Attachment 22 - Technical Questions and Answers.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
36C77623B0012 - Y1DZ - Construct CLC Phase 2 Minor Construction - Big Spring - Solicitation Federal contract opportunity
Solicitation number
36C77623B0012
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

View the file

Other files for this federal contract opportunity

Other files attached to 36C77623B0012 - Y1DZ - Construct CLC Phase 2 Minor Construction - Big Spring - Solicitation, newest first.
File Type Posted
36C77623B0012 0002.pdf PDF
36C77623B0012 0001.pdf PDF
Attachment 21 - Site Visit Sign in Sheet.pdf PDF
Attachment 01 - Drawings - Electrical.pdf PDF
Attachment 02 - Drawings - Fire Protection.pdf PDF
Attachment 03 - Drawings - Interiors.pdf PDF
Attachment 08 - Drawings - Civil.pdf PDF
Attachment 15 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 20 - Sheet Index.pdf PDF
Attachment 07 - Drawings - Architecture.pdf PDF
Attachment 09 - Master Specifications - Volume 1.pdf PDF
Attachment 12 - Geotechnical Report - West Texas VA CLC.pdf PDF
36C77623B0012.pdf PDF
Attachment 04 - Drawings - Mechanical.pdf PDF
Attachment 05 - Drawings - Plumbing.pdf PDF
Attachment 10 - Master Specifications - Volume 2.pdf PDF
Attachment 11 - Material Finishes.pdf PDF
Attachment 16 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 17 - Wage Rates - Howard County.pdf PDF
Attachment 19 - Specifications - Addendum 01.pdf PDF
Attachment 18 - Addendum 01.pdf PDF
Attachment 06 - Drawings - Structural.pdf PDF
Attachment 13 - Geotechnical Report - Executive Summary.pdf PDF
Attachment 14 - COVID-19 Safety Protocols 12-14-21 (1).pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 CLC Phase 2 - Big Springs (2090.05) Pre-Bid RFIs

RFI QuestionsRFI Answers
01Who is the manufacturer currently for the existing data cabling?There are mixmatched manufacturers but we are going to cat 6 a for all data cables. We are not specific as to what the manufacturers are.
02What is the existing Access Control System?We are going to pacs for all access controls, the current mag readers are not going to be acceptable per the guidance in the psrdm.
03What is the existing Video Surveillance System?We do not currently have a surveillance system for the cottages.
04Regarding the ceiling hoists: There is a request for 825 lb motors but according to the drawings there's a live point load of maximum 800 lb along truss at the lift track locations, this means that we cannot put an 825 lb motor nor a 550 lb motor onto this structure as we weight test at 1.5 times the weight capacity. We are missing schematics for the truss for the building itself, not the pavilion. please advise regarding this. How do you want us to proceed?Specs indicate 880 lb lifting capacity. Truss will require modification to support 1.5 x 880 lb.

Truss will require modification to support load as indicated in specifications (see above) Spur to request modified truss schematic, including load calculations, from structural engineer to comply with specification requirements

