Attch_22_A0003_CRS_Lim_on_Subcontracting_Breakout_0003.xlsx
XLSX spreadsheet 91 KB Posted
- Attached to
- D-B GAOA CAHUILLA RANGER STATION REPLACEMENT
- Solicitation number
- 140L0625R0007
About this file
This is a Limitations on Subcontracting Breakout spreadsheet for a Design-Build project for the Cahuilla Ranger Station Replacement. The solicitation (140L0625R0007) is a total small business set-aside for the Department of the Interior's Bureau of Land Management, with a performance period of 906 days after Notice to Proceed. The contract requires a minimum of 15% self-performance by the prime contractor, with specific tracking mechanisms for labor costs from small business and large business subcontractors.
The spreadsheet provides a detailed template for tracking subcontractor labor costs, including designated sections for total proposed amount, material costs, self-performed labor, small business subcontractor labor, and large business subcontractor labor. It includes calculation fields to ensure compliance with the limitation on subcontracting requirements, with a note that the limitation percentage must be greater than the required self-performance percentage to maintain contract compliance.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | 140L0625R0007 - GAOA Design-Build Cahuilla Ranger Station Replacement |
| Type of Set Aside | Total Small Business |
| Performance Period | 906 Days After NTP |
| Required Self-Performance | 15% |
(A) Total Amount Proposed*
(B) Total Material Cost
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost $0.00
| (G) Limitation on Subcontracting Percentage* | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) = (B) + (F) |
| *Note 2: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .