Text version
BID DOCUMENTS
FULLY SPRINKLERED
BID DOCUMENTS SUBMISSION
1/16" = 1'-0"1 OVERALL PLUMBING SITE PLAN
1. COORDINATE ALL PIPING WITH ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL, FIRE
PROTECTION, AND ELECTRICAL.
CONTRACTOR SHALL LOCATE ALL EXISTING UNDERGROUND UTILITIES AND COORDINATE
EXACT ROUTING PRIOR TO COMMENCING WORK.
INSTALL BARE COPPER TRACER WIRE ON TOP OF ALL NEW BURIED GAS PIPING. TERMINATE
TRACER WIRE AS SPECIFIED.
REFER TO CIVIL DRAWINGS FOR WATER, SEWER, AND STORM SEWER UTILITIES.
ALL NEW GAS PIPING ROUTED BELOW CONCRETE SHALL BE SLEEVED USING SCHEDULE 40
PVC.
CONNECT NEW 3 INCH MEDIUM PRESSURE GAS PIPING TO EXISTING AND ROUTE AS SHOWN
TO SERVE NEW FACILITIES.
TRANSITION TO 2 INCH SCHEDULE 40 STEEL PIPING AND EXTEND MEDIUM PRESSURE GAS
PIPING UP FROM BELOW GRADE TO SERVE FACILITY. REFER TO 27-P2.0 FOR CONTINUATION.
TRANSITION TO 2 INCH SCHEDULE 40 STEEL PIPING AND EXTEND MEDIUM PRESSURE GAS
PIPING UP FROM BELOW GRADE TO SERVE FACILITY. REFER TO 26-P2.0 FOR CONTINUATION.
2.
3.
4.
5.
PS1.0
SCALE: 1/16" = 1'-0"
OVERALL PLUMBING
SITE PLAN
EXISTING
COMMUNITY
BUILDING #24
EXISTING COTTAGE
BUILDING #25
FUTURE COTTAGE
BUILDING #28
NEW COTTAGE
BUILDING #26
NEW COTTAGE
BUILDING #27
EX G
EX 6"
G
2"
2"
G
G
G
3"
5 PSIG
3"
5 PSIG
G
EX
G
EX
G
EX 5 PSIG
BID DOCUMENTS SUBMISSION
26-P1.0 1/4" = 1'-0"1
WASTE AND VENT FLOOR PLAN -
COTTAGE BUILDING #26
26-P1.0.dwg
1. COORDINATE ALL PIPING WITH ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL,
FIRE PROTECTION, AND ELECTRICAL.
FLOW LINE ELEVATIONS INDICATED RELATIVE TO FINISHED FLOOR REFERENCE
ELEVATION OF 100'-0".
ROUTE ALL STORM DRAIN PIPING AS HIGH AS POSSIBLE.
REFER TO ARCHITECTURAL ELEVATIONS FOR INSTALLATION HEIGHTS OF STORM
DRAIN DOWNSPOUT NOZZLES.
ROUTE 3 INCH COMBINATION DRAIN/VENT UP IN WALL AND TERMINATE TO VENT THRU
ROOF AS SHOWN.
REFER TO CIVIL DRAWINGS FOR CONTINUATION.
3 INCH DOWNSPOUT FROM ROOF DRAIN. ROUTE PIPING OVERHEAD AS SHOWN AND
DOWN IN WALL TO BELOW FINISHED FLOOR AT 98'-0". EXTEND PIPING AS SHOWN FOR
CONNECTION TO SITE UTILITIES.
3 INCH DOWNSPOUT FROM OVERFLOW DRAIN. ROUTE PIPING OVERHEAD AS SHOWN
AND DOWN IN WALL FOR TERMINATION TO DOWNSPOUT NOZZLE.
CONNECT 2 INCH WASTE TO FIXTURE AND INSTALL OATEY SURE-VENT (OR APPROVED
EQUAL) AIR ADMITTANCE VALVE WITHIN MILLWORK.
EXTEND 3/4 INCH WASTE FROM DISHWASHER AND CONNECT TO ADJACENT SINK.
INSTALL CONDENSATE DRAIN ASSEMBLY TO AIR HANDLING UNIT (PROPERLY TRAPPED)
AND TERMINATE TO FLOOR SINK.
INSTALL P-TRAP IN WASTE BELOW SLAB AND EXTEND UP TO WITHIN MILLWORK UNDER
WARMING TABLE. INSTALL 2 INCH SIOUX CHIEF (OR APPROVED EQUAL) BACKWATER
VALVE IN VERTICAL DIRECTLY ABOVE BASE OF MILLWORK.
ROUTE 2 INCH COMBINATION DRAIN/VENT UP IN WALL AND TERMINATE TO VENT THRU
ROOF AS SHOWN.
INSTALL P-TRAP BELOW SLAB AND EXTEND 2 INCH WASTE UP FOR TERMINATION TO
FIXTURE. COORDINATE EXACT CONNECTION LOCATION WITH FIXTURE PROVIDER.
4 INCH DOWNSPOUT FROM OVERFLOW DRAIN. ROUTE PIPING OVERHEAD AS SHOWN
AND DOWN IN WALL FOR TERMINATION TO DOWNSPOUT NOZZLE.
4 INCH DOWNSPOUT FROM ROOF DRAIN. ROUTE PIPING OVERHEAD AS SHOWN AND
DOWN IN WALL TO BELOW FINISHED FLOOR AT 98'-0". EXTEND PIPING AS SHOWN FOR
CONNECTION TO SITE UTILITIES.
BUILDING
N.I.C.
N.I.C.
N.I.C.
BUILDING
2.
3.
4.
SCALE: 1/4" = 1'-0"
COTTAGE BLDG. 26 -
WASTE AND VENT
FLOOR PLAN
NO SCALE
KEYPLAN
D
B
G
H E A
C
F
F = 98'-0"L 4"
CO
2" VTR
2"
P-1
P-2
WCO
2" FD
2"
P-8 4"
2" VTR
4"
2"
4" 2" FD
P-1
4" 4" DSN
CO
P-8 P-2
WCO
2" VTR
P-1
2" FD2" FD
P-2P-2
WCO
2"
4"
2"
P-1
2"
P-8P-8
4"
4"
4"
2" VTR
P-1
2" FD
4"
2"
2"
P-8
2"
P-2
WCO
2" VTR
P-7
3"
2" FD
P-10
2"2"
4"
P-4
4"
P-3
WCO
P-4
P-1
2" FD
3" DSN
3"
3"
2"
3"
3" FS
WM
4" DSN
CO
4"
4"
2" FD
P-1
P-1
P-1 P-1
P-1
P-2
WCO
P-2
P-2
WCO
P-2
WCO
P-8
P-8
P-8 P-8
P-8
4"
4"
2"
P-2
WCO
2" VTR
P-7
P-7
P-6
2"
2"
2" FD
2" VTR
3"
4"
4" 2"
2" VTR
2" FD
2"
2"
2" FD 2" FD
2"
2"2"
2" VTR
2" FD
P-9
2" VTR
2"2" FD
2"
4"
3" FS
3"
P-5
4"
3" DSN
3" VTR
3"
3" FS
DCO
F = 96'-6"L
AHU 26-1
3"
4"
3" VTR
2"
2"
3"
2"
2"
2" VTR
4"
2" VTR
3" FS
3"
3"
LAUNDRY/
SAFE
ROOM
DATA
16 SUPPLIES/EQUIP.
STOR.
ELEC.
STORAGE
18A
S
TO
R A
G E
B
MECHANICAL
STORAGE
11A
PANTRY
CORR.
