Mobile Production Center (MPC) P25 communication network ICE SMOTAR-SMODIM Tracking Analysis Recording Flight Following ATC remote radios

3.2.4.1 The contractor shall take in to consideration the following future efforts in to tower design consideration:

IC3NS OPFOR Cell Phones

3.3 SOUTHERN TOWER REHABILITATION

3.3.1 The contractor shall maintain or provide for an additional capability to handle 50% more equipment antenna space on the tower for potential future tower enhanced capability projects and future rack space requirements within the shelters. This shall be a constraint in the Southern tower and foundation loads analysis. If the 50% margin cannot be maintained, then the loads analysis shall define the new margin.

3.3.2 The contractor shall evaluate the foundation of Southern Tower, then rehabilitate the concrete pad and bring the tower structure and foundation back into regulatory compliance.

A003: (DI-MISC-80711A) Scientific and Technical Reports

3.3.3 The contractor shall provide, install and integrate all required communication equipment to bring the Southern Tower online and into the JRTC telecommunication network.

3.3.4 The contractor shall provide, install, integrate and test all equipment required to technology refresh and make Southern Tower match the capability of the four new tower’s subsystems. Systems on the current tower include:

a) Microwave network for Mobile Production Center (MPC)

b) P25 communication network

c) ICE SMOTAR-SMODIM Tracking Analysis Recording

d) VTM-SINCGARS Voice Tactical Monitoring (VTM) Subsystem

3.4 DISPOSITION OF TACTICAL COMMUNICATION TOWERS (Peason East, Peason West, Mill Creek, and Cemetery 13)

3.4.1 The contractor shall de-install the existing lattice towers (Note: Southern tower will not be de-installed).

3.4.2 The contractor shall obtain Government disposition instructions for towers antennas, associated cabling, and shelter equipment. De-install will not start until final acceptance of the new tower installations, on a tower by tower basis.

3.5 COORDINATION

3.5.1 The contractor shall coordinate with Fort Polk DPW and Fort Polk Airfield for flight obstruction clearance if needed during the installation of the new Tactical Communication Subsystem and de-installation of the existing Tactical Communication Towers.

3.5.2 The contractor shall coordinate with the commercial on-post electrical provider during the new installation of the Tactical Communication Towers.

3.5.3 The contractor shall prepare and coordinate the filing of Notice of Proposed Effort (FAA Form 7460-1) for an Obstruction Evaluation. More information can be found at the following site: https://oeaaa.faa.gov/oeaaa/external/portal.jsp

4.0 REQUIREMENTS FOR TACTICAL COMMUNICATION TOWER

TECHNOLOGY REFRESH AT JMRC

4.1 BASE - EQUPIMENT INSTALLATION PLAN

The contractor shall conduct a site survey and provide to the Government a complete Architectural and Engineering (A&E) plan for the installation of the Observer Controller Communications System (OCCS) and Range Data Measurement System (RDMS) networks on the two (2) existing towers at JMRC – Hohenfels, FRG (Kleinelberg Tower and Nussberg Tower), the integration of all communication systems onto the existing towers and shelters, and a complete schedule.

A003: (DI-MISC-80711A) Scientific and Technical Reports

4.1.1 The contractor shall perform tasks to provide additional telecommunications capability on two (2) existing towers at JMRC – Hohenfels, FRG (Kleinelberg Tower and Nussberg Tower).

The contractor shall install all equipment, integrate all communication equipment and test. For the two tower sites, the contractor shall perform a loads analysis on the existing towers and foundations to ensure that both sites will remain in regulatory compliance, after the technology refresh efforts are complete, create a plan for the technology refresh, and then conduct the technology refresh at each site, as part of each Option. The end result will be a structurally sound tower with additional telecommunication performance characteristics at each site. The contractor shall procure, implement, integrate, test, and document the components and architecture in accordance with requirements for the Tactical Communication Towers Replacement PWS. The contractor shall conduct the work efforts in accordance with the JMRC – Hohenfels. This effort will be divided contractually into two options.

Base - Tower installation Kleinelberg Tower Technology Refresh Nussberg Tower Technology Refresh Each Site will have its own Government Acceptance Test (GAT).

4.2 KLEINELBERG AND NUSSBERG TOWERS TECHNOLOGY REFRESH

4.2.1 The contractor shall coordinate, in concert with the Government project team, with JMRC’s Department of Public Works (DPW) to keep DPW apprised of tower efforts and status, and to obtain guidance and direction. The DPW is also a subject matter expert regarding German rules, regulations, and certifications on this matter.

4.2.2 The contractor shall procure and install antenna systems equipment onto the existing tower and associated equipment the existing shelters for the JMRC Instrumentation System's (JMRC-IS) Observer Controller Communications System (OCCS) and Range Data Measurement System (RDMS) networks. The contractor shall install all equipment, integrate all communication equipment and test. The contractor shall select devices that operate within the same RF bandwidth as the devices being replaced. The LCR task for the Range Data Measurement Subsystem (RDMS), a data communications system to relay position location and event data from the Tactical Engagement Simulation Systems (TESS) to the JMRC-IS, operates in the 361-372 MHz band. The Observer Controller Communications System (OCCS), a voice communications system for exercise controllers, operates in the 345-355 MHz band.

4.2.3 The contractor shall conduct an RF Co-site Interference Analysis between the PEO EIS RF components, the OCCS components and the RDMS components to determine an installation configuration that that does not degrade the current system. The contractor shall provide analysis results to the Government project team during a Program Management Review (PMR) or Technical Interchange Meeting (TIM). The contractor shall execute the technology refresh installation based on the agreed upon course of action with the Government team.

4.2.4 The contractor shall integrate all existing and additional technology refresh communication equipment to bring the Kleinelberg Tower online and into the JMRC-IS telecommunication network.

4.2.5 The contractor shall take into account the geography of JMRC – Hohenfels, FRG CTC operational schedule, JMRC – Hohenfels, FRG regulations, current tower locations, and the current existing fiber optic network (FON) characteristics, to perform the technology refresh.

4.2.6 The contractor shall maintain the towers additional capability to handle 50% more equipment antenna space on the tower and 50% more shelter rack space, for potential future tower enhanced capability projects and future rack space requirements within the shelter. This shall be a constraint in the tower and foundation loads analysis. If the 50% margin cannot be maintained, then the loads analysis shall define the new margin.

4.2.10 The contractor shall ensure that the tower and foundation maintain JMRC – Hohenfels, FRG regulatory compliance.

4.3 COORDINATION

The contractor shall coordinate with JMRC – Hohenfels, FRG DPW and JMRC – Hohenfels, FRG Airfield for flight obstruction clearance if needed during the technology refresh installation of the new Tactical Communication Subsystems on the two existing Tactical Communication Towers.

The contractor, if needed, shall coordinate with the commercial on-post electrical provider during the technology refresh installation of the new Tactical Communication Subsystems on the two existing Tactical Communication Towers.

The contractor, if needed, shall coordinate the filing of Notice of Proposed Effort (LBA Form TBD) for an Obstruction Evaluation.

5.0 GENERAL REQUIREMENTS

5.1 PROGRAM MANAGEMENT

The contractor shall provide the overall management and administrative support to ensure that the requirements of the PWS are satisfied. The contractor shall define and monitor metrics and Technical Performance Measures (TPMs) to evaluate the performance of each critical technical and management process and conformance of the evolving products with contract requirements.

The contractor shall provide documented program status and accomplishments, upcoming activities, identified issues and their resolution; a program integrated master schedule (IMS), and any other relevant items in periodic reports. The contractor shall implement, manage, update, and maintain the program in accordance with (IAW) the timelines defined in the IMS as approved by the Government. The IMS shall address total program activities including activities performed by subcontractors. The IMS shall identify critical path to be used to assess project progress, schedule risk and corrective actions required to mitigate risk. The IMS will be a part of the Monthly Report.

A004: (DI-MGMT-80227) Contractor’s Progress, Status and Management Report

5.1.1 Associated Contractor Agreements (ACAs)

The contractor shall implement ACA(s) with the Life Cycle Contractor Support (LCCS) Army TADSS Maintenance Program (ATMP) and the Consolidated Product Line Management (CPM) contractors for exchanging data, support for SW and HW integration, receiving technical support, support for Risk Management Framework (RMF) documentation, access to technical documentation, and working interface issues to achieve a fully functional system, with all support systems, that perform and operate in conjunction with existing JRTC-IS and/or JMRC- IS. ACAs shall be maintained to achieve interoperability and common component goals, as applicable.

