Attachment 05 - Drawings - Plumbing.pdf

PDF 5 MB Posted

Attached to
36C77623B0012 - Y1DZ - Construct CLC Phase 2 Minor Construction - Big Spring - Solicitation Federal contract opportunity
Solicitation number
36C77623B0012
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

View the file

Other files for this federal contract opportunity

Other files attached to 36C77623B0012 - Y1DZ - Construct CLC Phase 2 Minor Construction - Big Spring - Solicitation, newest first.
File Type Posted
Attachment 22 - Technical Questions and Answers.xlsx XLSX spreadsheet
36C77623B0012 0002.pdf PDF
36C77623B0012 0001.pdf PDF
Attachment 21 - Site Visit Sign in Sheet.pdf PDF
Attachment 01 - Drawings - Electrical.pdf PDF
Attachment 02 - Drawings - Fire Protection.pdf PDF
Attachment 03 - Drawings - Interiors.pdf PDF
Attachment 08 - Drawings - Civil.pdf PDF
Attachment 15 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 20 - Sheet Index.pdf PDF
36C77623B0012.pdf PDF
Attachment 04 - Drawings - Mechanical.pdf PDF
Attachment 10 - Master Specifications - Volume 2.pdf PDF
Attachment 11 - Material Finishes.pdf PDF
Attachment 16 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 17 - Wage Rates - Howard County.pdf PDF
Attachment 19 - Specifications - Addendum 01.pdf PDF
Attachment 18 - Addendum 01.pdf PDF
Attachment 06 - Drawings - Structural.pdf PDF
Attachment 13 - Geotechnical Report - Executive Summary.pdf PDF
Attachment 14 - COVID-19 Safety Protocols 12-14-21 (1).pdf PDF
Attachment 07 - Drawings - Architecture.pdf PDF
Attachment 09 - Master Specifications - Volume 1.pdf PDF
Attachment 12 - Geotechnical Report - West Texas VA CLC.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID DOCUMENTS

FULLY SPRINKLERED

BID DOCUMENTS SUBMISSION

1/16" = 1'-0"1 OVERALL PLUMBING SITE PLAN

1. COORDINATE ALL PIPING WITH ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL, FIRE

PROTECTION, AND ELECTRICAL.

CONTRACTOR SHALL LOCATE ALL EXISTING UNDERGROUND UTILITIES AND COORDINATE

EXACT ROUTING PRIOR TO COMMENCING WORK.

INSTALL BARE COPPER TRACER WIRE ON TOP OF ALL NEW BURIED GAS PIPING. TERMINATE

TRACER WIRE AS SPECIFIED.

REFER TO CIVIL DRAWINGS FOR WATER, SEWER, AND STORM SEWER UTILITIES.

ALL NEW GAS PIPING ROUTED BELOW CONCRETE SHALL BE SLEEVED USING SCHEDULE 40

PVC.

CONNECT NEW 3 INCH MEDIUM PRESSURE GAS PIPING TO EXISTING AND ROUTE AS SHOWN

TO SERVE NEW FACILITIES.

TRANSITION TO 2 INCH SCHEDULE 40 STEEL PIPING AND EXTEND MEDIUM PRESSURE GAS

PIPING UP FROM BELOW GRADE TO SERVE FACILITY. REFER TO 27-P2.0 FOR CONTINUATION.

TRANSITION TO 2 INCH SCHEDULE 40 STEEL PIPING AND EXTEND MEDIUM PRESSURE GAS

PIPING UP FROM BELOW GRADE TO SERVE FACILITY. REFER TO 26-P2.0 FOR CONTINUATION.

2.

3.

4.

5.

PS1.0

SCALE: 1/16" = 1'-0"

OVERALL PLUMBING

SITE PLAN

EXISTING

COMMUNITY

BUILDING #24

EXISTING COTTAGE

BUILDING #25

FUTURE COTTAGE

BUILDING #28

NEW COTTAGE

BUILDING #26

NEW COTTAGE

BUILDING #27

EX G

EX 6"

G

2"

2"

G

G

G

3"

5 PSIG

3"

5 PSIG

G

EX

G

EX

G

EX 5 PSIG

BID DOCUMENTS SUBMISSION

26-P1.0 1/4" = 1'-0"1

WASTE AND VENT FLOOR PLAN -

COTTAGE BUILDING #26

26-P1.0.dwg

1. COORDINATE ALL PIPING WITH ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL,

FIRE PROTECTION, AND ELECTRICAL.

FLOW LINE ELEVATIONS INDICATED RELATIVE TO FINISHED FLOOR REFERENCE

ELEVATION OF 100'-0".

ROUTE ALL STORM DRAIN PIPING AS HIGH AS POSSIBLE.

REFER TO ARCHITECTURAL ELEVATIONS FOR INSTALLATION HEIGHTS OF STORM

DRAIN DOWNSPOUT NOZZLES.

ROUTE 3 INCH COMBINATION DRAIN/VENT UP IN WALL AND TERMINATE TO VENT THRU

ROOF AS SHOWN.

REFER TO CIVIL DRAWINGS FOR CONTINUATION.

3 INCH DOWNSPOUT FROM ROOF DRAIN. ROUTE PIPING OVERHEAD AS SHOWN AND

DOWN IN WALL TO BELOW FINISHED FLOOR AT 98'-0". EXTEND PIPING AS SHOWN FOR

CONNECTION TO SITE UTILITIES.

3 INCH DOWNSPOUT FROM OVERFLOW DRAIN. ROUTE PIPING OVERHEAD AS SHOWN

AND DOWN IN WALL FOR TERMINATION TO DOWNSPOUT NOZZLE.

CONNECT 2 INCH WASTE TO FIXTURE AND INSTALL OATEY SURE-VENT (OR APPROVED

EQUAL) AIR ADMITTANCE VALVE WITHIN MILLWORK.

EXTEND 3/4 INCH WASTE FROM DISHWASHER AND CONNECT TO ADJACENT SINK.

INSTALL CONDENSATE DRAIN ASSEMBLY TO AIR HANDLING UNIT (PROPERLY TRAPPED)

AND TERMINATE TO FLOOR SINK.

INSTALL P-TRAP IN WASTE BELOW SLAB AND EXTEND UP TO WITHIN MILLWORK UNDER

WARMING TABLE. INSTALL 2 INCH SIOUX CHIEF (OR APPROVED EQUAL) BACKWATER

VALVE IN VERTICAL DIRECTLY ABOVE BASE OF MILLWORK.

ROUTE 2 INCH COMBINATION DRAIN/VENT UP IN WALL AND TERMINATE TO VENT THRU

ROOF AS SHOWN.

INSTALL P-TRAP BELOW SLAB AND EXTEND 2 INCH WASTE UP FOR TERMINATION TO

FIXTURE. COORDINATE EXACT CONNECTION LOCATION WITH FIXTURE PROVIDER.

4 INCH DOWNSPOUT FROM OVERFLOW DRAIN. ROUTE PIPING OVERHEAD AS SHOWN

AND DOWN IN WALL FOR TERMINATION TO DOWNSPOUT NOZZLE.

4 INCH DOWNSPOUT FROM ROOF DRAIN. ROUTE PIPING OVERHEAD AS SHOWN AND

DOWN IN WALL TO BELOW FINISHED FLOOR AT 98'-0". EXTEND PIPING AS SHOWN FOR

CONNECTION TO SITE UTILITIES.

BUILDING

N.I.C.

N.I.C.

N.I.C.

BUILDING

2.

3.

4.

