Attachment 18 - Addendum 01.pdf

PDF 131 KB Posted

Attached to
36C77623B0012 - Y1DZ - Construct CLC Phase 2 Minor Construction - Big Spring - Solicitation
Solicitation number
36C77623B0012
Issued by

View the file

Other files

File Type Posted
Attachment 22 - Technical Questions and Answers.xlsx XLSX spreadsheet
36C77623B0012 0002.pdf PDF
36C77623B0012 0001.pdf PDF
Attachment 21 - Site Visit Sign in Sheet.pdf PDF
Attachment 08 - Drawings - Civil.pdf PDF
Attachment 11 - Material Finishes.pdf PDF
Attachment 05 - Drawings - Plumbing.pdf PDF
Attachment 17 - Wage Rates - Howard County.pdf PDF
Attachment 15 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 03 - Drawings - Interiors.pdf PDF
Attachment 02 - Drawings - Fire Protection.pdf PDF
Attachment 12 - Geotechnical Report - West Texas VA CLC.pdf PDF
Attachment 19 - Specifications - Addendum 01.pdf PDF
Attachment 10 - Master Specifications - Volume 2.pdf PDF
Attachment 09 - Master Specifications - Volume 1.pdf PDF
Attachment 16 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 04 - Drawings - Mechanical.pdf PDF
Attachment 01 - Drawings - Electrical.pdf PDF
Attachment 07 - Drawings - Architecture.pdf PDF
Attachment 20 - Sheet Index.pdf PDF
36C77623B0012.pdf PDF
Attachment 13 - Geotechnical Report - Executive Summary.pdf PDF
Attachment 14 - COVID-19 Safety Protocols 12-14-21 (1).pdf PDF
Attachment 06 - Drawings - Structural.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM

PROJECT NUMBER VA 519-369 (SPUR.2090.05)

PROJECT NAME Construct New CLC-Phase II

ADDENDUM NUMBER 01

DATE March 17, 2023

SUBJECT Addendum 01

A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com

THE FOLLOWING MODIFICATIONS, ADDITIONS, AND DELETIONS ARE HEREBY MADE A PART OF THE CONTRACT DOCUMENTS.

SEAL:

GENERAL:

PROJECT MANUAL:

General

1. 00 01 10 Table of Contents

Item 1: Added Specification Section: “01 45 00 Quality Control”

2. 01 00 00 General Requirements

Item 1: Paragraph 1.3-Statement of Bid Item(s), Sub-paragraph B: Removed Bid deduct descriptions and replace with new language that states, “Refer to drawings for Bid Alternates.”

Item 2: 1.3, Statement of Bod Item(s), “B. Alternate 01” added.

3. 01 45 00 Quality Control

Item 1: Added Specification section, “01 45 00 Quality Control”

4. 04 20 00 Unit Masonry

Item 1: Paragraph 1.2-Related Requirements: Removed Sub-paragraph B, reference to section 09 06

00 schedule for finishes is removed.

5. 05 12 00 Metal Fabrications

Item 1: Paragraph 2.3-Products – General: Removed Sub-paragraph A, reference to section 09 06 00 schedule for finishes is removed.

6. 05 50 00 Metal Fabrications

Item 1: Paragraph 1.2-Related Work: Removed Sub-paragraph A, reference to section 09 06 00 schedule for finishes is removed.

7. 06 20 00 Finish Carpentry

Item 1: Removed references out of 06 20 00 Finish Carpentry to Specification Section 09 06 00

Schedule for Finishes.

A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com

8. 07 24 00 EIFS

Item 1: Removed references out of 07 24 00 EIFS to Specification Section 09 06 00 Schedule for

Finishes.

9. 07 52 16-12 Mod-Bit Roofing

Item 1: Removed references out of 07 52 16-12 Mod-Bit Roofing to Specification Section 09 06 00

Schedule for Finishes.

10. 08 11 13 Hollow Metal Doors and Frames

Item 1: Removed references out of 08 11 13 Hollow Metal Doors and Frames to Specification Section

09 06 00 Schedule for Finishes.

11. 08 14 00 Wood Doors

Item 1: Removed references out of 08 14 00 Wood Doors to Specification Section 09 06 00 Schedule for Finishes.

12. 08 31 13 Access Doors

Item 1: Removed references out of 08 31 13 Access Doors to Specification Section 09 06 00 Schedule for Finishes.

13. 08 33 00 Coiling Doors and Grilles

Item 1: Removed references out of 08 33 00 Coiling Doors and Grilles to Specification Section 09 06

00 Schedule for Finishes.

14. 08 71 13 Automatic Door Operators

Item 1: Removed references out of 08 71 13 Automatic Door Operators to Specification Section 09 06

00 Schedule for Finishes.

15. 09 30 13 Tiling

Item 1: Removed references out of 09 30 13 Tiling to Specification Section 09 06 00 Schedule for

Finishes.

16. 09 51 00 Acoustical Ceilings

Item 1: Removed references out of 09 51 00 Acoustical Ceilings to Specification Section 09 06 00

Schedule for Finishes.

17. 09 65 13 Resilient Base and Accessories

Item 1: Removed references out of 09 65 13 Resilient Base and Accessories to Specification Section

09 06 00 Schedule for Finishes.

18. 09 91 00 Painting

Item 1: Removed references out of 09 91 00 Painting to Specification Section 09 06 00 Schedule for

Finishes.

19. 10 14 00 Signage

Item 1: Removed references out of 10 14 00 Signage to Specification Section 09 06 00 Schedule for

Finishes.

20. 10 28 00 Toilet, Bath & Laundry Accessories

A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com

Item 1: Removed references out of 10 28 00 Toilet, Bath & Laundry Accessories to Specification Section

09 06 00 Schedule for Finishes.

21. 22 05 23 General-Duty Valves for Plumbing Piping

Item 1: Removed Specification edit marks.

22. 22 31 11 Water Softeners

Item 1: Removed Specification edit marks.

23. 26 05 19 Low-Voltage Electrical Power Conductors and Cables

Item 1: Removed Specification edit marks.

24. 26 05 33 Raceway and Boxes for Electrical Systems

Item 1: Removed Specification writer notes.

25. 26 51 00 Interior Lighting

Item 1: Removed Specification writer notes.

Item 2: Removed Specification edit marks.

26. 26 56 00 Exterior Lighting

Item 1: Removed Specification edit marks.

27. 27 15 00 Communications Structured Cabling

Item 1: Removed Specification edit marks.

28. 27 52 23 Nurse Call and Code Blue Systems

Item 1: Removed Specification edit marks.

29. 28 05 13 Conductors and Cables for Electronic Safety and Security

Item 1: Removed Specification writer notes.

Item 2: Removed Specification edit marks.

30. 28 13 00 Physical Access Control System

Item 1: Removed Specification edit marks.

31. 28 31 00 Fire Detection and Alarm

Item 1: Paragraph 1.5-Warranty: Updated warranty period from one (1) year to five (5) years.

Item 2: Paragraph 1.6-Guaranty Period Services: This section has been removed. Following sections have been renumbered.

Item 3: Removed Specification writer notes.

Item 4: Removed Specification edit marks.

CONSTRUCTION DRAWINGS:

General

1. 00-GN1 Index Sheet, General Notes, Symbols and Abbreviations

Item 1: Add-In Bid Alternates: Bid Deductive Alternate descriptions have been updated with new language.

A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.842.6100 E | howdy@spur-design.com W | spur-design.com

TOTAL: 31 Specification Sections 8 ½ x 11

01 Drawing Pages 30 x 42

END OF ADDENDUM NO. 01