This document is a comprehensive set of civil engineering plans for the Cahuilla Ranger Station replacement project located at 4500 Gecko Road in Brawley, California, prepared for the Bureau of Land Management. The plans include detailed drawings covering multiple aspects of site development, including civil site planning, grading and drainage, demolition, utility infrastructure, fencing, landscaping, and irrigation.
Key elements of the project include constructing a new ranger station building, relocating and installing a fuel station with two tanks, installing a single module restroom, creating secure parking areas, implementing stormwater management systems (including a dry well), establishing new utility connections (water, sewer, electrical), and constructing an 8-foot high chain link security fence with barbed wire. The site design incorporates native landscaping with local plant species like Blue Palo Verde, Honey Mesquite, and Creosote Bush, and includes provisions for erosion control, irrigation, and site accessibility. The plans are dated March 17, 2023, and represent the final construction documents revision.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GECKO RD
CAT D8
TR310
JD
K
D U
M P
T R
U C
K
S E
M I
LO
W
B O
Y
'T
R A
IL
E
R
'T
R A
IL
E
R
25'TRAILER
25'TRAILER
25'TRAILER
25'TRAILER
25'TRAILER
'T
R
AI
LE
R
'T
R
AI
LE
R
'T
R
AI
LE
R
'T
R
AI
LE
R
REST RM
S
XXXXXXXXXXXXXX
X X
X X
X X
X X
X X
XXXXXXXXXXXXX
XXX
X
XXXXX
FU
E
L
FU
E
L
CARPOOL
D D
NO
PARKING
NO
PARKING
NO
PARKING NO PARKING
D
S
X X
X
XXXX
X
X X
X
X X X X X X X X X
X X
(230.0)
(215.0)
(210.0)
(205.0)
(225.0)
(225.0)
(215.0)
(220.0)
(210.0)(215.0)
(22 0.0
(225.0)
(220.0)
N: 1935465.3118 E: 6891998.4344
N: 1935543.3438 E: 6891951.4537
N: 1935553.8674 E: 6891968.9290
N: 1935587.9905 E: 6891948.3789
N: 1935513.3844 E: 6892077.7462N: 1935625.3113
E: 6892010.3530
A
B
C
A
B
C
A
B
C A
B
C
A
A
B
C
A B
C
A
B CC
B A
C A
B A
B C
A
C B
C
A B
A C
B
A B
C
C
A
B B
A
C A
C
B C
A B
B
C
A
B C
C B
A
B C
A
C
A B
A C
B A
B C
TREES CODE BOTANICAL NAME COMMON NAME SIZE CONTAINER QTY DETAIL REMARKS
PAR FLO Parkinsonia florida Blue Palo Verde 24" Box 3
PRO GLA Prosopis glandulosa Honey Mesquite 24" Box 3
B C
A C
B
CA
C
N: 1935487.9031 E: 6892091.9239
N: 1935487.3452 E: 6892159.1243
N: 1935332.3930 E: 6892251.5706
N: 1935220.1509 E: 6892111.0818
N: 1935291.4714 E: 6892272.2282
N: 1935269.8330 E: 6892270.0470
N: 1935465.3118 E: 6891998.4344 N: 1935465.3118 E: 6891998.4344
N: 1935461.7484 E: 6892048.4892
N: 1935853.3840 E: 6891935.4790
N: 1935547.7812 E: 6891913.7828
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
SHEET ID
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
TE
M ic he ls on D riv e, S ui te
Irv in e, C A
(9
) 2
-7
FA
X
(9
) 2
-7
P lo t D at e:
C H
E C
K E
D B
Y
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
S H
E E
T S
IZ
E
Fi le
P at h:
M
A R
K D
E S
C R
IP
TI
O N
D A
TE
A
S C
H E
M A
TI
C
D E
S
IG
N
-2 8-
B
D
E S
IG
N
D E
V E
LO
P
M E
N T
-1
2-
C
0%
D E
S
IG
N D
E V
E
LO
P M
E N
T
-1 5-
D
0% D
E S
IG
N
D E
V E
LO
P
M E
N T
R E
S U
B M
IT
TA
L
-1 3-
E
C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 8-
F
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 3-
G
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
R
E V
IS
IO
N
-1
1-
H
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
-2
4-
I
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
-1 7-
CS101
C
IV
IL
S
IT
E
P
LA
N (B
A S
E B
ID
M S
M
M S
M
S F
JF
L
C :\p w _w or kd ir\ de n0
\c h2 m hi ll_ m ca m is m s\ d0
\D
6-
C S
-1 -0
1.
dw g 9/
/2
4:
:0
P M
A N
S I D
0L
D
M
A R
C H
S
A C
R A
M E
N
TO
, C A
B
U R
E A
U O
F
LA
N D
M A
N A
G E
M E
N T
P R
O
JE
C T
0L
D
C A
H U
IL
LA
R A
N G
E R
S
TA
TI
O
N
G
E C
K O
R D
. B R
A W
LE
Y
, C A
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
1"=30'
0 60 FT.30
1 CAHUILLA RANGER STATION BUILDING
2 FUEL STATION (TWO RELOCATED TANKS) WITH CANOPY
3 SINGLE MODULE RESTROOM (RELOCATED)
4 EXISTING WATER WELL
5 PAD-MOUNT ELECTRICAL TRANSFORMER
6 SEPTIC TANK (BUILDING LEACH FIELD SYSTEM)
7 DRY HYDRANT
8 2,000 GAL UNDERGROUND WATER TANK FOR DRY HYDRANT
9 STORMWATER DRY WELL
10 FLAG POLE (RELOCATED)
11 MONUMENT SIGN (RELOCATED CAHUILLA RANGER STATION
SIGN)
12 SCREEN WALL
13 8'-0" HIGH CHAIN LINK FENCE WITH 3-STRAND BARBED WIRE
14 24'-0" WIDE MANUAL DOUBLE-LEAF SWING GATE
15 STORMWATER INLET BASIN
16 16'-0" WIDE MANUAL SINGLE-LEAF SWING GATE
17 PEDESTRIAN SECURITY GATE
18 LANDMARK PEDESTAL WITH PLAQUE (RELOCATED)
19 MAIL BOX (RELOCATED)
EXISTING
COMMUNICATION
BUILDING
CAHUILLA RANGER STATION
GECKO ROAD
NEW ASPHALT CONCRETE PAVEMENT (5"AC/6"AB)
NEW CONCRETE PAVEMENT (WALK: 4"PCC/4"AB; DRIVE: 8"PCC/6"AB)
NEW LANDSCAPING OR UNIMPROVED (SEE LANDSCAPE PLANS)
EXISTING ASPHALT CONCRETE PAVEMENT TO REMAIN
UNPAVED/CRUSHED MISCELLANEOUS BASE (CMB; RECYCLED AC/PCC)
NEW / REUSED RIP RAP
CONSTRUCTION LIMITS
TYP
814.19'
5.
4.
.9
9'
25.00'
.0
0'
25.00'
28.57'
20.00'
70.23'280.60'
6.
.0
0'
.0 0'
.0
0'
.0 0'
.0
0'45 .0
0'
.5 9'
.0
0'
.0
0'
6'
.5
LEGEND SHEET KEYNOTES
E1 CIVIL SITE PLAN - BASE BID
1" = 30'-0"
R35.00'
R30.00'R26 .0
0'
R26 .00
R3 5.
133.17'
.0
0'
149.44'
32.44' 117.00'
19.16' 144.00'
32.43'
.0
0'
.0 0'
.0
0'
5.44'72.00' 8.20'
OVERHANG (TYP)
R50.0'
R35.00'
R25.00'
R15.00'
20.00' 119.99'
1416 13
19.33'
CANOPY COLUMN
CANOPY OVERHANG
PLAN
NORTH
18 19
26.00'
10.00'
27.00'
381.42'130.28'4400.80'19.25'
.9
6'
.8
0'
122.96' 84.35' 85.34' 25.00' 2460.04' 27.71' 3°'
94°'
R20 .00
13 NO BARBED
WIRE
CONTROL
POINT 2001
AutoCAD SHX Text
ASPHALT ROAD
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
GUY
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
EX COMM
AutoCAD SHX Text
PLANT SCHEDULE
AutoCAD SHX Text
EXP. 12-31-24
AutoCAD SHX Text No. 60573
CAT D8
TR310
JD
K
D U
M P
T R
U C
K
S E
M I
LO
W
B O
Y
'T
R A
IL
E
R
'T
R A
IL
E
R
25'TRAILER
25'TRAILER
25'TRAILER
25'TRAILER
25'TRAILER
'T
R
AI
LE
R
'T
R
AI
LE
R
'T
R
AI
LE
R
'T
R
AI
LE
R
REST RM
S
XXXXXXXXXXXXXX
X X
X X
X X
X X
X X
XXXXXXXXXXXXX
XXX
X
XXXXX
FU
E
L
FU
E
L
CARPOOL
D D
NO
PARKING
NO
PARKING
NO
PARKING NO PARKING
D
S
X X
X
XXXX
X
X X
X
X X X X X X X X X
X X
GECKO RD
(230.0)
(215.0)
(210.0)
(205.0)
(225.0)
(225.0)
(215.0)
(220.0)
(210.0)(215.0)
(22 0.0
(225.0)
(220.0)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
SHEET ID
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
TE
M ic he ls on D riv e, S ui te
Irv in e, C A
(9
) 2
-7
FA
X
(9
) 2
-7
P lo t D at e:
C H
E C
K E
D B
Y
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
S H
E E
T S
IZ
E
Fi le
P at h:
M
A R
K D
E S
C R
IP
TI
O N
D A
TE
A
S C
H E
M A
TI
C
D E
S
IG
N
-2 8-
B
D
E S
IG
N
D E
V E
LO
P
M E
N T
-1
2-
C
0%
D E
S
IG
N D
E V
E
LO
P M
E N
T
-1 5-
D
0% D
E S
IG
N
D E
V E
LO
P
M E
N T
R E
S U
B M
IT
TA
L
-1 3-
E
C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 8-
F
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 3-
G
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
R
E V
IS
IO
N
-1
1-
H
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
-2
4-
I
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
-1 7-
CS102
C
IV
IL
S
IT
E
P
LA
N
B
ID
O P
TI
O
N
M S
M
M S
M
S F
JF
L
C :\p w _w or kd ir\ de n0
\c h2 m hi ll_ m ca m is m s\ d0
\D
6-
C S
-1 -0
2.
