Attachment 2 Requirement Matrix_20200610v1.xlsx

XLSX spreadsheet 100 KB Posted

Attached to
JRTC tower replacements/JMRC tech. refresh Federal contract opportunity
Solicitation number
W900KK-20-R-0058
Issued by
Department of the Army Materiel Command Contracting Command Orlando Contracting Center

About this file

This document contains a requirements matrix for evaluating proposals submitted in response to solicitation number W900KK-20-R-0058. The solicitation seeks to replace four tactical communication towers and shelters at Joint Readiness Training Center (JRTC) sites, perform a technology refresh of equipment at one JRTC tower, and perform technology refreshes at two tower sites located at the Joint Multinational Readiness Center (JMRC) in Germany. Evaluators will use the matrix to determine whether proposals adequately address technical, management, logistics, and past performance requirements set forth in the performance work statement for tasks such as tower and site designs, equipment replacements, certifications, construction, and maintenance. Submissions are due by the amended date specified in the solicitation. The Department of the Army Materiel Command Contracting Command Orlando Contracting Center issued the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to JRTC tower replacements/JMRC tech. refresh, newest first.
File Type Posted
Attachment 5 PPQ_Amendment 02.pdf PDF
Attachment 4 Cost Workbook_Amendment 02.xlsx XLSX spreadsheet
Responses to CTC Tower Efforts Questions_Jul2020_Amendment 02.xlsx XLSX spreadsheet
Attachment 1 JRTC and JRMC Tower PWS_25 JUN 20_Amendment 02.pdf PDF
W900KK-20-R-0058 Amendment 02 Conformed Solicitation.pdf PDF
W900KK-20-R-0058 Amendment 02.pdf PDF
Attachment 2 Requriement Matrix_July2020_Amendment 02.xlsx XLSX spreadsheet
Attachment 3_ CDRLs.pdf PDF
Attachment 1_ PWS_PWS_2019_031_CTC_Tower_ Replacement.pdf PDF
Attachment 8_DBA_Wage_Determination_LA20200006.pdf PDF
Attachment 4_ Cost Workbook.xlsx XLSX spreadsheet
Attachment 6 LT2 Instruction.docx DOCX document
Attachment 5_ PPQ.PDF PDF
Attachment 7_Industry_Comment Form.doc DOC document
W900KK-20-R-0058 Amendment 01.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JRTC_Technical

Tactical Communication Tower Replacement at the Joint Readiness Training Center (JRTC) and Technical Refresh at Joint Multinational Readiness Center (JMRC)
Offeror Requirements Matrix
Company Name:Company Name:

Instructions to Evaluator: Use this matrix to determine compliance with the requirements of the Solicitation. You shall evaluate each requirement 'Acceptable' or 'Unacceptable' against each specified section of the Tactical Communication Tower Replacement Performance Work Statement Document PWS-2019-031 dated 9 Mar 2020. If determined 'Unacceptable' you shall provide justification in the Notes Section.

Note to Offerors: All proposals must demonstrate that the Offeror has an understanding of the requirements and associated risks as well as possesses the resources and acumen in providing the solutions necessary to meet the requirements set forth in this solicitation. The Government considers statements that the prospective Offeror understands, can or will comply with the statements paraphrasing the requirements or parts thereof, to be inadequate and unacceptable. The Government further considers mere reiteration of the requirement or standard reference material to also be inadequate and unacceptable.

In the reference section you shall provide a page number of your proposal which shows your compliance with the requirements identified below. If the page contains a significant amount of information, then you shall include the specific section/paragraph of the page. Only input data in the reference section. Data input in the acceptable, unacceptable or notes sections will not be considered.

AJRTC - TECHNICALReferenceAcceptableUnacceptableReference Section (Offeror)
1PWS 3.1.2 - The offeror's solution is consistent with the geography of Fort Polk, JRTC CTC operational schedule, Ft. Polk and County/State regulations, current tower locations, and current existing fiber optic network (FON) ring when designing the new towers and locations (see Appendix A of PWS).Spec Para 3.1.2
2PWS 3.1.3 - The offeror's proposed approach for site surveys at each tower location is viable considering the existing conditions, the scope of the work intended for the project, the new tower locations (within 500 meters of the existing locations), and construction, demolition and removal of construction debris is considered.
3PWS 3.1.4 - The offeror's approach in conducting certified modeling tool's analysis output provides 98% overall network (LTE and P25 radio) coverage of the maneuver area under the full load of a training rotation; historical model analysis data from past Tower programs that demonstrates correlation shall be included.
4PWS 3.1.5 The offeror's approach considers the JRTC Standard Tower Hardware, Appendix C of PWS.
5PWS 3.1.6 The offeror's solution provides an additional capability to handle 75% more equipment antenna space on the towers and 50% more shelter rack space, for potential future tower/shelter upgrades.
6PWS 3.1.7 The offeror's approach complies with: 1) FAA Regulatory Policy Title 14 CFR Part 77 for all new Towers; 2) the latest revision of Advisory Circular 70/7460-1L - Obstruction Marking and Lighting; and 3) with FAA regulations and requirements for all new and existing Towers.
7PWS 3.1.9 The offeror's solution is in accordance with ACI 318 and AISC-LRFD, for all new and existing Towers.
8PWS 3.2.1 The offeror's tower design is a self-supporting (three platform minimum) galvanized (no guy wires) Class III structure per TIA-222-H and includes the use of UFGS 09 97 13.25 Part 2.
9PWS 3.2.2 The Offeror's proposed Tower and site design sustains environmental conditions of 95 mph winds, and 30 mph winds with ½ inch of ice as defined by TIA-222-H (Vernon Parish, LA).
10PWS 3.2.2 The Offeror's tower and site design provides climbing provisions consistent with TIA-222-H, complete with anchorages and platforms for regular periodic maintenance or trouble shooting of antenna systems.
11PWS 3.2.2 The offeror's tower and site design provides a grounding system in accordance with the IEEE Standard 142. The proposed total resistance of the structure’s connected primary grounds as referenced to remote earth does not exceed 10 ohms.
12PWS 3.2.2 The offeror's tower and site design provides a lightning arresting system in accordance with NFPA 780: Standard for the Installation of Lightning Protection Systems.
13PWS 3.2.2 The offeror's tower design provides a FAA Advisory Circular AC 150/5345-43 compliant obstruction light system for night-time operation installed in accordance with Chapter 5 of FAA Advisory Circular AC 70/7460-1, and painted in accordance with Chapter 5 of FAA Advisory Circular AC 70/7460-1 and ASTM A123 and A153.
14PWS 3.2.2 The offeror's tower and site design provides a four (4)-sided perimeter FE-6 security fence around the tower with one key control entrance that provides code measurement layout of facilities and access capability within.
15PWS 3.2.2 The offeror's tower and site design provides a Transient Voltage Surge Suppressor (TVSS); sized to the amperage and/or voltage required of each panel, grounded, wired to the panel, and also connected to the grounding system.
16PWS 3.2.2 The offeror's tower and site design provides a back-up Power Generator that seamlessly converts and operates to provide power to the tower site for 48 hours of uninterrupted operations. The Generator is the same model as used in construction of the newest towers at JRTC (North Fort / Land Expansion). (See Appendix C of the PWS)
17PWS 3.2.2 The offeror's tower and site design provides a Uninterruptible Power Supply (UPS) that provides continuous power to all communication equipment during the time interval between the loss of commercial power source, detection, and start of back-up generators, provides line surge and over voltage protection for all core equipment, and provides full load operations for a minimum of 1 hour until equipment can be safely brought down or power restored. The UPS system shall have sufficient capacity to power any alarms, modems, multi-coupler, amplifier, and/or other ancillary equipment for 1 hour, at a maximum design load plus twenty-five (25 %) future growth.
18PWS 3.2.2 The offeror's approach provides a Asentria S550-6 Siteboss alarm/monitoring system (temperature, UPS/loss of power/shelter access at a minimum) with communication to Building 1560.
19PWS 3.2.2 The offeror's approach provides a shelter to house and protect electrical and electronic equipment installed in meeting the PWS requirements. The shelter design shall maximize commonality with the newly established JOC Tower and Land Expansion Towers. The shelters shall be concrete pre-cast with stone aggregate exterior, installed on a reinforced poured concrete slab secured with metal tie-down plates and contain an integrated grounding system that meets the guidelines of Motorola R56. A single point ground is provided for all equipment and systems within the shelter and each equipment rack shall have a sub- system ground bar (SSG) that provides a location for racked equipment to be properly grounded. The shelter shall be sized to accommodate all equipment with additional square footage to accommodate an additional 50% more racks for future growth.
20PWS 3.2.3 The offeror's tower design provides an additional capability to handle 50% more cabling and antennas for future upgrades.Spec Para XXX
21PWS 3.2.4 The offeror's approach provides a 100% equipment replacement design to make the new tower’s subsystems match the old tower’s capability.
22PWS 3.2.4.1 The offeror's tower design approach takes into consideration a future IC3NS OPFOR Cell Phones capability.
23PWS 3.3.1 The offeror's Southern tower and foundation loads analysis approach defines the new future capability upgrade margins. The design goal at the mimimum is the ability to support the subsystem identified in Attachment 1, PWS-2019-031, Section 3.3.4 and the additional capability of the IC3NS OPFOR Cell Phones Section 3.2.4.1.
24PWS 3.3.2 The offeror's foundation design approach provides how it meets the geotechnical report and the structural concrete in accordance with ACI 318-11. The foundation design approach brings the tower structure and foundation back into regulatory compliance.
25PWS 3.3.3 and 3.3.4 The offeror's solution provides a technology refresh of all of the equipment required to make the Southern Tower match the capability of the four new tower’s subsystems.

JRTC_Management

Tactical Communication Tower Replacement at the Joint Readiness Training Center (JRTC) and Techncial Refresh at Joint Multinational Readiness Center (JMRC)
Offeror Requirements Matrix
Company Name:Company Name:

Instructions to Evaluator: Use this matrix to determine compliance with the requirements of the Solicitation. You shall evaluate each requirement 'Acceptable' or 'Unacceptable' against each specified section of the Tactical Communication Tower Replacement Performance Work Statement Document PWS-2019-031 dated 9 Mar 2020. If determined 'Unacceptable' you shall provide justification in the Notes Section.

Note to Offerors: All proposals must demonstrate that the Offeror has an understanding of the requirements and associated risks as well as possesses the resources and acumen in providing the solutions necessary to meet the requirements set forth in this solicitation. The Government considers statements that the prospective Offeror understands, can or will comply with the statements paraphrasing the requirements or parts thereof, to be inadequate and unacceptable. The Government further considers mere reiteration of the requirement or standard reference material to also be inadequate and unacceptable.

In the reference section you shall provide a page number of your proposal which shows your compliance with the requirements identified below. If the page contains a significant amount of information, then you shall include the specific section/paragraph of the page. Only input data in the reference section. Data input in the acceptable, unacceptable or notes sections will not be considered.

BJRTC - MANAGEMENTReferenceAcceptableUnacceptableReference Section (Offeror)
1The Offeror's technical approach/solution meets the technical requirements as defined in Section 3.1.1 of the Performance Work Statement PWS-2019-031 dated 9 Mar 2020. The plan includes how the Offeror will accomplish the work while maintaining deconfliction with the JRTC rotation schedule.
2The Offeror's technical approach/solution meets the technical requirements as defined in Section 3.3.1 of the Performance Work Statement PWS-2019-031 dated 9 Mar 2020.
3The Offeror's technical approach/solution meets the technical requirements as defined in Section 3.3.2 of the Performance Work Statement PWS-2019-031 dated 9 Mar 2020.
4The Offeror's technical approach/solution meets the technical requirements as defined in Section 5.4.3.3 of the Performance Work Statement PWS-2019-031 dated 9 Mar 2020. The Offeror's solution runs in parallel the legacy systems and the new systems during the two rotation period. The Offeror's solution specifically addresses the switchover design, back to the legacy systems if the new systems fail, so that the training rotation is not interupted.
5The Proposed Integrated Master Plan and Integrated Master Schedule identify a plan for critical paths to be used to assess project progress, schedule risk, and corrective actions required to mitigate risk in compliance with the requirements in section 5.1 of the Performance Work Statement PWS-2019-031 dated 9 Mar 2020.Spec Para XXX
6The Offeror's approach adheres to the guidelines of Cybersecurity in compliance with the requirements in Section 5.8.1 and Section 5.8.2 of the Performance Work Statement PWS-2019-031 dated 9 Mar 2020.Spec Para XXX
Spec Para XXX
Spec Para XXX
Spec Para XXX

JRTC_Logistics

Tactical Communication Tower Replacement at the Joint Readiness Training Center (JRTC) and Techncial Refresh at Joint Multinational Readiness Center (JMRC)
Offeror Requirements Matrix
Company Name:Company Name:

Instructions to Evaluator: Use this matrix to determine compliance with the requirements of the Solicitation. You shall evaluate each requirement 'Acceptable' or 'Unacceptable' against each specified section of the Tactical Communication Tower Replacement Performance Work Statement Document PWS-2019-031 dated 9 Mar 2020. If determined 'Unacceptable' you shall provide justification in the Notes Section.

Note to Offerors: All proposals must demonstrate that the Offeror has an understanding of the requirements and associated risks as well as possesses the resources and acumen in providing the solutions necessary to meet the requirements set forth in this solicitation. The Government considers statements that the prospective Offeror understands, can or will comply with the statements paraphrasing the requirements or parts thereof, to be inadequate and unacceptable. The Government further considers mere reiteration of the requirement or standard reference material to also be inadequate and unacceptable.

In the reference section you shall provide a page number of your proposal which shows your compliance with the requirements identified below. If the page contains a significant amount of information, then you shall include the specific section/paragraph of the page. Only input data in the reference section. Data input in the acceptable, unacceptable or notes sections will not be considered.

CJRTC - LOGISTICSReferenceAcceptableUnacceptableReference Section (Offeror)
1PWS 5.3 The Offeror's approach towards maintenance actions and support structure are aligned with the current two level LCCS maintenance concept (field and sustainment).
2The Offeror's technical approach/solutions in meeting the standardization requirement of the system and subsystems meets the requirement identified in PWS 3.2 and 5.3.4.
3The Offeror's approach in meeting the removal and disposal of legacy equipment requirement is in accordance with PWS 3.4 and 5.9.11

JRTC_PP

Tactical Communication Tower Replacement at the Joint Readiness Training Center (JRTC) and Techncial Refresh at Joint Multinational Readiness Center (JMRC)
Offeror Requirements Matrix
Company Name:Company Name:

Instructions to Evaluator: Use this matrix to determine compliance with the requirements of the Solicitation. You shall evaluate each requirement 'Acceptable' or 'Unacceptable' against each specified section of the Tactical Communication Tower Replacement Performance Work Statement Document PWS-2019-031 dated 9 Mar 2020. If determined 'Unacceptable' you shall provide justification in the Notes Section.

Note to Offerors: All proposals must demonstrate that the Offeror has an understanding of the requirements and associated risks as well as possesses the resources and acumen in providing the solutions necessary to meet the requirements set forth in this solicitation. The Government considers statements that the prospective Offeror understands, can or will comply with the statements paraphrasing the requirements or parts thereof, to be inadequate and unacceptable. The Government further considers mere reiteration of the requirement or standard reference material to also be inadequate and unacceptable. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.

In the reference section you shall provide a page number of your proposal which shows your compliance with the requirements identified below. If the page contains a significant amount of information, then you shall include the specific section/paragraph of the page. Only input data in the reference section. Data input in the acceptable, unacceptable or notes sections will not be considered.

DJRTC - PAST PERFORMANCEReferenceAcceptableUnacceptableReference Section (Offeror)
1The Offeror's past performance demonstrates their capability to provide technical and/or management expertise against the knowledge and skill sets required to fulfill the requirements as defined in the Attachment 1, PWS-2019-031, Section 3.0. At a minimum, the offeror’s proposal shall includes 3 years of experience for the prime and all subcontractors:
a. Manufacturing: Your company/Team possesses not less than three years’ experience in the actual production of the specified tower site/shelter materials and equipment/products that are required in Section 3.0 demonstrating adherance to the requirements of Appendix A of Attachment 1, PWS-2019-031 (see Appendix C of PWS). Performance has met program objectives with corrective action taken to overcome performance problems.
b. Installation: Your Company/Team possesses not less than five years’ experience in the installation of electrical systems and equipment similar in scope and complexity to those required in Section 3.0 and adhering to the requirements of Appendix A of Attachment 1, PWS-2019-031. Your firm has completed successfully at least five (5) comparable scale projects. Performance has met program objectives with corrective action taken to overcome performance problems.
2Offeror has submitted a list of at a minimum of THREE (3) Government and/or commercial contracts for the prime and for each major subcontractor) in performance or awarded, during the past 3 years, which are relevant to the efforts required by this solicitation. Relevant efforts are defined as demonstrating past performance that is similar to cost (over $10M), schedule, and performance requirements on programs in the context of this effort:
a. Offeror has submitted the Contractor/Subcontractor place of performance, CAGE Code, DUNS Number, and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers) for proposed past performance contracts.
b. For the proposed contracts, the contract type (specific type such as Firm Fixed Price (FFP), Cost Reimbursement (CR), Time and Materials (T&M)), Awarded price/cost, Final or projected final price/cost, Original delivery schedule, and Final delivery projected schedule or date has been provided.
c. For the proposed contracts, the Government’s technical representative/COR, and current e-mail address, telephone and fax numbers, if applicable have been provided.
3PWS 3.1.7 and 3.1.8 The Offeror has demonstrated their prior approach and their prior experience interfacing with the FCC and FAA and successfully meeting the FCC, FAA, and NOTAM’s requirements
4PWS 5.3.5 The Offeror's prior their approach and their prior experience interfacing with coordination obtaining DoD spectrum approval and successfully meeting the JF12/1494 requirements.Spec Para XXX

JMRC_Management

Tactical Communication Tower Replacement at the Joint Readiness Training Center (JRTC) and Techncial Refresh at Joint Multinational Readiness Center (JMRC)
Offeror Requirements Matrix
Company Name:Company Name:

Instructions to Evaluator: Use this matrix to determine compliance with the requirements of the Solicitation. You shall evaluate each requirement 'Acceptable' or 'Unacceptable' against each specified section of the Tactical Communication Tower Replacement Performance Work Statement Document PWS-2019-031 dated 9 Mar 2020. If determined 'Unacceptable' you shall provide justification in the Notes Section.

Note to Offerors: All proposals must demonstrate that the Offeror has an understanding of the requirements and associated risks as well as possesses the resources and acumen in providing the solutions necessary to meet the requirements set forth in this solicitation. The Government considers statements that the prospective Offeror understands, can or will comply with the statements paraphrasing the requirements or parts thereof, to be inadequate and unacceptable. The Government further considers mere reiteration of the requirement or standard reference material to also be inadequate and unacceptable.

In the reference section you shall provide a page number of your proposal which shows your compliance with the requirements identified below. If the page contains a significant amount of information, then you shall include the specific section/paragraph of the page. Only input data in the reference section. Data input in the acceptable, unacceptable or notes sections will not be considered.

BJMRC - MANAGEMENTReferenceAcceptableUnacceptableReference Section (Offeror)
1The Offeror' solution meets the technical requirements as defined in Section 4.1 of the Performance Work Statement PWS-2019-031 dated 9 Mar 2020.
2The Offeror's proposed Integrated Master Plan and Integrated Master Schedule to identify a plan for critical paths to be used to assess project progress, schedule risk and corrective actions required to mitigate risk in compliance with the requirements in section 5.1 of the Performance Work Statement PWS-2019-031 dated 9 Mar 2020.Spec Para XXX
3The Offeror's solution adheres to guidelines of Cybersecurity in compliance with the requirements in Section 5.8.1 and Section 5.8.2 of the Performance Work Statement PWS-2019-031 dated 9 Mar 2020.Spec Para XXX
Spec Para XXX
Spec Para XXX
Spec Para XXX

JMRC_PP

Tactical Communication Tower Replacement at the Joint Readiness Training Center (JRTC) and Techncial Refresh at Joint Multinational Readiness Center (JMRC)
Offeror Requirements Matrix
Company Name:Company Name:

Instructions to Evaluator: Use this matrix to determine compliance with the requirements of the Solicitation. You shall evaluate each requirement 'Acceptable' or 'Unacceptable' against each specified section of the Tactical Communication Tower Replacement Performance Work Statement Document PWS-2019-031 dated 9 Mar 2020. If determined 'Unacceptable' you shall provide justification in the Notes Section.

Note to Offerors: All proposals must demonstrate that the Offeror has an understanding of the requirements and associated risks as well as possesses the resources and acumen in providing the solutions necessary to meet the requirements set forth in this solicitation. The Government considers statements that the prospective Offeror understands, can or will comply with the statements paraphrasing the requirements or parts thereof, to be inadequate and unacceptable. The Government further considers mere reiteration of the requirement or standard reference material to also be inadequate and unacceptable. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.

In the reference section you shall provide a page number of your proposal which shows your compliance with the requirements identified below. If the page contains a significant amount of information, then you shall include the specific section/paragraph of the page. Only input data in the reference section. Data input in the acceptable, unacceptable or notes sections will not be considered.

DJMRC - PAST PERFORMANCEReferenceAcceptableUnacceptableReference Section (Offeror)
1The Offeror's past performance demonstrates their capability to provide technical and/or management expertise against the knowledge and skill sets required to fulfill the requirements as defined in the Attachment 1, PWS-2019-031, Section 4.0. At a minimum, the offeror’s proposal includes 3 years of experience for the prime and all subcontractors:
a. Manufacturing: Your Company/Team possesses not less than three years’ experience in the actual production of the specified tower site/shelter materials and equipment/products that are required in Attachment 1, PWS-2019-031, Section 4.0. (see Appendix C of PWS). Performance has met program objectives with corrective action taken to overcome performance problems.
b. Installation: Your Company/Team possesses not less than five years’ experience in the installation of electrical systems and equipment similar in scope and complexity to those required in Section 4.0 and having successfully completed at least five (5) comparable scale projects within Germany. Performance has met program objectives with corrective action taken to overcome performance problems.
2Offeror has submitted a list of at a minimum of THREE (3) Government and/or commercial contracts for the prime and for each major subcontractor) in performance or awarded, during the past 3 years, which are relevant to the efforts required by this solicitation. Relevant efforts are defined as demonstrating past performance that is similar to cost (over $10M), schedule, and performance requirements on programs in the context of this effort:
a. Offeror has submitted the Contractor/Subcontractor place of performance, CAGE Code, DUNS Number, and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers) for proposed past performance contracts.
b. For the proposed contracts, the contract type (specific type such as Firm Fixed Price (FFP), Cost Reimbursement (CR), Time and Materials (T&M)), Awarded price/cost, Final or projected final price/cost, Original delivery schedule, and Final delivery projected schedule or date has been provided.
c. For the proposed contracts, the Government’s technical representative/COR, and current e-mail address, telephone and fax numbers, if applicable have been provided.
3PWS 5.3.5 The Offeror's prior their approach and their prior experience interfacing with coordination obtaining DoD spectrum approval and successfully meeting the JF12/1494 requirements.Spec Para XXX

Sheet1

File details come from the government source that posted it. Updated .