RECEIVING/STORAGE
KITCHEN
DINING
ROOM
LIVING
ROOM
FOYER
STAFF
OFFICE
TOIL.
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
TOIL.
TOIL.
TOIL.
S O
IL
E
D
C
LE
A N
CORR.
GUEST
TOIL.
MEDS
S
P A
/B A
TH
/S
A
FE
R O
O M
TOIL.
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
25 RESIDENT
ROOM
TOIL.
TOIL.
S O
IL
E
D
C
LE
A N
CORR.
TOIL.
RESIDENT
ROOM
SOILED
UTIL.
RESIDENT
ROOM
CORR.
TOIL.
CORR.
H.A.C.
STORAGE
4"4"
TOIL.
BID DOCUMENTS SUBMISSION
26-P2.0 1/4" = 1'-0"1
DOMESTIC WATER AND GAS FLOOR PLAN -
COTTAGE BUILDING #26
26-P2.0.dwg
1.
BUILDING
N.I.C.
N.I.C.
N.I.C.
BUILDING
2.
3.
ALL EXPOSED CW, HW, HWC, AND RO PIPING WITHIN MECHANICAL 15 SHALL HAVE
WHITE PVC JACKETING AND PVC FITTING COVERS INSTALLED OVER INSULATION.
THE MAXIMUM LENGTH OF PIPING FROM THE HW CIRCULATION LOOP WITHIN WALL TO
ANGLE STOPS SHALL NOT EXCEED 2'-0" FOR ALL P-2 AND P-3 FIXTURES.
COORDINATE ALL PIPING WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL, FIRE
PROTECTION, AND ELECTRICAL.
ROUTE 1/2 INCH REVERSE OSMOSIS WATER PIPING DOWN IN WALL AND EXTEND AS
REQUIRED TO SERVE WALL BOXES AND KITCHEN SINK RO FAUCET. INSTALL WALL BOX
FOR EACH REFRIGERATOR AT 36 INCHES AFF AND CONNECT 1/2 INCH RO WATER PIPING.
ROUTE 1/2 INCH CW AND 3/4 INCH HW PIPING DOWN IN WALL TO SERVE KITCHEN SINK.
ROUTE PIPING WITHIN WALL AS REQUIRED TO SERVE FIXTURE.
CONNECT 1/2 INCH CW, HW, AND RO PIPING TO KITCHEN SINK.
INSTALL DEDICATED ANGLE STOP BELOW KITCHEN SINK TO SERVE DISHWASHER.
EXTEND 1/2 INCH HW PIPING FROM STOP TO DISHWASHER. COORDINATE FINAL
TERMINATION WITH EQUIPMENT PROVIDER.
ROUTE 1/2 INCH CW AND HW PIPING DOWN IN WALL TO SERVE FIXTURE.
ROUTE CW, HW, AND HWC PIPING CONCEALED WITHIN ARCHITECTURAL FURRING
ACROSS FOYER 10.
ROUTE 1/2 INCH CW, HW, AND HWC PIPING DOWN IN WALL TO SERVE FIXTURE.
ROUTE 1-1/2 INCH CW AND 1/2 INCH HW PIPING DOWN IN WALL TO SERVE FIXTURES.
CONNECT 1/2 INCH CW AND HW PIPING TO SHOWER. EXTEND 1-1/2 INCH CW PIPING IN
WALL TO SERVE WATER CLOSET.
INSTALL ISOLATION BALL VALVE AND HW CIRCULATION BALANCE VALVE IN HWC PIPING.
ROUTE 3/4 INCH CW PIPING DOWN IN WALL TO SERVE FREEZE PROOF WALL HYDRANT.
ROUTE 3/4 INCH CW, HW, AND HWC PIPING DOWN IN WALL TO SERVE FIXTURES.
CONNECT 1/2 INCH CW AND HW PIPING TO EACH LAVATORY.
ROUTE 3/4 INCH CW AND HW PIPING DOWN IN WALL TO SERVE BATHTUB. COORDINATE
CW AND HW TERMINATION REQUIREMENTS WITH EQUIPMENT PROVIDER.
ROUTE 3/4 INCH CW AND HW PIPING DOWN THRU CONCRETE LID OF ROOM AND
EXTEND AS SHOWN ABOVE CEILING. SLEEVE PIPING PENETRATIONS AND FIRE CAULK
ANNULAR SPACE AS REQUIRED.
ROUTE 3/4 INCH CW AND HW PIPING DOWN IN WALL TO SERVE FIXTURES. CONNECT 1/2
INCH CW AND HW PIPING TO EACH FIXTURE. EXTEND PIPING IN WALL AS REQUIRED.
INSTALL ISOLATION BALL VALVES IN CW AND HW PIPING ABOVE CEILING. PROVIDE
12x12 ACCESS DOOR IN GYP BOARD CEILING TO ACCESS VALVES.
ROUTE 3/4 INCH CW AND HW PIPING DOWN IN WALL TO SERVE FIXTURES. CONNECT 1/2
INCH CW AND HW PIPING TO SINK. EXTEND 1/2 INCH CW AND HW PIPING IN WALL TO
SERVE WASHING MACHINE.
ROUTE 1-1/2 INCH CW, 1/2 INCH HW, AND 1/2 INCH HWC PIPING DOWN IN WALL TO
SERVE FIXTURES. CONNECT 1/2 INCH CW AND HW PIPING TO LAVATORY. EXTEND 1-1/2
INCH CW PIPING IN WALL TO SERVE WATER CLOSET.
EXTEND 3/4 INCH CW PIPING UP TO SERVE FREEZE PROOF ROOF HYDRANT.
ROUTE 1/2 INCH CW PIPING DOWN IN WALL AND EXTEND PIPING BELOW
SLAB AS SHOWN TO SERVE EQUIPMENT.
EXTEND 1/2 INCH CW PIPING UP FROM BELOW SLAB TO SERVE EQUIPMENT.
INSTALL BALL VALVE IN PIPING AT 6 INCHES AFF. COORDINATE FINAL
EQUIPMENT TERMINATION WITH EQUIPMENT PROVIDER.
REFER TO PS1.0 FOR CONTINUATION.
REFER TO CIVIL DRAWINGS FOR CONTINUATION.
EXTEND 2-1/2 INCH CW PIPING UP FROM BELOW SLAB AND INSTALL REDUCED
PRESSURE BACKFLOW PREVENTER ON WALL IN AREA SHOWN SHADED AT 48 INCHES
AFF. CONNECT 2-1/2 INCH CW PIPING TO DISCHARGE AND ROUTE OVERHEAD AS
SHOWN.
CONNECT 2-1/2 INCH CW PIPING TO WATER SOFTENER INLET HEADER. REFER TO
DETAIL 7/26-P4.0.
CONNECT 2-1/2 INCH CW PIPING TO WATER SOFTENER OUTLET HEADER. REFER TO
DETAIL 7/26-P4.0.
MOUNT WATER SOFTENER EQUIPMENT ON 4 INCH CONCRETE HOUSEKEEPING PAD.
REFER TO DETAIL 7/26-P4.0 FOR ALL PIPING CONNECTIONS.
MOUNT OXIDANT TANK ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER TO DETAIL
8/26-P4.0 FOR ALL PIPING CONNECTIONS.
MOUNT REVERSE OSMOSIS SKID ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER
TO DETAIL 8/26-P4.0 FOR ALL PIPING CONNECTIONS.
MOUNT MIOX GENERATOR ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER TO
DETAIL 8/26-P4.0 FOR ALL PIPING CONNECTIONS.
CONNECT 1 INCH LOW PRESSURE GAS PIPING TO WATER HEATER. PROVIDE GAS
COCK, DIRT LEG, AND UNION AT RIGID CONNECTION.
MOUNT WATER HEATER ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER TO DETAIL
6/26-P4.0 FOR ALL PIPING CONNECTIONS.
MOUNT THERMOSTATIC MIXING VALVE ON WALL IN AREA SHOWN SHADED. REFER TO
DETAIL 6/26-P4.0 FOR ALL PIPING CONNECTIONS.
CONNECT 1-1/2 INCH LOW PRESSURE GAS PIPING TO BOILER. PROVIDE GAS COCK,
DIRT LEG, AND UNION AT RIGID CONNECTION.
EXTEND 2 INCH MEDIUM PRESSURE GAS PIPING UP FROM BELOW GRADE. INSTALL
UNION, GAS COCK, AND PRESSURE REGULATOR IN VERTICAL PIPING AT 18 INCHES
ABOVE GRADE. TRANSITION TO 2 INCH LOW PRESSURE GAS PIPING AND PENETRATE
EXTERIOR WALL. ROUTE PIPING UP WALL TO DIRECTLY BELOW STRUCTURAL FRAMING
AND EXTEND AS SHOWN. GAS PRESSURE REGULATOR TO DELIVER 1200 CFH WITH AN
INLET PRESSURE OF 5 PSIG AND OUTLET PRESSURE OF 11 INCHES WATER COLUMN.
SCALE: 1/4" = 1'-0"
COTTAGE BLDG. 26 -
DOMESTIC WATER
AND GAS FLOOR PLAN
NO SCALE
KEYPLAN
D
B
G
H E A
C
F
AHU 26-1
MIOX 26-1
WS 26-1
P-1
P-2
P-8
P-1
P-8
P-2
P-1
P-2P-2
P-1
P-8
P-8 P-1
P-8
P-2
P-8
P-11
P-4
P-3
P-4
P-1
P-1
P-1
P-1 P-1
P-1
P-2
P-2P-2
P-2
P-8
P-8
P-8 P-8
P-8
P-2
P-8
P-7
P-6
P-9
P-5
RO
RO
GG
WH 26-1
8 9
22 22
26 WM
1/2"
2" 2"
3/4"
3/4"
2"
1-1/2"
2-1/2"
1-1/2"
2-1/2" 1-1/2"
1"
1"
1"
2-1/2"
1-1/2"
1/2"
1-1/2"
WB
WB
1/2"
1-1/2"
3/4"
3/4"
1-1/2"
3/4"1/2"
1"
3/4"
1-1/2" 1-1/2"
1/2"
3/4" 1/2"
1-1/2"
1/2"
1-1/2"
1/2"
3/4"
3/4"
3/4"
3/4"
3/4"
1/2"
1/2"
3/4"
3/4"
1-1/2"
3/4"
1-1/2"
1/2"
3/4"
FPWH
FPWH
FPWH
1/2"
3/4"
3/4"
1-1/2"
1"
3/4"
1-1/2" 3/4" 1/2"
2-1/2"
1"
3/4"
2-1/2"
1/2" U.F.
LAUNDRY/
SAFE
ROOM
DATA
16 SUPPLIES/EQUIP.
STOR.
ELEC.
STORAGE
18A
STORAGE
19B
MECHANICAL
S
TO
R A
G E
A
PANTRY
CORR.
RECEIVING/STORAGE
KITCHEN
DINING
ROOM
LIVING
ROOM
FOYER
STAFF
OFFICE
TOIL.
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
TOIL.
TOIL.
TOIL.
S O
IL
E
D
C
LE
A N
CORR.
GUEST
TOIL.
MEDS
SPA/BATH/SAFE
ROOM
TOIL.
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
25 RESIDENT
ROOM
TOIL.
TOIL.
S O
IL
E
D
C
LE
A N
CORR.
TOIL.
RESIDENT
ROOM
SOILED
UTIL.
RESIDENT
ROOM
CORR.
TOIL.
CORR.
H.A.C.
33 STORAGE
BID DOCUMENTS SUBMISSION
26-P3.0 1/4" = 1'-0"1
PLUMBING ROOF PLAN - COTTAGE
BUILDING #26
26-P3.0.dwg
BUILDING
N.I.C.
N.I.C.
N.I.C.
BUILDING
SCALE: 1/4" = 1'-0"
COTTAGE BLDG. 26 -
PLUMBING ROOF PLAN
NO SCALE
KEYPLAN
EF 26-2
EF 26-1
4" RD 4" OD
4" RD 4" OD
4" RD4" OD
4" RD4" OD
2" VTR
2" VTR
2" VTR
2" VTR
2" VTR
2" VTR
2" VTR
2" VTR
2" VTR
2" VTR
3" VTR
3" VTR
2" VTR
2" VTR
FPRH
RH 26-1
CU 26-1
CU 26-2
CU 26-A
BID DOCUMENTS SUBMISSION
26-P4.0 26-P4.0.dwg
SCALE: 1/4" = 1'-0"
COTTAGE BLDG. 26 -
PLUMBING DETAILS
AND SCHEDULES
PLUMBING FIXTURE CONNECTION SCHEDULE
MARK FIXTURE
CONNECTIONS
CW HW WASTE VENT
FPWH FREEZE PROOF WALL HYDRANT 3/4 - - - - - - - - -
FPRH FREEZE PROOF ROOF HYDRANT 3/4 - - - - - - - - -
WM WASHING MACHINE BOX 1/2 1/2 2 2
WB RECESSED WALL BOX 1/2 - - - - - - - - -
HB INTERIOR HOSE BIBB 3/4 - - - - - - - - -
2" FD 2 INCH FLOOR DRAIN, ROUND STRAINER - - - - - - 2 - - -
3" FS 12x12x8 FLOOR SINK, FULL GRATE, DOME STRAINER - - - - - - 3 - - -
WM WASHING MACHINE BOX 1/2 1/2 2 2
P-1 WATER CLOSET, FLOOR MOUNTED, MANUAL FLUSH VALVE - ADA 1-1/2 - - - 4 2
P-2 LAVATORY, COUNTER MOUNTED - ADA 1/2 1/2 2 2
P-3 LAVATORY, WALL HUNG - ADA 1/2 1/2 2 2
P-4 SINGLE COMPARTMENT STAINLESS STEEL SINK - ADA 1/2 1/2 2 2
P-5 DOUBLE COMPARTMENT STAINLESS STEEL SINK - ADA 1/2 1/2 2 2
P-6 HANDSINK, WALL HUNG - ADA 1/2 1/2 2 2
P-7 ALL-PURPOSE SINK, WALL HUNG 1/2 1/2 2 2
P-8 SHOWER - ADA 1/2 1/2 2 2
P-9 BATHTUB 1/2 1/2 2 2
P-10 MOP BASIN, CORNER TERRAZZO, 32x32x12 1/2 1/2 3 2
WATER HEATER SCHEDULE
MARK SIZE IN GALLONS TYPE INPUT (MBH) EFFICIENCY RECOVERY (GPH) ELECTRICAL EXAMPLE: PVI
WH 26-1 100 NATURAL GAS 199.9 95% 326 120/1/60 20 L 100A-GCL
NOTES: 1. RECOVERY RATE BASED ON TEMPERATURE RISE OF 70° F.
2. PROVIDE WITH CONDENSATE NEUTRALIZATION KIT, PIGTAIL KIT FOR 120V PLUG-IN POWER CORD, AND CONCENTRIC VENT KIT.
3. PROVIDE WITH FACTORY-AUTHORIZED STARTUP SERVICES.
HOT WATER CIRCULATOR SCHEDULE
MARK SYSTEM GPM HEAD (FT) HP ELECTRICAL EXAMPLE: GRUNDFOS
CP 26-1 WH-1 4 8 1/25 115/1/60 UP 15-18 B5
NOTES: 1. PUMP SHALL BE LEAD-FREE CONSTRUCTION IN ACCORDANCE WITH NSF 62.
EXPANSION TANK SCHEDULE
SYSTEM ACCEPTANCE VOLUME @ 60 PSIG MAX WORKING PRESSURE EXAMPLE: STATE
WH 26-1 2.2 GALLONS 150 PSIG ETC-5X
WATER SOFTENER SCHEDULE
MARK
MINERAL TANKS BRINE TANKS INLET/OULET
CONNECTIONS FLOW RANGE SYSTEM REGENERATION
CAPACITY
ELECTRICAL DATA EXAMPLE:
BRASWELLQUANTITY CONSTRUCTION GALLONS QUANTITY SALT CAPACITY (EA) SIZE (GAL) SERVICE FLA
WS 26-1 4 POLYESTER 27.6 2 700 LBS 80 2" 20 - 100 GPM 312,000 GRAINS 120/1/60 2.0 130454-2
NOTES: 1. PROVIDE WITH INITIAL SALT FILL AND TEST KIT.
MIXED OXIDANT GENERATOR SCHEDULE
MARK
MIXED OXIDANT SOLUTION UNIT REVERSE OSMOSIS SKID INJECTION PUMP
EXAMPLE: MIOX
CAPACITY BRINE TANK ELECTRICAL STAGES MAX FLOW RATE ELECTRICAL GPH HEAD (PSI) ELECTRICAL
MIOX 26-1 1 LB/DAY 40 GALLONS 120/1/60 4 150 GPD 120/1/60 2.0 101 120/1/60 RIO ZUNI
NOTES: 1. PROVIDE FACTORY SUPERVISED STARTUP, COMMISSIONING, AND OPERATOR TRAINING.
LC
16"-18"
WALL
WATER CLOSET
1NO SCALE
INSTALL FLUSH VALVE WITH
HANDLE FACING OPEN
PORTION OF TAS STALL
FLOOR MOUNT WATER
CLOSET INSTALLATION - ADA
MAY EXTEND AS
WASTE OR VENT
CHROME WALL
COVER & SCREW
BALANCE OF PIPING
SAME AS CLEANOUT
TO GRADE
WALL CLEANOUT DETAIL
NO SCALE
FLOOR LINE
WALL
PLUGGED TEE
W/CLEANOUT
1/8" C.I. BEND
15"x15"x6" CONCRETE SLAB
FLUSH W/GRADE
2" ABOVE LANDSCAPED
GRADE
CAST IRON FERRULE
W/COUNTERSUNK BRASS
CLEANOUT PLUG
GRADE
45° WYE
1/8 BEND
LONG SWEEP
EXTERIOR CLEANOUT DETAIL
NO SCALE
CAST IRON FERRULE WITH
COUNTERSUNK BRASS
CLEANOUT PLUG
2" ABOVE
LANDSCAPED
GRADE
TYPICAL TWO WAY CLEANOUT
NO SCALE
CLEANOUT STACK
WIRE MESH REINF.
FLUSH W/ GRADE
24"x12"
FLOW
CONCRETE SLAB
6"
ROOF DRAIN BODY
GRAVEL STOP INTREGRAL
WITH FLASHING RING
CAST IRON DOME
TY-SEAL
UNDER DECK CLAMP
INSULATION
PIPE
METAL ROOF DECK
GRAVEL
BALLAST
ROOF DRAIN DETAIL
NO SCALE 5
ROOFING
FELTS
EXPANSION TANK
1-1/2"
1-1/2" 1-1/2" 1-1/2"
1"CP 26-1
RADA MODEL 425R
THERMOSTATIC MIXING
VALVE - FLOW RATE 10 GPM
HW SUPPLY FROM
WATER HEATER
HW SUPPLY
TO SYSTEM
HW RETURN
FROM SYSTEM
CW SUPPLY
THERMOSTATIC
RETURN LIMITER
FROM SYSTEM
TO SYSTEM
1-1/2"
1"
1-1/2"
4" CONCRETE
EQUIPMENT PAD
UNION
BALL VALVE
CONNECT FULL SIZE RELIEF
TO T&P VALVE AND EXTEND
TO FLOOR DRAIN
MOUNT WATER HEATER
IN GALVANIZED STEEL
DRAIN PAN
G
GAS COCK
6" DIRT LEG
WATER HEATER PIPING DETAIL
NO SCALE
CONNECT 4" FLUE AND
3" COMBUSTION AIR
INTAKE. ROUTE UP AND
TERMINATE THRU ROOF
USING MANUFACTURER
PROVIDED CONCENTRIC
VENT KIT. PIPING SHALL
BE SCH 40 PVC.
CHECK
VALVE
4"
3"
3/4" CONDENSATE
CONNECTION
1-1/2"
1-1/2" CW
2-1/2" SOFT WATER
TO FACILITY
2-1/2" BYPASS TO BE
NORMALLY CLOSED
INSTALL UNION AT END
OF FACTORY HEADER
TO SERVE BYPASS
INLET PRESSURE
GAUGE
2-1/2" CW PIPING FROM
BACKFLOW PREVENTER
WATER SOFTENER
CONTROLLER
UNION
BALL VALVE
FACTORY INLET HEADER
WITH CONNECTIONS TO
EACH MINERAL TANK
OUTLET PRESSURE
GAUGE
MINERAL TANK (TYP. OF 4)
CONTRACTOR TO PROVIDE AND INSTALL
ALL INTERCONNECTING TUBING FROM
BRINE TANKS TO MINERAL TANKS PER
MFG'S REQUIREMENTS
BRINE TANK (TYP. OF 2) IN
FRONT OF MINERAL TANK
4" CONCRETE
HOUSEKEEPING PAD
UNIONBALL VALVE
WATER SOFTENER INSTALLATION DETAIL
NO SCALE
PLUMBING LEGEND
SYMBOL DESCRIPTION
VENT THRU ROOF
SANITARY SOIL LINE
SANITARY VENT LINE
COLD WATER
HOT WATER
HOT WATER RETURN
REVERSE OSMOSIS
CONDENSATE DRAIN
BALL VALVE
GLOBE VALVE
CHECK VALVE
UNION
GAS COCK
ELBOW TURNED DOWN
ELBOW TURNED UP
FLOW IN DIRECTION OF ARROW
AFF ABOVE FINISHED FLOOR
TAS TEXAS ACCESSIBILITY STANDARD
VTR
D
RO
GASG
2. PROVIDE WITH FACTORY INLET AND DISCHARGE HEADERS.
3. ALL ISOLATION VALVES SHALL BE LEAD-FILL CONSTRUCTION WITH STAINLESS STEEL TRIM.
MIOX SYSTEM INSTALLATION DETAIL
NO SCALE
3/4"1/2"
RO
RO
3/4"
1/2"
3/4"
3/4" BYPASS
3/4" TO DOMESTIC
WATER MAINZUNI MIOX
TERMINATE HYDROGEN
VENT THRU ROOF
CHECK VALVE
4" CONCRETE
HOUSEKEEPING PAD
OXIDANT TANK
UNION
1/4"
BALL VALVE
RO PROCESSING SKID
INJECTION PUMP
BALL VALVE
1/2" RAW COLD
WATER PIPING
FROM MAIN
1/2" RO WATER
PIPING TO
KITCHEN
3/4" RAW COLD
WATER FROM
MAIN
1/2"
BID DOCUMENTS SUBMISSION
27-P1.0 1/4" = 1'-0"1
WASTE AND VENT FLOOR PLAN -
COTTAGE BUILDING #27
27-P1.0.dwg
BUILDING
N.I.C.