dw g 9/
/2
4:
:0
P M
A N
S I D
0L
D
M
A R
C H
S
A C
R A
M E
N
TO
, C A
B
U R
E A
U O
F
LA
N D
M A
N A
G E
M E
N T
P R
O
JE
C T
0L
D
C A
H U
IL
LA
R A
N G
E R
S
TA
TI
O
N
G
E C
K O
R D
. B R
A W
LE
Y
, C A
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
1"=30'
0 60 FT.30
1 BID OPTION 1 - STABILIZED PARKING AND DRIVE AREAS
2 BID OPTION 2 - STAND-BY GENERATOR
EXISTING
COMMUNICATION
BUILDING
CAHUILLA RANGER STATION
GECKO ROAD
BID OPTION 1 - STABILIZED PARKING AND DRIVE AREAS
CONSTRUCTION LIMITS
LEGEND SHEET KEYNOTES
E1 CIVIL SITE PLAN - BID OPTION
1" = 30'-0"
PLAN
NORTH
GENERAL NOTES
A. STABILIZER SHALL BE A MIX-IN TYPE POLYMER SOIL BINDER.
B. MIX DEPTH SHALL BE 4 INCHES.
C. PRODUCT SHALL BE:
D. CONTRACTOR SHALL INSTALL IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
E. STABILIZED SOIL SHALL BE INSTALLED ON NATIVE OR IMPORT
SOIL. AGGREGATE BASE AND GEOTECTILE SHALL NOT BE USED.
a. POLY PAVEMENT
b. RNR NATURAL PAVEMENT
c. OR APPROVED EQUAL
1. STABILIZED PARKING AND DRIVE AREAS:
2. IF BID OPTION 1 IS INSTALLED, CMB PRODUCED FROM CRUSHING
ON-SITE EXISTING PAVEMENTS AND CONCRETE AS INDICATED ON
CD101 SHALL BE REUTILIZED AS AGGREGATE BASE MATERIAL, OR
SHALL BE DISPOSED OF AS DEMOLITION WASTE. REUTILIZED CMB
SHALL MEET REQUIREMENTS OF SPECIFICATIONS.
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
EXP. 12-31-24
X X
X X
XXX
X X
X X
X
XXXXXXXXXXXX
XXXXXXXXXXXXXX
X X
X X
X X
X
X
X
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
SHEET ID
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
TE
M ic he ls on D riv e, S ui te
Irv in e, C A
(9
) 2
-7
FA
X
(9
) 2
-7
P lo t D at e:
C H
E C
K E
D B
Y
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
S H
E E
T S
IZ
E
Fi le
P at h:
M
A R
K D
E S
C R
IP
TI
O N
D A
TE
CD101
D E
M O
LI
TI
O N
P
LA
N
M S
M
M S
M
S F
JF
L
C :\p w _w or kd ir\ de n0
\c h2 m hi ll_ m ca m is m s\ d0
\D
6-
C D
-1 -0
1.
dw g 9/
/2
4:
:0
P M
A N
S I D
0L
D
M
A R
C H
S
A C
R A
M E
N
TO
, C A
B
U R
E A
U O
F
LA
N D
M A
N A
G E
M E
N T
P R
O
JE
C T
0L
D
C A
H U
IL
LA
R A
N G
E R
S
TA
TI
O
N
G
E C
K O
R D
. B R
A W
LE
Y
, C A
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
P16
P1
P3 P3
P3
P9
P8
P7
SAW CUT
LINE (TYP)
SAW CUT
LINE (TYP)
11111111
P5
P2 P2
P4
P14
5 6
EXISTING TOP
OF SLOPE
EXISTING TOP
OF SLOPE
GECKO ROAD
SAW CUT
LINE (TYP)
1"=30'
0 60 FT.30
P1 PROTECT-IN-PLACE EXISTING TOWER COMPOUND
P2 PROTECT-IN-PLACE EXISTING FENCE
P3 PROTECT-IN-PLACE EXISTING ASPHALT PAVEMENT
P4 PROTECT-IN-PLACE EXISTING SURVEY CONTROL
POINT
P5 PROTECT-IN-PLACE EXISTING POWER POLE
P6 PROTECT-IN-PLACE EXISTING WATER WELL
P7 PROTECT AND RELOCATE EXISTING SINGLE
MODULE VAULT TOILET; RELOCATE TO VISITOR
PARKING AS SHOWN ON SITE PLAN DRAWING
CS101
P8 PROTECT AND RELOCATE EXISTING DUAL MODULE
VAULT TOILET; TO BE RELOCATED TO SITE
PERIMETER
P9 PROTECT AND RELOCATE EXISTING FUEL TANK;
TEMPORARILY RELOCATE TO NORTHERLY
CANOPY ADJACENT TO EXISTING 300 GALLON
CYLINDRICAL TANK; COORDINATE WITH BLM
STAFF FOR TEMPORARY LOCATION
P10 PROTECT AND RELOCATE EXISTING LANDMARK
PLAQUE; RELOCATE TO FRONT OF NEW RANGE
STATION IN NEW PEDESTAL AT BASE OF FLAG
POLE AS SHOWN ON SITE PLAN DRAWING CS101
P11 PROTECT AND RELOCATE EXISTING FLAG POLE;
RELOCATE TO FRONT OF RANGER STATION AS
SHOWN ON SITE PLAN DRAWING CS101
REMOVE EXISTING ASPHALT PAVEMENT SECTION
AND RECYCLE ON-SITE
EXISTING RIP RIP (LIMITS ASSUMED)
CONSTRUCTION LIMITS
LEGEND SHEET PROTECTION KEYNOTES
F1 DEMOLITION PLAN
1" = 30'-0"
1 REMOVE AND DISPOSE OF EXISTING 1-STORY
MODULAR BUILDING COMPLETE WITH
FOUNDATION AND RELATED APPURTENANCES
2 REMOVE AND DISPOSE OF EXISTING 1-STORY
METAL BUILDING COMPLETE WITH FOUNDATION
AND RELATED APPURTENANCES
3 REMOVE AND DISPOSE OF EXISTING 1-STORY
SINGLE WIDE MODULAR BUILDING COMPLETE
WITH FOUNDATION AND RELATED
APPURTENANCES
4 REMOVE AND DISPOSE OF EXISTING WATER
TANK SHED COMPLETE WITH FOUNDATION AND
APPURTENANCES
5 REMOVE AND DISPOSE OF CANOPY COMPLETE
WITH FOUNDATION
6 REMOVE AND DISPOSE OF EXISTING CHAN LINK
FENCE AND GATES COMPLETE WITH
FOUNDATION AND APPURTENANCES
7 REMOVE AND RECYCLE EXISTING ASPHALT
PAVEMENT AND BASE; CRUSH ASPHALT ON
SITE FOR REUSE
8 REMOVE AND DISPOSE OF EXISTING BOLLARD
9 REMOVE AND DISPOSE OF EXISTING SIGN
10 REMOVE AND DISPOSE OF EXISTING TRAILER
11 REMOVE EXISTING PAVEMENT MARKING
SHEET DEMOLITION KEYNOTES
12 REMOVE AND DISPOSE OF EXISTING PIPE
BARRIER
13 REMOVE AND DISPOSE OF EXISTING KIOSK
14 REMOVE AND RECYCLE EXISTING CONCRETE
PAVEMENT; CRUSH CONCRETE ON-SITE FOR
REUSE
15 REMOVE AND RECYCLE EXISTING CONCRETE
PAD; CRUSH CONCRETE ON-SITE FOR REUSE
16 REMOVE AND RECYCLE EXISTING CONCRETE
STAIRS WITH RAILING; CRUSH CONCRETE
ON-SITE FOR REUSE
17 REMOVE AND RECYCLE EXISTING CONCRETE
RAMP WITH RAILING; CRUSH CONCRETE
ON-SITE FOR REUSE
18 REMOVE AND DISPOSE OF EXISTING RAMP AND
DECK
1. REFER TO DRAWING CD102 FOR UTILITY DEMOLITION.
2. CONTRACTOR SHALL DIVERT 75% OF TOTAL
CONSTRUCTION AND DEMOLITION MATERIALS IN
CONFORMANCE WITH SPECIFICATION SECTION 01 74 19
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.
3. EXISTING RIP RAP TO BE SALVAGED FROM AREAS
RECEIVING FILL FOR REUSE ON NEW FILL SLOPES
SHOWN ON CG101. CONTRACTOR SHALL VERIFY
EXISTING LIMITS OF RIP RAP AND RIP RAP SALVAGE
LIMITS IN FIELD.
4. EXISTING RIP RAP OUTSIDE THE SALVAGE LIMITS SHALL
BE PROTECTED. CONTRACTOR MAY TEMPORARILY
RELOCATE PORTIONS OF EXISTING RIP RAP TO BE
PROTECTED, IN ORDER TO PERFORM WORK.
5. EXISTING ASPHALT CONCRETE PAVEMENT AND
CONCRETE SHALL BE CRUSHED ON-SITE FOR FOR
REUSE AS CRUSHED MISCELLANEOUS BASE (CMB).
6. CONTRACTOR SHALL MAKE EVERY EFFORT TO PROTECT
AND RELOCATE EXISTING WEATHER STATION IN
ACCORDANCE WITH OWNER REQUIREMENTS, IN ORDER
TO MAINTAIN MANDATORY CONTINUOUS OPERATION.
GENERAL NOTES
SALVAGE EXISTING
RIP RAP FOR REUSE;
SEE GENERAL NOTE 3
SALVAGE EXISTING
RIP RAP FOR REUSE;
SEE GENERAL NOTE 3
SALVAGE EXISTING
RIP RAP FOR REUSE;
SEE GENERAL NOTE 3
P6
P12
P10 P11
P12
P15
PLAN
NORTH
P12 PROTECT AND RELOCATE EXISTING CONCRETE
PICNIC TABLE AND BENCH; RELOCATE TO VISITOR
AREA AS SHOWN IN LANDSCAPE PLAN LP101
P13 PROTECT AND RELOCATE EXISTING CAHUILLA
RANGER STATION SIGN. RELOCATE TO SCREEN
WALL NEAR FLAG POLE AND GECKO ROAD AS
SHOWN IN SITE PLAN CS101
P14 PROTECT AND RELOCATED EXISTING MAIL BOX.
RELOCATE MAIL BOX TO NEW SECURE YARD
CHAIN LINK FENCE AS SHOWN IN SITE PLAN CS101
P15 TEMPORARILY PROTECT EXISTING CONCRETE
PAD, 300 GALLON FUEL TANK, AND RELOCATED
500 GALLON FUEL TANK UNTIL THE NEW FUEL
STATION SHOWN ON CS101 HAS BEEN
COMPLETED; MOVE THE EXISTING 300 GALLON
FUEL TANK, 500 GALLON FUEL TANK, AND
APPURTENANCES TO THE NEW FUEL STATION
PRIOR TO DEMOLISHING THE EXISTING CONCRETE
PAD
P16 TEMPORARILY PROTECT THE EXISTING CANOPY
UNTIL THE NEW FUEL STATION SHOWN ON CS101
HAS BEEN COMPLETED AND THE EXISTING 300
GALLON AND 500 GALLON FUEL TANKS HAVE BEEN
MOVED TO THE NEW FUEL STATION PRIOR TO
DEMOLISHING THE EXISTING CANOPY
P13
A S
C H
E M
A
TI
C D
E S
IG
N
-2
8-
B
D E
S
IG
N D
E V
E
LO
P M
E N
T
-1 2-
C
0% D
E S
IG
N
D E
V E
LO
P
M E
N T
-1
5-
D
0%
D E
S
IG
N D
E V
E
LO
P M
E N
T R
E S
U B
M
IT
TA
L
-1
3-
E
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
-2
8-
F
0%
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
-2
3-
G
0%
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
-1 1-
H
FI
N A
L C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 4-
I
FI
N A
L C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
R
E V
IS
IO
N
-1
7-
AutoCAD SHX Text
AV
AutoCAD SHX Text
AV
AutoCAD SHX Text
AV
AutoCAD SHX Text
AV
AutoCAD SHX Text
AV
AutoCAD SHX Text
AV
AutoCAD SHX Text
ASPHALT ROAD
AutoCAD SHX Text
ASPHALT ROAD
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
CANOPY
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
TRAILER
AutoCAD SHX Text
TRAILER
AutoCAD SHX Text
CANOPY
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
UNDER GROUND WATER LINE NON SURVEY ASSUMED DEPTH=3'-5'
AutoCAD SHX Text
UNDER GROUND WATER LINE NON SURVEY ASSUMED DEPTH=3'-5'
AutoCAD SHX Text
LEACH AREA ASSUMED DEPTH=3'-5'
AutoCAD SHX Text
SEPTIC TANK RIM EL=227.17
AutoCAD SHX Text
CMP WATER TANK RIM EL-226.16
AutoCAD SHX Text
WELL RIM EL= 224.95
AutoCAD SHX Text
WATER WELL CONC EL=225.00
AutoCAD SHX Text T
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text W
AutoCAD SHX Text
MB
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text E
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
PP
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
EX COMM
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
DECK
AutoCAD SHX Text
FUEL STA. W/CANOPY & FENCE
AutoCAD SHX Text
DUAL VAULT TOILET
AutoCAD SHX Text
SINGLE VAULT TOILET
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
EXP. 12-31-24
WW
W W
W W
SAN
SAN
SAN
SAN
SAN
SAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
SHEET ID
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
TE
M ic he ls on D riv e, S ui te
Irv in e, C A
(9
) 2
-7
FA
X
(9
) 2
-7
P lo t D at e:
C H
E C
K E
D B
Y
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
S H
E E
T S
IZ
E
Fi le
P at h:
M
A R
K D
E S
C R
IP
TI
O N
D A
TE
A
S C
H E
M A
TI
C
D E
S
IG
N
-2 8-
B
D
E S
IG
N
D E
V E
LO
P
M E
N T
-1
2-
C
0%
D E
S
IG
N D
E V
E
LO
P M
E N
T
-1 5-
D
0% D
E S
IG
N
D E
V E
LO
P
M E
N T
R E
S U
B M
IT
TA
L
-1 3-
E
C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 8-
F
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 3-
G
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
R
E V
IS
IO
N
-1
1-
H
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
-2
4-
I
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
-1 7-
CD102
U
TI
LI
TY
D E
M O
LI
TI
O N
P
LA
N
M S
M
LD
C
S F
JF
L
C :\p w _w or kd ir\ de n0
\c h2 m hi ll_ m ca m is m s\ d0
\D
6-
C D
-1 -0
2.
dw g 9/
/2
4:
:0
P M
A N
S I D
0L
D
M
A R
C H
S
A C
R A
M E
N
TO
, C A
B
U R
E A
U O
F
LA
N D
M A
N A
G E
M E
N T
P R
O
JE
C T
0L
D
C A
H U
IL
LA
R A
N G
E R
S
TA
TI
O
N
G
E C
K O
R D
. B R
A W
LE
Y
, C A
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
P1
P3 P3
P3 P9
P8
P7
P6
U5
U2
U4
U3
U7
U10
U8
U8
U8
P5
U8
U11
U12
U12
U12
U8
U8
P2 P2
P4
U9
U12 U6
EXISTING TOP
OF SLOPE
EXISTING TOP
OF SLOPE
GECKO ROAD
U8
1"=30'
0 60 FT.30
P1 PROTECT-IN-PLACE EXISTING TOWER COMPOUND
P2 PROTECT-IN-PLACE EXISTING FENCE
P3 PROTECT-IN-PLACE EXISTING ASPHALT PAVEMENT
P4 PROTECT-IN-PLACE EXISTING SURVEY CONTROL POINT
P5 PROTECT-IN-PLACE EXISTING POWER POLE
P6 PROTECT-IN-PLACE EXISTING WATER WELL
P7 PROTECT AND RELOCATED EXISTING SINGLE MODULE
RESTROOM; RELOCATE TO VISITOR PARKING AS SHOWN ON
SITE PLAN DRAWING CS101
P8 PROTECT AND RELOCATE EXISTING DUAL MODULE RESTROOM;
TO BE RELOCATED OFF-SITE BY BLM
P9 PROTECT AND RELOCATE EXISTING FUEL TANK; RELOCATE TO
NEW SECURE YARD AS SHOWN ON SITE PLAN DRAWING CS101
LEGEND SHEET PROTECTION KEYNOTES
E1 UTILITY DEMOLITION PLAN
1" = 30'-0"
U1 NOT USED
U2 REMOVE AND DISPOSE OF EXISTING ABOVEGROUND 1,000 GALLON WATER TANK
U3 REMOVE AND DISPOSE OF EXISTING ABANDONED UNDERGROUND WATER TANK;
SIZE AND MATERIAL UNKNOWN
U4 REMOVE AND DISPOSE OF EXISTING UNDERGROUND SEPTIC TANK; SIZE AND
MATERIAL UNKNOWN
U5 REMOVE AND DISPOSE OF EXISTING WATER LINE; SIZE AND MATERIAL UNKNOWN
U6 REMOVE AND DISPOSE OF EXISTING SEWER LINE; ASSUMED LOCATION SHOWN,
SIZE AND MATERIAL UNKNOWN
U7 REMOVE AND DISPOSE OF EXISTING LEACH FIELD DISTRIBUTION PIPING;
ASSUMED LOCATION SHOWN, SIZE AND MATERIAL UNKNOWN
U8 REMOVE AND DISPOSE OF EXISTING POWER POLE
U9 REMOVE AND DISPOSE OF EXISTING ELECTRICAL METER
U10 REMOVE AND DISPOSE OF EXISTING ELECTRICAL PANEL
U11 REMOVE AND DISPOSE OF EXISTING TELECOM PULL BOX
U12 REMOVE AND DISPOSE OF EXISTING AIR STATION AND ASSOCIATED PIPING
FROM COMPRESSOR
SHEET UTILITY DEMOLITION KEYNOTES
GENERAL NOTES
1. REFER TO DRAWING CD101 FOR SITE DEMOLITION.
2. CONTRACTOR SHALL DIVERT 75% OF TOTAL
CONSTRUCTION AND DEMOLITION MATERIALS IN
CONFORMANCE WITH SPECIFICATION SECTION 01 74 19
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL.
3. CONTRACTOR SHALL APPLY FOR PERMIT WITH IMPERIAL
COUNTY ENVIRONMENTAL HEALTH FOR REMOVAL OF
SEPTIC SYSTEM, INCLUDING LEACH FIELD, PRIOR TO
CONSTRUCTION.
4. THE EXISTENCE, LOCATION, AND CHARACTERISTICS OF
UNDERGROUND UTILITIES SHOWN ON THESE PLANS HAS
BEEN OBTAINED FROM A REVIEW OF AVAILABLE
RECORDS. NO REPRESENTATION IS MADE AS TO THE
ACCURACY OR COMPLETENESS OF SAID UTILITY
INFORMATION. THE CONTRACTOR SHALL POTHOLE OR
OTHERWISE CONFIRM CONDITIONS. IF THE CONDITIONS
DIFFER FROM THOSE SHOWN ON THE PLANS, THE
CONTRACTOR SHALL NOTIFY THE OWNER AND SHALL
NOT BEGIN THE CONSTRUCTION UNTIL THE CHANGED
CONDITIONS HAVE BEEN EVALUATED. THE CONTRACTOR
SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT
THE UTILITY LINES SHOWN AND ANY OTHER LINES NOT
OF RECORD OR NOT SHOWN ON THESE PLANS.
CONSTRUCTION LIMITS
U12
PLAN
NORTH
AutoCAD SHX Text
AV
AutoCAD SHX Text
AV
AutoCAD SHX Text
AV
AutoCAD SHX Text
AV
AutoCAD SHX Text
AV
AutoCAD SHX Text
AV
AutoCAD SHX Text
ASPHALT ROAD
AutoCAD SHX Text
ASPHALT ROAD
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
CANOPY
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
GUY
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
TRAILER
AutoCAD SHX Text
TRAILER
AutoCAD SHX Text
CANOPY
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
UNDER GROUND WATER LINE NON SURVEY ASSUMED DEPTH=3'-5'
AutoCAD SHX Text
UNDER GROUND WATER LINE NON SURVEY ASSUMED DEPTH=3'-5'
AutoCAD SHX Text
LEACH AREA ASSUMED DEPTH=3'-5'
AutoCAD SHX Text
SEPTIC TANK RIM EL=227.17
AutoCAD SHX Text
CMP WATER TANK RIM EL-226.16
AutoCAD SHX Text
WELL RIM EL= 224.95
AutoCAD SHX Text
WATER WELL CONC EL=225.00
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text W
AutoCAD SHX Text
MB
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text E
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
PP
AutoCAD SHX Text
GT
AutoCAD SHX Text
GT
AutoCAD SHX Text
EX COMM
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
DECK
AutoCAD SHX Text
FUEL STA. W/CANOPY & FENCE
AutoCAD SHX Text
DUAL VAULT TOILET
AutoCAD SHX Text
SINGLE VAULT TOILET
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
EXP. 12-31-24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
SHEET ID
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
TE
M ic he ls on D riv e, S ui te
Irv in e, C A
(9
) 2
-7
FA
X
(9
) 2
-7
P lo t D at e:
C H
E C
K E
D B
Y
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
S H
E E
T S
IZ
E
Fi le
P at h:
M
A R
K D
E S
C R
IP
TI
O N
D A
TE
A
S C
H E
M A
TI
C
D E
S
IG
N
-2 8-
B
D
E S
IG
N
D E
V E
LO
P
M E
N T
-1
2-
C
0%
D E
S
IG
N D
E V
E
LO
P M
E N
T
-1 5-
D
0% D
E S
IG
N
D E
V E
LO
P
M E
N T
R E
S U
B M
IT
TA
L
-1 3-
E
C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 8-
F
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 3-
G
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
R
E V
IS
IO
N
-1
1-
H
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
-2
4-
I
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
-1 7-
CG001
G R
A D
IN
G
A N
D D
R A
IN
A
G E
N O
TE
S
M S
M
M S
M
S F
JF
L
A N
S I D
0L
D
M
A R
C H
S
A C
R A
M E
N
TO
, C A
B
U R
E A
U O
F
LA
N D
M A
N A
G E
M E
N T
P R
O
JE
C T
0L
D
C A
H U
IL
LA
R A
N G
E R
S
TA
TI
O
N
G
E C
K O
R D
. B R
A W
LE
Y
, C A
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
C
:\p w
_w or kd ir\ de n0
\c h2 m hi ll_ m ca m is m s\ d0
\D
6- C
G -0
-0 1-
.d w g 9/
/2
4:
:0
P M
PORTLAND CEMENT IN CONCRETE
DRAINAGE STRUCTURES
PIPES
GENERAL STORM DRAIN NOTES
1. PRIOR TO COMMENCING CONSTRUCTION, THE CONTRACTOR
SHALL VERIFY ALL JOIN CONDITIONS, IF CONDITIONS DIFFER
FROM THOSE SHOWN ON THE PLANS, THE CONTRACTOR SHALL
NOTIFY THE ENGINEER AND SHALL NOT BEGIN THE
CONSTRUCTION UNTIL THE CHANGED CONDITIONS HAVE BEEN
EVALUATED.
2. THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE
PLANS, THE SOILS AND/OR GEOLOGY REPORTS AND THE SITE
CONDITIONS PRIOR TO COMMENCING WORK.
3. SHOULD CONFLICTING INFORMATION BE FOUND ON THE PLANS,
THE CONTRACTOR SHALL NOTIFY THE ENGINEER BEFORE
PROCEEDING WITH THE WORK IN QUESTION.
4. THE EXISTENCE, LOCATION AND CHARACTERISTICS OF
UNDERGROUND UTILITIES SHOWN ON THESE PLANS HAS BEEN
OBTAINED FROM A REVIEW OF AVAILABLE RECORD DATA. NO
REPRESENTATION IS MADE AS TO THE ACCURACY OR
COMPLETENESS OF SAID UTILITY INFORMATION. THE
CONTRACTOR SHALL POTHOLE OR OTHERWISE CONFIRM
CONDITIONS. IF CONDITIONS DIFFER FROM THOSE SHOWN ON
THE PLANS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER
AND SHALL NOT BEGIN CONSTRUCTION UNTIL THE CHANGED
CONDITIONS HAVE BEEN EVALUATED. THE CONTRACTOR SHALL
TAKE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY
LINES SHOWN AND ANY OTHER LINES NOT OF RECORD OR NOT
SHOWN ON THESE PLANS.
5. UNDERGROUND SERVICE ALERT: BEFORE COMMENCING ANY
EXCAVATION, THE CONTRACTOR SHALL OBTAIN AN
UNDERGROUND SERVICE ALERT INQUIRY I.D. NUMBER BY
PHONING: 1-800-422-4133. TWO WORKING DAYS SHALL BE
ALLOWED AFTER THE NUMBER IS OBTAINED AND BEFORE THE
EXCAVATION IS STARTED SO THAT UTILITY OWNERS CAN BE
NOTIFIED.
6. ALL REINFORCED CONCRETE STRUCTURES FOR STORM
DRAINAGE MUST BE 4,000 POUNDS PER SQUARE INCH IN 28 DAYS
UNLESS SPECIFIED ON THE PLANS OR AS APPROVED BY THE
ENGINEER. TYPE OF PORTLAND CEMENT CONCRETE WILL BE
SHOWN ON THE PLANS OR SPECIFICATIONS.
7. ALL PIPE LENGTHS ARE HORIZONTAL PROJECTIONS UNLESS
OTHERWISE NOTED.
8. FOR ALL TRENCH AND STRUCTURE EXCAVATIONS, SHORING
SHALL BE PROVIDED TO SATISFY ALL CAL/OSHA SAFETY
REQUIREMENTS.
9. PIPE CONSTRUCTION IN FILL AREAS SHALL BE COORDINATED
WITH THE GRADING TO ENSURE THAT, WHEN THE FILL
OPERATION HAS BEEN COMPLETED AT GRADE, THERE IS A
MINIMUM OF TWO (2) FEET OF COVER ABOVE THE TOP OF PIPE.
10. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AT LEAST TWO
(2) WORKING DAYS PRIOR TO COMMENCEMENT OF ANY STORM
DRAIN CONSTRUCTION.
11. ALL FILLS SHALL BE COMPACTED TO 95% RELATIVE COMPACTION
AS DETERMINED BY ASTM D 1557." ALL BACKFILL MUST BE FREE
OF VEGETATIVE MATTER.
12. ALL SURVEYING REQUIRED FOR VERTICAL OR HORIZONTAL
ALIGNMENT SHALL BE PROVIDED, OR AS NOTED IN THE PROJECT
SPECIFICATIONS.
13. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE
CONTRACTOR SHALL OBTAIN A PERMIT FROM THE STATE
DIVISION OF INDUSTRIAL SAFETY. A COPY OF THE PERMIT SHALL
BE KEPT ON THE JOB SITE AT ALL TIMES.
1. ALL NEW CAST-IN-PLACE STRUCTURES SHALL USE ASTM C 150
TYPE V CEMENT WITH LESS THAN 5% TRICALCIUM ALUMINATE
(C3A) CONTENT, OR TYPE II CEMENT WITH LESS THAN 8% C3A
WHEN THE SULFUR TRIOXIDE (SO3) CONTENT IS LESS THAN 3%.
CEMENT WITH C3A CONTENT UP TO 10% MAY BE USED IF THE
SO3 CONTENT DOES NOT EXCEED 2.5%.
2. THE OPTIMUM CONCRETE IS 61/2 TO 71/2 SACKS OF CEMENT PER
CUBIC YARD, AND WITH A WATER/CEMENT RATIO NOT TO
EXCEED 6 GALLONS PER SACK OF CEMENT. MAXIMUM SLUMP
SHALL NOT EXCEED 4 INCHES.
1. CONCRETE PIPE SUPPORT ACROSS TRENCHES SHALL BE IN
ACCORDANCE WITH SPPWC STANDARD PLAN 224-2.
2. TRENCH EXCAVATION AND WIDTH REQUIREMENTS SHALL BE IN
ACCORDANCE WITH POLB STANDARD PLAN U-1.
3. CARE SHALL BE TAKEN THAT THE STORM DRAIN PIPING DOES
NOT INTERFERE WITH WATER SERVICES AND SEWER LATERALS.
VERTICAL SEPARATION OF 1 FOOT AND HORIZONTAL
SEPARATION OF 3 FEET (OD TO OD) IS REQUIRED UNLESS
WRITTEN APPROVAL IS OBTAINED FROM THE ENGINEER.
4. SEWER LATERALS CROSSING OVER STORM DRAIN LINES ARE
REQUIRED TO BE ENCASED IN CONCRETE OR SUPPORTED PER
SPPWC STANDARD PLAN 224-1.
5. A MINIMUM OF 12 INCHES OF VERTICAL AND/OR HORIZONTAL
SEPARATION MUST BE MAINTAINED BETWEEN STORM DRAIN
PIPING AND GAS OR HIGH PRESSURE WATER INJECTION LINES
AND OIL LINES.
6. THE CONNECTION OF STORM DRAIN PIPE TO AN EXISTING
STORM DRAIN SHALL BE IN ACCORDANCE WITH SPPWC
STANDARD PLAN 335-2.
GEOTECHNICAL RECOMMENDATIONS
REFER TO THE SOIL REPORT TITLED "CAHUILLA RANGER STATION -
FACILITY REPLACEMENT, GEOTECHNICAL REPORT", DATED OCTOBER 5,
2020 AND DIVISION 31, SECTION 312000 FOR MORE INFORMATION.
EARTHWORK
1. SITE PREPARATION
1.1. SITE PREPARATION WILL INCLUDE THE DEMOLITION OF EXISTING
STRUCTURES, REMOVAL OF SURFACE VEGETATION, AND ANY
TRASH OR DEBRIS IN THE AREAS WHERE STRUCTURE
FOUNDATIONS WILL BE LOCATED. LOOSE, SOFT, OR WET
MATERIAL SHOULD ALSO BE REMOVED AND REPLACED WITH
COMPETENT BACKFILL. ON-SITE GRANULAR SOIL IS CONSIDERED
SUITABLE FOR RE-USE AS BACKFILL IF IT IS FREE OF
DELETERIOUS MATERIALS. SITE CLEARING, GRUBBING, AND
EARTHWORK SHOULD BE PERFORMED IN ACCORDANCE WITH
THE PROJECT SPECIFICATIONS. SUPERFICIAL VEGETATION,
ORGANIC TOPSOIL, AND DELETERIOUS MATERIAL SHOULD BE
STRIPPED AND COMPLETELY REMOVED FROM THE SITE.
2. SUBGRADE PREPARATION
2.1. TO PROVIDE A UNIFORM BEARING LAYER BELOW THE
PROPOSED FOUNDATIONS AND PAVEMENT SECTION
STRUCTURES, IT IS RECOMMENDED THAT THE SOIL WITHIN 24
INCHES BELOW THE BOTTOM OF FOOTING SHOULD BE REMOVED
AND RECOMPACTEDAND 8 INCHES BELOW THE PAVEMENT
SECTION SHOULD BE SCARIFIED. THE SOIL SHOULD BE
MOISTURE CONDITIONED TO WITHIN ±2 PERCENT OF OPTIMUM
MOISTURE CONTENT, AND RECOMPACTED TO 95 PERCENT
RELATIVE DENSITY PER ASTM D1557-09 TEST PROCEDURE.
3. FILL PLACEMENT
3.1. THE BACKFILL AND FILL MATERIALS SHOULD CONFORM WITH
THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS. THE
FILL MATERIALS SHOULD BE SAND OR GRAVEL MATERIALS WITH
A LIQUID LIMIT OF LESS THAN 35, PLASTICITY INDEX OF LESS
THAN 12, AND A MAXIMUM OF 30 PERCENT FINES PASSING
75-MICROMETER SIEVE. FILL MATERIALS SHOULD BE PLACED IN
LAYERS NOT EXCEEDING 8 INCHES IN LOOSE THICKNESS,
MOISTURE CONDITIONED, AND COMPACTED TO A MINIMUM OF 95
PERCENT OF THE MAXIMUM DRY UNIT WEIGHT AS DETERMINED
IN ACCORDANCE WITH ASTM D1557-09 TEST PROCEDURE. THE
MOISTURE CONTENT OF THE FILL MATERIAL SHOULD BE WITHIN
±2 PERCENT OF THE OPTIMUM MOISTURE CONTENT.
PERMANENT FILL SHOULD BE PLACED IN A GRADIENT NO
STEEPER THAN 2H:1V (HORIZONTAL TOVERTICAL), AND
TEMPORARY FILL, SUCH AS SURCHARGE FILL, SHOULD BE
PLACED IN A GRADIENT NO STEEPER THAN A GRADIENT OF
1.5H:1V.
4. TEMPORARY EXCAVATIONS
4.1. EXCAVATIONS MAY BE EITHER SLOPED BACK OR SHORED.
EXCAVATION OF THE TEMPORARY CUT SLOPES GREATER THAN
12-INCHES IN HEIGHT SHOULD BE NO STEEPER THAN A
GRADIENT OF 1.5H:1V OR AS THE FIELD CONDITIONS DICTATE TO
PROVIDE SAFE AND STABLE THE EXCAVATIONS SHOULD NOT
EXTEND INTO THE INFLUENCE ZONE OF ADJACENT STRUCTURES
OR UTILITY LINES, UNLESS THE EXCAVATIONS ARE SHORED. IN
GENERAL, THE INFLUENCE ZONE MAY BE OBTAINED BY
PROJECTING A LINE SLOPING OUTWARD AND DOWNWARD AT
1H:1V FROM THE EDGE OF THE EXISTING STRUCTURE. ALL
TEMPORARY EXCAVATIONS SHOULD BE PERFORMED IN
ACCORDANCE WITH THE SAFETY REQUIREMENTS OF
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
EXCAVATION REGULATIONS ALONG WITH LOCAL, AND STATE
REQUIREMENTS. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO PROVIDE STABLE EXCAVATION FOR THE
TEMPORARY CUTS AT THE PROJECT SITE.
4.2. THE EVENTUAL EVALUATION OF THE SAFETY OF CONSTRUCTION
SLOPES IS THE RESPONSIBILITY OF THE CONTRACTOR AND
SHOULD BE BASED ON HIS APPROACH TO THE FIELD WORK. WE
RECOMMEND THAT THE ACTUAL SAFE INCLINATION OF THE
CONSTRUCTION SLOPES AND OTHER SAFETY PRECAUTIONS
FOR THE PROPOSED EXCAVATION BE EVALUATED AND
DETERMINED BY THE CONTRACTOR AT THE TIME OF
CONSTRUCTION.
ABBREVIATIONS
AC ASPHALT CONCRETE GRADE
BC BEGIN CURVE
EC END CURVE
FF FINISH FLOOR
FG FINISH GRADE
FL FLOW LINE
FS FINISH SURFACE
GB GRADE BREAK
INV INVERT
NG NATIVE GROUND
TG TOP OF GRATE
TP TOP OF PAD
AutoCAD SHX Text
EXP. 12-31-24
(230.0)
(215.0)
(210.0)
(205.0)
(225.0)
(225.0)
(215.0)
(220.0)
(210.0)(215.0)
(22 0.0
(225.0)
(220.0)
GECKO RD
REST RM
S
XXXXXXXXXXXXXX
X X
X X
X X
X X
X X
XXXXXXXXXXXXX
XXX
X
XXXXX
FU
E
L
FU
E
L
D D
D
S
X X
X
XXXX
X
X X
X
X X X X X X X X X
X X
-1.72% D
DD
D
D
D
D
D
D
D
D
D
D
D
D D
2.5%2.6%
1.
9%
1.3%
2.
0%
2.
0%
1.1%
1.
4%
1.
7%1.7%
1.
4%
2.
0%
2.
5% 1.3
(0.8%) (1.0%) (0.8%)
(0.9% ) (1.7%) (1.9%)
(2 .0
)(3
.5
(2 .9
(2 .2
D
D
D
D
D
D
D
D
D
D
D
D
5.
220.00
215.00
215.00
220.00
220.00 225.00
215.00 220.00
210.00
225.00
226.00
225.00
226.00
224.00
223.00
222.00
6.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
SHEET ID
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
TE
M ic he ls on D riv e, S ui te
Irv in e, C A
(9
) 2
-7
FA
X
(9
) 2
-7
P lo t D at e:
C H
E C
K E
D B
Y
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
S H
E E
T S
IZ
E
Fi le
P at h:
M
A R
K D
E S
C R
IP
TI
O N
D A
TE
A
S C
H E
M A
TI
C
D E
S
IG
N
-2 8-
B
D
E S
IG
N
D E
V E
LO
P
M E
N T
-1
2-
C
0%
D E
S
IG
N D
E V
E
LO
P M
E N
T
-1 5-
D
0% D
E S
IG
N
D E
V E
LO
P
M E
N T
R E
S U
B M
IT
TA
L
-1 3-
E
C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 8-
F
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 3-
G
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
R
E V
IS
IO
N
-1
1-
H
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
-2
4-
I
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
-1 7-
226.01FG
(226.01)AC
EXISTING
COMMUNICATION
BUILDING
CAHUILLA RANGER STATION
GECKO ROAD
FINISH FLOOR = 227.02
CG101
G R
A D
IN
G
A N
D D
R A
IN
A
G E
P
LA
N
M S
M
M S
M
S F
JF
L
A N
S I D
0L
D
M
A R
C H
S
A C
R A
M E
N
TO
, C A
B
U R
E A
U O
F
LA
N D
M A
N A
G E
M E
N T
P R
O
JE
C T
#1
L4
8D
C A
H U
IL
LA
R A
N G
E R
S
TA
TI
O
N
G
E C
K O
R D
. B R
A W
LE
Y
, C A
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
225.78FG
(225.78)AC
225.36FG
(225.36)AC
224.83FG
(224.83)AC224.74FG
(224.74)AC
226.65FG
(226.65)AC
226.49FG
(226.49)AC
227.02FF
227.00FS
227.02FF
226.83FG
227.02FF
227.00FS
227.02FF
227.00FS
227.02FF
227.00FG
227.02FF
227.00FS
227.02FF
227.00FS
225.14FG
(225.14)AC
224.35FG
(224.35)AC
(228.26)AC
JOIN
(228.21)AC
JOIN
(227.71)AC
JOIN
(227.52)AC
JOIN
3:1 SLOPE
TOE OF SLOPE;
JOIN EXIST
3:1 SLOPE
TOE OF SLOPE;
JOIN EXIST
10:1 RAMP
1 INSTALL 8" HDPE DUAL WALL CORRUGATED STORM DRAIN PIPE
WITH WATER TIGHT JOINTS.
2 INSTALL DRAIN BASIN WITH 12" SUMP PER DETAIL E1, SHEET
CG501
3 INSTALL DRY WELL PER DETAIL H16, SHEET CG501
LEGEND SHEET KEYNOTES
TOP OF SLOPE
TOP OF SLOPE
TOP OF SLOPE
EXIST TOP
OF SLOPE
EXIST TOP
OF SLOPE
TOP OF SLOPE
BEARINGS AND HORIZONTAL CONTROL ARE BASED ON THE
CALIFORNIA COORDINATE SYSTEM (CCS 83), ZONE VI, RELATIVE TO
THE NORTH AMERICAN VERTICAL DATUM OF 1983 (NAD83, 2011),
EPOCH 2010, USING GLOBAL POSITIONING SYSTEM (G.P.S.) TIES TO
THE FOLLOWING CONTINUOUS GPS STATION OPERATED BY THE
NATIONAL GEODETIC SURVEY:
AZYU
P500
GMPK
LOCAL CONTROL POINTS FOR THE SITE TOPOGRAPHY WERE
ESTABLISHED AS FOLLOWS:
POINT #2000, N1936114.5270, E6891778.5570, 222.124 FEET ELEVATION,
CNPT SET REBAR & CAP
POINT #2001, N1935269.8330, E6892270.0470, 227.448 FEET ELEVATION,
SET REBAR & CAP
SURVEY CONTROL
CONTROL
POINT 2001
E1 GRADING & DRAINAGE PLAN
1" = 30'-0"
EXIST TOP
OF SLOPE
3:1 SLOPE
1"=30'
0 60 FT.30
F2
CG301 F9
CG301
F15
CG301
L3
CG301
C :\p w _w or kd ir\ de n0
\c h2 m hi ll_ m ca m is m s\ d0
\D
6-
C G
-1 -0
1- .d w g
9/
/2
4:
:0
P
M
ASPHALT CONCRETE PAVEMENT (4"AC/6"AB); SEE CP101
CONCRETE PAVEMENT (8"PCC/6"AB OR 4"PCC/4"AB); SEE CP101
LANDSCAPING OR OPEN AREA (SEE LANDSCAPING PLANS)
EXISTING ASPHALT CONCRETE PAVEMENT
UNPAVED/UNTREATED; SEE CP101
NEW / SALVAGED RIP RAP; SEE CP101
EXISTING RIP RAP
CONSTRUCTION LIMITS
EXISTING CONTOUR
NEW CONTOUR999.00
(999.0)
224.08FG
223.75FG
(223.75)NG
223.93FG
223.98FS
223.98FG
224.27FS
224.27FG
224.42FS/EC
224.42FG
224.34FS
224.34FG
224.54FG
224.57FG/EC
224.98FG
225.55FG/BC
225.71FG
224.19FG
(224.10)NG
225.46FG 226.92FS
226.88FG
227.02FF
227.00FS
226.92FS
226.88FG
226.92FS
226.88FG
225.81FG
225.69FG
225.42FG
225.06FG 223.58FG
225.00FS
225.00FG 226.00FG
(226.98)AC
JOIN
(226.55)AC
JOIN
226.48FS
226.48FG
226.85FS
226.85FG
(226.39)AC
JOIN
(227.31)AC
JOIN226.95FS
226.91FG
227.02FF
227.00FS
227.02FF
227.00FS
STRUCTURE TABLE
1 DRY WELL
RIM = 223.27
INV (LINE "B") = 218.65
INV (LINE "C") = 219.25
2 DRY WELL
RIM = 222.71
INV (LINE "C") = 219.35
INV (LINE "D") = 216.27
INV (LINE "E") = 216.41
3 DRY WELL
RIM = 227.57
INV (LINE "F") = 217.75
E1
CG102
PLAN
NORTH
226.31FS
226.60FG
226.60FG
226.92FS
226.88FG
226.77FG226.77FG
226.78FG (227.50)AC
JOIN
(227.44)AC
JOIN
(227.72)AC
JOIN
(227.64)AC
JOIN
224.87FG
(224.87)AC
224.25FS
224.25FG
SD LINE "C"
SD LINE "B"
SD LINE "A"
SD LINE "F"
SD LINE "D"
225.75TG
222.75INV
224.00TG
219.99INV
220.80TG
217.80INV
221.75TG
218.75INV
226.24FS/BC
226.24FG
224.25TG
221.25INV
225.77FG
225.50FG
225.77FG
SD LINE "E"
E1
CG103
L=117' S=0.02
L=76.5' S=0.02
L=67' S=0.02
1 L=19.10' S=0.005
L=138' S=0.021
L=174.83' S=0.02
GB GB
G
BG
B
GB
G B
GB
R
ID
G E
209.50RIM +/-
213.07FG
(213.07)NG
210.00FG
(210.00)NG
221.00FG
(221.00)NG
223.46FG
(223.46)NG
224.10FG
225.09FG
226.31FG224.13TP
223.75FG
(223.75)NG
224.13TP
223.71FG
(223.71)NG
224.13TP
223.63FG
(223.63)NG
224.13TP
223.67FG
(223.67)NG
224.97FG
(224.97)NG
213.99FG
(213.99)NG
212.82FG
(212.82)NG
212.61FG
(212.61)NG
213.15FG
(213.15)NG
212.96FG
(212.96)NG
211.86FG
(211.86)NG
210.00FG
(210.00)NG
210.00FG
(210.00)NG
210.00FG
(210.00)NG
211.08FG
(211.08)NG
212.00FG
(212.00)NG
213.00FG
(213.00)NG
222.00FG
(222.00)NG
223.00FG
(223.00)NG
CONCRETE PAD FOR
FUTURE GENERATOR; SEE
STRUCTURAL PLANS
226.95FS
226.91FG
227.27FS
227.52FS
(227.52)AC
227.02FS
(227.02)AC
AutoCAD SHX Text
ASPHALT ROAD
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
GUY
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
EX COMM
AutoCAD SHX Text
EXP. 12-31-24
(225.0)
X X
X
XXXXXXXXXXXXXXX
X X
X X
X X X
D
D
D
D
D
D
D
D
D2.5%
1.3%
2.