5.2 MEETINGS AND REVIEWS

The contractor shall plan, host and conduct meetings and reviews as defined herein. All meeting and technical reviews shall occur at a timeframe in the program recommended by the contractor and approved by the Government. The contractor shall document the results of the meetings/reviews, including any resulting action items and any updates to the meeting briefing charts.

A005: (DI-MISC-80711A) Scientific and Technical Reports (Minutes) A006: (DI-ADMN-81373) Presentation Material

5.2.1 Post Award Conference

A Post Award Conference (PAC) shall be held at JRTC, LA (For Base Option and Options 1, 2, 3, 4 and 5) and at JMRC, FRG within 10 days after contract award. The conference shall introduce key Integrated Product Team (IPT) participants with emphasis on the top level management of the program, identify points of contact and discuss both parties understanding of the scope of work, agreement on the metrics that shall be used as management indicators, identify the partnering approach, and other contract issues.

5.2.2 Preliminary Design Review (PDR)

The contractor shall conduct a PDR to demonstrate the technology/design of the Tactical Communication Tower replacement/rehabilitation (For JRTC Options 1, 2, 3, 4 and 5) and the technology refresh (For JMRC Options 6 and 7). The PDR shall be a formal technical review of the basic design approach. The PDR shall cover the progress and technical adequacy of the selected design approach. The PDR shall allow the Government to evaluate the technical risk associated with the selected design approach. The PDR shall include an initial concept design, subsystem block and functional diagram, infrastructure connections, concept and theory of operation, design standards and drawings, and logistical considerations (including training and manuals). The PDR shall be conducted at JRTC, LA (For Options 1, 2, 3, 4 and 5) and at JMRC, FRG (For Options 6 and 7), and shall be conducted 45 days after the Post Award Conference.

5.2.3 65% and Final Design Reviews

The contractor shall plan and conduct a 65% and Final Design Review of the Tactical Communication Tower replacement/rehabilitation (For JRTC Options 1, 2, 3, 4 and 5) and the technology refresh (For JMRC Options 6 and 7). These design reviews shall cover the progress and technical adequacy of the selected design approach. The design reviews shall allow the Government to evaluate the drawings and technical risk associated with the selected design approach. These design reviews shall be conducted at JRTC, LA (For Options 1, 2, 3, 4 and 5) and at JMRC, FRG (For Options 6 and 7), or teleconference with Government approval. The 65% Design Review shall be conducted 45 days after approval of the PDR. The Final Design Review shall be conducted 45 days after approval of the 65% Design Review.

5.2.4 Integrated Product Team (IPT) Meetings

The contractor shall plan and conduct the monthly IPT meeting via telephone. The contractor shall address the full spectrum of program management concerns including program management, program status, schedule, program risk (cost, schedule and performance), and review and track action items.

5.2.5 Test Integration Working Groups (TIWGs)

The contractor shall plan and participate in TIWGs as part of the monthly IPT meetings to support the following:

a. Assist in managing the system test and evaluation process throughout the system.

b. Develop and document the test and evaluation strategy.

c. Ensure that the test and evaluation of the system is planned and conducted to sufficiently verify all the requirements and stress the system in its represented operational environment.

5.3 SYSTEMS ENGINEERING (SE)

The contractor shall provide an overall system engineering approach and activities necessary to maintain the allocated baseline and to deploy a complete and functional system. System engineering includes all planning, organizing, and control to ensure that the operational needs and requirements are delineated as functional requirements. The contractor shall include into the Systems Engineering process considerations for supportability, maintenance concepts, obsolescence, and total ownership cost management (reduction). The system engineering approach shall be one of an incremental build when applicable. Each build shall add functionality to the previous build, so that the final build shall be one that is tested and verified at acceptance testing. Systems integration includes the integration of technical components, organizational components, and verification (final acceptance testing). The area of system integration may make use of technical laboratories, prototype systems, and pilot systems. The development of these systems shall include all necessary safety, reliability/maintainability engineering, Manpower and Personnel Integration (MANPRINT), pollution prevention, and human factors considerations. The contractor shall employ a quality engineering program to measure and track key processes and establish metrics and process control systems.

5.3.1 Hardware and Software Integration

The contractor shall perform all activities to integrate and assemble the hardware and software to achieve a fully functional system, with all support systems, to seamlessly integrate with the existing JRTC, LA and JMRC, FRG Instrumentation Systems (JRTC-IS and JMRC-IS) without degrading current capabilities.

5.3.2 Software and Hardware Configuration Control

The contractor shall adhere to the PM TRADE Configuration Management (CM) Procedure.

The contractor shall obtain approval of the Government IPT prior to committing to use any version of any COTS product. The contractor shall ensure that all COTS products included in the system deliverable configuration are commercially supported for a period of not less than two years after Government acceptance.

5.3.3 Engineering Change Proposals (ECP)

The contractor shall document and the IPT shall review all changes to established baselines and all changes to the requirements (other than the functional baseline), including changes to the statement of work, contract data requirements list (CDRL), and the contract schedule. In coordination with the government, the contractor shall hold a requirements review on all proposed routine changes prior to the submittal of the engineering change proposal in order to clarify requirements, format and content. Depending upon the criticality of the proposed changes, this review may take the form of a teleconference, a formal meeting at a Government facility, or a formal meeting at the contractor’s facility. Minutes shall be a historical record to allay any miscommunications. The contractor shall develop an Engineering Release Record (ERR) for each approved ECP.

A007: (DI-CMAN-80639C) Engineering Change Proposal A008: (DI-SAFT-80103B) Engineering Change Proposal System Safety A009: (DI-CMAN-80463C) Engineering Release Record

5.3.4 Standardization (JRTC only)

The contractor shall influence the system design to achieve maximum subsystem, component and repair parts commonality. The contractor shall minimize equipment and parts proliferation through a standardization effort. The standardization effort shall include coordination with the IPT(s) and Life Cycle Contractor Support (LCCS) to maximize use of parts already in the inventory or to determine that the existing logistics support resources will benefit from the items chosen for the system. Refer to Appendix D, Standard Tower Site Hardware.

5.3.5 Spectrum

Any system radiating on a military installation shall be required to obtain DoD approval. The contractor shall provide and implement a technical solution including the identification of required spectrum and plan to obtain the spectrum to meet training objectives. If needed, the contractor shall provide all information required to support the Spectrum Certification Process. If needed, the contractor shall support the Application for Equipment Frequency Allocation (DD- 1494) and other applicable Spectrum Approval Documents to be used by the Government to determine whether or not the proposed system will interfere with other existing systems. The system must be already approved by US Spectrum authority. If needed, this will require the contractor to provide an approved JF12/1494 for JRTC - Fort Polk, LA Operational Area and an approved JF12/1494 for JMRC – Hohenfels, FRG Operational Area, prior to government acceptance.

A010: (DI-MISC-81174) Frequency Allocation Data

5.3.6 Product Definition Data (PDD)

In accordance with MIL-STD-31000A, the contractor shall develop, produce, and maintain product definition data (PDD) that accurately depicts the final product. The PDD is the technical description of items adequate for supporting an acquisition strategy, production, engineering, cyber security and logistics support. The contractor shall develop a PDD that discloses the complete design, logistics, support requirements, and the means of measuring compliance with the requirements. The contractor shall produce and maintain documentation for all assemblies and subassemblies in such a manner to ensure their functional integration without recourse to special test equipment (STE) or installation of the assemblies or subassemblies into a next higher assembly. The contractor shall maintain, modify, correct, and amend the existing TDP or develop new documentation or drawings as required to accommodate modifications if no existing TDP documentation. The TDP includes (at a minimum) the following data:

a. Product Drawings and Associated Lists

b. Commercial Drawings and Associated Lists

B001: DI-SESS-81000E: Product Drawings and Associated Lists (PDAL) B002: DI-SESS-81003E: Commercial Drawings/Models and Associated Lists B003: DI-ADMN-80925A: Revision to Existing Government Documents

5.4 TEST AND EVALUATION

The contractor shall plan, coordinate, establish and implement a test and evaluation effort of the Tactical Communication Tower replacement/rehabilitation and the technology refresh. The contractor shall prepare acceptance test plans for Government approval. The testing of the equipment at the JRTC, LA or the JMRC, FRG cannot interfere with the training operations;

therefore, the contractor shall work around the training rotation schedule. The contractor shall identify support resources and infrastructure necessary for test and evaluation activities. If the contractor requires Government support or assets for a test, the contractor shall submit a request for approval to the Government at least 120 days prior to the start of the test. The contractor shall host a Test Readiness Review prior to the start of any Government-witnessed test.

A011: (DI-NDTI-80603A) Test Procedure A012: (DI-NDTI-80809B) Test/Inspection Report

5.4.1 Test Readiness Review (TRR)

The TRR shall occur before any Government witnessed testing begins, and shall normally last not more than one day. Prior to the start of the test event, the contractor shall present evidence that the documentation is complete, the system is ready, prior test(s) were successful and open issues have been addressed. There shall be reasonable confidence that the system to be tested can satisfactorily pass the test. This review shall determine what actions are required to ensure resources, training, and test hardware will be in place to support the successful conduct of the test, and to ensure that test articles, documentation, design maturity, configuration, and data systems have been adequately addressed. The contractor shall document action items and coordinate and track resolutions for each item until closure.

5.4.2 Security Control Assessment (SCA)

The contractor shall support an individual SCA (formerly called a Certification Test and Evaluation (CT&E)) event in order to verify/validate the system(s) Cybersecurity compliance in accordance with RMF. The contractor shall provide a testing environment and technical support for the accreditation of the system(s). The contractor shall work with the Government to schedule the SCA, which shall be a critical milestone that shall be successful prior to Government approval for deployment. The contractor shall provide all required RMF documentation and compliance scans of the system to support the accreditation events and sustained Cybersecurity compliance through the life of the contract including Federal Information System Management Act (FISMA) evaluations. The contractor shall provide preliminary scans prior to the SCA for the Government to review and then final (clean) scans again as part of the SCA and before each GAT as part of the Test Readiness Review (TRR).

5.4.3 Government Acceptance Test (GAT)

The Government will test all requirements of the system. The contactor shall provide the adequate number of printed paper copies of all the documents as well as the appropriate personnel support required for GAT. The GAT shall consist of three main parts: Functional Testing, Physical Configuration Audit (PCA), and Operational Testing (OT) (two successful rotations).

5.4.3.1 Functional Testing

The required functional system testing will be executed by the Government with pre-approved test procedure, and with the support of the contractor(s). The contractor shall support the Government run functional testing which follows the GAT test procedure to test the functional requirements. The test procedure shall include testing of the entire system. The test shall demonstrate the functional requirements, assess the adequacy of the system to include testing of all the data ports and devices in the various buildings and within the maneuver where the video subsystem components are located to verify connectivity. All issues that arise during testing shall be documented via a Test Incident Report (TIR). The contractor shall use a TIR tracking tool to capture the classification, description, status, progress, and completion of all open and closed TIRs.

5.4.3.3 Two (2) Rotational Test

In addition to the functional test conducted by the Government, the GAT shall also include a two

(2) Rotation Operational Test (OT). The OT consists of running the system during 2 rotations at the Combat Training Centers JRTC and JMRC (without incident(s) – the failure to transmit voice, video and data from the towers to/from and/or CIS.

5.5 FINAL ACCEPTANCE

Final acceptance will not be provided by the Government until successful completion of the following:

Functional Testing of each tower site, Two Rotations (without incidents or failure), and

Physical Configuration Audit (PCA)

5.6 QUALITY ASSURANCE (QA)

The contractor shall implement a QA program using industry-accepted best practices that comply with ISO 9001 and software QA (SQA) in accordance with the contractor’s internal SQA processes to ensure the system requirements are met. The contractor shall utilize measurement points that will provide maximum visibility into processes. The contractor shall select the proper methods to analyze these processes to continuously improve the system.

5.7 SAFETY ASSESSMENT AND HEALTH HAZARD ANALYSIS

The contractor shall utilize a safety…