N.I.C.
N.I.C.
BUILDING
1. COORDINATE ALL PIPING WITH ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL,
FIRE PROTECTION, AND ELECTRICAL.
FLOW LINE ELEVATIONS INDICATED RELATIVE TO FINISHED FLOOR REFERENCE
ELEVATION OF 100'-0".
ROUTE ALL STORM DRAIN PIPING AS HIGH AS POSSIBLE.
REFER TO ARCHITECTURAL ELEVATIONS FOR INSTALLATION HEIGHTS OF STORM
DRAIN DOWNSPOUT NOZZLES.
ROUTE 3 INCH COMBINATION DRAIN/VENT UP IN WALL AND TERMINATE TO VENT THRU
ROOF AS SHOWN.
REFER TO CIVIL DRAWINGS FOR CONTINUATION.
3 INCH DOWNSPOUT FROM ROOF DRAIN. ROUTE PIPING OVERHEAD AS SHOWN AND
DOWN IN WALL TO BELOW FINISHED FLOOR AT 98'-0". EXTEND PIPING AS SHOWN FOR
CONNECTION TO SITE UTILITIES.
3 INCH DOWNSPOUT FROM OVERFLOW DRAIN. ROUTE PIPING OVERHEAD AS SHOWN
AND DOWN IN WALL FOR TERMINATION TO DOWNSPOUT NOZZLE.
CONNECT 2 INCH WASTE TO FIXTURE AND INSTALL OATEY SURE-VENT (OR APPROVED
EQUAL) AIR ADMITTANCE VALVE WITHIN MILLWORK.
EXTEND 3/4 INCH WASTE FROM DISHWASHER AND CONNECT TO ADJACENT SINK.
INSTALL CONDENSATE DRAIN ASSEMBLY TO AIR HANDLING UNIT (PROPERLY TRAPPED)
AND TERMINATE TO FLOOR SINK.
INSTALL P-TRAP IN WASTE BELOW SLAB AND EXTEND UP TO WITHIN MILLWORK UNDER
WARMING TABLE. INSTALL 2 INCH SIOUX CHIEF (OR APPROVED EQUAL) BACKWATER
VALVE IN VERTICAL DIRECTLY ABOVE BASE OF MILLWORK.
ROUTE 2 INCH COMBINATION DRAIN/VENT UP IN WALL AND TERMINATE TO VENT THRU
ROOF AS SHOWN.
INSTALL P-TRAP BELOW SLAB AND EXTEND 2 INCH WASTE UP FOR TERMINATION TO
FIXTURE. COORDINATE EXACT CONNECTION LOCATION WITH FIXTURE PROVIDER.
4 INCH DOWNSPOUT FROM OVERFLOW DRAIN. ROUTE PIPING OVERHEAD AS SHOWN
AND DOWN IN WALL FOR TERMINATION TO DOWNSPOUT NOZZLE.
4 INCH DOWNSPOUT FROM ROOF DRAIN. ROUTE PIPING OVERHEAD AS SHOWN AND
DOWN IN WALL TO BELOW FINISHED FLOOR AT 98'-0". EXTEND PIPING AS SHOWN FOR
CONNECTION TO SITE UTILITIES.
2.
3.
4.
SCALE: 1/4" = 1'-0"
COTTAGE BLDG. 27 -
WASTE AND VENT
FLOOR PLAN
NO SCALE
KEYPLAN
D
B
G
HEA
C
F
4"
CO
2" VTR
2"
P-1
2" FD
2"
4"
2" VTR
4"
2"
4"2" FD
P-1
4"4" DSN
CO
P-2
WCO
2" VTR
P-1
2" FD 2" FD
P-2 P-2
WCO
2"
4"
2"
P-1
2" 4"
4"
4"
2" VTR
P-1
2" FD
4"
2"
2"
2"
P-2
WCO
2" VTR
P-7
3"
2" FD
P-10
2" 2"
4"
P-4
4"
P-3
WCO
P-4
P-1
2" FD
3" DSN
3"
3"
2"
3"
3" FS
WM
4" DSN
CO
4"
4"
2" FD
P-1
P-1
P-1P-1
P-1
P-2
WCO
P-2
P-2
WCO
P-2
WCO
4"
4"
2"
P-2
WCO
2" VTR
P-7
P-7
P-6
2"
2"
2" FD
2" VTR
3"
4"
4"2"
2" VTR
2" FD
2"
2"
2" FD2" FD
2" 4"
2" 2"
2" VTR
2" FD
P-9
2" VTR
2" 2" FD
2"
4"
3" FS
3"
P-5
4"
3" DSN
3" VTR
3"
3" FS
DCO
F = 96'-6"L
AHU 27-1
3"
4"
3" VTR
4"
2"
2"
3"
2"
2"
2" VTR
4"
2" VTR
3" FS
3"
3"
DATA
SUPPLIES/EQUIP.
STOR. 18
ELEC.
S
TO
R A
G E
A
S
TO
R A
G E
B
MECHANICAL
S
TO
R A
G E
A
PANTRY
CORR.
RECEIVING/STORAGE
KITCHEN
DINING
ROOM
LIVING
ROOM
FOYER
STAFF
OFFICE
TOIL.
RESIDENT
ROOM
7RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
TOIL.
TOIL.
TOIL.
S O
IL
E
D
C
LE
A N
CORR.
GUEST
TOIL. 37
MEDS 38
SPA/BATH/
SAFE ROOM
TOIL.
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
TOIL.
TOIL.
S O
IL
E
D
C
LE
A N
CORR.
TOIL.
RESIDENT
ROOM
SOILED
UTIL. 35
RESIDENT
ROOM
CORR.
TOIL.
CORR.
H.A.C.
STORAGE
LAUNDRY/ SAFE
ROOM 34
TOIL.
P-8
P-8
P-8 P-8
P-8
P-8
P-8
P-8P-8
P-8
P-2
WCO
F = 98'-0"L
BID DOCUMENTS SUBMISSION
27-P2.0 1/4" = 1'-0"1
DOMESTIC WATER AND GAS FLOOR PLAN -
COTTAGE BUILDING #27
27-P2.0.dwg
BUILDING
N.I.C.
N.I.C.
N.I.C.
BUILDING
1.
2.
3.
31 EXTEND 3/4 INCH CW PIPING UP TO SERVE FREEZE PROOF ROOF HYDRANT.
ROUTE 1/2 INCH CW PIPING DOWN IN WALL AND EXTEND PIPING BELOW
SLAB AS SHOWN TO SERVE EQUIPMENT.
EXTEND 1/2 INCH CW PIPING UP FROM BELOW SLAB TO SERVE FIXTURE.
INSTALL BALL VALVE IN PIPING AT 6 INCHES AFF. COORDINATE FINAL
EQUIPMENT TERMINATION WITH EQUIPMENT PROVIDER.
REFER TO PS1.0 FOR CONTINUATION.
COORDINATE ALL PIPING WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL, FIRE
PROTECTION, AND ELECTRICAL.
THE MAXIMUM LENGTH OF PIPING FROM THE HW CIRCULATION LOOP WITHIN WALL TO
ANGLE STOPS SHALL NOT EXCEED 2'-0" FOR ALL P-2 AND P-3 FIXTURES.
ALL EXPOSED CW, HW, HWC, AND RO PIPING WITHIN MECHANICAL 15 SHALL HAVE
WHITE PVC JACKETING AND PVC FITTING COVERS INSTALLED OVER INSULATION.
REFER TO CIVIL DRAWINGS FOR CONTINUATION.
EXTEND 2-1/2 INCH CW PIPING UP FROM BELOW SLAB AND INSTALL REDUCED
PRESSURE BACKFLOW PREVENTER ON WALL IN AREA SHOWN SHADED AT 48 INCHES
AFF. CONNECT 2-1/2 INCH CW PIPING TO DISCHARGE AND ROUTE OVERHEAD AS
SHOWN.
CONNECT 2-1/2 INCH CW PIPING TO WATER SOFTENER INLET HEADER. REFER TO
DETAIL 7/27-P4.0.
CONNECT 2-1/2 INCH CW PIPING TO WATER SOFTENER OUTLET HEADER. REFER TO
DETAIL 7/27-P4.0.
MOUNT WATER SOFTENER EQUIPMENT ON 4 INCH CONCRETE HOUSEKEEPING PAD.
REFER TO DETAIL 7/27-P4.0 FOR ALL PIPING CONNECTIONS.
MOUNT OXIDANT TANK ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER TO DETAIL
8/27-P4.0 FOR ALL PIPING CONNECTIONS.
MOUNT REVERSE OSMOSIS SKID ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER
TO DETAIL 8/27-P4.0 FOR ALL PIPING CONNECTIONS.
MOUNT MIOX GENERATOR ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER TO
DETAIL 8/27-P4.0 FOR ALL PIPING CONNECTIONS.
CONNECT 1 INCH LOW PRESSURE GAS PIPING TO WATER HEATER. PROVIDE GAS
COCK, DIRT LEG, AND UNION AT RIGID CONNECTION.
MOUNT WATER HEATER ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER TO DETAIL
6/27-P4.0 FOR ALL PIPING CONNECTIONS.
MOUNT THERMOSTATIC MIXING VALVE ON WALL IN AREA SHOWN SHADED. REFER TO
DETAIL 6/27-P4.0 FOR ALL PIPING CONNECTIONS.
CONNECT 1-1/2 INCH LOW PRESSURE GAS PIPING TO BOILER. PROVIDE GAS COCK,
DIRT LEG, AND UNION AT RIGID CONNECTION.
EXTEND 2 INCH MEDIUM PRESSURE GAS PIPING UP FROM BELOW GRADE. INSTALL
UNION, GAS COCK, AND PRESSURE REGULATOR IN VERTICAL PIPING AT 18 INCHES
ABOVE GRADE. TRANSITION TO 2 INCH LOW PRESSURE GAS PIPING AND PENETRATE
EXTERIOR WALL. ROUTE PIPING UP WALL TO DIRECTLY BELOW STRUCTURAL FRAMING
AND EXTEND AS SHOWN. GAS PRESSURE REGULATOR TO DELIVER 1200 CFH WITH AN
INLET PRESSURE OF 5 PSIG AND OUTLET PRESSURE OF 11 INCHES WATER COLUMN.
ROUTE 1/2 INCH REVERSE OSMOSIS WATER PIPING DOWN IN WALL AND EXTEND AS
REQUIRED TO SERVE WALL BOXES AND KITCHEN SINK RO FAUCET. INSTALL WALL BOX
FOR EACH REFRIGERATOR AT 36 INCHES AFF AND CONNECT 1/2 INCH RO WATER PIPING.
ROUTE 1/2 INCH CW AND 3/4 INCH HW PIPING DOWN IN WALL TO SERVE KITCHEN SINK.
ROUTE PIPING WITHIN WALL AS REQUIRED TO SERVE FIXTURE.
CONNECT 1/2 INCH CW, HW, AND RO PIPING TO KITCHEN SINK.
INSTALL DEDICATED ANGLE STOP BELOW KITCHEN SINK TO SERVE DISHWASHER.
EXTEND 1/2 INCH HW PIPING FROM STOP TO DISHWASHER. COORDINATE FINAL
TERMINATION WITH EQUIPMENT PROVIDER.
ROUTE 1/2 INCH CW AND HW PIPING DOWN IN WALL TO SERVE FIXTURE.
ROUTE CW, HW, AND HWC PIPING CONCEALED WITHIN ARCHITECTURAL FURRING
ACROSS FOYER 10.
ROUTE 1/2 INCH CW, HW, AND HWC PIPING DOWN IN WALL TO SERVE FIXTURE.
ROUTE 1-1/2 INCH CW AND 1/2 INCH HW PIPING DOWN IN WALL TO SERVE FIXTURES.
CONNECT 1/2 INCH CW AND HW PIPING TO SHOWER. EXTEND 1-1/2 INCH CW PIPING IN
WALL TO SERVE WATER CLOSET.
INSTALL ISOLATION BALL VALVE AND HW CIRCULATION BALANCE VALVE IN HWC PIPING.
ROUTE 3/4 INCH CW PIPING DOWN IN WALL TO SERVE FREEZE PROOF WALL HYDRANT.
ROUTE 3/4 INCH CW, HW, AND HWC PIPING DOWN IN WALL TO SERVE FIXTURES.
CONNECT 1/2 INCH CW AND HW PIPING TO EACH LAVATORY.
ROUTE 3/4 INCH CW AND HW PIPING DOWN IN WALL TO SERVE BATHTUB. COORDINATE
CW AND HW TERMINATION REQUIREMENTS WITH EQUIPMENT PROVIDER.
ROUTE 3/4 INCH CW AND HW PIPING DOWN THRU CONCRETE LID OF ROOM AND
EXTEND AS SHOWN ABOVE CEILING. SLEEVE PIPING PENETRATIONS AND FIRE CAULK
ANNULAR SPACE AS REQUIRED.
ROUTE 3/4 INCH CW AND HW PIPING DOWN IN WALL TO SERVE FIXTURES. CONNECT 1/2
INCH CW AND HW PIPING TO EACH FIXTURE. EXTEND PIPING IN WALL AS REQUIRED.
INSTALL ISOLATION BALL VALVES IN CW AND HW PIPING ABOVE CEILING. PROVIDE
12x12 ACCESS DOOR IN GYP BOARD CEILING TO ACCESS VALVES.
ROUTE 3/4 INCH CW AND HW PIPING DOWN IN WALL TO SERVE FIXTURES. CONNECT 1/2
INCH CW AND HW PIPING TO SINK. EXTEND 1/2 INCH CW AND HW PIPING IN WALL TO
SERVE WASHING MACHINE.
ROUTE 1-1/2 INCH CW, 1/2 INCH HW, AND 1/2 INCH HWC PIPING DOWN IN WALL TO
SERVE FIXTURES. CONNECT 1/2 INCH CW AND HW PIPING TO LAVATORY. EXTEND 1-1/2
INCH CW PIPING IN WALL TO SERVE WATER CLOSET.
SCALE: 1/4" = 1'-0"
COTTAGE BLDG. 27 -
DOMESTIC WATER AND
GAS FLOOR PLAN
NO SCALE
KEYPLAN
D
B
G
HEA
C
F
AHU 27-1
MIOX 27-1
WS 27-1
P-1
P-2
P-8
P-1
P-8
P-2
P-1
P-2 P-2
P-1
P-8 P-8
P-1
P-8
P-2
P-8
P-11
P-4
P-3
P-4
P-1
P-1
P-1
P-1P-1
P-1
P-2
P-2 P-2
P-2
P-8
P-8
P-8P-8
P-8
P-2
P-8
P-7
P-6
P-9
P-5
RO
RO
G G
WH 27-1
9 13
20 22
26WM
1/2"
2"2"
3/4"
3/4"
2"
1-1/2"
2-1/2"
1-1/2"
2-1/2" 1-1/2"
1"
1"
1"
2-1/2"
1-1/2"
1/2"
1-1/2"
WB
WB
1/2"
1-1/2"
3/4"
3/4"
1-1/2"
3/4" 1/2"
1"
3/4"
1-1/2" 1-1/2"
1/2"
3/4" 1/2"
1-1/2"
1/2"
1-1/2"
1/2"
3/4"
3/4"
3/4"
3/4"
1/2"
1/2"
3/4"
3/4"
1-1/2"
3/4"
1-1/2"
1/2"
3/4"
FPWH
FPWH
FPWH
1/2"
3/4"
3/4"
1-1/2"
1"
3/4"
1-1/2" 3/4"1/2"
2-1/2"
1"
3/4"
3/4"
1/2" U.F.
DATA
SUPPLIES/EQUIP.
STOR. 18
ELEC.
S
TO
R A
G E
A
STORAGE
19B
MECHANICAL
S
TO
R A
G E
A
PANTRY
CORR.
RECEIVING/STORAGE
KITCHEN
DINING
ROOM
LIVING
ROOM
FOYER
STAFF
OFFICE
TOIL.
RESIDENT
ROOM
7RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
TOIL.
TOIL.
TOIL.
S O
IL
E
D
C
LE
A N
CORR.
GUEST
TOIL. 37
MEDS 38
SPA/BATH/
SAFE ROOM
TOIL.
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
25RESIDENT
ROOM
TOIL.
TOIL.
S O
IL
E
D
C
LE
A N
CORR.
TOIL.
RESIDENT
ROOM
SOILED
UTIL. 35
RESIDENT
ROOM
CORR.
TOIL.
CORR.
H.A.C.
STORAGE
LAUNDRY/
SAFE
ROOM
BID DOCUMENTS SUBMISSION
27-P3.0 1/4" = 1'-0"1
PLUMBING ROOF PLAN - COTTAGE
BUILDING #26
27-P3.0.dwg
BUILDING
N.I.C.
N.I.C.
N.I.C.
BUILDING
SCALE: 1/4" = 1'-0"
COTTAGE BLDG. 27 -
PLUMBING ROOF PLAN
NO SCALE
KEYPLAN
EF 27-1
EF 27-2
4" RD4" OD
4" RD4" OD
4" RD 4" OD
4" RD 4" OD
2" VTR
2" VTR
2" VTR
2" VTR
2" VTR
2" VTR
2" VTR
2" VTR
2" VTR
2" VTR
3" VTR
3" VTR
2" VTR
2" VTR
FPRH
RH 27-1
CU 27-1
CU 27-2
CU 27-A
BID DOCUMENTS SUBMISSION
27-P4.0 27-P4.0.dwg
SCALE: 1/4" = 1'-0"
COTTAGE BLDG. 27 -
PLUMBING DETAILS
AND SCHEDULES
PLUMBING FIXTURE CONNECTION SCHEDULE
MARK FIXTURE
CONNECTIONS
CW HW WASTE VENT
FPWH FREEZE PROOF WALL HYDRANT 3/4 - - - - - - - - -
FPRH FREEZE PROOF ROOF HYDRANT 3/4 - - - - - - - - -
WM WASHING MACHINE BOX 1/2 1/2 2 2
WB RECESSED WALL BOX 1/2 - - - - - - - - -
HB INTERIOR HOSE BIBB 3/4 - - - - - - - - -
2" FD 2 INCH FLOOR DRAIN, ROUND STRAINER - - - - - - 2 - - -
3" FS 12x12x8 FLOOR SINK, FULL GRATE, DOME STRAINER - - - - - - 3 - - -
WM WASHING MACHINE BOX 1/2 1/2 2 2
P-1 WATER CLOSET, FLOOR MOUNTED, MANUAL FLUSH VALVE - ADA 1-1/2 - - - 4 2
P-2 LAVATORY, COUNTER MOUNTED - ADA 1/2 1/2 2 2
P-3 LAVATORY, WALL HUNG - ADA 1/2 1/2 2 2
P-4 SINGLE COMPARTMENT STAINLESS STEEL SINK - ADA 1/2 1/2 2 2
P-5 DOUBLE COMPARTMENT STAINLESS STEEL SINK - ADA 1/2 1/2 2 2
P-6 HANDSINK, WALL HUNG - ADA 1/2 1/2 2 2
P-7 ALL-PURPOSE SINK, WALL HUNG 1/2 1/2 2 2
P-8 SHOWER - ADA 1/2 1/2 2 2
P-9 BATHTUB 1/2 1/2 2 2
P-10 MOP BASIN, CORNER TERRAZZO, 32x32x12 1/2 1/2 3 2
WATER HEATER SCHEDULE
MARK SIZE IN GALLONS TYPE INPUT (MBH) EFFICIENCY RECOVERY (GPH) ELECTRICAL EXAMPLE: PVI
WH 27-1 100 NATURAL GAS 199.9 95% 326 120/1/60 20 L 100A-GCL
NOTES: 1. RECOVERY RATE BASED ON TEMPERATURE RISE OF 70° F.
2. PROVIDE WITH CONDENSATE NEUTRALIZATION KIT, PIGTAIL KIT FOR 120V PLUG-IN POWER CORD, AND CONCENTRIC VENT KIT.
3. PROVIDE WITH FACTORY-AUTHORIZED STARTUP SERVICES.
HOT WATER CIRCULATOR SCHEDULE
MARK SYSTEM GPM HEAD (FT) HP ELECTRICAL EXAMPLE: GRUNDFOS
CP 27-1 WH-1 4 8 1/25 115/1/60 UP 15-18 B5
NOTES: 1. PUMP SHALL BE LEAD-FREE CONSTRUCTION IN ACCORDANCE WITH NSF 62.
EXPANSION TANK SCHEDULE
SYSTEM ACCEPTANCE VOLUME @ 60 PSIG MAX WORKING PRESSURE EXAMPLE: STATE
WH 27-1 2.2 GALLONS 150 PSIG ETC-5X
WATER SOFTENER SCHEDULE
MARK
MINERAL TANKS BRINE TANKS INLET/OULET
CONNECTIONS FLOW RANGE SYSTEM REGENERATION
CAPACITY
ELECTRICAL DATA EXAMPLE:
BRASWELLQUANTITY CONSTRUCTION GALLONS QUANTITY SALT CAPACITY (EA) SIZE (GAL) SERVICE FLA
WS 27-1 4 POLYESTER 27.6 2 700 LBS 80 2" 20 - 100 GPM 312,000 GRAINS 120/1/60 2.0 130454-2
NOTES: 1. PROVIDE WITH INITIAL SALT FILL AND TEST KIT.
MIXED OXIDANT GENERATOR SCHEDULE
MARK
MIXED OXIDANT SOLUTION UNIT REVERSE OSMOSIS SKID INJECTION PUMP
EXAMPLE: MIOX
CAPACITY BRINE TANK ELECTRICAL STAGES MAX FLOW RATE ELECTRICAL GPH HEAD (PSI) ELECTRICAL
MIOX 27-1 1 LB/DAY 40 GALLONS 120/1/60 4 150 GPD 120/1/60 2.0 101 120/1/60 RIO ZUNI
NOTES: 1. PROVIDE FACTORY SUPERVISED STARTUP, COMMISSIONING, AND OPERATOR TRAINING.
LC
16"-18"
WALL
WATER CLOSET
1NO SCALE
INSTALL FLUSH VALVE WITH
HANDLE FACING OPEN
PORTION OF TAS STALL
FLOOR MOUNT WATER
CLOSET INSTALLATION - ADA
MAY EXTEND AS
WASTE OR VENT
CHROME WALL
COVER & SCREW
BALANCE OF PIPING
SAME AS CLEANOUT
TO GRADE
WALL CLEANOUT DETAIL
NO SCALE
FLOOR LINE
WALL
PLUGGED TEE
W/CLEANOUT
1/8" C.I. BEND
15"x15"x6" CONCRETE SLAB
FLUSH W/GRADE
2" ABOVE LANDSCAPED
GRADE
CAST IRON FERRULE
W/COUNTERSUNK BRASS
CLEANOUT PLUG
GRADE
45° WYE
1/8 BEND
LONG SWEEP
EXTERIOR CLEANOUT DETAIL
NO SCALE
CAST IRON FERRULE WITH
COUNTERSUNK BRASS
CLEANOUT PLUG
2" ABOVE
LANDSCAPED
GRADE
TYPICAL TWO WAY CLEANOUT
NO SCALE
CLEANOUT STACK
WIRE MESH REINF.
FLUSH W/ GRADE
24"x12"
FLOW
CONCRETE SLAB
6"
ROOF DRAIN BODY
GRAVEL STOP INTREGRAL
WITH FLASHING RING
CAST IRON DOME
TY-SEAL
UNDER DECK CLAMP
INSULATION
PIPE
METAL ROOF DECK
GRAVEL
BALLAST
ROOF DRAIN DETAIL
NO SCALE 5
ROOFING
FELTS
EXPANSION TANK
1-1/2"
1-1/2" 1-1/2" 1-1/2"
1"CP 27-1
RADA MODEL 425R
THERMOSTATIC MIXING
VALVE - FLOW RATE 10 GPM
HW SUPPLY FROM
WATER HEATER
HW SUPPLY
TO SYSTEM
HW RETURN
FROM SYSTEM
CW SUPPLY
THERMOSTATIC
RETURN LIMITER
FROM SYSTEM
TO SYSTEM
1-1/2"
1"
1-1/2"
4" CONCRETE
EQUIPMENT PAD
UNION
BALL VALVE
CONNECT FULL SIZE RELIEF
TO T&P VALVE AND EXTEND
TO FLOOR DRAIN
MOUNT WATER HEATER
IN GALVANIZED STEEL
DRAIN PAN
G
GAS COCK
6" DIRT LEG
WATER HEATER PIPING DETAIL
NO SCALE
CONNECT 4" FLUE AND
3" COMBUSTION AIR
INTAKE. ROUTE UP AND
TERMINATE THRU ROOF
USING MANUFACTURER
PROVIDED CONCENTRIC
VENT KIT. PIPING SHALL
BE SCH 40 PVC.
CHECK
VALVE
4"
3"
3/4" CONDENSATE
CONNECTION
1-1/2"
1-1/2" CW
2-1/2" SOFT WATER
TO FACILITY
2-1/2" BYPASS TO BE
NORMALLY CLOSED
INSTALL UNION AT END
OF FACTORY HEADER
TO SERVE BYPASS
INLET PRESSURE
GAUGE
2-1/2" CW PIPING FROM
BACKFLOW PREVENTER
WATER SOFTENER
CONTROLLER
UNION
BALL VALVE
FACTORY INLET HEADER
WITH CONNECTIONS TO
EACH MINERAL TANK
OUTLET PRESSURE
GAUGE
MINERAL TANK (TYP. OF 4)
CONTRACTOR TO PROVIDE AND INSTALL
ALL INTERCONNECTING TUBING FROM
BRINE TANKS TO MINERAL TANKS PER
MFG'S REQUIREMENTS
BRINE TANK (TYP. OF 2) IN
FRONT OF MINERAL TANK
4" CONCRETE
HOUSEKEEPING PAD
UNIONBALL VALVE
WATER SOFTENER INSTALLATION DETAIL
NO SCALE
PLUMBING LEGEND
SYMBOL DESCRIPTION
VENT THRU ROOF
SANITARY SOIL LINE
SANITARY VENT LINE
COLD WATER
HOT WATER
HOT WATER RETURN
REVERSE OSMOSIS
CONDENSATE DRAIN
BALL VALVE
GLOBE VALVE
CHECK VALVE
UNION
GAS COCK
ELBOW TURNED DOWN
ELBOW TURNED UP
FLOW IN DIRECTION OF ARROW
AFF ABOVE FINISHED FLOOR
TAS TEXAS ACCESSIBILITY STANDARD
VTR
D
RO
GASG
2. PROVIDE WITH FACTORY INLET AND DISCHARGE HEADERS.
3. ALL ISOLATION VALVES SHALL BE LEAD-FILL CONSTRUCTION WITH STAINLESS STEEL TRIM.
MIOX SYSTEM INSTALLATION DETAIL
NO SCALE
3/4" 1/2"
RO
RO
3/4"
1/2"
3/4"
3/4" BYPASS
3/4" TO DOMESTIC
WATER MAIN ZUNI MIOX
TERMINATE HYDROGEN
VENT THRU ROOF
CHECK VALVE
4" CONCRETE
HOUSEKEEPING PAD
OXIDANT TANK
UNION
1/4"
BALL VALVE
RO PROCESSING SKID
INJECTION PUMP
BALL VALVE
1/2" RAW COLD
WATER PIPING
FROM MAIN
1/2" RO WATER
PIPING TO
KITCHEN
3/4" RAW COLD
WATER FROM
MAIN
| PS1.0 - PLUMBING SITE PLAN |
| Sheets and Views |
| PS1.0 - PLUMBING SITE PLAN |
| 26-P1.0 - WASTE AND VENT FLOOR PLAN |
| Sheets and Views |
| 26-P1.0 - WASTE AND VENT FLOOR PLAN |
| 26-P2.0 - DOMESTIC WATER AND GAS FLOOR PLAN |
| Sheets and Views |
| 26-P2.0 - DOMESTIC WATER AND GAS FLOOR PLAN |
| 26-P3.0 - PLUMBING ROOF PLAN |
| Sheets and Views |
| 26-P3.0 - PLUMBING ROOF PLAN |
| 26-P4.0 - PLUMBING DETAILS AND SCHEDULES |
| Sheets and Views |
| 26-P4.0 - PLUMBING DETAILS AND SCHEDULES |
| 27-P1.0 - WASTE AND VENT FLOOR PLAN |
| Sheets and Views |
| 27-P1.0 - WASTE AND VENT FLOOR PLAN |
| 27-P2.0 - DOMESTIC WATER AND GAS FLOOR PLAN |
| Sheets and Views |
| 27-P2.0 - DOMESTIC WATER AND GAS FLOOR PLAN |
| 27-P3.0 - PLUMBING ROOF PLAN |
| Sheets and Views |
| 27-P3.0 - PLUMBING ROOF PLAN |
| 27-P4.0 - PLUMBING DETAILS AND SCHEDULES |
| Sheets and Views |
| 27-P4.0 - PLUMBING DETAILS AND SCHEDULES |
File details come from the government source that posted it. Updated .