0% 2.
0%
2.
0%
1.1%
1.
5%
1.0% 0.5%
2.
0%
1.
2%
2.0%
2.0%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
SHEET ID
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
TE
M ic he ls on D riv e, S ui te
Irv in e, C A
(9
) 2
-7
FA
X
(9
) 2
-7
P lo t D at e:
C H
E C
K E
D B
Y
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
S H
E E
T S
IZ
E
Fi le
P at h:
M
A R
K D
E S
C R
IP
TI
O N
D A
TE
A
S C
H E
M A
TI
C
D E
S
IG
N
-2 8-
B
D
E S
IG
N
D E
V E
LO
P
M E
N T
-1
2-
C
0%
D E
S
IG
N D
E V
E
LO
P M
E N
T
-1 5-
D
0% D
E S
IG
N
D E
V E
LO
P
M E
N T
R E
S U
B M
IT
TA
L
-1 3-
E
C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 8-
F
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 3-
G
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
R
E V
IS
IO
N
-1
1-
H
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
-2
4-
I
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
-1 7-
CG102
E N
LA
R
G E
D G
R A
D
IN
G A
N D
D R
A
IN
A G
E P
LA
N
M S
M
M S
M
S F
JF
L
A N
S I D
0L
D
M
A R
C H
S
A C
R A
M E
N
TO
, C A
B
U R
E A
U O
F
LA
N D
M A
N A
G E
M E
N T
P R
O
JE
C T
#1
L4
8D
C A
H U
IL
LA
R A
N G
E R
S
TA
TI
O
N
G
E C
K O
R D
. B R
A W
LE
Y
, C A
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
1LEGEND
BEARINGS AND HORIZONTAL CONTROL ARE BASED ON THE
CALIFORNIA COORDINATE SYSTEM (CCS 83), ZONE VI, RELATIVE TO
THE NORTH AMERICAN VERTICAL DATUM OF 1983 (NAD83, 2011),
EPOCH 2010, USING GLOBAL POSITIONING SYSTEM (G.P.S.) TIES TO
THE FOLLOWING CONTINUOUS GPS STATION OPERATED BY THE
NATIONAL GEODETIC SURVEY:
AZYU
P500
GMPK
LOCAL CONTROL POINTS FOR THE SITE TOPOGRAPHY WERE
ESTABLISHED AS FOLLOWS:
POINT #2000, N1936114.5270, E6891778.5570, 222.124 FEET ELEVATION,
CNPT SET REBAR & CAP
POINT #2001, N1935269.8330, E6892270.0470, 227.448 FEET ELEVATION,
SET REBAR & CAP
SURVEY CONTROL
E1 ENLARGED GRADING & DRAINAGE PLAN
1" = 10'-0" 1"=10'
0 20 FT.10
C :\p w _w or kd ir\ de n0
\c h2 m hi ll_ m ca m is m s\ d0
\D
6-
C G
-1 -0
2- .d w g
9/
/2
4:
:0
P
M
ASPHALT CONCRETE PAVEMENT (4"AC/6"AB); SEE CP101
CONCRETE PAVEMENT (8"PCC/6"AB OR 4"PCC/4"AB); SEE CP101
LANDSCAPING OR OPEN AREA (SEE LANDSCAPING PLANS)
EXISTING ASPHALT CONCRETE PAVEMENT
UNPAVED/UNTREATED; SEE CP101
NEW / SALVAGED RIP RAP; SEE CP101
EXISTING RIP RAP
CONSTRUCTION LIMITS
EXISTING CONTOUR
NEW CONTOUR999.00
(999.0)
226.14FS
226.14FG
224.31FS
224.31FG
226.31FS
226.31FG
226.24FS
226.24FG
224.71FS
226.90FS
226.86FG
226.90FS
226.86FG
226.25FS
226.21FG
226.71FS
226.71FG
226.54FS
226.50FG
226.09FS
226.09FG
226.14FS
226.14FG
226.21FS
226.17FG
226.76FS
226.72FG
226.76FS
226.76FG
226.76FS
226.76FG
226.53FS
226.53FG
226.51FS
226.51FG
226.63FS
226.63FG
226.76FS
226.76FG
226.76FS
226.76FG
226.75FS
226.75FG
227.05FS
227.05FG
PLAN
NORTH
CAHUILLA RANGER STATION
GECKO ROAD
227.02FF
227.00FS
227.00FG
227.02FS
(227.02)AC
225.75TG
226.25FG
226.25FG
226.25FG
226.25FG
225.88FL 226.11FL
226.25FL
226.54FS
226.54FL
227.02FF
227.00FS
227.02FF
227.00FS
227.02FF
227.00FS
227.02FF
227.00FS
227.02FF
227.00FS
227.02FF
227.00FS
FINISH FLOOR = 227.02
226.90FS
226.78FG
226.61FS
226.57FG
G B
G B
G B
GB
R
ID
G E
226.45FS
226.45FG
226.48FG
226.48AC
226.71FG
226.71AC
226.66FG
226.71AC
227.00FG
(227.00)AC
226.76FG
(226.76)AC
226.64FG
(226.64)AC
226.89FS
226.89FG
(226.89)AC
227.07FG
(227.07)AC
227.04FS
227.04FG
(227.04)AC
227.02FG
(227.02)AC
226.93FS
226.93FG
226.93FS
226.93FG
227.02FF
227.00FG
227.02FF
227.00FS
227.02FF
227.00FS
227.52FG
(227.52)AC
227.27FG
AutoCAD SHX Text T
AutoCAD SHX Text
EXP. 12-31-24
REST RM
D
D
D
D
D
D
D
D
D
D D D D D
1.5%
2.
0%
2.0%
0.6%
1.
2%
0.4%
0.4%
1.
6%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
SHEET ID
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
TE
M ic he ls on D riv e, S ui te
Irv in e, C A
(9
) 2
-7
FA
X
(9
) 2
-7
P lo t D at e:
C H
E C
K E
D B
Y
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
S H
E E
T S
IZ
E
Fi le
P at h:
M
A R
K D
E S
C R
IP
TI
O N
D A
TE
A
S C
H E
M A
TI
C
D E
S
IG
N
-2 8-
B
D
E S
IG
N
D E
V E
LO
P
M E
N T
-1
2-
C
0%
D E
S
IG
N D
E V
E
LO
P M
E N
T
-1 5-
D
0% D
E S
IG
N
D E
V E
LO
P
M E
N T
R E
S U
B M
IT
TA
L
-1 3-
E
C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 8-
F
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 3-
G
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
R
E V
IS
IO
N
-1
1-
H
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
-2
4-
I
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
-1 7-
CG103
E N
LA
R
G E
D G
R A
D
IN
G A
N D
D R
A
IN
A G
E P
LA
N
M S
M
M S
M
S F
JF
L
A N
S I D
0L
D
M
A R
C H
S
A C
R A
M E
N
TO
, C A
B
U R
E A
U O
F
LA
N D
M A
N A
G E
M E
N T
P R
O
JE
C T
#1
L4
8D
C A
H U
IL
LA
R A
N G
E R
S
TA
TI
O
N
G
E C
K O
R D
. B R
A W
LE
Y
, C A
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
1LEGEND
BEARINGS AND HORIZONTAL CONTROL ARE BASED ON THE
CALIFORNIA COORDINATE SYSTEM (CCS 83), ZONE VI, RELATIVE TO
THE NORTH AMERICAN VERTICAL DATUM OF 1983 (NAD83, 2011),
EPOCH 2010, USING GLOBAL POSITIONING SYSTEM (G.P.S.) TIES TO
THE FOLLOWING CONTINUOUS GPS STATION OPERATED BY THE
NATIONAL GEODETIC SURVEY:
AZYU
P500
GMPK
LOCAL CONTROL POINTS FOR THE SITE TOPOGRAPHY WERE
ESTABLISHED AS FOLLOWS:
POINT #2000, N1936114.5270, E6891778.5570, 222.124 FEET ELEVATION,
CNPT SET REBAR & CAP
POINT #2001, N1935269.8330, E6892270.0470, 227.448 FEET ELEVATION,
SET REBAR & CAP
SURVEY CONTROL
E1 ENLARGED GRADING & DRAINAGE PLAN
1" = 10'-0" 1"=10'
0 20 FT.10
C :\p w _w or kd ir\ de n0
\c h2 m hi ll_ m ca m is m s\ d0
\D
6-
C G
-1 -0
3- .d w g
9/
/2
4:
:0
P
M
ASPHALT CONCRETE PAVEMENT (4"AC/6"AB); SEE CP101
CONCRETE PAVEMENT (8"PCC/6"AB OR 4"PCC/4"AB); SEE CP101
LANDSCAPING OR OPEN AREA (SEE LANDSCAPING PLANS)
EXISTING ASPHALT CONCRETE PAVEMENT
UNPAVED/UNTREATED; SEE CP101
NEW / SALVAGED RIP RAP; SEE CP101
EXISTING RIP RAP
EXISTING CONTOUR
NEW CONTOUR999.00
(999.0)
221.90FS
221.85FG
221.90FS
221.85FG
221.90FS
221.85FG
222.00FS
222.00FG
222.00FS
222.00FG
222.00FS
222.00FG
222.10FS
222.10FG
PLAN
NORTH
222.02FF
221.75TG
218.75INV
222.06FG
220.80TG
217.80INV
221.66FG
CG301
A2
221.80FS
221.80FG
222.00FS
222.02FF
222.00FS
222.02FF
222.00FS
222.02FF
222.00FS
222.02FF
AutoCAD SHX Text
AV
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
EXP. 12-31-24
(230.0)
(215.0)
(210.0)
(205.0)
(225.0)
(225.0)
(215.0)
(220.0)
(210.0)(215.0)
(22 0.0
(225.0)
(220.0)
GECKO RD
REST RM
S
XXXXXXXXXXXXXX
X X
X X
X X
X X
X X
XXXXXXXXXXXXX
XXX
X
XXXXX
FU
E
L
FU
E
L
D D
D
S
X X
X
XXXX
X
X X
X
X X X X X X X X X
X X
226.00
6.
