GILA BOX GAOA CAMPGROUND IMPROVEMENTS Federal contract opportunity
Solicitation number
140L0624R0032
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This document is a Statement of Work (SOW) for the GILA BOX RNCA Campground Improvements project. The SOW outlines the work to be performed at the Owl Creek Campground, Riverview Campground, and Camp Host site.

The key work to be performed includes demolition and removal of existing site amenities, regrading of parking lots, access roads, and campsites, installation of new ramadas, picnic tables, fire rings, and grills, replacement of a single-vault toilet building and informational kiosks, and installation of new stormwater culverts and a solar array for the Camp Host site. The work is to be completed with minimal disruption to the public, who will have access to the campgrounds during construction. The contractor is responsible for obtaining any required permits to perform the work.

The related federal contract opportunity is solicitation number 140L0624R0032, titled "GILA BOX GAOA CAMPGROUND IMPROVEMENTS", issued by the Department of the Interior Bureau of Land Management National Office.

View the file

Other files for this federal contract opportunity

Other files attached to GILA BOX GAOA CAMPGROUND IMPROVEMENTS, newest first.
File Type Posted
Sol_140L0624R0032_Amd_0005.pdf PDF
Attachment11B_QuestionsAnswers_3_0005.pdf PDF
Attachment11A_QuestionsAnswers_2_0004.pdf PDF
Sol_140L0624R0032_Amd_0004.pdf PDF
Sol_140L0624R0032_Amd_0003.pdf PDF
Attachment_11_QuestionsAnswers_1_0003.pdf PDF
Attachment_12_Gila_Box_Potential_Laydown_Area_0003.pdf PDF
Attachment_10_24R0032_Site_Visit_Sign_In_Sheet_0003.pdf PDF
Attachment_3E_Specifications_Compaction_Test_Schedule_0003.pdf PDF
140L0624R0032_SF30_Continuation_Pages_Amend_3_0003.pdf PDF
Attachment_2D_Drawings_Kearney_Camp_Rd_Profile_May_2024_0003.pdf PDF
Sol_140L0624R0032_Amd_0002.pdf PDF
Attachment_3D_Site_Furnishings_Specifications_0001.pdf PDF
SF30_Continuation_Pages_Amend_1_0001.pdf PDF
Sol_140L0624R0032_Amd_0001.pdf PDF
Attachment_7_Gila_Box_Geotechnical_Evaluation.pdf PDF
Attachment_5_Price_Breakout.pdf PDF
Attachment_4B_Wage_Determination_AZ20240025.pdf PDF
Attachment_2A_Drawings_Camp_Host_Site.pdf PDF
Attachment_8_Lim_on_SubK_Breakout.xlsx XLSX spreadsheet
Attachment_4C_Wage_Determination_AZ20240029.pdf PDF
Sol_140L0624R0032.pdf PDF
Attachment_3A_Specifications_Camp_Host_Site.pdf PDF
Attachment_2C_Drawings_Riverview_Campground.pdf PDF
Attachment_6_Submittal_Schedule.pdf PDF
Attachment_3B_Specifications_Owl_Creek_Campground.pdf PDF
Attachment_3C_Specifications_Riverview_Campground.pdf PDF
Attachment_4A_Wage_Determination_AZ20230009.pdf PDF
Attachment_9_SF1442_Completion_Instructions.pdf PDF
Attachment_2B_Drawings_Owl_Creek_Campground.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Owl Creek Campground, Riverview Campground, Site Host IMPROVEMENTS Work Summary

GILA BOX RNCA

Work performed to follow plans and specifica�ons in contract documents.

Owl Creek work to be performed includes but not limited to:

1. Demolish and remove existing camp site amenities including ramada, concrete picnic table, site number post, fire ring and grill at each of seven camp sites.

2. Re-grade parking lot, access road and campsites. Install new ramada, picnic table, site number post, fire ring and grill at each of seven camp sites.

3. Remove and replace the door and roof of existing single-vault toilet building at the parking lot.

4. Remove and replace existing informational kiosk at the parking lot.

5. Install four new, 12” HDPE storm water culverts with rip rap at inlets and outlets, and grade outlet channels to daylight at an existing wash.

Riverview work to be performed includes but not limited to:

1. Demolish and remove existing camp site amenities including ramada, concrete picnic table, site number post, fire ring and grill at each of thirteen camp sites.

2. Repair and re-grade access road in two locations. Install two, 24” Corrugated Metal pipe culverts at wash crossing in main access road.

3. Install new ramada, picnic table, site number post, fire ring and grill at each of thirteen camp sites. Re-grade and stabilize campsites.

4. Remove and replace existing informational kiosk at the parking lot.

Camp Host work to be performed includes but not limited to:

1. Demolish and remove an existing conex box, shade structure, two concrete slabs, concrete picnic table, fire ring and grill.

2. Construct a new concrete slab for RV parking. Construct a new shade structure over the slab. Install new picnic table, fire ring and grill.

3. Construct a new concrete slab and a small pre-engineered building for laundry, storage, and power supply batteries.

4. Construct a solar array to power the RV, site lighting and laundry. Array to be connected to the batteries. Install chain link fence perimeter around solar array.

5. Construct a new concrete slab and install a liquid propane tank and propane-powered generator to provide emergency power.

Campgrounds to remain open to public during construc�on. Public will be made aware of construc�on to be performed, but sites will not be formally closed.

Contractor to provide work schedule that shows work to be performed with minimal public interac�on which could include comple�ng one site before moving to the next site.

It is the contractor’s responsibility to ensure any/all required permits are in place to perform construc�on work.