SCALE: 1/4" = 1'-0"

COTTAGE BLDG. 26 -

WASTE AND VENT

FLOOR PLAN

NO SCALE

KEYPLAN

D

B

G

H E A

C

F

F = 98'-0"L 4"

CO

2" VTR

2"

P-1

P-2

WCO

2" FD

2"

P-8 4"

2" VTR

4"

2"

4" 2" FD

P-1

4" 4" DSN

CO

P-8 P-2

WCO

2" VTR

P-1

2" FD2" FD

P-2P-2

WCO

2"

4"

2"

P-1

2"

P-8P-8

4"

4"

4"

2" VTR

P-1

2" FD

4"

2"

2"

P-8

2"

P-2

WCO

2" VTR

P-7

3"

2" FD

P-10

2"2"

4"

P-4

4"

P-3

WCO

P-4

P-1

2" FD

3" DSN

3"

3"

2"

3"

3" FS

WM

4" DSN

CO

4"

4"

2" FD

P-1

P-1

P-1 P-1

P-1

P-2

WCO

P-2

P-2

WCO

P-2

WCO

P-8

P-8

P-8 P-8

P-8

4"

4"

2"

P-2

WCO

2" VTR

P-7

P-7

P-6

2"

2"

2" FD

2" VTR

3"

4"

4" 2"

2" VTR

2" FD

2"

2"

2" FD 2" FD

2"

2"2"

2" VTR

2" FD

P-9

2" VTR

2"2" FD

2"

4"

3" FS

3"

P-5

4"

3" DSN

3" VTR

3"

3" FS

DCO

F = 96'-6"L

AHU 26-1

3"

4"

3" VTR

2"

2"

3"

2"

2"

2" VTR

4"

2" VTR

3" FS

3"

3"

LAUNDRY/

SAFE

ROOM

DATA

16 SUPPLIES/EQUIP.

STOR.

ELEC.

STORAGE

18A

S

TO

R A

G E

B

MECHANICAL

STORAGE

11A

PANTRY

CORR.

RECEIVING/STORAGE

KITCHEN

DINING

ROOM

LIVING

ROOM

FOYER

STAFF

OFFICE

TOIL.

RESIDENT

ROOM

RESIDENT

ROOM

RESIDENT

ROOM

RESIDENT

ROOM

TOIL.

TOIL.

TOIL.

S O

IL

E

D

C

LE

A N

CORR.

GUEST

TOIL.

MEDS

S

P A

/B A

TH

/S

A

FE

R O

O M

TOIL.

RESIDENT

ROOM

RESIDENT

ROOM

RESIDENT

ROOM

25 RESIDENT

ROOM

TOIL.

TOIL.

S O

IL

E

D

C

LE

A N

CORR.

TOIL.

RESIDENT

ROOM

SOILED

UTIL.

RESIDENT

ROOM

CORR.

TOIL.

CORR.

H.A.C.

STORAGE

4"4"

TOIL.

BID DOCUMENTS SUBMISSION

26-P2.0 1/4" = 1'-0"1

DOMESTIC WATER AND GAS FLOOR PLAN -

COTTAGE BUILDING #26

26-P2.0.dwg

1.

BUILDING

N.I.C.

N.I.C.

N.I.C.

BUILDING

2.

3.

ALL EXPOSED CW, HW, HWC, AND RO PIPING WITHIN MECHANICAL 15 SHALL HAVE

WHITE PVC JACKETING AND PVC FITTING COVERS INSTALLED OVER INSULATION.

THE MAXIMUM LENGTH OF PIPING FROM THE HW CIRCULATION LOOP WITHIN WALL TO

ANGLE STOPS SHALL NOT EXCEED 2'-0" FOR ALL P-2 AND P-3 FIXTURES.

COORDINATE ALL PIPING WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL, FIRE

PROTECTION, AND ELECTRICAL.

ROUTE 1/2 INCH REVERSE OSMOSIS WATER PIPING DOWN IN WALL AND EXTEND AS

REQUIRED TO SERVE WALL BOXES AND KITCHEN SINK RO FAUCET. INSTALL WALL BOX

FOR EACH REFRIGERATOR AT 36 INCHES AFF AND CONNECT 1/2 INCH RO WATER PIPING.

ROUTE 1/2 INCH CW AND 3/4 INCH HW PIPING DOWN IN WALL TO SERVE KITCHEN SINK.

ROUTE PIPING WITHIN WALL AS REQUIRED TO SERVE FIXTURE.

CONNECT 1/2 INCH CW, HW, AND RO PIPING TO KITCHEN SINK.

INSTALL DEDICATED ANGLE STOP BELOW KITCHEN SINK TO SERVE DISHWASHER.

EXTEND 1/2 INCH HW PIPING FROM STOP TO DISHWASHER. COORDINATE FINAL

TERMINATION WITH EQUIPMENT PROVIDER.

ROUTE 1/2 INCH CW AND HW PIPING DOWN IN WALL TO SERVE FIXTURE.

ROUTE CW, HW, AND HWC PIPING CONCEALED WITHIN ARCHITECTURAL FURRING

ACROSS FOYER 10.

ROUTE 1/2 INCH CW, HW, AND HWC PIPING DOWN IN WALL TO SERVE FIXTURE.

ROUTE 1-1/2 INCH CW AND 1/2 INCH HW PIPING DOWN IN WALL TO SERVE FIXTURES.

CONNECT 1/2 INCH CW AND HW PIPING TO SHOWER. EXTEND 1-1/2 INCH CW PIPING IN

WALL TO SERVE WATER CLOSET.

INSTALL ISOLATION BALL VALVE AND HW CIRCULATION BALANCE VALVE IN HWC PIPING.

ROUTE 3/4 INCH CW PIPING DOWN IN WALL TO SERVE FREEZE PROOF WALL HYDRANT.

ROUTE 3/4 INCH CW, HW, AND HWC PIPING DOWN IN WALL TO SERVE FIXTURES.

CONNECT 1/2 INCH CW AND HW PIPING TO EACH LAVATORY.

ROUTE 3/4 INCH CW AND HW PIPING DOWN IN WALL TO SERVE BATHTUB. COORDINATE

CW AND HW TERMINATION REQUIREMENTS WITH EQUIPMENT PROVIDER.

ROUTE 3/4 INCH CW AND HW PIPING DOWN THRU CONCRETE LID OF ROOM AND

EXTEND AS SHOWN ABOVE CEILING. SLEEVE PIPING PENETRATIONS AND FIRE CAULK

ANNULAR SPACE AS REQUIRED.

ROUTE 3/4 INCH CW AND HW PIPING DOWN IN WALL TO SERVE FIXTURES. CONNECT 1/2

INCH CW AND HW PIPING TO EACH FIXTURE. EXTEND PIPING IN WALL AS REQUIRED.

INSTALL ISOLATION BALL VALVES IN CW AND HW PIPING ABOVE CEILING. PROVIDE

12x12 ACCESS DOOR IN GYP BOARD CEILING TO ACCESS VALVES.

ROUTE 3/4 INCH CW AND HW PIPING DOWN IN WALL TO SERVE FIXTURES. CONNECT 1/2

INCH CW AND HW PIPING TO SINK. EXTEND 1/2 INCH CW AND HW PIPING IN WALL TO

SERVE WASHING MACHINE.

ROUTE 1-1/2 INCH CW, 1/2 INCH HW, AND 1/2 INCH HWC PIPING DOWN IN WALL TO

SERVE FIXTURES. CONNECT 1/2 INCH CW AND HW PIPING TO LAVATORY. EXTEND 1-1/2

INCH CW PIPING IN WALL TO SERVE WATER CLOSET.

EXTEND 3/4 INCH CW PIPING UP TO SERVE FREEZE PROOF ROOF HYDRANT.

ROUTE 1/2 INCH CW PIPING DOWN IN WALL AND EXTEND PIPING BELOW

SLAB AS SHOWN TO SERVE EQUIPMENT.

EXTEND 1/2 INCH CW PIPING UP FROM BELOW SLAB TO SERVE EQUIPMENT.

INSTALL BALL VALVE IN PIPING AT 6 INCHES AFF. COORDINATE FINAL

EQUIPMENT TERMINATION WITH EQUIPMENT PROVIDER.

REFER TO PS1.0 FOR CONTINUATION.

REFER TO CIVIL DRAWINGS FOR CONTINUATION.

EXTEND 2-1/2 INCH CW PIPING UP FROM BELOW SLAB AND INSTALL REDUCED

PRESSURE BACKFLOW PREVENTER ON WALL IN AREA SHOWN SHADED AT 48 INCHES

AFF. CONNECT 2-1/2 INCH CW PIPING TO DISCHARGE AND ROUTE OVERHEAD AS

SHOWN.

CONNECT 2-1/2 INCH CW PIPING TO WATER SOFTENER INLET HEADER. REFER TO

DETAIL 7/26-P4.0.

CONNECT 2-1/2 INCH CW PIPING TO WATER SOFTENER OUTLET HEADER. REFER TO

DETAIL 7/26-P4.0.

MOUNT WATER SOFTENER EQUIPMENT ON 4 INCH CONCRETE HOUSEKEEPING PAD.

REFER TO DETAIL 7/26-P4.0 FOR ALL PIPING CONNECTIONS.

MOUNT OXIDANT TANK ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER TO DETAIL

8/26-P4.0 FOR ALL PIPING CONNECTIONS.

MOUNT REVERSE OSMOSIS SKID ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER

TO DETAIL 8/26-P4.0 FOR ALL PIPING CONNECTIONS.

MOUNT MIOX GENERATOR ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER TO

DETAIL 8/26-P4.0 FOR ALL PIPING CONNECTIONS.

CONNECT 1 INCH LOW PRESSURE GAS PIPING TO WATER HEATER. PROVIDE GAS

COCK, DIRT LEG, AND UNION AT RIGID CONNECTION.

MOUNT WATER HEATER ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER TO DETAIL

6/26-P4.0 FOR ALL PIPING CONNECTIONS.

MOUNT THERMOSTATIC MIXING VALVE ON WALL IN AREA SHOWN SHADED. REFER TO

DETAIL 6/26-P4.0 FOR ALL PIPING CONNECTIONS.

CONNECT 1-1/2 INCH LOW PRESSURE GAS PIPING TO BOILER. PROVIDE GAS COCK,

DIRT LEG, AND UNION AT RIGID CONNECTION.

EXTEND 2 INCH MEDIUM PRESSURE GAS PIPING UP FROM BELOW GRADE. INSTALL

UNION, GAS COCK, AND PRESSURE REGULATOR IN VERTICAL PIPING AT 18 INCHES

ABOVE GRADE. TRANSITION TO 2 INCH LOW PRESSURE GAS PIPING AND PENETRATE

EXTERIOR WALL. ROUTE PIPING UP WALL TO DIRECTLY BELOW STRUCTURAL FRAMING

AND EXTEND AS SHOWN. GAS PRESSURE REGULATOR TO DELIVER 1200 CFH WITH AN

INLET PRESSURE OF 5 PSIG AND OUTLET PRESSURE OF 11 INCHES WATER COLUMN.

SCALE: 1/4" = 1'-0"

COTTAGE BLDG. 26 -

DOMESTIC WATER

AND GAS FLOOR PLAN

NO SCALE

KEYPLAN

D

B

G

H E A

C

F

AHU 26-1

MIOX 26-1

WS 26-1

P-1

P-2

P-8

P-1

P-8

P-2

P-1

P-2P-2

P-1

P-8

P-8 P-1

P-8

P-2

P-8

P-11

P-4

P-3

P-4

P-1

P-1

P-1

P-1 P-1

P-1

P-2

P-2P-2

P-2

P-8

P-8

P-8 P-8

P-8

P-2

P-8

P-7

P-6

P-9

P-5

RO

RO

GG

WH 26-1

8 9

22 22

26 WM

1/2"

2" 2"

3/4"

3/4"

2"

1-1/2"

2-1/2"

1-1/2"

2-1/2" 1-1/2"

1"

1"

1"

2-1/2"

1-1/2"

1/2"

1-1/2"

WB

WB

1/2"

1-1/2"

3/4"

3/4"

1-1/2"

3/4"1/2"

1"

3/4"

1-1/2" 1-1/2"

1/2"

3/4" 1/2"

1-1/2"

1/2"

1-1/2"

1/2"

3/4"

3/4"

3/4"

3/4"

3/4"

1/2"

1/2"

3/4"

3/4"

1-1/2"

3/4"

1-1/2"

1/2"

3/4"

FPWH

FPWH

FPWH

1/2"

3/4"

3/4"

1-1/2"

1"

3/4"

1-1/2" 3/4" 1/2"

2-1/2"

1"

3/4"

2-1/2"

1/2" U.F.

LAUNDRY/

SAFE

ROOM

DATA

16 SUPPLIES/EQUIP.

STOR.

ELEC.

STORAGE

18A

STORAGE

19B

MECHANICAL

S

TO

R A

G E

A

PANTRY

CORR.

RECEIVING/STORAGE

KITCHEN

DINING

ROOM

LIVING

ROOM

FOYER

STAFF

OFFICE

TOIL.

RESIDENT

ROOM

RESIDENT

ROOM

RESIDENT

ROOM

RESIDENT

ROOM

TOIL.

TOIL.

TOIL.

S O

IL

E

D

C

LE

A N

CORR.

GUEST

TOIL.

MEDS

SPA/BATH/SAFE

ROOM

TOIL.

RESIDENT

ROOM

RESIDENT

ROOM

RESIDENT

ROOM

25 RESIDENT

ROOM

TOIL.

TOIL.

S O

IL

E

D

C

LE

A N

CORR.

TOIL.

RESIDENT

ROOM

SOILED

UTIL.

RESIDENT

ROOM

CORR.

TOIL.

CORR.

H.A.C.

33 STORAGE

BID DOCUMENTS SUBMISSION

26-P3.0 1/4" = 1'-0"1

PLUMBING ROOF PLAN - COTTAGE

BUILDING #26

26-P3.0.dwg

BUILDING

N.I.C.

N.I.C.

N.I.C.

BUILDING

SCALE: 1/4" = 1'-0"

COTTAGE BLDG. 26 -

PLUMBING ROOF PLAN

NO SCALE

KEYPLAN

EF 26-2

EF 26-1

4" RD 4" OD

4" RD 4" OD

4" RD4" OD

4" RD4" OD

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

3" VTR

3" VTR

2" VTR

2" VTR

FPRH

RH 26-1

CU 26-1

CU 26-2

CU 26-A

BID DOCUMENTS SUBMISSION

26-P4.0 26-P4.0.dwg

SCALE: 1/4" = 1'-0"

COTTAGE BLDG. 26 -

PLUMBING DETAILS

AND SCHEDULES

PLUMBING FIXTURE CONNECTION SCHEDULE

MARK FIXTURE

CONNECTIONS

CW HW WASTE VENT

FPWH FREEZE PROOF WALL HYDRANT 3/4 - - - - - - - - -

FPRH FREEZE PROOF ROOF HYDRANT 3/4 - - - - - - - - -

WM WASHING MACHINE BOX 1/2 1/2 2 2

WB RECESSED WALL BOX 1/2 - - - - - - - - -

HB INTERIOR HOSE BIBB 3/4 - - - - - - - - -

2" FD 2 INCH FLOOR DRAIN, ROUND STRAINER - - - - - - 2 - - -

3" FS 12x12x8 FLOOR SINK, FULL GRATE, DOME STRAINER - - - - - - 3 - - -

WM WASHING MACHINE BOX 1/2 1/2 2 2

P-1 WATER CLOSET, FLOOR MOUNTED, MANUAL FLUSH VALVE - ADA 1-1/2 - - - 4 2

P-2 LAVATORY, COUNTER MOUNTED - ADA 1/2 1/2 2 2

P-3 LAVATORY, WALL HUNG - ADA 1/2 1/2 2 2

P-4 SINGLE COMPARTMENT STAINLESS STEEL SINK - ADA 1/2 1/2 2 2

P-5 DOUBLE COMPARTMENT STAINLESS STEEL SINK - ADA 1/2 1/2 2 2

P-6 HANDSINK, WALL HUNG - ADA 1/2 1/2 2 2

P-7 ALL-PURPOSE SINK, WALL HUNG 1/2 1/2 2 2

P-8 SHOWER - ADA 1/2 1/2 2 2

P-9 BATHTUB 1/2 1/2 2 2

P-10 MOP BASIN, CORNER TERRAZZO, 32x32x12 1/2 1/2 3 2

WATER HEATER SCHEDULE

MARK SIZE IN GALLONS TYPE INPUT (MBH) EFFICIENCY RECOVERY (GPH) ELECTRICAL EXAMPLE: PVI

WH 26-1 100 NATURAL GAS 199.9 95% 326 120/1/60 20 L 100A-GCL

NOTES: 1. RECOVERY RATE BASED ON TEMPERATURE RISE OF 70° F.