05Will the Government confirm that an annual reoccurring remote technical support assurance maintenance and licensing maintenance fee charged to the VA each year after go live for remote help technical support assurance maintenance and licensing fee maintenance updates be accepted?An annual re-occurring fee will not be accepted.
06The spec in the TIL state the nurse call code blue shall be brand new and stand-alone nurse call. We also know that Rauland, Jeron and Westcom are also deployed in various buildings. Because of the TIL spec calling for stand-alone, the brand name listed on 27 52 23 - 19 on page 479 of attachment 10 is not relevant nor legal per the V.A.A.R. and F.A.R. As such, will the Government consider other nurse call brands?Yes.
07Will the Government confirm that five years of hardware warranty, remote technical phone support and licensing assurance for the nurse call system MUST be included in the proposal to the Government?Warranty shall be provided as indicated in 27 52 13 4.2.
08Will the VA allow use of middleware to connect the new nurse call system to other systems such as Vocera badges, nurse phones, Cisco and other VA systems such as the VAs ADT system?No.
09Will the Government confirm that all new Nurse Call devices installed in walls within the Mental Health areas MUST be anti-ligature, vandal‐proof and flush mount?There are no Mental Health areas on this project.
10Will the Government confirm that new Nurse Call System be networked together or is stand alone nurse call in each building or unit be acceptable?A stand alone nurse call in each building is acceptable.
11Will the Government's current overhead paging system have the ability to integrate with the nurse call for processing the Nurse Call text to speech such as code alerts?No.
12Per VA TIL, Nurse Call pull stations in bathrooms must also provide audio. Should all bathroom areas be equipped with an audio capable pull cord where pull cords are required?Yes.
13Can the Government confirm that the Nurse Call system equipment must be readily available to ship with in 30-days of an order being approved by the VA for installation?Nurse call equipment shall be provided in a timely fashion according to the schedule of the project.
14Can the Government confirm that the Nurse Call system must have a FDA 510K Class II Listing?Refer to Specification 27 52 23 for requirements.
15Can the Government confirm that the Nurse Call system must have a FCC Part 68 compliance for interface to the wireless phone switch?Refer to Specification 27 52 23 for requirements.
16Can the Government confirm that the Nurse call devices must be plug-n-play replaceable by MAC address and not require programming or dip-switches?Refer to Specification 27 52 23 for requirements.
17Can the Government confirm that the Nurse call system must be VoIP based?Refer to Specification 27 52 23 for requirements.
18Can the Government confirm that the Nurse call system audio must be full duplex and that one way and two-way walkie talkie voice will NOT be accepted?The nurse call system requires two-way voice communication. Please clarify what is meant by "two-way walkie talkie voice" referenced.
19Can the Government confirm that the Shower pull cords must be IP68 certified?Refer to the nurse call Drawings. Pull cord stations in the toilets are located outside of the showers and do not require an IP68 certification.
20Can the Government confirm that the Nurse call system devices must not utilize legacy dip-switches?Refer to Specification 27 52 23 for requirements.
21Can the Government confirm that the Nurse Call system must include real-time visibility of all events including date, time, unit, event type, recipients, status, delivery history, and action taken?Refer to Specification 27 52 23 for requirements.
22Can the Government confirm that the Nurse Call System Corridor Lights must be capable of continuous supervision with status indication when controller or associated room devices are not operating properly?Refer to Specification 27 52 23 for requirements.
23Can the Government confirm that the Nurse Call must allow for custom WAV files to be used for setting different sounds/tones?Refer to Specification 27 52 23 for requirements.
24Is wire mold (surface mounted wire molding) acceptable for installation of new nurse call equipment or will all new nurse call equipment be required to be installed in the walls?Surface mounted raceway is not permitted. This is a new construction project and devices shall be installed flush with the wall and conduit/boxes hidden within the walls.
25Where wire mold is currently installed, does all of this existing wire mold need to be replaced with new wire mold or can existing wire mold be reused?Surface mounted raceway is not permitted. This is a new construction project and devices shall be installed flush with the wall and conduit/boxes hidden within the walls.
26Will the Government require waterproof IP68 nurse call patent pull cord stations be installed in bathrooms and showers where power washing is done by environmental services? If so, will the Government require each bidder to provide a written letter from the International Electrotechnical Commission (IEC) as proof that the nurse call system waterproof pull cords are IP68 or equivalent as rated by the IEC?Refer to the nurse call Drawings. Pull cord stations in the toilets are located outside of the showers and do not require an IP68 certification.
27Will the Government confirm the "waterproof" referenced in the specs is referring to the IP68 waterproof emergency pull cord for the showers and bathrooms?Refer to the nurse call Drawings. Pull cord stations in the toilets are located outside of the showers and do not require an IP68 certification.
28Does each Staff Terminal Station require the capability to display up to 990 workflows configurations?Refer to Specification 27 52 23 for requirements.
29Is complete HL7 integration in-scope for this project or just licensing and with future capability to be provided?Future capability shall be provided.
30Is integration with nurse Wireless Communicators such as Vocera to be included or is only the future capability of integration required?Future capability shall be provided.
31In the patient locations where a Bed Connection to the Nurse Call System is listed as being required, what brand of beds does the facility have?A nurse call connection to the patient beds is not required on this project.
32Must the Nurse Call System installers install the cabling in Mobile Containment Units with Negative Air Machines while working on ladders, while working in patient areas as being apart of the VA TIL Infection Control Measures?There are no existing patient care areas on this project. This is a new construction project and installation of the nurse call system shall occur during the normal course of construction.
33Is the nurse call system software required to be One ‐VA Technical Reference Model (TRM) (www.va.gov/trm) approved for installation within the Government?Refer to Specification 27 52 23 for requirements.
34Will the Government confirm that the nurse call software, which provides unit level nurse to bed assignment controls and nursing reports, be installed on the existing VA PCs that are already running in the nursing units and that adding new standalone, single use PC’s for just the nurse call is NOT acceptable?This is a new construction project, no existing PCs exist as there is not an existing nursing unit on this project.
35Will the nurse call system be required to have a SIP interface for patient room call back?No.
