Attachment 09 - Master Specifications - Volume 1.pdf

PDF 9 MB Posted

Attached to
36C77623B0012 - Y1DZ - Construct CLC Phase 2 Minor Construction - Big Spring - Solicitation Federal contract opportunity
Solicitation number
36C77623B0012
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

View the file

Other files for this federal contract opportunity

Other files attached to 36C77623B0012 - Y1DZ - Construct CLC Phase 2 Minor Construction - Big Spring - Solicitation, newest first.
File Type Posted
Attachment 22 - Technical Questions and Answers.xlsx XLSX spreadsheet
36C77623B0012 0002.pdf PDF
36C77623B0012 0001.pdf PDF
Attachment 21 - Site Visit Sign in Sheet.pdf PDF
36C77623B0012.pdf PDF
Attachment 04 - Drawings - Mechanical.pdf PDF
Attachment 05 - Drawings - Plumbing.pdf PDF
Attachment 10 - Master Specifications - Volume 2.pdf PDF
Attachment 11 - Material Finishes.pdf PDF
Attachment 16 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 17 - Wage Rates - Howard County.pdf PDF
Attachment 19 - Specifications - Addendum 01.pdf PDF
Attachment 18 - Addendum 01.pdf PDF
Attachment 01 - Drawings - Electrical.pdf PDF
Attachment 02 - Drawings - Fire Protection.pdf PDF
Attachment 03 - Drawings - Interiors.pdf PDF
Attachment 08 - Drawings - Civil.pdf PDF
Attachment 15 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 20 - Sheet Index.pdf PDF
Attachment 06 - Drawings - Structural.pdf PDF
Attachment 13 - Geotechnical Report - Executive Summary.pdf PDF
Attachment 14 - COVID-19 Safety Protocols 12-14-21 (1).pdf PDF
Attachment 07 - Drawings - Architecture.pdf PDF
Attachment 12 - Geotechnical Report - West Texas VA CLC.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.673.2148 E | howdy@spur-design.com W | spur-design.com

Project Number: 519-369 Project Title: Construct New CLC, Phase II Address: WTVAHCS Big Spring, Texas

BID DOCUMENTS:

Specifications Sign and Seal: 12/23/2020 Specifications Sign and Seal: 12/23/2020 Texas Arch Registration No. 22680 Texas Engr (Civil) Registration No. 124209

Specifications Sign and Seal: 12/23/2020 Specifications Sign and Seal: 12/23/2020 Texas Engr (Structural) Registration No. 102233 Texas Engr (Mechanical) Registration No. 106163

A | 312 SW 25th St. Oklahoma City, OK 73109 P | 405.673.2148 E | howdy@spur-design.com W | spur-design.com

Specifications Sign and Seal: 12/23/2020 Texas Engr (Electricall) Registration No. 106039

WEST TEXAS VA HEALTH CARE SYSTEM

BIG SPRING, TEXAS 79720

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

TABLE OF CONTENTS

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 10-17

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 35 26 Safety Requirements 02-17

01 42 19 Reference Standards 05-16

01 45 29 Testing Laboratory Services 08-17

01 45 35 Special Inspections 04-18

01 57 19 Temporary Environmental Controls 01-11

01 74 19 Construction Waste Management 09-13

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 12-15

03 37 13 Shotcrete 07-19

DIVISION 04 – MASONRY

04 20 00 Unit Masonry 08-17

04 85 10 Dimensional Stone Cladding

04 85 20 Split-Face Limestone Mortar Set

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 02-16

05 31 00 Steel Decking 10-15

05 40 00 Cold-Formed Metal Framing 05-16

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

06 20 00 Finish Carpentry 08-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