2. PROVIDE WITH CONDENSATE NEUTRALIZATION KIT, PIGTAIL KIT FOR 120V PLUG-IN POWER CORD, AND CONCENTRIC VENT KIT.

3. PROVIDE WITH FACTORY-AUTHORIZED STARTUP SERVICES.

HOT WATER CIRCULATOR SCHEDULE

MARK SYSTEM GPM HEAD (FT) HP ELECTRICAL EXAMPLE: GRUNDFOS

CP 26-1 WH-1 4 8 1/25 115/1/60 UP 15-18 B5

NOTES: 1. PUMP SHALL BE LEAD-FREE CONSTRUCTION IN ACCORDANCE WITH NSF 62.

EXPANSION TANK SCHEDULE

SYSTEM ACCEPTANCE VOLUME @ 60 PSIG MAX WORKING PRESSURE EXAMPLE: STATE

WH 26-1 2.2 GALLONS 150 PSIG ETC-5X

WATER SOFTENER SCHEDULE

MARK

MINERAL TANKS BRINE TANKS INLET/OULET

CONNECTIONS FLOW RANGE SYSTEM REGENERATION

CAPACITY

ELECTRICAL DATA EXAMPLE:

BRASWELLQUANTITY CONSTRUCTION GALLONS QUANTITY SALT CAPACITY (EA) SIZE (GAL) SERVICE FLA

WS 26-1 4 POLYESTER 27.6 2 700 LBS 80 2" 20 - 100 GPM 312,000 GRAINS 120/1/60 2.0 130454-2

NOTES: 1. PROVIDE WITH INITIAL SALT FILL AND TEST KIT.

MIXED OXIDANT GENERATOR SCHEDULE

MARK

MIXED OXIDANT SOLUTION UNIT REVERSE OSMOSIS SKID INJECTION PUMP

EXAMPLE: MIOX

CAPACITY BRINE TANK ELECTRICAL STAGES MAX FLOW RATE ELECTRICAL GPH HEAD (PSI) ELECTRICAL

MIOX 26-1 1 LB/DAY 40 GALLONS 120/1/60 4 150 GPD 120/1/60 2.0 101 120/1/60 RIO ZUNI

NOTES: 1. PROVIDE FACTORY SUPERVISED STARTUP, COMMISSIONING, AND OPERATOR TRAINING.

LC

16"-18"

WALL

WATER CLOSET

1NO SCALE

INSTALL FLUSH VALVE WITH

HANDLE FACING OPEN

PORTION OF TAS STALL

FLOOR MOUNT WATER

CLOSET INSTALLATION - ADA

MAY EXTEND AS

WASTE OR VENT

CHROME WALL

COVER & SCREW

BALANCE OF PIPING

SAME AS CLEANOUT

TO GRADE

WALL CLEANOUT DETAIL

NO SCALE

FLOOR LINE

WALL

PLUGGED TEE

W/CLEANOUT

1/8" C.I. BEND

15"x15"x6" CONCRETE SLAB

FLUSH W/GRADE

2" ABOVE LANDSCAPED

GRADE

CAST IRON FERRULE

W/COUNTERSUNK BRASS

CLEANOUT PLUG

GRADE

45° WYE

1/8 BEND

LONG SWEEP

EXTERIOR CLEANOUT DETAIL

NO SCALE

CAST IRON FERRULE WITH

COUNTERSUNK BRASS

CLEANOUT PLUG

2" ABOVE

LANDSCAPED

GRADE

TYPICAL TWO WAY CLEANOUT

NO SCALE

CLEANOUT STACK

WIRE MESH REINF.

FLUSH W/ GRADE

24"x12"

FLOW

CONCRETE SLAB

6"

ROOF DRAIN BODY

GRAVEL STOP INTREGRAL

WITH FLASHING RING

CAST IRON DOME

TY-SEAL

UNDER DECK CLAMP

INSULATION

PIPE

METAL ROOF DECK

GRAVEL

BALLAST

ROOF DRAIN DETAIL

NO SCALE 5

ROOFING

FELTS

EXPANSION TANK

1-1/2"

1-1/2" 1-1/2" 1-1/2"

1"CP 26-1

RADA MODEL 425R

THERMOSTATIC MIXING

VALVE - FLOW RATE 10 GPM

HW SUPPLY FROM

WATER HEATER

HW SUPPLY

TO SYSTEM

HW RETURN

FROM SYSTEM

CW SUPPLY

THERMOSTATIC

RETURN LIMITER

FROM SYSTEM

TO SYSTEM

1-1/2"

1"

1-1/2"

4" CONCRETE

EQUIPMENT PAD

UNION

BALL VALVE

CONNECT FULL SIZE RELIEF

TO T&P VALVE AND EXTEND

TO FLOOR DRAIN

MOUNT WATER HEATER

IN GALVANIZED STEEL

DRAIN PAN

G

GAS COCK

6" DIRT LEG

WATER HEATER PIPING DETAIL

NO SCALE

CONNECT 4" FLUE AND

3" COMBUSTION AIR

INTAKE. ROUTE UP AND

TERMINATE THRU ROOF

USING MANUFACTURER

PROVIDED CONCENTRIC

VENT KIT. PIPING SHALL

BE SCH 40 PVC.

CHECK

VALVE

4"

3"

3/4" CONDENSATE

CONNECTION

1-1/2"

1-1/2" CW

2-1/2" SOFT WATER

TO FACILITY

2-1/2" BYPASS TO BE

NORMALLY CLOSED

INSTALL UNION AT END

OF FACTORY HEADER

TO SERVE BYPASS

INLET PRESSURE

GAUGE

2-1/2" CW PIPING FROM

BACKFLOW PREVENTER

WATER SOFTENER

CONTROLLER

UNION

BALL VALVE

FACTORY INLET HEADER

WITH CONNECTIONS TO

EACH MINERAL TANK

OUTLET PRESSURE

GAUGE

MINERAL TANK (TYP. OF 4)

CONTRACTOR TO PROVIDE AND INSTALL

ALL INTERCONNECTING TUBING FROM

BRINE TANKS TO MINERAL TANKS PER

MFG'S REQUIREMENTS

BRINE TANK (TYP. OF 2) IN

FRONT OF MINERAL TANK

4" CONCRETE

HOUSEKEEPING PAD

UNIONBALL VALVE

WATER SOFTENER INSTALLATION DETAIL

NO SCALE

PLUMBING LEGEND

SYMBOL DESCRIPTION

VENT THRU ROOF

SANITARY SOIL LINE

SANITARY VENT LINE

COLD WATER

HOT WATER

HOT WATER RETURN

REVERSE OSMOSIS

CONDENSATE DRAIN

BALL VALVE

GLOBE VALVE

CHECK VALVE

UNION

GAS COCK

ELBOW TURNED DOWN

ELBOW TURNED UP

FLOW IN DIRECTION OF ARROW

AFF ABOVE FINISHED FLOOR

TAS TEXAS ACCESSIBILITY STANDARD

VTR

D

RO

GASG

2. PROVIDE WITH FACTORY INLET AND DISCHARGE HEADERS.

3. ALL ISOLATION VALVES SHALL BE LEAD-FILL CONSTRUCTION WITH STAINLESS STEEL TRIM.

MIOX SYSTEM INSTALLATION DETAIL

NO SCALE

3/4"1/2"

