Attachment 17 - Pre-Award Survey Accounting System Checklist.pdf

PDF 1 MB Posted

Attached to
DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP Federal contract opportunity
Solicitation number
W31P4Q-20-R-0015
Issued by
Department of the Army Materiel Command Contracting Command Redstone Arsenal

About this file

This document contains a pre-award survey checklist of a prospective contractor's accounting system and a draft request for proposal for the Integrated Battle Command System Hardware Low Rate Initial Production/Full Rate Production effort.

The accounting system checklist questions whether the contractor's accounting system complies with various requirements including proper segregation and accumulation of direct and indirect costs, identification of costs by contract and cost objectives, and development of cost data for pricing follow-on acquisitions. It requires narrative responses from the contractor for each question.

The draft RFP seeks production of Integrated Battle Command System hardware end items and maintenance of approved software and firmware updates, cybersecurity, and authority to operate for existing hardware components. It also includes potential engineering changes for obsolescence, new capabilities, and export considerations. As this is a draft for comment only, the government is not currently seeking proposals based on the information provided.

View the file

Other files for this federal contract opportunity

Other files attached to DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP, newest first.
File Type Posted
Attachment 21 - Task Order 0001 Statement of Work.docx DOCX document
Attachment 10c.10 – E060 Shelter Switch – 02-FMECA.xlsx XLSX spreadsheet
Attachment 10a.16– R034 Media Converter Power Supply-FMECA.xlsx XLSX spreadsheet
W31P4Q-20-R-0015_DRAFT_28 May 2020.pdf PDF
Attachment 10a.3 – R003 KG-250X-FMECA.xlsx XLSX spreadsheet
Attachment 04b - Draft_Relay Acceptance Test Procedures.docx DOCX document
Attachment 13c - IBCS-A301-003 Vol II Instructor Guide.pdf PDF
Attachment 22a.1.f - EOC Shelter views.pptx PPTX presentation
Attachment 22a.1.d - ALH-213030 00 CABLE ASSEMBLY, CASS J1 AND J3.pdf PDF
Attachment 10a.14 – R032 Media Converter Module 11-FMECA.xlsx XLSX spreadsheet
Attachment 20 - Section M - Evaluation Factors For Award.docx DOCX document
Attachment 22a - CASS to PDRS.docx DOCX document
Attachment 10d.7 – E153 RS112 Server -06 Shelter with PT-FMECA.xlsx XLSX spreadsheet
Attachment 10e.10 – E148 – Table 4 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 10e.5 – E122 – EMI Tent PDU-FMECA.xlsx XLSX spreadsheet
Attachment 22a.1.g - PL-ALH-209032 00 CABLE ASSEMBLY CASS ETHERNET.pdf PDF
Attachment 22a.1.e - ALH-215333 00 S-280 CASS INSTALLATION.PDF PDF
Attachment 22a.4 - CASS Task Purpose.pptx PPTX presentation
Attachment 10a.15 – R033 Media Converter Module 12-FMECA.xlsx XLSX spreadsheet
Attachment 10c.6 – E051 IGRM-FMECA.xlsx XLSX spreadsheet
Attachment 03 - GFP Attachment - LRIP_FRP - 20 April 2020.xlsx XLSX spreadsheet
Attachment 22a.2 - PDRS Support information for integration task.pptx PPTX presentation
Attachment 15b - Fixed Price Level of Effort Labor Categories.xlsx XLSX spreadsheet
Attachment 10h - SWFMEA RESULTS.xlsx XLSX spreadsheet
Attachment 22a.1.h - PL-ALH-211130 00 CABLE ASSEMBLY CASS DC POWER.pdf PDF
Attachment 04c - ECT_Acceptance Test Procedures_FINAL.DOCX DOCX document
Attachment 22a.1.a - ALH-208670 05 IBCS SHELTER INTERCONNECT.pdf PDF
Attachment 10a.4 – R004 IGRM-FMECA.xlsx XLSX spreadsheet
Attachment 13 - Training Documentation.docx DOCX document
Attachment 10a.9 – R015 PDU Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 10a.5 – R005 SCIM-FMECA.xlsx XLSX spreadsheet
Attachment 22a.1.j - PL-ALH-215333 00 S-280 CASS INSTALLATION.PDF PDF
Attachment 10c.5 – E050 KG-250X-FMECA.xlsx XLSX spreadsheet
Attachment 10b.9 – E033 R112 Shelter – Server Stack – 03-FMECA.xlsx XLSX spreadsheet
Attachment 10b.2 – E002 Power Inverter Shelter Power-FMECA.xlsx XLSX spreadsheet
Attachment 10a.13 – R031 Black Router--FMECA.xlsx XLSX spreadsheet
Attachment 10a.1 – R001 HRFU-FMECA.xlsx XLSX spreadsheet
Attachment 19 - Section L - Instructions - Conditions - And Notices To Offerors.docx DOCX document
Attachment 10c.8 – E053 Shelter Time Server-FMECA.xlsx XLSX spreadsheet
Attachment 10e.9 – E147 – Table 3 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 22a.1.b - ALH-209032 00 CABLE ASSEMBLY CASS ETHERNET.pdf PDF
Attachment 10c.1 – E043 Firewall Red-FMECA.xlsx XLSX spreadsheet
Attachment 02 - AIAMD System of Systems (SoS)(MIS-PRF-56500).pdf PDF
Attachment 10b.1 – E001 28VDC Pwr Supply Shelter Power-FMECA.xlsx XLSX spreadsheet
Attachment 10e.11 – E149 – Table 5 Assembly-FMECA.xlsx XLSX spreadsheet
Attachment 10d.2 – E144 RWS Bkup Batteries-FMECA.xlsx XLSX spreadsheet
Attachment 12 - Risk Management Plan.pdf PDF
Attachment 04 - Acceptance Test Plan.docx DOCX document
Attachment 10c.13 – E063 Isolation Router Black-FMECA.xlsx XLSX spreadsheet
Attachment 10b.8 – E032 R112 Shelter – Server Stack – 02-FMECA.xlsx XLSX spreadsheet
Show all 50

DRAFT RFP for Integrated Battle Command System (IBCS) LRIP/FRP has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM CHECKLIST

PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM

Name, Title, and signature of Company Principal (President/VP/Controller, etc) responsible for the design of the Accounting System.

PLEASE ANSWER THE QUESTIONS BELOW:

HAVE YOU READ THE DCAA PUBLICATION DCAAM 7641.90 - "Information for Contractors" ON For each question, check only one box. ALL questions must have explanatory narrative text entered in the boxes. Please provide sufficient detail to describe the process (Including Account Numbers/Process Flow etc.) Each Question must be complete. Do NOT refer to previous answers, (i.e. "See Question 3 Above").

Pre-award Survey of Prospective Contractor Accounting System Checklist

1. Has your organization's Accounting System ever been audited by DCAA?

the DCAA Report number or DCAA POC info.

1.A. If the answer is "Yes" to Question 1 above, when was the audit performed?

1.B. If the answer is "Yes" to Question 1 above, did DCAA determine the Accounting System acceptable for award of prospective contracts?

1.C. If the answer is "Yes" to Question 1 above, have there been any changes to the Accounting System since the DCAA audit?

2.B. Has your organization been notified by DCAA that it is (or may be in) non-compliance with its disclosure statement or CAS?

Pre-award Survey of Prospective Contractor Accounting System Checklist

2. Is your organization subject to CAS (48 CFR Chapter 99)?

(If YES (FULL or MODIFIED), the Offeror MUST attach a copy of their most recent audit reports/documentation regarding all CAS compliance or non-compliance issues to this Modified Pre-Award Survey) 2.A. Has your organization submitted a CASB disclosure statement (CASB DS-1) to DCAA and has it been determined adequate?

2.c. Is any aspect of this proposal inconsistent with your orgnaization's disclosed practices or applicable CAS?

Instruction: If the Contractor is planning on bidding on Cost Type Contracts, the contractor MUST provide explanatory narrative for all of the following questions:

3. Has your organization's Accounting System been audited by an outside Certified Public Accountant/Consultant or other Cognizant Federal Agency other than DCAA?

4. Is your organization's Accounting System currently in full operation?

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

6. Is your organization's Accounting System ready for a DCAA audit?

7. Are the loaded hourly labor rates proposed consistent with your established estimating and accounting principles and procedures and FAR Part 31, Cost Principles? (Answer this Questions "N/A" if you do not have an active proposal)

5. Is your organization's Accounting System in accord with Generally Accepted Accounting Principles (GAAP) Applicable in the Circumstances?

8. Does the Accounting System provide for the proper segregation of Direct Costs from Indirect Costs?

9. Does the Accounting System provide for the identification and accumulation of Direct Costs by contract?

10. Does the Accounting System provide for a logical and consistent method for the allocation of Indirect Costs to intermediate and final cost objectives? (A contract is a final cost objective.)

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

11. Does the Accounting System Provide for the accumulation of costs under general ledger control?

12. Does the Accounting System provide for a timekeeping system that identifies employees' labor by intermediate or final cost objectives?

13. Does the Accounting System provide for a labor distribution system that charges Direct and Indirect labor to the appropriate cost objectives?

14. Does the Accounting System provide for an interim (at least monthly) determination of costs charged to a contract through routine posting of books of account?

15. Does the Accounting System provide for an exclusion of costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions?

16. Does the Accounting System provide for the identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract?

Pre-award Survey of Prospective Contractor Accounting System Checklist Pre-award Survey of Prospective Contractor Accounting System Checklist

17. Does the Accounting System provide for the segregation of preproduction costs from production costs?

18. Does the Accounting System provide financial information required by contract clauses concerning limitation of cost (FAR 52.232.20) or limitation on payments (FAR 52.216-16)?

19. Does the Accounting System provide financial information required to support requests for Progress Payments?

Pre-award Survey of Prospective Contractor Accounting System Checklist

22. Is your organization currently performing on Cost-Type (FAR 16.3) contracts/task orders?

21. Is your organization planning on submitting proposals on Cost-Type (FAR 16.3) contracts/task orders?

20. Is the Accounting System designed, and are the records maintained, in such manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

Pre-award Survey of Prospective Contractor Accounting System Checklist 11.0.0.20130303.1.892433.887364 7142287093 1/06/2016 DCAA/Policy and Plans DCAA Preaward survey of Prospective Contractor Accounting System Checklist Naomi Vaughn Draft Preaward survey of Prospective Contractor Accounting System Checklist

Enter Date as MONTH/DAY/YEAR XX/XX/XXXX:
TextField1:
TextField2:
TextField3:
DateField2:
TextField4:
TextField5:
CheckBox1:
CheckBox2:
CheckBox3:
TextField6:
CheckBox4:
CheckBox5:
TextField7:
CheckBox6:

File details come from the government source that posted it. Updated .