Attachment 2 - Price List.xlsx
XLSX spreadsheet 32 KB Posted
- Solicitation number
- FA524026Q0034
About this file
This is a pricing template attachment for an Indefinite Delivery Indefinite Quantity (IDIQ) contract for Basewide Utility Vehicle Maintenance and Repair Services (Solicitation FA524026Q0034) at Andersen Air Force Base, Guam. Offerors must complete all cells within designated green boxes on the Price List tab, providing fully burdened fixed unit prices for five ordering periods that include all direct costs, indirect costs, and profit. Prices must be rounded to two decimal places.
The contract includes three primary CLINs: CLIN 0001 covers Periodic Scheduled Maintenance (PM) services for gas ATVs/UTVs, diesel UTVs, and electric carts with various service intervals; CLIN 0002 encompasses repair services such as diagnostics, drivetrain work, electrical system repairs, brake service, tire maintenance, and component replacements, with parts explicitly excluded and invoiced at actual cost; and CLIN 0003 addresses pickup and delivery/transportation services in two towing categories (light and heavy). The template includes a Total Evaluated Price (TEP) calculation tab that applies offeror pricing to four historical requirements spanning various service types and quantities to determine evaluation pricing for award purposes. Offerors are prohibited from modifying existing formulas and must ensure pricing is accurate, complete, and balanced.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Instructions
Step 1 Offerors are required to complete all cells within the green boxes on the tab entitled "PRICE LIST."
Step 2 Offerors shall NOT modify the formulas used on any of the tabs of this spreadsheet. If there is no formula, then the offeror may input a formula.
| Step 3 | Offerors shall round each Unit Price to 2 decimal places (Example: $X.XX). |
| Step 4 | Offerors shall fully burden each proposed Unit Price to inlcude all direct costs, indirect costs, and profit as described in each CLIN. |
CLIN 0001: Periodic Scheduled Maintenance (PM) per PWS 2.1.
Unit Prices for these services shall be fully burdened fixed rates, inclusive of all direct costs, indirect costs, and profit.
CLIN 0002: Repair Services per PWS 2.2.
Unit Prices for these services shall be fully burdened fixed rates, inclusive of all direct costs, indirect costs, and profit.
Parts are explicitly excluded from these fixed rates; approved parts will be invoiced at actual cost (zero markup) in accordance with PWS Section 2.6.3.
CLIN 0003: Pickup and Delivery/Transportation (Roundtrip) per PWS 2.3 Unit Prices for these services shall be fully burdened fixed rates, inclusive of all direct costs, indirect costs, and profit.
| Step 5 | Offerors are required to ensure that the pricing submitted is accurate, complete, and balanced. The Government will not verify offeror input formulas. |
| NOTE | The Government will evaluate price for award by calculating a Total Evaluated Price (TEP) for each Offeror. The TEP is for evaluation purposes only. The TEP will be calculated for each Offeror utilizing proposed Unit Prices for each repair service during the ordering period. Offerors shall complete the cells within the green boxes on the tab entitled "PRICE LIST." The tab entitled "TEP" will calculate the TEP. The historical requirements on the TEP tab are only utilized for the purposes of determining TEP. |
PRICE LIST
| ATTACHMENT 2 - PRICE LIST |
| Indefinite Delivery Indefinite Quantity |
| Contract/Solicitation: FA524026Q0034 |
| Basewide Utility Vehicle |
Maintenance and Repair Services
| CLIN / ELIN | DESCRIPTION | QTY | UOM | ORDERING PERIOD 1 | |
| UNIT PRICE | ORDERING PERIOD 2 | ||||
| UNIT PRICE | ORDERING PERIOD 3 | ||||
| UNIT PRICE | ORDERING PERIOD 4 | ||||
| UNIT PRICE | ORDERING PERIOD 5 |
UNIT PRICE
0001 Periodic Scheduled Maintenance (PM) in accordance with PWS 2.1.
Unit Prices for these services shall be fully burdened fixed rates, inclusive of all direct costs, indirect costs, and profit.