RO

RO

3/4"

1/2"

3/4"

3/4" BYPASS

3/4" TO DOMESTIC

WATER MAINZUNI MIOX

TERMINATE HYDROGEN

VENT THRU ROOF

CHECK VALVE

4" CONCRETE

HOUSEKEEPING PAD

OXIDANT TANK

UNION

1/4"

BALL VALVE

RO PROCESSING SKID

INJECTION PUMP

BALL VALVE

1/2" RAW COLD

WATER PIPING

FROM MAIN

1/2" RO WATER

PIPING TO

KITCHEN

3/4" RAW COLD

WATER FROM

MAIN

1/2"

BID DOCUMENTS SUBMISSION

27-P1.0 1/4" = 1'-0"1

WASTE AND VENT FLOOR PLAN -

COTTAGE BUILDING #27

27-P1.0.dwg

BUILDING

N.I.C.

N.I.C.

N.I.C.

BUILDING

1. COORDINATE ALL PIPING WITH ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL,

FIRE PROTECTION, AND ELECTRICAL.

FLOW LINE ELEVATIONS INDICATED RELATIVE TO FINISHED FLOOR REFERENCE

ELEVATION OF 100'-0".

ROUTE ALL STORM DRAIN PIPING AS HIGH AS POSSIBLE.

REFER TO ARCHITECTURAL ELEVATIONS FOR INSTALLATION HEIGHTS OF STORM

DRAIN DOWNSPOUT NOZZLES.

ROUTE 3 INCH COMBINATION DRAIN/VENT UP IN WALL AND TERMINATE TO VENT THRU

ROOF AS SHOWN.

REFER TO CIVIL DRAWINGS FOR CONTINUATION.

3 INCH DOWNSPOUT FROM ROOF DRAIN. ROUTE PIPING OVERHEAD AS SHOWN AND

DOWN IN WALL TO BELOW FINISHED FLOOR AT 98'-0". EXTEND PIPING AS SHOWN FOR

CONNECTION TO SITE UTILITIES.

3 INCH DOWNSPOUT FROM OVERFLOW DRAIN. ROUTE PIPING OVERHEAD AS SHOWN

AND DOWN IN WALL FOR TERMINATION TO DOWNSPOUT NOZZLE.

CONNECT 2 INCH WASTE TO FIXTURE AND INSTALL OATEY SURE-VENT (OR APPROVED

EQUAL) AIR ADMITTANCE VALVE WITHIN MILLWORK.

EXTEND 3/4 INCH WASTE FROM DISHWASHER AND CONNECT TO ADJACENT SINK.

INSTALL CONDENSATE DRAIN ASSEMBLY TO AIR HANDLING UNIT (PROPERLY TRAPPED)

AND TERMINATE TO FLOOR SINK.

INSTALL P-TRAP IN WASTE BELOW SLAB AND EXTEND UP TO WITHIN MILLWORK UNDER

WARMING TABLE. INSTALL 2 INCH SIOUX CHIEF (OR APPROVED EQUAL) BACKWATER

VALVE IN VERTICAL DIRECTLY ABOVE BASE OF MILLWORK.

ROUTE 2 INCH COMBINATION DRAIN/VENT UP IN WALL AND TERMINATE TO VENT THRU

ROOF AS SHOWN.

INSTALL P-TRAP BELOW SLAB AND EXTEND 2 INCH WASTE UP FOR TERMINATION TO

FIXTURE. COORDINATE EXACT CONNECTION LOCATION WITH FIXTURE PROVIDER.

4 INCH DOWNSPOUT FROM OVERFLOW DRAIN. ROUTE PIPING OVERHEAD AS SHOWN

AND DOWN IN WALL FOR TERMINATION TO DOWNSPOUT NOZZLE.

4 INCH DOWNSPOUT FROM ROOF DRAIN. ROUTE PIPING OVERHEAD AS SHOWN AND

DOWN IN WALL TO BELOW FINISHED FLOOR AT 98'-0". EXTEND PIPING AS SHOWN FOR

CONNECTION TO SITE UTILITIES.

2.

3.

4.

SCALE: 1/4" = 1'-0"

COTTAGE BLDG. 27 -

WASTE AND VENT

FLOOR PLAN

NO SCALE

KEYPLAN

D

B

G

HEA

C

F

4"

CO

2" VTR

2"

P-1

2" FD

2"

4"

2" VTR

4"

2"

4"2" FD

P-1

4"4" DSN

CO

P-2

WCO

2" VTR

P-1

2" FD 2" FD

P-2 P-2

WCO

2"

4"

2"

P-1

2" 4"

4"

4"

2" VTR

P-1

2" FD

4"

2"

2"

2"

P-2

WCO

2" VTR

P-7

3"

2" FD

P-10

2" 2"

4"

P-4

4"

P-3

WCO

P-4

P-1

2" FD

3" DSN

3"

3"

2"

3"

3" FS

WM

4" DSN

CO

4"

4"

2" FD

P-1

P-1

P-1P-1

P-1

P-2

WCO

P-2

P-2

WCO

P-2

WCO

4"

4"

2"

P-2

WCO

2" VTR

P-7

P-7

P-6

2"

2"

2" FD

2" VTR

3"

4"

4"2"

2" VTR

2" FD

2"

2"

2" FD2" FD

2" 4"

2" 2"

2" VTR

2" FD

P-9

2" VTR

2" 2" FD

2"

4"

3" FS

3"

P-5

4"

3" DSN

3" VTR

3"

3" FS

DCO

F = 96'-6"L

AHU 27-1

3"

4"

3" VTR

4"

2"

2"

3"

2"

2"

2" VTR

4"

2" VTR

3" FS

3"

3"

DATA

SUPPLIES/EQUIP.

STOR. 18

ELEC.

S

TO

R A

G E

A

S

TO

R A

G E

B

MECHANICAL

S

TO

R A

G E

A

PANTRY

CORR.

RECEIVING/STORAGE

KITCHEN

DINING

ROOM

LIVING

ROOM

FOYER

STAFF

OFFICE

TOIL.

RESIDENT

ROOM

7RESIDENT

ROOM

RESIDENT

ROOM

RESIDENT

ROOM

TOIL.

TOIL.

TOIL.

S O

IL

E

D

C

LE

A N

CORR.

GUEST

TOIL. 37

MEDS 38

SPA/BATH/

SAFE ROOM

TOIL.

RESIDENT

ROOM

RESIDENT

ROOM

RESIDENT

ROOM

RESIDENT

ROOM

TOIL.

TOIL.

S O

IL

E

D

C

LE

A N

CORR.

TOIL.

RESIDENT

ROOM

SOILED

UTIL. 35

RESIDENT

ROOM

CORR.

TOIL.

CORR.

H.A.C.

STORAGE

LAUNDRY/ SAFE

ROOM 34

TOIL.

P-8

P-8

P-8 P-8

P-8

P-8

P-8

P-8P-8

P-8

P-2

WCO

F = 98'-0"L

BID DOCUMENTS SUBMISSION

27-P2.0 1/4" = 1'-0"1

DOMESTIC WATER AND GAS FLOOR PLAN -

COTTAGE BUILDING #27

27-P2.0.dwg

BUILDING

N.I.C.

N.I.C.

N.I.C.

BUILDING

1.

2.

3.

31 EXTEND 3/4 INCH CW PIPING UP TO SERVE FREEZE PROOF ROOF HYDRANT.

ROUTE 1/2 INCH CW PIPING DOWN IN WALL AND EXTEND PIPING BELOW

SLAB AS SHOWN TO SERVE EQUIPMENT.

EXTEND 1/2 INCH CW PIPING UP FROM BELOW SLAB TO SERVE FIXTURE.

INSTALL BALL VALVE IN PIPING AT 6 INCHES AFF. COORDINATE FINAL

EQUIPMENT TERMINATION WITH EQUIPMENT PROVIDER.

REFER TO PS1.0 FOR CONTINUATION.

COORDINATE ALL PIPING WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL, FIRE

PROTECTION, AND ELECTRICAL.

THE MAXIMUM LENGTH OF PIPING FROM THE HW CIRCULATION LOOP WITHIN WALL TO

ANGLE STOPS SHALL NOT EXCEED 2'-0" FOR ALL P-2 AND P-3 FIXTURES.

ALL EXPOSED CW, HW, HWC, AND RO PIPING WITHIN MECHANICAL 15 SHALL HAVE

WHITE PVC JACKETING AND PVC FITTING COVERS INSTALLED OVER INSULATION.

REFER TO CIVIL DRAWINGS FOR CONTINUATION.

EXTEND 2-1/2 INCH CW PIPING UP FROM BELOW SLAB AND INSTALL REDUCED

PRESSURE BACKFLOW PREVENTER ON WALL IN AREA SHOWN SHADED AT 48 INCHES

AFF. CONNECT 2-1/2 INCH CW PIPING TO DISCHARGE AND ROUTE OVERHEAD AS

SHOWN.

CONNECT 2-1/2 INCH CW PIPING TO WATER SOFTENER INLET HEADER. REFER TO

DETAIL 7/27-P4.0.

CONNECT 2-1/2 INCH CW PIPING TO WATER SOFTENER OUTLET HEADER. REFER TO

DETAIL 7/27-P4.0.

MOUNT WATER SOFTENER EQUIPMENT ON 4 INCH CONCRETE HOUSEKEEPING PAD.

REFER TO DETAIL 7/27-P4.0 FOR ALL PIPING CONNECTIONS.

MOUNT OXIDANT TANK ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER TO DETAIL

8/27-P4.0 FOR ALL PIPING CONNECTIONS.

MOUNT REVERSE OSMOSIS SKID ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER

TO DETAIL 8/27-P4.0 FOR ALL PIPING CONNECTIONS.

MOUNT MIOX GENERATOR ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER TO

DETAIL 8/27-P4.0 FOR ALL PIPING CONNECTIONS.

CONNECT 1 INCH LOW PRESSURE GAS PIPING TO WATER HEATER. PROVIDE GAS

COCK, DIRT LEG, AND UNION AT RIGID CONNECTION.

MOUNT WATER HEATER ON 4 INCH CONCRETE HOUSEKEEPING PAD. REFER TO DETAIL

6/27-P4.0 FOR ALL PIPING CONNECTIONS.

MOUNT THERMOSTATIC MIXING VALVE ON WALL IN AREA SHOWN SHADED. REFER TO

DETAIL 6/27-P4.0 FOR ALL PIPING CONNECTIONS.

CONNECT 1-1/2 INCH LOW PRESSURE GAS PIPING TO BOILER. PROVIDE GAS COCK,

DIRT LEG, AND UNION AT RIGID CONNECTION.

EXTEND 2 INCH MEDIUM PRESSURE GAS PIPING UP FROM BELOW GRADE. INSTALL

UNION, GAS COCK, AND PRESSURE REGULATOR IN VERTICAL PIPING AT 18 INCHES

ABOVE GRADE. TRANSITION TO 2 INCH LOW PRESSURE GAS PIPING AND PENETRATE

EXTERIOR WALL. ROUTE PIPING UP WALL TO DIRECTLY BELOW STRUCTURAL FRAMING

AND EXTEND AS SHOWN. GAS PRESSURE REGULATOR TO DELIVER 1200 CFH WITH AN

INLET PRESSURE OF 5 PSIG AND OUTLET PRESSURE OF 11 INCHES WATER COLUMN.

ROUTE 1/2 INCH REVERSE OSMOSIS WATER PIPING DOWN IN WALL AND EXTEND AS

REQUIRED TO SERVE WALL BOXES AND KITCHEN SINK RO FAUCET. INSTALL WALL BOX

FOR EACH REFRIGERATOR AT 36 INCHES AFF AND CONNECT 1/2 INCH RO WATER PIPING.

ROUTE 1/2 INCH CW AND 3/4 INCH HW PIPING DOWN IN WALL TO SERVE KITCHEN SINK.

ROUTE PIPING WITHIN WALL AS REQUIRED TO SERVE FIXTURE.

CONNECT 1/2 INCH CW, HW, AND RO PIPING TO KITCHEN SINK.

INSTALL DEDICATED ANGLE STOP BELOW KITCHEN SINK TO SERVE DISHWASHER.

EXTEND 1/2 INCH HW PIPING FROM STOP TO DISHWASHER. COORDINATE FINAL

TERMINATION WITH EQUIPMENT PROVIDER.

ROUTE 1/2 INCH CW AND HW PIPING DOWN IN WALL TO SERVE FIXTURE.

ROUTE CW, HW, AND HWC PIPING CONCEALED WITHIN ARCHITECTURAL FURRING

ACROSS FOYER 10.

ROUTE 1/2 INCH CW, HW, AND HWC PIPING DOWN IN WALL TO SERVE FIXTURE.

ROUTE 1-1/2 INCH CW AND 1/2 INCH HW PIPING DOWN IN WALL TO SERVE FIXTURES.

CONNECT 1/2 INCH CW AND HW PIPING TO SHOWER. EXTEND 1-1/2 INCH CW PIPING IN

WALL TO SERVE WATER CLOSET.

INSTALL ISOLATION BALL VALVE AND HW CIRCULATION BALANCE VALVE IN HWC PIPING.

ROUTE 3/4 INCH CW PIPING DOWN IN WALL TO SERVE FREEZE PROOF WALL HYDRANT.

ROUTE 3/4 INCH CW, HW, AND HWC PIPING DOWN IN WALL TO SERVE FIXTURES.

CONNECT 1/2 INCH CW AND HW PIPING TO EACH LAVATORY.

ROUTE 3/4 INCH CW AND HW PIPING DOWN IN WALL TO SERVE BATHTUB. COORDINATE

CW AND HW TERMINATION REQUIREMENTS WITH EQUIPMENT PROVIDER.

ROUTE 3/4 INCH CW AND HW PIPING DOWN THRU CONCRETE LID OF ROOM AND

EXTEND AS SHOWN ABOVE CEILING. SLEEVE PIPING PENETRATIONS AND FIRE CAULK

ANNULAR SPACE AS REQUIRED.

ROUTE 3/4 INCH CW AND HW PIPING DOWN IN WALL TO SERVE FIXTURES. CONNECT 1/2

INCH CW AND HW PIPING TO EACH FIXTURE. EXTEND PIPING IN WALL AS REQUIRED.

INSTALL ISOLATION BALL VALVES IN CW AND HW PIPING ABOVE CEILING. PROVIDE

12x12 ACCESS DOOR IN GYP BOARD CEILING TO ACCESS VALVES.

ROUTE 3/4 INCH CW AND HW PIPING DOWN IN WALL TO SERVE FIXTURES. CONNECT 1/2

INCH CW AND HW PIPING TO SINK. EXTEND 1/2 INCH CW AND HW PIPING IN WALL TO

SERVE WASHING MACHINE.

ROUTE 1-1/2 INCH CW, 1/2 INCH HW, AND 1/2 INCH HWC PIPING DOWN IN WALL TO

SERVE FIXTURES. CONNECT 1/2 INCH CW AND HW PIPING TO LAVATORY. EXTEND 1-1/2

INCH CW PIPING IN WALL TO SERVE WATER CLOSET.

SCALE: 1/4" = 1'-0"

COTTAGE BLDG. 27 -

DOMESTIC WATER AND

GAS FLOOR PLAN

NO SCALE

KEYPLAN

D

B

G

HEA

C

F

AHU 27-1

MIOX 27-1

WS 27-1

P-1

P-2

P-8

P-1

P-8

P-2

P-1

P-2 P-2

P-1

P-8 P-8

P-1

P-8

P-2

P-8

P-11

P-4

P-3

P-4

P-1

P-1

P-1

P-1P-1

P-1

P-2

P-2 P-2

P-2

P-8

P-8

P-8P-8

P-8

P-2

P-8

P-7

P-6

P-9

P-5

RO

RO

G G

WH 27-1

9 13

20 22

26WM

1/2"

2"2"

3/4"

3/4"

2"

1-1/2"

2-1/2"

1-1/2"

2-1/2" 1-1/2"

1"

1"

1"

2-1/2"

1-1/2"

1/2"

1-1/2"

WB

WB

1/2"

1-1/2"

3/4"

3/4"

1-1/2"

3/4" 1/2"

1"

3/4"

1-1/2" 1-1/2"

1/2"

3/4" 1/2"

1-1/2"

1/2"

1-1/2"

1/2"

3/4"

3/4"

3/4"

3/4"

1/2"

1/2"

3/4"

3/4"

1-1/2"

3/4"

1-1/2"

1/2"

3/4"

FPWH

FPWH

FPWH

1/2"

3/4"

3/4"

1-1/2"

1"

3/4"

1-1/2" 3/4"1/2"

2-1/2"

1"

3/4"

3/4"

1/2" U.F.

DATA

SUPPLIES/EQUIP.

STOR. 18

ELEC.

S

TO

R A

G E

A

STORAGE

19B

MECHANICAL

S

TO

R A

G E

A

PANTRY

CORR.

RECEIVING/STORAGE

KITCHEN

DINING

ROOM

LIVING

ROOM

FOYER

STAFF

OFFICE

TOIL.

RESIDENT

ROOM

7RESIDENT

ROOM

RESIDENT

ROOM

RESIDENT

ROOM

TOIL.

TOIL.

TOIL.

S O

IL

E

D

C

LE

A N

CORR.

GUEST

TOIL. 37

MEDS 38

SPA/BATH/

SAFE ROOM

TOIL.

RESIDENT

ROOM

RESIDENT

ROOM

RESIDENT

ROOM

25RESIDENT

ROOM

TOIL.

TOIL.

S O

IL

E

D

C

LE

A N

CORR.

TOIL.

RESIDENT

ROOM

SOILED

UTIL. 35

RESIDENT

ROOM

CORR.

TOIL.

CORR.

H.A.C.

STORAGE

LAUNDRY/

SAFE

ROOM

BID DOCUMENTS SUBMISSION

27-P3.0 1/4" = 1'-0"1

PLUMBING ROOF PLAN - COTTAGE

BUILDING #26

27-P3.0.dwg

BUILDING

N.I.C.

N.I.C.

N.I.C.

BUILDING

SCALE: 1/4" = 1'-0"

COTTAGE BLDG. 27 -

PLUMBING ROOF PLAN

NO SCALE

KEYPLAN

EF 27-1

EF 27-2

4" RD4" OD

4" RD4" OD

4" RD 4" OD

4" RD 4" OD

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

2" VTR

3" VTR

3" VTR

2" VTR

2" VTR

FPRH

RH 27-1

CU 27-1

CU 27-2

CU 27-A

BID DOCUMENTS SUBMISSION

27-P4.0 27-P4.0.dwg

SCALE: 1/4" = 1'-0"

COTTAGE BLDG. 27 -

PLUMBING DETAILS

AND SCHEDULES

PLUMBING FIXTURE CONNECTION SCHEDULE

MARK FIXTURE

CONNECTIONS

CW HW WASTE VENT

FPWH FREEZE PROOF WALL HYDRANT 3/4 - - - - - - - - -

FPRH FREEZE PROOF ROOF HYDRANT 3/4 - - - - - - - - -

WM WASHING MACHINE BOX 1/2 1/2 2 2

WB RECESSED WALL BOX 1/2 - - - - - - - - -

HB INTERIOR HOSE BIBB 3/4 - - - - - - - - -

2" FD 2 INCH FLOOR DRAIN, ROUND STRAINER - - - - - - 2 - - -

3" FS 12x12x8 FLOOR SINK, FULL GRATE, DOME STRAINER - - - - - - 3 - - -

WM WASHING MACHINE BOX 1/2 1/2 2 2

P-1 WATER CLOSET, FLOOR MOUNTED, MANUAL FLUSH VALVE - ADA 1-1/2 - - - 4 2

P-2 LAVATORY, COUNTER MOUNTED - ADA 1/2 1/2 2 2

P-3 LAVATORY, WALL HUNG - ADA 1/2 1/2 2 2

P-4 SINGLE COMPARTMENT STAINLESS STEEL SINK - ADA 1/2 1/2 2 2

P-5 DOUBLE COMPARTMENT STAINLESS STEEL SINK - ADA 1/2 1/2 2 2

P-6 HANDSINK, WALL HUNG - ADA 1/2 1/2 2 2

P-7 ALL-PURPOSE SINK, WALL HUNG 1/2 1/2 2 2

P-8 SHOWER - ADA 1/2 1/2 2 2

P-9 BATHTUB 1/2 1/2 2 2

P-10 MOP BASIN, CORNER TERRAZZO, 32x32x12 1/2 1/2 3 2

WATER HEATER SCHEDULE

MARK SIZE IN GALLONS TYPE INPUT (MBH) EFFICIENCY RECOVERY (GPH) ELECTRICAL EXAMPLE: PVI

WH 27-1 100 NATURAL GAS 199.9 95% 326 120/1/60 20 L 100A-GCL

NOTES: 1. RECOVERY RATE BASED ON TEMPERATURE RISE OF 70° F.

2. PROVIDE WITH CONDENSATE NEUTRALIZATION KIT, PIGTAIL KIT FOR 120V PLUG-IN POWER CORD, AND CONCENTRIC VENT KIT.

3. PROVIDE WITH FACTORY-AUTHORIZED STARTUP SERVICES.

HOT WATER CIRCULATOR SCHEDULE

MARK SYSTEM GPM HEAD (FT) HP ELECTRICAL EXAMPLE: GRUNDFOS

CP 27-1 WH-1 4 8 1/25 115/1/60 UP 15-18 B5

NOTES: 1. PUMP SHALL BE LEAD-FREE CONSTRUCTION IN ACCORDANCE WITH NSF 62.

EXPANSION TANK SCHEDULE

SYSTEM ACCEPTANCE VOLUME @ 60 PSIG MAX WORKING PRESSURE EXAMPLE: STATE

WH 27-1 2.2 GALLONS 150 PSIG ETC-5X

WATER SOFTENER SCHEDULE

MARK

MINERAL TANKS BRINE TANKS INLET/OULET

CONNECTIONS FLOW RANGE SYSTEM REGENERATION

CAPACITY

ELECTRICAL DATA EXAMPLE:

BRASWELLQUANTITY CONSTRUCTION GALLONS QUANTITY SALT CAPACITY (EA) SIZE (GAL) SERVICE FLA

WS 27-1 4 POLYESTER 27.6 2 700 LBS 80 2" 20 - 100 GPM 312,000 GRAINS 120/1/60 2.0 130454-2

NOTES: 1. PROVIDE WITH INITIAL SALT FILL AND TEST KIT.

MIXED OXIDANT GENERATOR SCHEDULE

MARK

MIXED OXIDANT SOLUTION UNIT REVERSE OSMOSIS SKID INJECTION PUMP

EXAMPLE: MIOX

CAPACITY BRINE TANK ELECTRICAL STAGES MAX FLOW RATE ELECTRICAL GPH HEAD (PSI) ELECTRICAL

MIOX 27-1 1 LB/DAY 40 GALLONS 120/1/60 4 150 GPD 120/1/60 2.0 101 120/1/60 RIO ZUNI

NOTES: 1. PROVIDE FACTORY SUPERVISED STARTUP, COMMISSIONING, AND OPERATOR TRAINING.

LC

16"-18"

WALL

WATER CLOSET

1NO SCALE

INSTALL FLUSH VALVE WITH

HANDLE FACING OPEN

PORTION OF TAS STALL

FLOOR MOUNT WATER

CLOSET INSTALLATION - ADA

MAY EXTEND AS

WASTE OR VENT

CHROME WALL

COVER & SCREW

BALANCE OF PIPING

SAME AS CLEANOUT

TO GRADE

WALL CLEANOUT DETAIL

NO SCALE

FLOOR LINE

WALL

PLUGGED TEE

W/CLEANOUT

1/8" C.I. BEND

15"x15"x6" CONCRETE SLAB

FLUSH W/GRADE

2" ABOVE LANDSCAPED

GRADE

CAST IRON FERRULE

W/COUNTERSUNK BRASS

CLEANOUT PLUG

GRADE

45° WYE

1/8 BEND

LONG SWEEP

EXTERIOR CLEANOUT DETAIL

NO SCALE

CAST IRON FERRULE WITH

COUNTERSUNK BRASS

CLEANOUT PLUG

2" ABOVE

LANDSCAPED

GRADE

TYPICAL TWO WAY CLEANOUT

NO SCALE

CLEANOUT STACK

WIRE MESH REINF.

FLUSH W/ GRADE

24"x12"

FLOW

CONCRETE SLAB

6"

ROOF DRAIN BODY

GRAVEL STOP INTREGRAL

WITH FLASHING RING

CAST IRON DOME

TY-SEAL

UNDER DECK CLAMP

INSULATION

PIPE

METAL ROOF DECK

GRAVEL

BALLAST

ROOF DRAIN DETAIL

NO SCALE 5

ROOFING

FELTS

EXPANSION TANK

1-1/2"

1-1/2" 1-1/2" 1-1/2"

1"CP 27-1

RADA MODEL 425R

THERMOSTATIC MIXING

VALVE - FLOW RATE 10 GPM

HW SUPPLY FROM

WATER HEATER

HW SUPPLY

TO SYSTEM

HW RETURN

FROM SYSTEM

CW SUPPLY

THERMOSTATIC

RETURN LIMITER

FROM SYSTEM

TO SYSTEM

1-1/2"

1"

1-1/2"

4" CONCRETE

EQUIPMENT PAD

UNION

BALL VALVE

CONNECT FULL SIZE RELIEF

TO T&P VALVE AND EXTEND

TO FLOOR DRAIN

MOUNT WATER HEATER

IN GALVANIZED STEEL

DRAIN PAN

G

GAS COCK

6" DIRT LEG

WATER HEATER PIPING DETAIL

NO SCALE

CONNECT 4" FLUE AND

3" COMBUSTION AIR

INTAKE. ROUTE UP AND

TERMINATE THRU ROOF

USING MANUFACTURER

PROVIDED CONCENTRIC

VENT KIT. PIPING SHALL

BE SCH 40 PVC.

CHECK

VALVE

4"

3"

3/4" CONDENSATE

CONNECTION

1-1/2"

1-1/2" CW

2-1/2" SOFT WATER

TO FACILITY

2-1/2" BYPASS TO BE

NORMALLY CLOSED

INSTALL UNION AT END

OF FACTORY HEADER

TO SERVE BYPASS

INLET PRESSURE

GAUGE

2-1/2" CW PIPING FROM

BACKFLOW PREVENTER

WATER SOFTENER

CONTROLLER

UNION

BALL VALVE

FACTORY INLET HEADER

WITH CONNECTIONS TO

EACH MINERAL TANK

OUTLET PRESSURE

GAUGE

MINERAL TANK (TYP. OF 4)

CONTRACTOR TO PROVIDE AND INSTALL

ALL INTERCONNECTING TUBING FROM

BRINE TANKS TO MINERAL TANKS PER

MFG'S REQUIREMENTS

BRINE TANK (TYP. OF 2) IN

FRONT OF MINERAL TANK

4" CONCRETE

HOUSEKEEPING PAD

UNIONBALL VALVE

WATER SOFTENER INSTALLATION DETAIL

NO SCALE

PLUMBING LEGEND

SYMBOL DESCRIPTION

VENT THRU ROOF

SANITARY SOIL LINE

SANITARY VENT LINE

COLD WATER

HOT WATER

HOT WATER RETURN

REVERSE OSMOSIS

CONDENSATE DRAIN

BALL VALVE

GLOBE VALVE

CHECK VALVE

UNION

GAS COCK

ELBOW TURNED DOWN

ELBOW TURNED UP

FLOW IN DIRECTION OF ARROW

AFF ABOVE FINISHED FLOOR

TAS TEXAS ACCESSIBILITY STANDARD

VTR

D

RO

GASG

2. PROVIDE WITH FACTORY INLET AND DISCHARGE HEADERS.

3. ALL ISOLATION VALVES SHALL BE LEAD-FILL CONSTRUCTION WITH STAINLESS STEEL TRIM.

MIOX SYSTEM INSTALLATION DETAIL

NO SCALE

3/4" 1/2"

RO

RO

3/4"

1/2"

3/4"

3/4" BYPASS

3/4" TO DOMESTIC

WATER MAIN ZUNI MIOX

TERMINATE HYDROGEN

VENT THRU ROOF

CHECK VALVE

4" CONCRETE

HOUSEKEEPING PAD

OXIDANT TANK

UNION

1/4"

BALL VALVE

RO PROCESSING SKID

INJECTION PUMP

BALL VALVE

1/2" RAW COLD

WATER PIPING

FROM MAIN

1/2" RO WATER

PIPING TO

KITCHEN

3/4" RAW COLD

WATER FROM

MAIN

PS1.0 - PLUMBING SITE PLAN
Sheets and Views
PS1.0 - PLUMBING SITE PLAN
26-P1.0 - WASTE AND VENT FLOOR PLAN
Sheets and Views
26-P1.0 - WASTE AND VENT FLOOR PLAN
26-P2.0 - DOMESTIC WATER AND GAS FLOOR PLAN
Sheets and Views
26-P2.0 - DOMESTIC WATER AND GAS FLOOR PLAN
26-P3.0 - PLUMBING ROOF PLAN
Sheets and Views
26-P3.0 - PLUMBING ROOF PLAN
26-P4.0 - PLUMBING DETAILS AND SCHEDULES
Sheets and Views
26-P4.0 - PLUMBING DETAILS AND SCHEDULES
27-P1.0 - WASTE AND VENT FLOOR PLAN
Sheets and Views
27-P1.0 - WASTE AND VENT FLOOR PLAN
27-P2.0 - DOMESTIC WATER AND GAS FLOOR PLAN
Sheets and Views
27-P2.0 - DOMESTIC WATER AND GAS FLOOR PLAN
27-P3.0 - PLUMBING ROOF PLAN
Sheets and Views
27-P3.0 - PLUMBING ROOF PLAN
27-P4.0 - PLUMBING DETAILS AND SCHEDULES
Sheets and Views
27-P4.0 - PLUMBING DETAILS AND SCHEDULES

File details come from the government source that posted it. Updated .