00 01 10-2

07 12 00 Built-Up Bituminous Waterproofing

07 21 13 Thermal Insulation 10-17

07 22 00 Roof and Deck Insulation 02-16

07 24 00 Exterior Insulation and Finish Systems 02-16

07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 02-16

07 52 16.12 SBS Modified Bituminous Membrane Roofing 08-16

07 60 00 Flashing and Sheet Metal 07-14

07 61 00 Standing Seam Metal Roof

07 72 00 Roof Accessories 10-15

07 84 00 Firestopping 02-16

07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16

08 14 00 Interior Wood Doors 02-16

08 31 13 Access Doors and Frames 02-16

08 33 00 Coiling Doors and Grilles 09-18

08 41 13 Aluminum-Framed Entrances and Storefronts 08-16

08 51 13 Aluminum Windows 02-16

08 71 00 Door Hardware 01-16

08 71 13 Automatic Door Operators 02-16

08 80 00 Glazing 10-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 06-18

09 30 13 Ceramic/Porcelain Tiling 09-15

09 51 00 Acoustical Ceilings 12-16

09 65 13 Resilient Base and Accessories 02-16

09 65 19 Resilient Tile Flooring 05-18

09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

10 14 00 Signage 10-15

10 21 23 Cubicle Curtain Tracks 05-15

10 25 13 Patient Bed Service Walls 08-18

10 26 00 Wall and Door Protection 10-15

10 28 00 Toilet, Bath, and Laundry Accessories 02-16

10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT

11 70 00 Medical Equipment

11 73 00 Ceiling Mounted Patient Lift System 01-17

DIVISION 12 – FURNISHINGS

00 01 10-3

12 32 00 Manufactured Wood Casework 09-15

12 36 00 Countertops 12-15

DIVISION 13 - SPECIAL CONSTRUCTION – NOT USED

DIVISION 14– CONVEYING EQUIPEMENT – NOT USED

DIVISION 21- FIRE SUPPRESSION

21 05 11 Common Work Results for Fire Suppression

21 08 00 Commissioning of Fire Suppression System 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16

22 05 19 Meters and Gages for Plumbing Piping 09-15

22 05 23 General-Duty Valves for Plumbing Piping 09-15

22 07 11 Plumbing Insulation 09-15

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 09-15

22 11 23 Domestic Water Pumps 09-15

22 13 00 Facility Sanitary and Vent Piping 09-15

22 14 00 Facility Storm Drainage 09-15

22 31 11 Water Softeners 09-15

22 34 00 Fuel-Fired Domestic Water Heaters 09-15

22 40 00 Plumbing Fixtures 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 08-17

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

08-17

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15

23 07 11 HVAC and Boiler Plant Insulation 02-15

23 08 00 Commissioning of HVAC Systems 11-16

23 09 23 Direct-Digital Control System for HVAC 09-11

23 09 93 Sequence of Operations for HVAC Controls

23 21 13 Hydronic Piping 08-17 23 21 23 Hydronic Pumps 08-17 23 23 00 Refrigerant Piping 02-15

23 25 00 HVAC Water Treatment 02-15

23 31 00 HVAC Ducts and Casings 03-13

23 34 00 HVAC Fans 02-15

23 36 00 Air Terminal Units 02-15

23 37 00 Air Outlets and Inlets 02-15

23 52 25 Low-Pressure Water Heating Boilers 08-17 23 73 00 Indoor Central-Station Air-Handling Units 04-11

23 81 43 Air-Source Unitary Heat Pumps and Condensing Units 04-11

DIVISION 25 – INTEGRATED AUTOMATION – NOT USED

00 01 10-4

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 05 41 Underground Electrical Construction 01-17

26 05 73 Overcurrent Protective Device Coordination Study 01-18

26 08 00 Commissioning of Electrical Systems 11-16

26 09 23 Lighting Controls 01-18

26 24 16 Panelboards 01-18

26 27 26 Wiring Devices 01-18

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 51 00 Interior Lighting 01-18

26 56 00 Exterior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 06-15

27 08 00 Commissioning of Communications Systems 11-16

27 10 00 Control, Communication and Signal Wiring 06-15

27 11 00 Communications Equipment Room Fittings 06-15

27 15 00 Communications Structured Cabling 01-16

27 52 23 Nurse Call and Code Blue Systems 10-15

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

09-11

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 13 00 Physical Access Control System 10-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 07-16

31 23 19 Dewatering 10-12

31 63 26 Drilled Caissons (Shafts) 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 19.19 Geogrids for Exterior Improvements

00 01 10-5

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 12 16 Asphalt Paving 09-15

32 17 23 Pavement Markings 08-16

32 31 13 Chain Link Fences and Gates 06-18

32 32 23 Segmental Concrete Unit Masonry Retaining Walls

DIVISION 33 – UTILITIES

33 10 00 Water Utilities 03-17

33 30 00 Sanitary Sewer Utilities 06-13

33 40 00 Storm Sewer Utilities 12-17

DIVISION 34 – TRANSPORTATION – NOT USED

DIVISION 48 – Electrical Power Generation – NOT USED

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

07-01-15

LIST OF DRAWING SHEETS

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

GENERAL

Drawing No. Title

00-GN0 COVER SHEET

00-GN1 INDEX SHEET, GENERAL NOTES & ABBREVIATIONS

00-GN2 OVERALL SITE PLAN

00-GN3 COTTAGE 26 & 27 LIFE SAFETY PLANS

CIVIL

CS-001 DEMOLITION SITE LAYOUT

CS-002 ALIGNMENT LAYOUT

CS-100 OVERALL SITE LAYOUT

CS-101 ENLARGED SITE LAYOUT

CS-102 GRADING LAYOUT

CS-103 ENLARGED GRADING LAYOUT

CS-104 SECTIONS

CS-105 DRAINAGE AREA MAP

CS-106 SWPPP

CS-107 UTILITY LAYOUT

CS-200 RETAINING WALL PLAN & PROFILE

CS-300 PAVING DETAILS

CS-301 DRAINAGE DETAILS

CS-302 DRAINAGE DETAILS

CS-303 UTILITY DETAILS

CS-304 STRAIGHT FACE RETAINING WALL DETAILS

CS-305 FENCE DETAILS

STRUCTURAL

SS1 GENERAL NOTES

SS2 GENERAL NOTES

SS3 GENERAL NOTES

SS4 TYPICAL CONCRETE DETAILS

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

07-01-15

LIST OF DRAWING SHEETS

00 01 15 - 2

STRUCTURAL CONTINUED

Drawing No. Title

SS5 TYPICAL CFMF DETAILS

SS6 TYPICAL DETAILS

SS7 TYPICAL CMU DETAILS

SS8 FOUNDATION PLAN – COTTAGE #26

SS9 FOUNDATION PLAN – COTTAGE #27

SS10 ROOF FRAMING PLAN – COTTAGE #26

SS11 ROOF FRAMING PLAN – COTTAGE #27

SS12 FOUNDATION DETAILS

SS13 FRAMING DETAILS

SS14 FRAMING DETAILS

SS15 FRAMING DETAILS

SS16 FRAMING DETAILS

SS17 FRAMING DETAILS

ARCHITECTURAL

AS1.0 COTTAGE BLDG 26 & 27 - WALL TYPES

26-AS2.0 COTTAGE BLDG 26 – DIMENSION PLAN

26-AS2.1 COTTAGE BLDG 26 FOUNDATION DIMENSION PLAN

26-AS3.0 COTTAGE BLDG 26 – FLOOR PLAN

26-AS4.0 COTTAGE BLDG 26 – REFLECTED CEILING PLAN

26-AS5.0 COTTAGE BLDG 26 – ROOF PLAN

26-AS6.0 COTTAGE BLDG 26 – EXTERIOR ELEVATIONS

26-AS7.0 COTTAGE BLDG 26 – BUILDING SECTION

26-AS7.1 COTTAGE BLDG 26 – WALL SECTIONS

27-AS2.0 COTTAGE BLDG 27 – DIMENSION PLAN

27-AS2.1 COTTAGE BLDG 27 – FOUNDATION DIMENSION PLAN

27-AS3.0 COTTAGE BLDG 27 – FLOOR PLAN

27-AS4.0 COTTAGE BLDG 27 – REFLECTED CEILING PLAN

27-AS5.0 COTTAGE BLDG 27 – ROOF PLAN

27-AS6.0 COTTAGE BLDG 27 – EXTERIOR ELEVATIONS

27-AS7.0 COTTAGE BLDG 27 – BUILDING SECTION

27-AS7.1 COTTAGE BLDG 27 – WALL SECTIONS

27-AS8.0 COTTAGE BLDG 26 & 27 - DETAILS

27-AS8.1 COTTAGE BLDG 26 & 27 – DETAILS

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

07-01-15

LIST OF DRAWING SHEETS

00 01 15 - 3

ARCHITECTURAL CONTINUED

Drawing No. Title

27-AS8.2 COTTAGE BLDG 26 & 27 – DETAILS

27-AS8.3 COTTAGE BLDG 26 & 27 - DETAILS

27-AS9.0 COTTAGE BLDG 26 & 27 – SCHEDULE

INTERIORS

IF1.0 INTERIORS – DETAILS & SCHEDULES

IF2.0 FLOOR PLAN – FINISHES – COTTAGE 26 & 27

IF3.0 FLOOR PLAN – FF&E – COTTAGE 26 & 27

IF3.1 ENLARGED PLANS & INTERIOR ELEVATIONS

IF3.2 ENLARGED PLANS & INTERIOR ELEVATIONS

IF3.3 MILLWORK SECTIONS

PLUMBING

PS1.0 PLUMBING SITE PLAN

26-P1.0 WASTE & VENT FLOOR PLAN

26-P2.0 DOMESTIC WATER & GAS FLOOR PLAN

26-P3.0 PLUMBING ROOF PLAN

26-P4.0 PLUMBING DETAILS & SCHEDULES

27-P1.0 WASTE & VENT FLOOR PLAN

27-P2.0 DOMESTIC WATER & GAS FLOOR PLAN

27-P3.0 PLUMBING ROOF PLAN

27-P4.0 PLUMBING DETAILS & SCHEDULES

FIRE PROTECTION

26-FP1.0 FIRE PROTECTION FLOOR PLANS

26-FP2.0 FIRE PROTECTION DETAILS

27-FP1.0 FIRE PROTECTION FLOOR PLANS

27-FP2.0 FIRE PROTECTION DETAILS

MECHANICAL

26-M1.0 MECHANICAL FLOOR PLAN

26-M2.0 MECHANICAL PIPING FLOOR PLAN

26-M3.0 MECHANICAL ROOF PLAN

26-M4.0 MECHANICAL DETAILS & SCHEDULES

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

07-01-15

LIST OF DRAWING SHEETS

00 01 15 - 4

MECHANICAL CONTINUED

Drawing No. Title

26-M5.0 MECHANICAL DETAILS

27-M1.0 MECHANICAL FLOOR PLAN - 27

27-M2.0 MECHANICAL PIPING FLOOR PLAN - 27

27-M3.0 MECHANICAL ROOF PLAN - 27

27-M4.0 MECHANICAL DETAILS & SCHEDULES - 27

27-M5.0 MECHANICAL DETAILS

ELECTRICAL

ES1.0 OVERALL ELECTRICAL SITE PLAN

26-E1.0 POWER FLOOR PLAN

26-E2.0 EQUIPMENT POWER FLOOR PLAN

26-E3.0 LIGHTING FLOOR PLAN

26-E4.0 TELECOM FLOOR PLAN

26-E5.0 NURSE CALL FLOOR PLAN

26-E6.0 FIRE ALARM FLOOR PLAN

26-E8.0 ELECTRICAL DETAILS

26-E8.1 ELECTRICAL DETAILS

26-E8.2 ELECTRICAL DETAILS

27-E1.0 POWER FLOOR PLAN - 27

27-E2.0 EQUIPMENT POWER FLOOR PLAN

27-E3.0 LIGHTING FLOOR PLAN - 27

27-E4.0 TELECOM FLOOR PLAN - 27

27-E5.0 NURSE CALL FLOOR PLAN - 27

27-E6.0 FIRE ALARM FLOOR PLAN - 27

27-E8.0 ELECTRICAL DETAILS - 27

27-E8.1 ELECTRICAL DETAILS - 27

27-E8.2 ELECTRICAL DETAILS - 27

- - - E N D - - -

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18 i

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

1.10 RESTORATION

1.11 PHYSICAL DATA

1.12 PROFESSIONAL SURVEYING SERVICES

1.13 LAYOUT OF WORK

1.14 AS-BUILT DRAWINGS

1.15 WARRANTY MANAGEMENT

1.16 USE OF ROADWAYS

1.17 RESIDENT ENGINEER'S FIELD OFFICE

1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.21 TEMPORARY TOILETS

1.22 AVAILABILITY AND USE OF UTILITY SERVICES

1.23 NEW TELEPHONE EQUIPMENT

1.24 TESTS

1.25 INSTRUCTIONS

1.26 GOVERNMENT-FURNISHED PROPERTY

1.27 RELOCATED EQUIPMENT AND ITEMS

1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18 ii

1.29 CONSTRUCTION SIGN

1.30 SAFETY SIGN

1.31 PHOTOGRAPHIC DOCUMENTATION

1.32 FINAL ELEVATION Digital Images

1.33 HISTORIC PRESERVATION

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the construction of the new

Community Living Center as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

Medical Center Engineering Officer.

C. Offices of Spur Design, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, roads, walks, grading, drainage, necessary removal of existing construction and certain other items required for the

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -2 construction of two 10-bed CLC Cottages (#26 & #27) and associated site work in conformance with VA Standards for CLC Facilities.

ITEM II, Electrical Work: Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project.

ITEM III, Mechanical Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work on this project.

B. ALTERNATE NO.1: All of the work as indicated in Items I, II, and III, except omit the new steel framed covered walkway, omit landscape planting, omit decorative paving and replace with concrete, omit site furnishings, and omit new stone veneer at new and existing retaining walls.

C. ALTERNATE NO. 2: All of the work as indicated in Items I, II, and III, except replace roller shades at cottages with blinds, and replace t & g wood soffits with gypsum board soffits.

D. ALTERNATE NO. 3: All of the work as indicated in Items I, II, and III, and replace concrete porch paving with DG (temporary).

E. ALTERNATE NO. 4 All of the work as indicated in Items I, II, and III except remove kitchen appliances (temporary).

F. ALTERNATE NO. 5: All of the work as indicated in Items I, II, and III except omit paint, flooring, ceilings, specialties, appliances, millwork/furnishings, doors and hardware for Cottage #27; allow for 6 weeks of General Conditions.

G. ALTERNATE NO. 5A: All of the work as indicated in Items I, II, and III except omit tape, bed and texture of gypsum board at exterior walls, omit all gypsum board at interior partitions at Cottage #27.

H. ALTERNATE NO. 5B: All of the work as indicated in Items I, II, and III except omit Division 27 items (communications, public address, nurse call) from Cottage #27.

I. ALTERNATE NO. 5C: All of the work as indicated in Items I, II, and III except omit ductwork, duct insulation, VAV’s, Supply/Return grilles, 519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -3 flex connections, and dampers from Cottage #27; also omit testing and balance, and instrumentation.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense,.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -4

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting Officers Representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -5

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of (2 to 5) permits shall be issued for General

Contractor and its employees for parking in designated areas only.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -6 the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:

I. Phasing:

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -7 coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to

Medical Center Director, COR and Contractor, as follows:

Phase I:

Phase II:

J. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.

Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm

(one inch) above grade. Remove the fence when directed by COR.

K. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -8 site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

L. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -9

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

N. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

O. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -10

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

1.8 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

(FAR 52.236-9)

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -11 environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge

Elimination System (NPDES) permit is required for this project. The

Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements.

Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the

Contractor's method of operations and operations planning and the

Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:

- Designating areas for equipment maintenance and repair;

- Providing waste receptacles at convenient locations and provide regular collection of wastes;

- Locating equipment wash down areas on site, and provide appropriate control of wash-waters;

- Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and

- Providing adequately maintained sanitary facilities.

1.9 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -12 disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

1.10 PHYSICAL DATA

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by H2B

Engineers.

(FAR 52.236-4)

B. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -13

C. A copy of the soil report will be made available for inspection by bidders upon request to the Engineering Officer at the VA Medical

Center, and shall be considered part of the contract documents.

D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of

Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

1.11 PROFESSIONAL SURVEYING SERVICES

A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections.

The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.12 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The

Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them.

If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -14

(FAR 52.236-17)

B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structures, roads, and parking lots are in accordance with lines and elevations shown on contract drawings.

C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:

1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.

D. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings.

Furnish such certification to the COR before any major items of concrete work are placed. In addition, Contractor shall also furnish to the COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.

1. Lines of each building and/or addition.

2. Elevations of bottoms of footings and tops of floors of each building and/or addition.

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -15

3. Lines and elevations of sewers and of all outside distribution systems.

5. Lines of elevations of all swales and interment areas.

6. Lines and elevations of roads, streets and parking lots.

E. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.

F. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of

Article "Professional Surveying Services".

1.13 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets ofas-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.14 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction at least 30 days before the planned pre-warranty conference, submit two sets of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the

Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -16 tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Name and phone numbers of manufacturers or suppliers.

f. Names, addresses and phone numbers of sources of spare parts.

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -17

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

i. Summary of maintenance procedures required to continue the warranty in force.

j. Cross-reference to specific pertinent Operation and Maintenance manuals.

k. Organizations, names and phone numbers of persons to call for warranty service.

l. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance Bond: The Performance Bond must remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -18 contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for

Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for

Contractor response, and other details deemed necessary by the

Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor.

This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service Requirements:

Following oral or written notification by the Contracting Officer, the

Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period.

Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the

Contractor does not perform the construction warranty within the

519-369 CONSTRUCT NEW CLC PHASE 2

BID DOCUMENTS

12-01-18

GENERAL REQUIREMENTS

01 00 00 -19 timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.

1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.

3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.

4. The “Construction Warranty Service Priority List” is as follows:

Code 1-Life Safety Systems

a. Fire suppression systems.

b. Fire alarm system(s).

Code 1-Air Conditioning Systems

a. Air conditioning leak in part of the building, if causing damage.

b. Air conditioning system not cooling properly.

Code 1 Doors

a. Overhead doors not operational, causing a security, fire or safety problem.

b. Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.

Code 3-Doors

a. Overhead doors not operational.

b. Interior/exterior personnel doors or hardware not functioning properly.