| 0001AA | Gas ATVs, UTVs: Standard Service (150-Hr or 6-Mo) | 1 | JB | |||||
| 0001AB | Gas ATVs, UTVs: Comprehensive Service (300-Hr or 12-Mo) | 1 | JB | |||||
| 0001AC | Diesel UTVs: Standard Service (100-Hr or 6-Mo) | 1 | JB | |||||
| 0001AD | Diesel UTVs: Comprehensive Service (200-Hr or 12-Mo) | 1 | JB | |||||
| 0001AE | Gas ATVs, UTVs, Diesel UTVs: Annual Drivetrain Service | 1 | JB | |||||
| 0001AF | North Star Edition: Annual HVAC Service | 1 | JB | |||||
| 0001AG | Electric Carts & UTVs: Standard Service (6-Mo) | 1 | JB | --- | --- | --- | --- | --- |
| 0001AH | Electric Carts & UTVs: Comprehensive Service (12-Mo) | 1 | JB | --- | --- | --- | --- | --- |
| 0001AH | Electric Carts & UTVs: Comprehensive Service (6-Mo) | 1 | EA | $295.00 | $295.00 | $295.00 | $295.00 | $295.00 |
| 0002 | Repair Services in accordance with PWS 2.2. |
Unit Prices for these services shall be fully burdened fixed rates, inclusive of all direct costs, indirect costs, and profit.
Parts are explicitly excluded from these fixed rates; approved parts will be invoiced at actual cost (zero markup) in accordance with PWS Section 2.6.3.
| 0002AA | Gas ATVs, UTVs, Diesel UTVs: General Mechanical Diagnostic | 1 | JB | |
| 0002AB | Gas ATVs, UTVs, Diesel UTVs: Electronic/EFI Diagnostic | 1 | JB | |
| 0002AC | Gas ATVs, UTVs, Diesel UTVs: Electrical System Diagnostic | 1 | JB | |
| 0002AD | Gas ATVs, UTVs, Diesel UTVs: Anti-Corrosion Treatment | 1 | JB | |
| 0002AE | Gas ATVs, UTVs, Diesel UTVs: CVT Belt Replacement | 1 | JB | |
| 0002AF | Gas ATVs, UTVs, Diesel UTVs: CV Axle Replacement (Per corner) | 1 | JB | |
| 0002AG | Gas ATVs, UTVs, Diesel UTVs: CV Boot Replacement (Per boot) | 1 | JB | |
| 0002AH | Gas ATVs, UTVs, Diesel UTVs: Wheel Bearing Replacement (Per wheel) | 1 | JB | |
| 0002AJ | Gas ATVs, UTVs, Diesel UTVs: Clutch Rebuild / Service | 1 | JB | |
| 0002AK | Gas ATVs, UTVs, Diesel UTVs: Carrier Bearing / Prop Shaft | 1 | JB | |
| 0002AL | Gas ATVs, UTVs, Diesel UTVs: A-Arm Bushing Replace (Per arm) | 1 | JB | |
| 0002AM | Gas ATVs, UTVs, Diesel UTVs: Ball Joint Replace (Per joint) | 1 | JB | |
| 0002AN | Gas ATVs, UTVs, Diesel UTVs: Tie Rod End Replace (Per end) | 1 | JB | |
| 0002AP | Gas ATVs, UTVs, Diesel UTVs: Shock Absorber Rebuild (Per shock) | 1 | JB | |
| 0002AQ | Gas ATVs, UTVs, Diesel UTVs: Brake Pad Replace (Per axle) | 1 | JB | |
| 0002AR | Gas ATVs, UTVs, Diesel UTVs: Brake Rotor Replace (Per rotor) | 1 | JB | |
| 0002AS | Gas ATVs, UTVs, Diesel UTVs: Brake System Flush | 1 | JB | |
| 0002AT | Gas ATVs, UTVs, Diesel UTVs: Tire Mount & Balance (Per tire) | 1 | JB | |
| 0002AU | Gas ATVs, UTVs, Diesel UTVs: Tire Puncture Repair (Per tire) | 1 | JB | |
| 0002AV | Gas ATVs, UTVs, Diesel UTVs: Battery Replacement | 1 | JB | |
| 0002AW | Gas ATVs, UTVs, Diesel UTVs: Stator / Alternator Replacement | 1 | JB | |
| 0002AX | Gas ATVs, UTVs, Diesel UTVs: Winch Cable Replacement | 1 | JB | |
| 0002AY | Gas ATVs, UTVs: Gas Fuel Pump Replacement | 1 | JB | |
| 0002AZ | Diesel UTVs: Diesel Fuel System Service | 1 | JB | |
| 0002BA | Gas ATVs, UTVs, Diesel UTVs: Fan / Radiator Replacement | 1 | JB | |
| 0002BB | Gas ATVs, UTVs, Diesel UTVs: Dump Bed Shocks / Latches | 1 | JB | |
| 0002BC | North Star Edition: Windshield / Glass Replace | 1 | JB | |
| 0002BD | North Star Edition: A/C Evacuate & Recharge | 1 | JB | |
| 0002BE | North Star Edition: A/C Compressor / Condenser | 1 | JB | |
| 0002BF | Over & Above Maintenance and Repair (O&A) in accordance with PWS 2.2.5 | |||
| Price to be determined at the Task Order Level based on a Formal Repair Quote | 1 | JB |
