Attachment_2D_Drawings_Kearney_Camp_Rd_Profile_May_2024_0003.pdf

PDF 209 KB Posted

Attached to
GILA BOX GAOA CAMPGROUND IMPROVEMENTS Federal contract opportunity
Solicitation number
140L0624R0032
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This document appears to be an attachment to a federal contract opportunity. It contains a profile drawing for the Kearney Camp Road at the Gila Box campground improvements project. The drawing shows the planned installation of new 24-inch corrugated metal pipes, with a minimum 1-foot cover, to be spaced 2 feet apart. The road will require importing fill material to be compacted in 4-inch layers to 98% density, topped with 5 inches of aggregate base compact to 98% density. The drawing indicates a 1% minimum slope to the south.

The related federal contract opportunity is Solicitation Number 140L0624R0032 for the "GILA BOX GAOA CAMPGROUND IMPROVEMENTS" project, issued by the Department of the Interior's Bureau of Land Management National Office.

View the file

Other files for this federal contract opportunity

Other files attached to GILA BOX GAOA CAMPGROUND IMPROVEMENTS, newest first.
File Type Posted
Attachment11B_QuestionsAnswers_3_0005.pdf PDF
Sol_140L0624R0032_Amd_0005.pdf PDF
Attachment11A_QuestionsAnswers_2_0004.pdf PDF
Sol_140L0624R0032_Amd_0004.pdf PDF
Attachment_3E_Specifications_Compaction_Test_Schedule_0003.pdf PDF
Sol_140L0624R0032_Amd_0003.pdf PDF
Attachment_11_QuestionsAnswers_1_0003.pdf PDF
Attachment_12_Gila_Box_Potential_Laydown_Area_0003.pdf PDF
Attachment_10_24R0032_Site_Visit_Sign_In_Sheet_0003.pdf PDF
140L0624R0032_SF30_Continuation_Pages_Amend_3_0003.pdf PDF
Sol_140L0624R0032_Amd_0002.pdf PDF
SF30_Continuation_Pages_Amend_1_0001.pdf PDF
Attachment_3D_Site_Furnishings_Specifications_0001.pdf PDF
Sol_140L0624R0032_Amd_0001.pdf PDF
Attachment_2A_Drawings_Camp_Host_Site.pdf PDF
Attachment_8_Lim_on_SubK_Breakout.xlsx XLSX spreadsheet
Attachment_4C_Wage_Determination_AZ20240029.pdf PDF
Attachment_7_Gila_Box_Geotechnical_Evaluation.pdf PDF
Attachment_1_SOW_20240213.pdf PDF
Attachment_5_Price_Breakout.pdf PDF
Attachment_4B_Wage_Determination_AZ20240025.pdf PDF
Attachment_9_SF1442_Completion_Instructions.pdf PDF
Attachment_2B_Drawings_Owl_Creek_Campground.pdf PDF
Sol_140L0624R0032.pdf PDF
Attachment_3A_Specifications_Camp_Host_Site.pdf PDF
Attachment_2C_Drawings_Riverview_Campground.pdf PDF
Attachment_6_Submittal_Schedule.pdf PDF
Attachment_3B_Specifications_Owl_Creek_Campground.pdf PDF
Attachment_3C_Specifications_Riverview_Campground.pdf PDF
Attachment_4A_Wage_Determination_AZ20230009.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9+70 10+00 11+00 11+80

9+80 10+2010+4010+6010+80 11+2011+4011+60

STA:9+79.08

℄ELEV:3299.00

STA:11+72.88

℄ELEV:3299.00

PROJECT NO.:20049.01

DESIGN BY:

DRAWN BY:

CHECKED BY:

DATE: MAY 2024

G

IL

A B

O X

RN

C

A

IM

PR

O

V

EM

EN

TS

SA

FF

O

RD

F

IE

LD

O

FF

IC

E, A

Z

ALL RIGHTS RESERVED

© 2024 GLHN ARCHITECTS & ENGINEERS, INC.

2939 E Broadway Blvd, Tucson, AZ 85716 T 520.881.4546 GLHN.com

BU

RE

A U

O F

LA

N

D M

A N

A G

EM

EN

T

U.

S.

D

EP

A

RT

M

EN

T O

F

TH

E

IN

TE

RI

O R

SK01

LVL

TLH

DCM

SCALE: NOT TO SCALE1 STA 9+70 TO STA 11+80

KEARNEY CAMP RD PROFILE - SEE CG101

INSTALL NEW 24" CMP X 2

45 LF, SPACED 2' APART

MIN 1' COVER OVER PIPES

EXISTING GRADE

IMPORT FILL,

COMPACT IN 4"

LAYERS TO 98%.

TOP WITH 5" OF A.B.

COMPACT TO 98%

SLOPE 1% MIN TO SOUTH

Sheets and Views
SK01

File details come from the government source that posted it. Updated .