224.00
223.00
222.00
227.00
227.00
228.00
226.00
220.00215.00 210.00
225.00
225.00
220.00
215.00
220.00
215.00
-1.72%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
SHEET ID
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
IS
S
U E
D A
TE
M ic he ls on D riv e, S ui te
Irv in e, C A
(9
) 2
-7
FA
X
(9
) 2
-7
P lo t D at e:
C H
E C
K E
D B
Y
S U
B M
IT
TE
D B
Y
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
S H
E E
T S
IZ
E
Fi le
P at h:
M
A R
K D
E S
C R
IP
TI
O N
D A
TE
A
S C
H E
M A
TI
C
D E
S
IG
N
-2 8-
B
D
E S
IG
N
D E
V E
LO
P
M E
N T
-1
2-
C
0%
D E
S
IG
N D
E V
E
LO
P M
E N
T
-1 5-
D
0% D
E S
IG
N
D E
V E
LO
P
M E
N T
R E
S U
B M
IT
TA
L
-1 3-
E
C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 8-
F
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
-2 3-
G
0% C
O N
S
TR
U C
TI
O
N D
O C
U M
E N
TS
R
E V
IS
IO
N
-1
1-
H
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
-2
4-
I
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
-1 7-
CAHUILLA RANGER STATION
GECKO ROAD
FINISH FLOOR = 227.02
CG110
E R
O S
IO
N
C O
N
TR
O L
P
LA
N
M S
M
M S
M
S F
JF
L
A N
S I D
0L
D
M
A R
C H
S
A C
R A
M E
N
TO
, C A
B
U R
E A
U O
F
LA
N D
M A
N A
G E
M E
N T
P R
O
JE
C T
0L
D
C A
H U
IL
LA
R A
N G
E R
S
TA
TI
O
N
G
E C
K O
R D
. B R
A W
LE
Y
, C A
FI
N
A L
C O
N S
TR
U
C
TI
O N
D O
C U
M E
N
TS
R E
V
IS
IO
N
TOE OF SLOPE;
JOIN EXIST
10:1 RAMP
1 INSTALL STABILIZED CONSTRUCTION ENTRANCE/EXIT (TC1)
2 INSTALL CONCRETE WASH OUT (WM8)
3 INSTALL GRAVEL BAG BERM (SE6)
4 INSTALL FIBER ROLLS (SE5)
5 INSTALL CHECK DAM (SE4)
6 INSTALL INLET PROTECTION (SE10)
CONSTRUCTION LIMITS
EXISTING CONTOUR
NEW CONTOUR
GRAVEL BAG BERM
FIBER ROLL
FLOW DIRECTION
LEGEND SHEET KEYNOTES
999.00
(999.0)
TOP OF SLOPE
TOP OF
SLOPE
EXIST TOP
OF SLOPE
EXIST TOP
OF SLOPE
TOP OF SLOPE
CONTROL
POINT 2001
K3 EROSION CONTROL PLAN
1" = 60'-0"
TOE OF
SLOPE; JOIN
EROSIONS CONTROL NOTES:
1. IN CASE OF EMERGENCY, CONTACT: NAME: ________________________ PHONE: _______________
(TO BE COMPLETED BY CONTRACTOR PRIOR TO PERMIT)
2. A STAND-BY CREW FOR EMERGENCY WORK SHALL BE AVAILABLE AT ALL TIMES DURING THE RAINY
SEASON (NOVEMBER 1 TO APRIL 15). NECESSARY MATERIALS SHALL BE AVAILABLE ONSITE AND
STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF EMERGENCY
DEVICES WHEN RAIN IS IMMINENT.
3. EROSION CONTROL DEVICES SHOWN ON THIS PLAN AND/OR REQUIRED BY THE BEST
MANAGEMENT PRACTICES MAY BE REMOVED WHEN APPROVED BY THE BUILDING OFFICIAL IF THE
GRADING OPERATION HAS PROGRESSED TO THE POINT WHERE THEY ARE NO LONGER REQUIRED.
4. GRADED AREAS ADJACENT TO FILL SLOPES LOCATED AT THE SITE PERIMETER MUST DRAIN AWAY
FROM THE TOP OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY.
5. ALL SILT AND DEBRIS SHALL BE REMOVED FROM ALL DEVICES WITHIN 24 HOURS AFTER EACH
RAINSTORM AND BE DISPOSED OF PROPERLY.
6. A GUARD SHALL BE POSTED ON THE SITE WHENEVER THE DEPTH OF WATER IN ANY DEVICE
EXCEEDS TWO FEET. THE DEVICE SHALL BE DRAINED OR PUMPED DRY WITHIN 24 HOURS AFTER
EACH RAINSTORM.
7. EXCEPT AS OTHERWISE APPROVED BY THE INSPECTOR, ALL REMOVABLE PROTECTIVE DEVICES
SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY OR ON WEEKENDS WHEN THE
FIVE DAY RAIN PROBABILITY FORECAST EXCEEDS 50%.
8. THE PLACEMENT OF ADDITIONAL DEVICES TO REDUCE EROSION DAMAGE WITHIN THE SITE IS LEFT
TO THE DISCRETION OF THE FIELD ENGINEER/CITY INSPECTOR. ADDITIONAL DEVICES AS NEEDED
SHALL BE INSTALLED TO RETAIN SEDIMENTS AND OTHER POLLUTANTS ON SITE.
9. DESILTING BASINS MAY NOT BE REMOVED OR MADE INOPERABLE BETWEEN NOVEMBER 1 AND
APRIL 15 OF THE FOLLOWING YEAR WITHOUT THE APPROVAL OF THE INSPECTOR. EROSION
CONTROL DEVICES ARE TO BE MODIFIED, AS NEEDED, AS THE PROJECT PROGRESSES. THE DESIGN
AND PLACEMENT OF THESE DEVICES IS THE RESPONSIBILITY OF THE FIELD ENGINEER. PLANS OF
THESE CHANGES MUST BE SUBMITTED FOR APPROVAL IF REQUESTED BY THE INSPECTOR.
10. EVERY EFFORT SHOULD BE MADE TO ELIMINATE THE DISCHARGE OF NON-STORMWATER FROM
THE PROJECT SITE AT ALL TIMES.
11. ERODED SEDIMENTS AND OTHER POLLUTANTS MUST BE RETAINED ON-SITE AND MAY NOT BE
TRANSPORTED FROM THE SITE VIA SHEET FLOW, SWALES, AREA DRAINS, NATURAL DRAINAGE
COURSES, OR WIND.
12. STOCKPILES OF EARTH OR OTHER CONSTRUCTION-RELATED MATERIALS MUST BE PROTECTED
FROM BEING TRANSPORTED FROM THE SITE BY THE FORCES OF WIND OR WATER.
13. FUELS, OILS, SOLVENTS AND OTHER TOXIC MATERIALS MUST BE STORED IN ACCORDANCE WITH
THEIR LISTING AND ARE NOT TO CONTAMINATE THE SOILS AND SURFACE WATERS. ALL APPROVED
STORAGE CONTAINERS ARE TO BE PROTECTED FROM THE WEATHER. SPILLS MUST BE CLEANED UP
IMMEDIATELY AND DISPOSED OF IN A PROPER MANNER. SPILLS MAY NOT BE WASHED INTO THE
DRAINAGE SYSTEM.
14. EXCESS WASTE CONCRETE MAY NOT BE WASHED INTO THE PUBLIC WAY OR ANY OTHER DRAINAGE
SYSTEM. PROVISIONS SHALL BE MADE TO RETAIN CONCRETE WASTES ON-SITE UNTIL THEY CAN
BE DISPOSED OF AS SOLID WASTE.
15. CONTRACTORS ARE RESPONSIBLE TO INSPECT ALL EROSION CONTROL DEVICES AND BMPs ARE
INSTALLED AND FUNCTIONING PROPERLY IF THERE IS A 50% OR GREATER PROBABILITY OF
PREDICTED PRECIPITATION, AND AFTER ACTUAL PRECIPITATION.
16. TRASH AND CONSTRUCTION-RELATED SOLID WASTES MUST BE DEPOSITED INTO A COVERED
RECEPTACLE TO PREVENT CONTAMINATION OF RAINWATER AND DISPERSAL BY WIND.
17. SEDIMENTS AND OTHER MATERIALS MAY NOT BE TRACKED FROM THE SITE BY VEHICLE TRAFFIC.
THE CONSTRUCTION ENTRANCE ROADWAYS MUST BE STABILIZED SO AS TO INHIBIT SEDIMENTS
FROM BEING DEPOSITED INTO THE PUBLIC WAY. ACCIDENTAL DEPOSITIONS MUST BE SWEPT UP
IMMEDIATELY AND MAY NOT BE WASHED DOWN BY RAIN OR OTHER MEANS.
