Attachment 2c Milan and Genoa Technical Specifications.doc
DOC document 716 KB Posted
- Attached to
- JANITORIAL SERVICES Federal contract opportunity
- Solicitation number
- 191T7026Q0002
- Issued by
- Department of State
About this file
This document is a detailed Technical Specifications attachment for janitorial services at the U.S. Consulate General in Milan and the Consular Agency in Genoa, Italy, for Fiscal Year 2025. The scope of service includes comprehensive cleaning for multiple government-owned and leased properties, encompassing approximately 50 leased units in Milan and surrounding areas, with specific requirements for interior and exterior spaces across various floors of the consulate building, including offices, bathrooms, common areas, equipment rooms, and glass surfaces.
The cleaning services are structured with daily, weekly, monthly, and periodic tasks, ranging from routine cleaning of toilets and kitchenettes to specialized maintenance of equipment rooms and temporary additional services. The contractor must provide all labor, materials, and equipment, including cleaning supplies, paper products, door mats, and two dedicated cleaning personnel for daily tasks. Specific requirements include using approved antimicrobial cleaning products, replacing dispensers, maintaining recycling containers, and performing deep cleaning of areas like gym facilities. The technical specifications outline precise cleaning frequencies, methods, and areas of focus for each location, with particular attention to sanitation, surface maintenance, and safety protocols.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers 2.docx | DOCX document | |
| Attachment 2b Florence Technical Specifications - Rev.1.docx | DOCX document | |
| Conference Minutes.pdf | ||
| Amendment of Solicitation - No. 0001.pdf | ||
| Attachment 1c Milan Prices - Rev.1.xlsx | XLSX spreadsheet | |
| Questions and Answers.pdf | ||
| 191T7026Q0002.docx | DOCX document | |
| Attachment 1c Milan Prices.xlsx | XLSX spreadsheet | |
| Attachment 1a Rome Prices.xlsx | XLSX spreadsheet | |
| Prospective Quoter Cover Letter.pdf | ||
| Attachment 5 Form W14.pdf | ||
| Attachment 2b Florence Technical Specifications.docx | DOCX document | |
| Attachment 2a Rome Technical Specifications.doc | DOC document | |
| Attachment 1d Genoa Prices.xlsx | XLSX spreadsheet | |
| Attachment 1b Florence Prices.xlsx | XLSX spreadsheet | |
| SF-1449.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US CONSULATE GENERAL
MILAN
VIA Principe Amedeo 2/10 Milan ITALY
Cleaning Services Government Leased Offices and Residences Technical Specifications Attachment 2c: Milan and Genoa
FY 2025
Facility Maintenance
1. SCOPE OF SERVICE
General
The American Consulate of the United States of America in Milan requires cleaning services for U.S. Government-owned and leased properties in Milan, including the Main Consular Building located at Via Principe Amedeo, the CGR at Via Pietro Cossa n. 1, the Marines Residence, and approximately 50 leased units in Milan and the surrounding area, and the Consular Agency of Genoa in Via Dante, 2, Palazzo Nuova Borsa, 3rd floor, Genoa.
The Contractor shall perform standard cleaning services as outlined in Chapter 3 and shall provide labor and equipment for any additional services as needed. The additional services, referred to in Chapter 3 as “Temporary Additional Services,” may be requested for extended periods under special circumstances. These services are not included under the "STANDARD SERVICES" section of the contract.
The Contractor shall provide all skilled and unskilled labor, materials, equipment, transportation, supervision, administrative and management oversight, as well as technical expertise necessary to execute all required services described in this contract. Additionally, the Contractor shall appoint one of its personnel as the supervisor for the workforce assigned to work within the U.S. Consulate. This individual will also serve as the liaison between the Contractor and the U.S. Consulate and shall be fluent in both written and spoken English.
Maximum attention shall be given to the safety of personnel working on-site. Workers shall adhere to all standard safety codes. Since the premises include office buildings and residential apartments, temporary safety awareness and protection measures for third parties shall be implemented with care and attention.
2. CONSISTENCY & LOCATIONS
The attached tables list the office locations, types of items, and detailed measurements of floors, wall-to-wall carpeting, rugs, glass surfaces, and all common areas for each building and/or Government-owned residence. Offerors shall specify the minimum cleaning staff to be assigned to each location, taking into account the consistency and frequency of services required.
MILAN
EXTERIOR AREAS
MEASUREMENTS OF COMPOUND
COMMON AREAS - Sq. mt.
| Location/ Description |
| Cement, |
Tiles and or Cobblestones
| Marble |
| Asphalt |
| Remarks/Frequency |
| Area in front of Consulate |
| 300 |
Once Weekly
| Balconies from 5th through 12th floor |
| NA |
No cleaning by contractor
| Building roof dedicated to the Consulate equipment room |
| NA |
No cleaning by contractor
| Total Sq. mt. |
| 300 |
BASEMENT FLOOR
Type of Floor - Sq. mt.
| Location and/or Offices |
| Wall to Wall Carpeting |
| Marble |
| Tiles |
| Rugs |
| Linoleum |
| Parquet |
| Number of Wash Basins |
| Number of Toilet Bowls |
| Remarks/ |
Frequency
Generator
See Equipment rooms details
Electrical Substation
See Equipment rooms details
Electrical POD (Point of Delivering)
See Equipment rooms details
Garage
Once a month
Total Sq. mt.
GROUND FLOOR
Type of Floor - Sq. mt.
Location and/or Offices
| Wall to Wall Carpeting |
| Marble |
| Tiles |
| Rugs |
| Linoleum |
| Parquet |
| Number of Sinks |
| Number of Toilet Bowls |
| Remarks/ |
Frequency
| CAC |
| N/A |
| 30 |
Corridors, Post One, Lobby, LGF office
| 70 |
| 20 |
Bathroom with wall tiles
| 1 |
| 1 |
Total Sq. mt.
| 30 |
| 73 |
| 30 |
GLASS SURFACES
| Description |
| Total Area of Glass Surface Sq. Mt. (*) |
| With Wooden Shutters |
| With Rolling Shutters |
| With |
Grilles Remarks/
Frequency
| Windows |
| No.1 300 x 120 cm |
No.1 380 x 400 cm
| N/A |
| N/A |
| N/A |
| Glass entrance doors and walls |
| No.2 300 x 280cm |
No.7 60 x 180 cm
CAC
| Glass wall partitions |
| No.4 80 x 50 cm |
No.1 540 x 70 cm
Marine Guard booth
(*) = Measurements of one side only. Service shall be performed on both sides.
5th FLOOR Type of Floor - Sq. m.
| Location and/or Offices |
| Wall to Wall Carpeting |
| Marble |
| Tiles |
| Rugs |
| Linoleum |
| Parquet |
| Number of Wash Basins |
| Number of Toilet Bowls |
| Remarks/ |
Frequency
| Offices |
| 172 |
Corridors
Storage room
Once every three months
Bathrooms + Laundry room with wall tiles
| 3 |
| 3 |
Lobby
GYM
| 80 |
| 30 |
| Storage |
| 30 |
Once every three months
| DVC Room + Control room |
| 60 |
Electrical room
| Total Sq. mt. |
| 262 |
| 80 |
| 40 |
GLASS SURFACES
| Description |
| Total Area of Glass Surface Sq. Mt. (*) |
| With Wooden Shutters |
| With Rolling Shutters |
| With |
Grilles Remarks/Frequency
Windows
No.8 270 x 160 cm No.4 130 x 280 cm
No.3 320 x 280 cm
No.2 60 x 120 cm.
No.1 200 x 120 cm
No.1 200 x 280 cm
| N/A |
| N/A |
| Glass Entrance Doors |
| No.2 360 x 280 cm |
7th FLOOR Type of Floor - Sq. mt.
| Location and/or Offices |
| Wall to Wall Carpeting |
| Marble |
| Tiles |
| Rugs |
| Linoleum |
| Parquet |
| Number of Sinks |
| Number of |
Toilet Bowls Remarks/
Offices
Corridors
Staircase going from 7th thru 12th floor
X
There are 6 small lobbies with linoleum floor on the 7th to 12th floors: total 24 m2
Once a week
Waiting Room
Bathrooms with wall tiles
| 2 |
| 3 |
Lobby
Vending machine space
Electrical room
Total Sq. mt.
GLASS SURFACES
| Description |
| Total Area of Glass Surface Sq. Mt. (*) |
| With Wooden Shutters |
| With Rolling Shutters |
| With |
Grilles Remarks/Frequency
Windows
No.2 130 x 160 cm
No.8 130 x 280 cm
No.2 200 x 280 cm
No.2 320 x 280 cm
No.1 60 x 120 cm.
| N/A |
| N/A |
| Glass Entrance Doors |
| No.2 360 x 280 cm |
8th FLOOR Type of Floor - Sq. mt.
| Location and/or Offices |
| Wall to Wall Carpeting |
| Marble |
| Tiles |
| Rugs |
| Linoleum |
| Parquet |
| Number of Sinks |
| Number of toilet bowls |
| Remarks/ |
Frequency
| Offices |
| 205 |
Corridors
Bathrooms with wall tiles
| 3 |
| 2 |
Lobby
Electrical Room
| Total Sq. mt. |
| 205 |
GLASS SURFACES
| Description |
| Total Area of Glass Surface Sq. Mt. (*) |
| With Wooden Shutters |
| With Rolling Shutters |
| With |
Grilles Remarks/Frequency
Windows
No.2 130 x 160 cm
No.8 130 x 280 cm
No.2 200 x 280 cm
No.2 320 x 280 cm
No.1 60 x 120 cm.
N/A
N/A
| Glass Entrance Doors |
| N.2 360 x 280 cm |
( * ) = Measurements of one side only. Service shall be performed on both sides.
9thFLOOR Type of Floor - Sq. mt.
| Location and/or Offices |
| Wall to Wall Carpeting |
| Marble |
| Tiles |
| Rugs |
| Linoleum |
| Parquet |
| Number of Sinks |
| Number of Toilet Bowls |
| Remarks/ |
Frequency
| Offices, |
| 175 |
| Corridors |
| 50 |
Bathrooms with wall tiles
| 3 |
| 3 |
Lobby
Kitchen
Electrical room
Health Unit
| Total Sq. mt. |
| 225 |
GLASS SURFACES
| Description |
| Total Area of Glass Surface Sq. Mt. (*) |
| With Wooden Shutters |
| With Rolling Shutters |
| With |
Grilles Remarks/Frequency
Windows
No.2 130 x 160 cm
No.8 130 x 280 cm
No.2 200 x 280 cm
No.2 320 x 280 cm
No.1 60 x 120 cm.
| N/A |
| N/A |
| Glass entrance doors |
| No.2 360 x 280 cm |
10th FLOOR Type of Floor - Sq. mt.
| Location and/or Offices |
| Wall to Wall Carpeting |
| Marble |
| Tiles |
| Rugs |
| Linoleum |
| Parquet |
| Number of Sinks |
| Number of Toilet Bowls |
| Remarks/ |
Frequency
| Offices, |
| 240 |
| Corridors |
| 40 |
Bathrooms with wall tiles
| 3 |
| 4 |
Lobby
Electrical Room
| Total Sq. mt. |
| 280 |
GLASS SURFACES
| Description |
| Total Area of Glass Surface Sq. Mt. (*) |
| With Wooden Shutters |
| With Rolling Shutters |
| With |
Grilles Remarks/Frequency
Windows
No.2 130 x 160 cm
No.8 130 x 280 cm
No.2 200 x 280 cm
No.2 320 x 280 cm
No.1 60 x 120 cm.
| N/A |
| N/A |
| Glass entrance doors |
| No.2 360 x 280 cm |
11th FLOOR Type of Floor - Sq. mt.
| Location and/or Offices |
| Wall to Wall Carpeting |
| Marble |
| Tiles |
| Rugs |
| Linoleum |
| Parquet |
| Number of Sinks |
| Number of Toilet Bowls |
| Remarks/ |
Frequency
| Offices |
| 100 |
| Restricted Office, Including a bathroom with no.1 sink and no.1 toilet |
| 190* |
| 1* |
| 1* |
| *Temporary additional service performed up-on request |
| Corridors |
| 8 |
Bathrooms with wall tiles
| 1 |
| 1 |
Lobby
Electrical room
| Total Sq. mt. |
| 298 |
| 1 |
| 1 |
GLASS SURFACES
| Description |
| Total Area of Glass Surface Sq. Mt. (*) |
| With Wooden Shutters |
| With Rolling Shutters |
| With |
Grilles Remarks/Frequency
Windows
No.2 130 x 160 cm
No.8 130 x 280 cm
No.2 200 x 280 cm
No.2 320 x 280 cm
No.1 60 x 120 cm.
| N/A |
| N/A |
| Glass entrance doors |
| No.2 360 x 280 cm |
( * ) = Measurements of one side only. Service shall be performed on both sides.
12th FLOOR Type of Floor - Sq. mt.
| Location and/or Offices |
| Wall to Wall Carpeting |
| Marble |
| Tiles |
| Rugs |
| Linoleum |
| Parquet |
| Number of Sinks |
| Number of Toilet Bowls |
| Remarks/ |
Frequency
| Offices, |
| 215 |
Corridors
Bathrooms with wall tiles
| 3 |
| 3 |
Lobby
Electrical room
| Total Sq. mt. |
| 215 |
GLASS SURFACES
| Description |
| Total Area of Glass Surface Sq. Mt. (*) |
| With Wooden Shutters |
| With Rolling Shutters |
| With |
Grilles Remarks/
Windows
No.2 130 x 160 cm
No.8 130 x 280 cm
No.2 200 x 280 cm
No.2 320 x 280 cm
No.1 60 x 120 cm.
| N/A |
| N/A |
| Glass entrance doors |
| No.2 360 x 280 cm |
EQUIPMENT ROOMS
| Location/ Floor |
| Electrical Room |
| Generator Room |
| Transformer Room |
| Equipment Room |
| Storage Areas |
| Basement |
| 1 |
| 1 |
| 1 |
| Ground floor |
| 1 |
| 5th Floor |
| 1 |
| 7th Floor |
| 1 |
| 8th Floor |
| 1 |
| 9th Floor |
| 1 |
| 10th Floor |
| 1 |
| 11th Floor |
| 1 |
| 12th Floor |
| 1 |
Roof
| TOTAL |
| 9 |
| 1 |
| 1 |
| 2 |
| 3 |
Bathroom Consistency
| LOCATION / BUILDING |
| Sinks |
| Toilet Bowls |
| Shower Boxes |
| Soap Dispensers |
| Towel Dispensers |
| Toilette Cover Dispensers |
| Toilet Paper Dispensers |
| Ground floor |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 5th Floor |
| 5 |
| 3 |
| 2 |
| 3 |
| 3 |
| 3 |
| 3 |
| 7th Floor |
| 2 |
| 3 |
| 2 |
| 3 |
| 3 |
| 3 |
| 8th Floor |
| 3 |
| 2 |
| 3 |
| 3 |
| 2 |
| 2 |
| 9th Floor |
| 3 |
| 2 |
| 3 |
| 3 |
| 2 |
| 2 |
| 10th Floor |
| 3 |
| 4 |
| 1 |
| 3 |
| 3 |
| 3 |
| 3 |
| 11th Floor |
| 1 |
| 1 |
| 1 |
| 1 |
| 3 |
| 1 |
| 12th Floor |
| 3 |
| 3 |
| 1 |
| 3 |
| 3 |
| 3 |
| 3 |
| TOTAL |
| 21 |
| 19 |
| 4 |
| 19 |
| 20 |
| 18 |
| 18 |
Recycled Material Containers
| ORGANIC |
| Paper |
| Glass |
| Plastic/Aluminum |
| Battery |
Basement floor
| Ground floor |
| 1 |
| 1 |
| 1 |
| 1 |
| 5th floor |
| 1 |
| 3 |
| 3 |
| 3 |
| 1 |
| 7th floor |
| 1 |
| 3 |
| 3 |
| 3 |
| 8th floor |
| 1 |
| 3 |
| 3 |
| 3 |
| 1 |
| 9th floor |
| 1 |
| 3 |
| 3 |
| 3 |
| 1 |
| 10th floor |
| 1 |
| 3 |
| 3 |
| 3 |
| 11th floor |
| 1 |
| 3 |
| 3 |
| 3 |
| 12th floor |
| 1 |
| 3 |
| 3 |
| 3 |
| Total |
| 8 |
| 36 |
| 36 |
| 36 |
| 3 |
3. WORK REQUIREMENTS & FREQUENCY OF TASKS
The required service consists of performing all tasks described in this section at the specified locations and frequencies. Routine janitorial services shall be scheduled Monday through Friday, from 07:30 to 16:30. The schedule for classified areas will be determined by the relevant offices during these hours.