36Is the nurse call system required to have the capability to provide a Bi‐Directional transfer of information interface for VistA CPRS or Cerner for ADT information, Patient Status, Positioning, Rounding, Wound Care, Pain Assessment, and Patient Data?No.
37Does the Nurse Call need to integrate with the VA's Active Directory? All other VA facilities have this as a requirement for nurse call given the implications and need.No.
38In the drawings and specification documents, the Government has stated that the emergency pull cord station must have audio all-in-one device. Can the Government confirm that a single nurse call device must provide audio and pull cord all-in-one is required?A single all-in-one device or two separate devices is acceptable.
39Will the Government require nurse call master console to nurse call master console calling?No, it is acceptable to have a stand-alone nurse call system for each building. Each building only has one nurse call master console.
40Will the Government require nurse calls and service calls to be displayed on a PC dashboard/whiteboard? (set service reminders for staff tasks (i.e. RN needed is a set service)) vs. dashboard/whiteboard displays that only show patient calls.Yes
41Will the Government require nurse call devices to be FDA 510K registered as nurse call is identified by the FDA as a medical device?Refer to Specification 27 52 23 for requirements.
42Can the Government clarify if the nurse call system needs to be FIPS 140‐2 certified or validated?Refer to Specification 27 52 23 for requirements.
43Can the Government validate that the selected vendor will be responsible for removing all old equipment?This is a new construction project, there is no old equipment to be removed.
44Can the Government confirm that the existing nurse call system needs to be maintained and remain fully operational and functioning during construction?This is a new construction project, there is no existing nurse call system in these two buildings.
45Network Connection: Can the government confirm that the new nurse call must be networked together and connected for all buildings? If so, must all these areas connect back to one central nurse call server?A stand-alone nurse call system for each building is acceptable on this project.
46Will the Government be responsible for temporarily removing the existing light fixtures located in many of the patient rooms so that the necessary access to the junction boxes for nurse call installation is provided to the nurse call installers? If not, will the Government require the contractor to handle the temporary removal of the existing light fixtures located in many of the patient rooms so the junction box can be accessed?This is a new construction project, there are no existing light fixtures to be removed.
47Should new nurse call cabling is to be installed in ¾” or 1" conduit within the walls and ceilings?Conduit shall be 3/4" minimum or sized larger as required for the cabling to be installed.
48What room should the new vendor provided nurse call servers be installed? E.g. room location.Nurse call equipment locations are identified on the Drawings.
49There was Asbestos Reinspection requested in the prior bids. Is any asbestos re-inspection or abatement to be included in this bid to the Government?N/A this is new construction.
50Please confirm if material staging at the facility is acceptable?Yes but contractor will be responsible for making sure materials are secured in containers.
51Please confirm that the Nurse Call interconnection between buildings (e.g. building‐to‐building) will be able to utilize existing fiber or copper cable network switches?A stand-alone nurse call system for each building is acceptable on this project. No interconnection is required.
52The patient room shown during the site visit had a gyp. bd. ceiling. Can the government confirm whether all patient rooms have hard ceilings or if some ceilings are lay‐in?Ceiling types for the rooms are identified on the Drawings. Since this is a new construction project, there are not existing patient rooms.
53Will nurse call pillow speakers be required to operate both the patient room lighting and televisions in all patient rooms?No.
54Please confirm whether all in‐patient rooms have a pre‐manufactured headwall.The patient rooms do not have a pre-manufactured headwall.
55Are all audio devices in all bathroom locations required to be full duplex audio? and also alarm in these immediate zoned areas??The nurse call system requires two-way voice communication. The nurse call system shall alarm at the master station and considering the side of the new building, will include the entire building.
56Are alarms from any bathroom with nurse call required to illuminate zone lights in the immediate zoned area or will it be require that a bathroom nurse call alarm illuminate the area zone light and send an alarm to a nurse console?The nurse call system shall alarm at the master station and considering the size of the new buildings, will include the entire building.
57Does the government require that the patient room audio stations have the capability to call room to room and staff to staff?No.
58Does the government have an existing firewall/Layer-3 switch between the isolated UL-1069 Nurse Call network and the OI&T network?Yes
59Can existing conduit be reused for the nurse call system?This is a new construction project, there is no existing conduit.
60Can existing back boxes be reused for the nurse call system?This is a new construction project, there are not existing back boxes.
61Will the Government be providing virtual servers for the nurse call system software to be in installed on?No.
62Will the Government require databases to be hosted on existing OI&T infrastructure or will the expectation be to separately host it on the Nurse Call isolated network?Separately.
63Does the contractor need to provide physical servers to support the Nurse Call platform or will virtual servers be provided by the government? If yes, does the contractor need to provide a UPS to support the physical servers? How long does the UPS need to maintain uptime?Refer to Specification 27 52 23 for requirements.
64Can the Government confirm that the Nurse Call system equipment must be manufactured in the USA?Refer to Specification 27 52 23 for requirements.
65Where is the server room located? What is the distance from the server room to the Nurse Call closet? If the server location is in another building is conduit available that can be used for the connection between buildings? If not, is the contractor responsible for trenching the conduit for the interconnection?Nurse call equipment locations are identified on the Drawings.
66Can you please confirm the weight capacity of the bariatric Lifts? In the specification 11.73.33_2.2B it lists 880 LBS but in the roof framing (page SS10 and SS11 )plan notes it list 800 LB point load.Specs indicate 880 lb lifting capacity. Truss will require modification to support 1.5 x 880 lb.
67Can you please verify which patient lift systems need to be bariatric?All Patient Lift System shall be Bariatric.

68 Can you please confirm the WT8’s on page SS14 and SS15 can support the Patient Lifts and that welding to the WT8’s can occur for attachments of the patient lifts? The WTs shown on SS14 and SS15 are part of the custom steel trusses over the kitchen area.

They do not occur at the resident rooms, so the patient lift load is not applicable. The trusses over the resident rooms are CFMF trusses to be designed by the CFMF truss manufacturer.