18. ANY SLOPES WITH DISTURBED SOILS OR DENUDED OF VEGETATION MUST BE STABILIZED SO AS TO
INHIBIT EROSION BY WIND AND WATER.
EROSIONS CONTROL NOTES:
19. ADD THE FOLLOWING NOTES (OR SIMILAR) TO THE PLANS TO DEFINE THE CURRENT STATE OF
CONSTRUCTION.
A. STORM DRAINS AND CATCH BASIN ARE NOT CONSTRUCTED.
B. STREETS ARE PAVED, EXCEPT AS NOTED ON THE EROSION CONTROL PLAN.
C. DRAINAGE DEVICES ARE NOT CONSTRUCTED, EXCEPT AS NOTED ON PLANS.
20. STORMWATER POLLUTION CONTROL REQUIREMENTS MUST BE INTEGRATED INTO THE EROSION
CONTROL PLANS FOR ANY CONSTRUCTION BETWEEN OCTOBER 1 AND APRIL 15.
21. BEST MANAGEMENT PRACTICES (BMPs) ARE SPECIFIED HEREON FOR THIS PROJECT TO
CONTROL STORMWATER AND OTHER RUNOFF POLLUTION FROM THE SITE DURING
CONSTRUCTION AND ARE TO BE IMPLEMENTED YEAR ROUND. THE BMPs ARE FROM THE
"CALIFORNIA STORMWATER BMP HANDBOOK" (JANUARY 2015) BY THE CALIFORNIA
STORMWATER QUALITY ASSOCIATION. EACH BMP HAS A FACT SHEET THAT DESCRIBES THE
BMP OBJECTIVES AND TARGETED CONSTITUENTS, AND EXPLAINS IMPLEMENTATION AND
INSPECTION REQUIREMENTS. THE BMPs ARE TO BE FOLLOWED PER THE FACT SHEETS UNLESS
OTHERWISE SUPERSEDED BY A NOTE ON THESE PLANS. BMP FACT SHEETS CAN BE PURCHASED
FROM CASQA AT WWW.CASQA.ORG/RESOURCES/BMP-HANDBOOKS/CONSTRUCTION.
22. THE SITE IS PRESENTLY (PRIOR TO CONSTRUCTION) PAVED WITH ASPHALT CONCRETE TO BE
REMOVED DURING CONSTRUCTION ACTIVITIES. THERE ARE NO AREAS OF VEGETATIVE COVER
OR NATIVE VEGETATION AT THE CONSTRUCTION SITE.
23. BY NECESSITY, THE ONSITE LOCATIONS OF CONSTRUCTION MATERIAL LOADING, UNLOADING
AND ACCESS; CONSTRUCTION VEHICLE AND EQUIPMENT STORAGE, CLEANING AND
MAINTENANCE; AND, TO A LESSER EXTENT WASTE STORAGE, WILL CHANGE FROM TIME TO TIME
AS WORK PROGRESSES FROM ONE AREA OF THE SITE TO ANOTHER. AS A RESULT, IT IS NOT
PRACTICAL TO SPECIFY LOCATIONS FOR THE ABOVE DESCRIBED CONSTRUCTION ACTIVITIES.
THE LOCATIONS FOR THE ABOVE ACTIVITIES CAN CHANGE AS WORK PROGRESSES BUT ONLY IF
THE FOLLOWING CONDITIONS ARE MET:
A. THE CHANGING OF SUCH LOCATIONS IS MINIMIZED TO THE EXTENT POSSIBLE, AND;
B. THE BEST MANAGEMENT PRACTICES FOR THESE ACTIVITIES ARE FOLLOWED AT EACH
LOCATION.
24. THE EROSION CONTROL PLANS AND GRADING PLANS SHOW AREAS OF SOIL DISTURBANCE, CUT
OR FILL AND THE DRAINAGE PATTERN ACROSS THE SITE, AND, (IF APPLICABLE) RELEVANT
OFFSITE DRAINAGE AREAS INCLUDING DRAINAGE PATTERN AND SLOPES ANTICIPATED AFTER
MAJOR GRADING ACTIVITIES, AND, (IF APPLICABLE) MEASURES NECESSARY TO DIVERT ONSITE
STORMWATER RUN-ON FROM OFFSITE PROPERTIES.
25. THE EROSION CONTROL PLANS AND GRADING PLANS SHOW THE CONSTRUCTION PROJECT
INCLUDING EXISTING AND PLANNED PAVED AREAS, ROADWAYS AND BUILDINGS, SITE
TOPOGRAPHY (BEFORE AND AFTER CONSTRUCTION), PROPOSED STORMWATER COLLECTION
AND DISCHARGE POINTS INCLUDING DRAINAGE AREA AND PATTERN FOR EACH STORMWATER
INLET POINT AND THE BEST MANAGEMENT PRACTICES NECESSARY TO PROTECT SUCH INLETS
FROM CONTAMINATED DISCHARGES.
26. A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SHALL BE PREPARED FOR THIS
PROJECT. THE SWPPP SHALL SPECIFY BEST MANAGEMENT PRACTICES TO CONTROL
NON-STORMWATER DISCHARGE FROM THE SITE.
27. THE GRADING PLANS SHOW POST-CONSTRUCTION MEASURES TO CONTROL STORMWATER
RUNOFF. A STORMWATER MITIGATION PLAN HAS BEEN PREPARED FOR THIS PROJECT IT
SPECIFIES THE SAME.
BEST MANAGEMENT PRACTICES (BMP) NOTES:
THE FOLLOWING BMPs FROM THE "CASQA CONSTRUCTION BMP HANDBOOK/PORTAL", MUST BE IMPLEMENTED FOR ALL CONSTRUCTION ACTIVITIES AS
APPLICABLE. BMPs FROM THE "CALIFORNIA STORMWATER BMP CONSTRUCTION HANDBOOK - JANUARY 2015" MAY BE USED IF DETAIL IS INDICATED.
ADDITIONAL MEASURES MAY BE REQUIRED IF DEEMED APPROPRIATE. BMPS IMPLEMENTED SHALL ALSO COMPLY WITH THE CALIFORNIA STORMWATER BEST
MANAGEMENT PRACTICE HANDBOOK-CONSTRUCTION ACTIVITY (2017) AND THE CALTRANS STORMWATER QUALITY HANDBOOKS, CONSTRUCTION GUIDE AND
SPECIFICATIONS (1997).
EROSION CONTROL BMPS:
EC1 - SCHEDULING - ESC1
EC2 - PRESERVATION OF EXISTING VEGETATION - ESC2
EC3 - HYDRAULIC MULCH - ESC11
EC4 - HYDROSEEDING - ESC10
EC5 - SOIL BINDERS
EC6 - STRAW MULCH - ESC11
EC7 - GEOTEXTILES AND MATS - ESC20
EC8 - WOOD MULCHING - ESC11
EC9 - EARTH DIKES AND DRAINAGE SWALES - ESC30/31
EC10 - VELOCITY DISSIPATION DEVICES
EC11 - SLOPE DRAINS - ESC32
EC12 - STREAMBANK STABILIZATION
EC13 - (RESERVED)
EC14 - COMPOST BLANKETS
EC15 - SOIL PREPARATION/ROUGHENING - ESC42
EC16 - NON-VEGETATED STABILIZATION
TEMPORARY SEDIMENT CONTROL BMPS:
SE1 - SILT FENCE - ESC50
SE2 - SEDIMENT BASIN - ESC56
SE3 - SEDIMENT TRAP - ESC55
SE4 - CHECK DAM - ESC41
SE5 - FIBER ROLLS - ESC53
SE6 - GRAVEL BAG BERM - ESC53
SE7 - STREET SWEEPING AND VACUUMING
SE8 - SANDBAG BARRIER - ESC52
SE9 - STRAW BALE BARRIER - ESC51
SE10 - STORM DRAIN INLET PROTECTION - ESC54
SE11 - ACTIVE TREATMENT SYSTEMS
SE12 - TEMPORARY SILT DIKE
SE13 - COMPOST SOCKS & BERMS
SE14 - BIOFILTER BAGS
WIND EROSION CONTROL BMPS:
WE1 - WIND EROSION CONTROL
TRACKING CONTROL BMPS:
TC1 - STABILIZED CONSTRUCTION ENTRANCE/EXIT - ESC24
TC2 - STABILIZED CONSTRUCTION ROADWAY - ESC23
TC3 - ENTRANCE/OUTLET TIRE WASH
NON-STORMWATER MANAGEMENT BMPS:
NS1 - WATER CONSERVATION PRACTICES - CD4(2)
NS2 - DEWATERING OPERATIONS
NS3 - PAVING AND GRINDING OPERATIONS
NS4 - TEMPORARY STREAM CROSSING - ESC22
NS5 - CLEAR WATER DIVERSION
NS6 - ILLICIT CONNECTION/DISCHARGE
NS7 - POTABLE WATER/IRRIGATION
NS8 - VEHICLE AND EQUIPMENT CLEANING - CA30
NS9 - VEHICLE AND EQUIPMENT FUELING - CA31
NS10 - VEHICLE AND EQUIPMENT MAINTENANCE - CA32
NS11 - PILE DRIVING OPERATIONS
NS12 - CONCRETE CURING
NS13 - CONCRETE FINISHING
NS14 - MATERIAL AND EQUIPMENT USE
NS15 - DEMOLITION ADJACENT TO WATER
NS16 - TEMPORARY BATCH PLANT
WASTE MANAGEMENT AND MATERIALS POLLUTION CONTROL BMPS:
WM1 - MATERIAL DELIVERY AND STORAGE - CA10
WM2 - MATERIAL USE - CA11
WM3 - STOCKPILE MANAGEMENT
WM4 - SPILL PREVENTION AND CONTROL - CA12
WM5 - SOLID WASTE MANAGEMENT - CA21
WM6 - HAZARDOUS WASTE MANAGEMENT
WM7 - CONTAMINATED SOIL MANAGEMENT
WM8 - CONCRETE WASTE MANAGEMENT - CA23
WM9 - SANITARY/SEPTIC WASTE MANAGEMENT
WM10 - LIQUID WASTE MANAGEMENT
1"=60'
0 120 FT.60
1 1
C :\p w _w or kd ir\ de n0
\c h2 m hi ll_ m ca m is m s\ d0
\D
6-
C G
-1 -1
0.
dw g 9/
/2
4:
:0
P M
PLAN
NORTH
AutoCAD SHX Text
ASPHALT ROAD
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
PP
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text
DIRT
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
BL
AutoCAD SHX Text
EX COMM
AutoCAD SHX Text
EXP. 12-31-24
2.0% 2.6% 0.2%0.5%
1.5% 1.8% 3.4%
5.8%
1.4% 2.7%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .