Attachment 2 Engineering Form 4025.pdf

PDF 87 KB Posted

Attached to
Fort Drum MATOC Federal contract opportunity
Solicitation number
W911S222R8001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Drum

About this file

This document contains an engineering transmittal form and information about a related federal contract opportunity. The engineering transmittal form is used by contractors to submit shop drawings, equipment data, material samples, or certificates of compliance to the U.S. Army Corps of Engineers for approval. It requires information such as the transmittal number, specification section, item numbers, submittal types, quantities, and spaces for approval codes from the contractor and approving authority.

The related federal contract opportunity is a solicitation notice for a Multiple Award Task Order Contract at Fort Drum, New York. The contract will encompass a wide variety of individual construction and repair tasks such as carpentry, road repair, roofing, excavation, electrical, HVAC, plumbing, painting, demolition, and more. The estimated maximum value is $150 million over the life of the contract, with a minimum guarantee of $5,000 per contract. Interested parties must register in the System for Award Management under NAICS code 236220 for commercial and institutional building construction. The point of contact is listed.

View the file

Other files for this federal contract opportunity

Other files attached to Fort Drum MATOC, newest first.
File Type Posted
Attachment 23 Solicitation RFI Responses W911S222R8001.pdf PDF
Solicitation Amendment W911S222R8001A0002.pdf PDF
Solicitation W911S222R80010002 Conformed Copy.pdf PDF
Solicitation Amendment W911S222R8001A001.pdf PDF
Attachment 1 Statement of Work.pdf PDF
Attachment 14- Performance Assessment Questionnaire.pdf PDF
Exhibit A.pdf PDF
Solicitation W91SS222R80010001 Conformed Copy.pdf PDF
Attachment 1 Statement of Work.pdf PDF
Attachment 8 NYSDEC Sewer Submittal Procedures.pdf PDF
Attachment 9 Excavation Permit Policy.pdf PDF
Attachment 16 HexFoam SOP.pdf PDF
Attachment 17 Construction Hold Point Template.pdf PDF
Exhibit A.pdf PDF
Attachment 7 Water Supply Improvement Submittal Procedures.pdf PDF
Attachment 11 Fort Drum Exterior Utility Standards.pdf PDF
Attachment 18 QCQA Report Template.pdf PDF
Attachment 20 Application and Certificate for Payment AIA Document G702.pdf PDF
Solicitation W91SS222R8001.pdf PDF
SOW W91SS222R8001.pdf PDF
Attachment 3 IMDR-ES Form 2 Application for Sponsorship.pdf PDF
Attachment 5 Endangered Species Act Requirements.pdf PDF
Attachment 12 Contractors Final Affidavit.pdf PDF
Attachment 15 AFFF Release SOP.pdf PDF
Attachment 4 Fort Drums SOP for Electrical Outages.pdf PDF
Attachment 6 Fort Drum Endangered Species Act Implementing Document.pdf PDF
Attachment 10 Confined Space Entry Procedures.pdf PDF
Attachment 13 Fort Drum Hazardous Waste Management Plan.PDF PDF
Attachment 14- Performance Assessment Questionnaire.pdf PDF
Attachment 19 DD Form 1354 Transfer and Acceptance of DoD Real Property.pdf PDF
Attachment 21 SPDES GP-0-20-001.pdf PDF
Attachment 22 AIA Document G703.xls XLS spreadsheet
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENG FORM 4025, MAY 2017 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2

U.S. Army Corps of Engineers (USACE)

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.

DATE TRANSMITTAL NO.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

TO:

PROJECT TITLE AND LOCATIONSPECIFICATION SEC. NO. (Cover only one section with each transmittal)

FROM: CONTRACT NO. CHECK ONE:

THIS TRANSMITTAL IS FOR: (Check one)

THIS IS A NEW TRANSMITTAL

THIS IS A RESUBMITTAL OF

TRANSMITTAL

FIO GA DA CR DA/CR DA/GA

ITEM

NO.

(See

Note 3)

USACE

ACTION

CODE

(Note 9)

SUBMITTAL

TYPE CODE

(See Note 8)

NO.

OF

COPIES

SPEC.

PARA. NO.

DRAWING

SHEET NO.

CONTRACTOR

REVIEW

CODE

VARIATION

Enter "Y" if requesting a variation

(See Note 6)

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.)

a. i.c. d. e. f. g. h.b.

CONTRACT DOCUMENT

REFERENCE

REMARKS

SECTION II - APPROVAL ACTION

I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.

NAME OF CONTRACTOR SIGNATURE OF CONTRACTOR

NAME AND TITLE OF APPROVING AUTHORITY SIGNATURE OF APPROVING AUTHORITY DATEENCLOSURES RETURNED (List by item No.)

ENG FORM 4025, MAY 2017 Page 2 of 2

INSTRUCTIONS

1. Section I will be initiated by the Contractor in the required number of copies.

2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.

3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.

4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.

5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.

6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.

7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.

8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.

Submittal types are the following:

SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports

SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout

9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal

Action Codes in column i of Section I. The Submittal Action Codes are:

A -- Approved as submitted.

B -- Approved, except as noted on drawings. Resubmission not required.

C -- Approved, except as noted on drawings. Refer to attached comments.

Resubmission required.

D -- Will be returned by separate correspondence.

E -- Disapproved. Refer to attached comments.

10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.

F -- Receipt acknowledged.

X -- Receipt acknowledged, does not comply with contract requirements, as noted.

G -- Other action required (Specify)

K -- Government concurs with intermediate design. (For D-B contracts)

R -- Design submittal is acceptable for release for construction. (For D-B contracts)

ENG FORM 4025, MAY 2017

PREVIOUS EDITIONS ARE OBSOLETE.

Page of

ENG FORM 4025, MAY 2017

Page of U.S. Army Corps of Engineers (USACE)

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

CHECK ONE:

THIS TRANSMITTAL IS FOR: (Check one)

ITEM

NO.

(See Note 3)

USACE

ACTION

CODE

(Note 9)

SUBMITTAL

TYPE CODE

(See Note 8)

NO.

OF

COPIES

SPEC.

PARA. NO.

DRAWING

SHEET NO.

CONTRACTOR

REVIEW

CODE

VARIATION

Enter "Y" if requesting a variation (See Note 6)

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.)

a.

i.

c.

d.

e.

f.

g.

h.

b.

CONTRACT DOCUMENT

REFERENCE

SECTION II - APPROVAL ACTION

I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.

INSTRUCTIONS

1. Section I will be initiated by the Contractor in the required number of copies.

2. Each Transmittal shall be numbered consecutively. The Transmittal Number typically includes two parts separated by a dash (-). The first part is the specification section number. The second part is a sequential number for the submittals under that spec section. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal.

3. The "Item No." for each entry on this form will be the same "Item No." as indicated on ENG FORM 4288-R.

4. Submittals requiring expeditious handling will be submitted on a separate ENG Form 4025-R.

5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.

6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column h, and enter a statement in the Remarks block describing he detailed reason for the variation.

7. ENG Form 4025-R is self-transmitting - a letter of transmittal is not required.

8. When submittal items are transmitted, indicate the "Submittal Type" (SD-01 through SD-11) in column c of Section I.

Submittal types are the following:

SD-01 - Preconstruction SD-02 - Shop Drawings SD-03 - Product Data SD-04 - Samples SD-05 - Design Data SD-06 - Test Reports

SD-07 - Certificates SD-08 - Manufacturer's Instructions SD-09 - Manufacturer's Field Reports SD-10 - O&M Data SD-11 - Closeout

9. For each submittal item, the Contractor will assign Submittal Action Codes in column g of Section I. The U.S. Army Corps of Engineers approving authority will assign Submittal Action Codes in column i of Section I. The Submittal Action Codes are:

A -- Approved as submitted. B -- Approved, except as noted on drawings. Resubmission not required. C -- Approved, except as noted on drawings. Refer to attached comments. Resubmission required. D -- Will be returned by separate correspondence. E -- Disapproved. Refer to attached comments.

10. Approval of items does not relieve the contractor from complying with all the requirements of the contract.

F -- Receipt acknowledged.

X -- Receipt acknowledged, does not comply with contract requirements, as noted.

G -- Other action required (Specify) K -- Government concurs with intermediate design. (For D-B contracts) R -- Design submittal is acceptable for release for construction. (For D-B contracts) 1.0 darwin.chen@usace.army.mil 2017-05-24 Forms Design Team Darwin Chen

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

2017-05-24

PrintButton1:
saveas:
EmailSubmitButton1:
CurrentPage:
PageCount:
No1_DateTime:
No2_Transmittal:
No3_To: Dept. of the Army - U.S. Army MICC

Contract Division - 45 West Street Fort Drum, NY 13602

No8_Pro_Title: Repair, Rehab & minor Const. (RRC)
No7_Specification:
No4_From:
No5_Cont_No:
No6a_CheckBox: 1
No6b_CheckBox: 0
No6_Transmittal:
No9a_CheckBox: 0
No9b_CheckBox: 1
No9c_CheckBox: 0
No9d_CheckBox: 0
No9e_CheckBox: 0
No9f_CheckBox: 0
ITEM NO. (See Note 3):
DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.):

SUBMITTAL TYPE CODE (See Note 8):
NO. OF COPIES: 1
SPEC. PARA. NO.:
DRAWING SHEET NO. :
CONTRACTOR REVIEW CODE
VARIATION Enter "Y" if requesting a variation (See Note 6):
USACE ACTION CODE (Note 9) :
Remarks: This submittal contains
Contractor_Name:
Contractor_Signature:
Authority_Name:
Authority_Signature:
Authority_DateTime:
Enclosures:

File details come from the government source that posted it. Updated .