Attachment 17 Construction Hold Point Template.pdf
PDF 1 MB Posted
- Attached to
- Fort Drum MATOC Federal contract opportunity
- Solicitation number
- W911S222R8001
About this file
This document provides details for a Multiple Award Task Order Contract (MATOC) solicitation from the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Drum. The solicitation seeks contractors to provide a wide variety of construction and repair services at Fort Drum, New York, including but not limited to carpentry, road repair, roofing, excavation, electrical, HVAC, plumbing, sheet metal work, painting, demolition, concrete masonry, welding, and emergency repairs. The contract will have an indefinite delivery, indefinite quantity structure with a maximum ordering value of $150 million over the life of the contract and a minimum guarantee of $5,000 per contract. Interested parties must be registered in the System for Award Management under NAICS code 236220, with representations and certifications on record, by the time proposals are due. The point of contact for the solicitation is listed.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION HOLD POINT INSPECTION FORM
CONTRACT:
TASK ORDER NUMBER:
PROJECT NUMBER:
TITLE:
PM: CR:
CHECK THOSE APPLICABLE TO
ABOVE PROJECT
Q.C
INSPECTED/
APPROVED
CON REP
INSPECTED/
APPROVED
DATE COMMENTS
A. BACKFILLING
Electric
Water
Sewer
Gas
Communications
B. PLACING CONCRETE
C. TEST REPORTS
D. GYCOL TEST
E. INSULATION
F.
ROOF AND ROOF
MATERIALS
G. ROUGH IN ELECTRIC
H. ROUGH IN PLUMBING
I. ENERGIZING ELECTRIC
J. BALANCING
CHECK THOSE APPLICABLE TO
ABOVE PROJECT
Q.C
INSPECTED/
APPROVED
CON REP
INSPECTED/
APPROVED
DATE COMMENTS
K. UMCS Site
L. PRE-TESTING
Cat 6
Fiber-OTDR Testall Strands
M. ROUGH IN
Ductbank
Cable Tray
Cat 6 EMT
Comm. Room Layout
N. DUCTBANK CONCRETE
O. MANDRIL TEST
P. FIBER PULL
Q. POST TESTING
Cat 6
Fiber
R. OPTIONAL
S. OPTIONAL
T. OPTIONAL
DPW PM/ COR Contractor
| Text77: |
| Text78: |
| Text81: |
| Text82: |
| Check Box83: Off |
| Check Box84: Off |
| Check Box85: Off |
| Check Box86: Off |
| Check Box87: Off |
| Check Box88: Off |
| Check Box89: Off |
| Check Box90: Off |
| Check Box91: Off |
| Check Box92: Off |
| Check Box93: Off |
| Check Box94: Off |
| Check Box95: Off |
| Check Box96: Off |
| Check Box97: Off |
| Check Box98: Off |
| Check Box99: Off |
| Check Box101: Off |
| Check Box102: Off |
| Check Box103: Off |
| Check Box104: Off |
| Check Box105: Off |
| Check Box106: Off |
| Check Box107: Off |
| Check Box108: Off |
| Check Box111: Off |
| Check Box110: Off |
| Check Box109: Off |
| Date114_af_date: |
| Date120_af_date: |
| Date116_af_date: |
| Date117_af_date: |
| Date118_af_date: |
| Date119_af_date: |
| Date121_af_date: |
| Date122_af_date: |
| Date123_af_date: |
| Date124_af_date: |
| Date125_af_date: |
| Date126_af_date: |
| Date128_af_date: |
| Date129_af_date: |
| Date130_af_date: |
| Date133_af_date: |
| Date135_af_date: |
| Date136_af_date: |
| Date137_af_date: |
| Date138_af_date: |
| Date140_af_date: |
| Date141_af_date: |
| Date142_af_date: |
| Date143_af_date: |
| Date144_af_date: |
| Text147: |
| Text148: |
| Text149: |
| Text150: |
| Text151: |
| Text152: |
| Text153: |
| Text154: |
| Text155: |
| Text156: |
| Text157: |
| Text158: |
| Text159: |
| Text160: |
| Text162: |
| Text163: |
| Text164: |
| Text165: |
| Text166: |
| Text167: |
| Text168: |
| Text169: |
| Text170: |
| Text171: |
| Text172: |
| Text174: |
| Text175: |
| Text176: |
| Text177: |
| Text178: |
| Text180: |
| Text181: |
| Text182: |
| Text183: |
| Text184: |
| Text186: |
| Text185: |
| Date127_af_date: |
| Text179: |
| Text173: |
| Text187: |
| Text188: |
| Text189: |
| Text80: |
| Text79: |
| Text190: |
| Text192: |
| Text193: |
| Text198: |
| Text199: |
| Text204: |
| Text205: |
| Text208: |
| Text210: |
| Text211: |
| Text212: |
| Text213: |
| Text215: |
| Text216: |
| Text217: |
| Text218: |
| Text219: |
| Text220: |
| Text221: |
| Text222: |
| Text223: |
| Text224: |
| Text225: |
| Text227: |
| Text228: |
| Text229: |
| Text230: |
| Text231: |
| Text232: |
| Text234: |
| Text235: |
| Text236: |
| Text237: |
| Text243: |
| Text242: |
| Text241: |
| Text240: |
| Text239: |
| Text207: |
| Date132_af_date: |
| Text201: |
| Text244: |
| Check Box245: Off |
| Text202: |
| Date112_af_date: |
| Text196: |
| Text209: |
| Date134_af_date: |
| Text233: |
File details come from the government source that posted it. Updated .