0003 Pickup and Delivery/Transportation (Roundtrip) in accordance with PWS 2.3.
Unit Prices for these services shall be fully burdened fixed rates, inclusive of all direct costs, indirect costs, and profit.
| 0003AA | Towing Category: Light | 1 | JB |
| 0003AB | Towing Category: Heavy | 1 | JB |
TEP
| TOTAL EVALUATED PRICE |
| Indefinite Delivery Indefinite Quantity |
| Contract/Solicitation: FA524026Q0034 |
| Basewide Utility Vehicle |
Maintenance and Repair Services
| Historical Requirement #1 | |||||
| ELIN | DESCRIPTION | QTY | UOM | ORDERING PERIOD 1 | |
| FFP | ORDERING PERIOD 2 | ||||
| FFP | ORDERING PERIOD 3 | ||||
| FFP | ORDERING PERIOD 4 | ||||
| FFP | ORDERING PERIOD 5 |
FFP
| 0001AA | Gas ATVs, UTVs: Standard Service (150-Hr or 6-Mo) | 35 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001AB | Gas ATVs, UTVs: Comprehensive Service (300-Hr or 12-Mo) | 10 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002AA | Gas ATVs, UTVs, Diesel UTVs: General Mechanical Diagnostic | 10 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002AB | Gas ATVs, UTVs, Diesel UTVs: Electronic/EFI Diagnostic | 10 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002AC | Gas ATVs, UTVs, Diesel UTVs: Electrical System Diagnostic | 1 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002AE | Gas ATVs, UTVs, Diesel UTVs: CVT Belt Replacement | 5 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002AT | Gas ATVs, UTVs, Diesel UTVs: Tire Mount & Balance (Per tire) | 5 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002AU | Gas ATVs, UTVs, Diesel UTVs: Tire Puncture Repair (Per tire) | 10 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002BA | Gas ATVs, UTVs, Diesel UTVs: Fan / Radiator Replacement | 1 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0003AA | Towing Category: Light | 40 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SUBTOTAL: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Historical Requirement #2 | |||||
| ELIN | DESCRIPTION | QTY | UOM | ORDERING PERIOD 1 | |
| FFP | ORDERING PERIOD 2 | ||||
| FFP | ORDERING PERIOD 3 | ||||
| FFP | ORDERING PERIOD 4 | ||||
| FFP | ORDERING PERIOD 5 |
FFP
| 0001AA | Gas ATVs, UTVs: Standard Service (150-Hr or 6-Mo) | 22 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001AB | Gas ATVs, UTVs: Comprehensive Service (300-Hr or 12-Mo) | 22 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001AC | Diesel UTVs: Standard Service (100-Hr or 6-Mo) | 4 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001AD | Diesel UTVs: Comprehensive Service (200-Hr or 12-Mo) | 4 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001AE | Gas ATVs, UTVs, Diesel UTVs: Annual Drivetrain Service | 26 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002AE | Gas ATVs, UTVs, Diesel UTVs: CVT Belt Replacement | 12 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002AQ | Gas ATVs, UTVs, Diesel UTVs: Brake Pad Replace (Per axle) | 16 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002AV | Gas ATVs, UTVs, Diesel UTVs: Battery Replacement | 8 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0003AB | Towing Category: Heavy | 6 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SUBTOTAL: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Historical Requirement #3 | |||||
| ELIN | DESCRIPTION | QTY | UOM | ORDERING PERIOD 1 | |
| FFP | ORDERING PERIOD 2 | ||||
| FFP | ORDERING PERIOD 3 | ||||
| FFP | ORDERING PERIOD 4 | ||||
| FFP | ORDERING PERIOD 5 |
FFP
| 0001AA | Gas ATVs, UTVs: Standard Service (150-Hr or 6-Mo) | 19 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001AB | Gas ATVs, UTVs: Comprehensive Service (300-Hr or 12-Mo) | 19 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001AE | Gas ATVs, UTVs, Diesel UTVs: Annual Drivetrain Service | 19 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0001AF | North Star Edition: Annual HVAC Service | 8 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002AE | Gas ATVs, UTVs, Diesel UTVs: CVT Belt Replacement | 6 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002AQ | Gas ATVs, UTVs, Diesel UTVs: Brake Pad Replace (Per axle) | 10 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002BC | North Star Edition: Windshield / Glass Replace | 2 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002BD | North Star Edition: A/C Evacuate & Recharge | 3 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0003AA | Towing Category: Light | 4 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0003AB | Towing Category: Heavy | 8 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SUBTOTAL: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Historical Requirement #4 | |||||
| ELIN | DESCRIPTION | QTY | UOM | ORDERING PERIOD 1 | |
| FFP | ORDERING PERIOD 2 | ||||
| FFP | ORDERING PERIOD 3 | ||||
| FFP | ORDERING PERIOD 4 | ||||
| FFP | ORDERING PERIOD 5 |
FFP
| 0002AD | Gas ATVs, UTVs, Diesel UTVs: Anti-Corrosion Treatment | 12 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0002AF | Gas ATVs, UTVs, Diesel UTVs: CV Axle Replacement (Per corner) | 8 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0002AG | Gas ATVs, UTVs, Diesel UTVs: CV Boot Replacement (Per boot) | 14 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0002AH | Gas ATVs, UTVs, Diesel UTVs: Wheel Bearing Replacement (Per wheel) | 12 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0002AJ | Gas ATVs, UTVs, Diesel UTVs: Clutch Rebuild / Service | 4 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0002AK | Gas ATVs, UTVs, Diesel UTVs: Carrier Bearing / Prop Shaft | 3 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0002AL | Gas ATVs, UTVs, Diesel UTVs: A-Arm Bushing Replace (Per arm) | 16 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0002AM | Gas ATVs, UTVs, Diesel UTVs: Ball Joint Replace (Per joint) | 10 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0002AR | Gas ATVs, UTVs, Diesel UTVs: Brake Rotor Replace (Per rotor) | 8 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0002AS | Gas ATVs, UTVs, Diesel UTVs: Brake System Flush | 6 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0002AW | Gas ATVs, UTVs, Diesel UTVs: Stator / Alternator Replacement | 2 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0002AX | Gas ATVs, UTVs, Diesel UTVs: Winch Cable Replacement | 5 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0002AZ | Diesel UTVs: Diesel Fuel System Service | 4 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0002BB | Gas ATVs, UTVs, Diesel UTVs: Dump Bed Shocks / Latches | 6 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0002BE | North Star Edition: A/C Compressor / Condenser | 1 | JB | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SUBTOTAL: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| TOTALS | ORDERING PERIOD 1 | ||||||||
| FFP | ORDERING PERIOD 2 | ||||||||
| FFP | ORDERING PERIOD 3 | ||||||||
| FFP | ORDERING PERIOD 4 | ||||||||
| FFP | ORDERING PERIOD 5 |
FFP
| Historical Requirement #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Historical Requirement #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Historical Requirement #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Historical Requirement #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SUBTOTAL: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL EVALUATED PRICE $ - 0
File details come from the government source that posted it. Updated .