Periodic janitorial services may be scheduled on Saturdays, from 06:00 to 13:00, for offices and/or common areas of all buildings. However, a written schedule shall be submitted to the Embassy’s COR in advance for approval.
3.1 Standard Services: Consulate Compound Office Spaces
The tasks required for cleaning services include a comprehensive set of activities to ensure cleanliness and hygiene across all designated areas. These tasks involve:
Daily Tasks
1. Thoroughly clean toilets, restrooms, and shower facilities using appropriate non-abrasive cleaners, chemical solutions, disinfectants, and deodorizers. Avoid using acid or other corrosive materials. Ensure all surfaces are free of grime, soap scum, mold, fingerprints, and smudges, maintaining sanitary conditions.
2. Replenish paper towels and toilet paper in all restrooms, ensuring sufficient supplies to last for 24 hours.
3. Clean the kitchenette, including dusting and mopping the floor, washing the kitchen sink and furniture, and emptying trash containers. Replace trash liners and ensure an adequate supply of paper towels to last for at least 24 hours.
4. Empty all recycling containers, replace plastic liners, and return them to their original locations. This task is limited to bathrooms, kitchenettes, and designated recycling centers, not individual offices. Each floor is estimated to have approximately two recycling collection centers.
5. Clean the exercise and aerobics room to include wiping exercise mats and benches, dusting equipment etc. and spraying with room deodorizer.
Twice a Day
Cleaning services shall be conducted in the following areas twice a day: once in the morning during the regular scheduled time and again in the afternoon between 13:30 and 16:30.
1. Inspect and clean the bathrooms located on the 5th floor near the gym and aerobic room.
2. Inspect and clean the bathroom accessible to the Consular Section on the 7th floor.
Once a Week
1. Empty all wastebaskets, including those in individual office spaces, replace plastic liners, and return them to their original locations.
2. Dust and mop marble, tiled, linoleum, and parquet floors in offices and corridors to ensure they are free of dust, mud, footprints, liquid spills, and debris.
3. Vacuum wall-to-wall carpeting and area rugs.
4. Wash and mop Marine Guard and LGF Guard booths.
5. Remove grease marks, fingerprints, and smudges from walls, doors, door frames, and similar surfaces using ammonia-based window cleaner and lint-free cloths or paper towels.
6. Wash glass surfaces, including public windows at the Marine Post, consulate visa offices, guard booths, glass doors, and glass partitions.
7. Clean the interior of elevators, including mirrors, floors, brass handles, and sliding door tracks.
8. Sweep building entrances.
9. Inspect all common areas, both interior and exterior, for leftover materials, remove them, and transport them to designated collection points.
10. Dust and clean all furniture, including desks, chairs, credenzas, computers, typing tables, empty bookshelves, coffee tables, conference tables, coat racks, telephones, typewriters, computers, table lamps, safes, and file cabinets, ensuring all surfaces are free of dust, dirt, and sticky residue.
11. Wash and sweep internal and external staircases, including dusting railings.
12. Dust fan coils.
13. Sweep outside areas, including the CAC area and the space in front of the building.
14. Perform deep cleaning of gym facilities, including dressing rooms, all equipment, light fixtures, ceiling fans, and ductwork.
Twice a Week
1. Water indoor plants and those around the CAC area.
Once a Month
1. Replace two door mats (size 200 x 80 cm) at the building entrances.
2. Wash, sweep, and degrease the garage floor.
Once Every Two Months
1. Wash windowpanes (inside and outside) and all glass surfaces.
2. Dust all pictures, maps, books, mountings, ceilings, door and walls.
Once Every Three Months
1. Wash and sweep floor tiles and dust equipment in equipment and electrical rooms.
Once Every Six Months
1. Clean ceiling light fixtures and floor lamps in all offices, corridors, bathrooms.
Once a Year Move floor protectors, sweep and wash the floor and the protectors, and return them to their original positions. This task includes moving furniture placed on top of the protectors, such as desks.
Additional Chairperson
The Contractor shall provide two cleaning personnel for 8 hours daily (Monday through
Friday, 08:00 to 17:00) to perform various assigned tasks during working hours and to respond to emergencies. The Contractor shall provide these personnel with a corporate vehicle or small cargo van to facilitate movement between residences and the Consulate as needed. The tasks to be assigned include:
· Checking, cleaning, and setting up all conference and training rooms before and after events.
· Setting up and providing cleaning services in the CGR for official events.
· Collecting trash from regular cleaning services and special events and transporting it to the common trash collection point (building basement).
· Removing trash accumulated in all areas and transporting all trash bags, including empty boxes, to the main collection points in the building basement.
· Performing minor moving tasks.
· Carrying out minor odd jobs and "fix-up tasks" related to cleaning operations and special events at the Consulate and CGR.
· Remaining on call any emergencies that may arise.
3.2 Standard Services
Equipment Rooms
The tasks listed below are to be completed in the specified equipment rooms once every three months:
Generator rooms
· Dust all existing pipes, electrical cables, engines, electrical panels, etc.
· Remove oil and grease stains from doors, pipes, etc.
· Wash and sweep floors.
· Dust and clean light fixtures.
Transformer Rooms
· Dust all existing pipes, electrical cables, the exterior of transformers, electrical panels, etc.
· Wash and sweep floors.
· Dust and clean light fixtures.
Switch Gear Rooms
· Dust all existing pipes, electrical cables, electrical panels, etc.
· Wash and sweep floors.
· Dust and clean light fixtures.
Elevator Machine Rooms
· Dust and clean electrical panels and light fixtures.
· Wash and sweep floors.
3.3 Temporary Additional Services
Temporary Additional Services are services that shall be provided by the contractor in addition to the scheduled services and shall be ordered by the COR on an as-needed basis, with a 24-hour advance notice.
1. Polish marble floors and floor tiles by smoothing with a planning machine, including rough-shaping and overhauling with a sharp-stone machine. Polishing near perimeter walls and corners shall be done by hand.
2. Wash curtains, including assembly and disassembly.
3. Smooth and refinish varnish coatings, and perform semi-lacquering of wooden floors.
4. Perform chemical polishing of marble, tile, and linoleum floors.
5. Shampoo carpets.
6. Power wash exterior fire bricks or ceramic tiles.
7. Remove dead plants, soil, pots, and other trash materials from terraces and/or balconies and transport them to the public dump (average area: 20 sq. m., estimated 2 cubic meters of trash).
8. Remove miscellaneous trash materials from cantinas/garages, including transportation to the public dump (estimated 2 cubic meters of trash).
9. Remove miscellaneous trash materials from apartments, terraces, or balconies, including transportation to the public dump (estimated 3 cubic meters of trash).
10. Provide maid services at the Ambassador and DCM residences. Tasks primarily include general cleaning, laundry, ironing, and bed-making.
3.3.1 Temporary Additional Service Government owned or leased apartments painted and furnished
Additional Temporary Services Upon COR Request
· Wash and/or mop all types of floors.
· Vacuum carpets.
· Wax marble floors and/or floor tiles.
· Clean entire restrooms, including wall tiles, bathtubs, accessories, etc.
· Wash the inside and outside of base and wall kitchen cabinets and countertops, including kitchen hoods.
· Clean the inside and outside of washing machines, dryers, gas ranges, and refrigerators.
· Dust furniture and bookshelves, including built-in closets, if applicable.
· Polish door and window handles.
· Wash and/or dust rolling and/or wooden shutters.
· Wash window glass panes and windowsills.
· Wash radiators.
· Wash and/or sweep terraces and/or balconies.
· Clean crystal chandeliers, if applicable, and/or light fixtures.
· Move furniture and return it to its original position after cleaning is completed.
· Polish and wax parquet floors.
· Remove and dispose of trash left in the apartment, up to one cubic meter. If there is additional trash, the contractor will be compensated for removal at the agreed-upon rate.
3.3.2 Temporary Additional Service
Government owned or leased apartments painted and NOT furnished
· Wash and/or mop all types of floors.
· Vacuum carpets.
· Wax marble floors and/or floor tiles.
· Clean entire restrooms, including wall tiles, bathtubs, accessories, etc.
· Wash the inside and outside of base and wall kitchen cabinets and countertops, including kitchen hoods.
· Clean the inside and outside of washing machines, dryers, gas ranges, and refrigerators.
· Dust furniture and bookshelves, including built-in closets, if applicable.
· Polish door and window handles.
· Wash and/or dust rolling and/or wooden shutters.
· Wash window glass panes and windowsills.
· Wash radiators.
· Wash and/or sweep terraces and/or balconies.
· Clean crystal chandeliers, if applicable, and/or light fixtures.
· Move furniture and return it to its original position after cleaning is completed.
· Polish and wax parquet floors.
· Remove and dispose of trash left in the apartment, up to one cubic meter. If there is additional trash, the contractor will be compensated for removal at the agreed-upon rate.
4. PRODUCTS AND TOOLS
The Contractor shall submit manufacturer Material Data Sheets for all products intended for use in performing the service throughout the contract period. These data sheets shall be approved and certified by the Ministry of Health as "PRESIDIO MEDICO."
All cleaning products shall be alcohol- or bleach-based and designated as antimicrobial products. Paper products provided for toilets, hand drying, and other uses shall contain recycled materials and be labeled with the percentage of recycled materials used. The Contractor shall use disposable dusting and cleaning cloths, which shall be replaced after cleaning each workstation. Additionally, the Contractor shall include a detailed description of the floor cleaning tools, methods, and products to be used.
Materials Included in the Service The Contractor is responsible for providing all materials and equipment necessary to complete both scheduled and unscheduled services. These materials and equipment include, but are not limited to, uniforms, personnel equipment, tools, clothes, detergents, plastic liners, urinal deodorant tablets, polishes, and any other items required to perform duties under this contract.
The following materials shall be supplied by the Contractor, with quantities determined based on the number of users and locations:
Material:
· Paper towels for bathrooms, Health Unit Labs, and kitchenettes
· Toilet paper
· Paper toilet covers
· Hand soap
· Dispensers for all materials*
*The Contractor shall supply, install, and maintain all required dispensers (refer to Section 2.0 for the list of bathrooms and kitchens).
Door Mats
The Contractor is responsible for supplying and replacing three door mats at the entrance of each building and CACs once a month. The size of the mats is approximately 100 x 200 cm, which shall be confirmed with the COR prior to placing the order.
5. RESTRICTED AREAS
As indicated in Section 2, the restricted spaces in the Milan Consulate will be cleaned as a temporary additional service, negotiated with the COR and agreed upon in writing.
6. GenoA cONSULAR AGENCY
Approx. 66 Sq. meters
Once a Week
· Empty all wastebaskets and outdoor ashtrays, replace plastic liners, and return them to their original positions.
· Dust and clean office furniture (no stepladder required).
· Sanitize all surfaces.
· Wash and sweep floor tiles.
· Clean entrance windows.
· Thoroughly clean of toilets, restrooms and shower facilities, using suitable non-abrasive cleaners, chemical solutions, disinfectants, and/or deodorizers, do not use acid and/or other corrosive materials, to ensure that surfaces are clean and free of grime, soap scum, mold, fingerprints or smudges, and that sanitary conditions are ensured.
· Replace paper towels and toilet paper in all restrooms, ensuring that there is enough to last 7 days.
Once Every Two Months
· Wash windows.
PAGE
_1286947071.doc
File details come from the government source that posted it. Updated .