This document is a set of Questions and Answers related to the Gila Box Campground Improvements solicitation (Solicitation Number: 140L0624R0032) issued by the Department of the Interior Bureau of Land Management.

The key details are as follows:

The solicitation includes the replacement of a Romtec restroom building, requiring a new door and roof. The door dimensions are specified as 35 3/4" wide by 83 1/4" high by 1 3/4" thick, with an outside door jam measurement of 40" wide by 88" high by 8" thick. The entire roof structure is to be replaced, not just the roofing material.

Other questions addressed include clarification on requirements for a lockable enclosure for a propane generator, details on interior water piping and connections for a laundry/electrical building, the provision of original CAD files, the need for stamped shop drawings for concrete work, the requirement for a concrete mock-up, and the acceptability of a 7-year limited warranty on the building panels instead of a 20-year warranty.

The solicitation also includes site furnishings such as picnic tables, grills, and fire rings, with specific quantities listed in the drawings.

View the file

Other files for this federal contract opportunity

Other files attached to GILA BOX GAOA CAMPGROUND IMPROVEMENTS, newest first.
File Type Posted
Attachment11B_QuestionsAnswers_3_0005.pdf PDF
Sol_140L0624R0032_Amd_0005.pdf PDF
Sol_140L0624R0032_Amd_0004.pdf PDF
Sol_140L0624R0032_Amd_0003.pdf PDF
Attachment_11_QuestionsAnswers_1_0003.pdf PDF
Attachment_12_Gila_Box_Potential_Laydown_Area_0003.pdf PDF
Attachment_10_24R0032_Site_Visit_Sign_In_Sheet_0003.pdf PDF
Attachment_3E_Specifications_Compaction_Test_Schedule_0003.pdf PDF
140L0624R0032_SF30_Continuation_Pages_Amend_3_0003.pdf PDF
Attachment_2D_Drawings_Kearney_Camp_Rd_Profile_May_2024_0003.pdf PDF
Sol_140L0624R0032_Amd_0002.pdf PDF
Attachment_3D_Site_Furnishings_Specifications_0001.pdf PDF
SF30_Continuation_Pages_Amend_1_0001.pdf PDF
Sol_140L0624R0032_Amd_0001.pdf PDF
Attachment_7_Gila_Box_Geotechnical_Evaluation.pdf PDF
Attachment_1_SOW_20240213.pdf PDF
Attachment_5_Price_Breakout.pdf PDF
Attachment_4B_Wage_Determination_AZ20240025.pdf PDF
Attachment_2A_Drawings_Camp_Host_Site.pdf PDF
Attachment_8_Lim_on_SubK_Breakout.xlsx XLSX spreadsheet
Attachment_4C_Wage_Determination_AZ20240029.pdf PDF
Attachment_9_SF1442_Completion_Instructions.pdf PDF
Attachment_2B_Drawings_Owl_Creek_Campground.pdf PDF
Sol_140L0624R0032.pdf PDF
Attachment_3A_Specifications_Camp_Host_Site.pdf PDF
Attachment_2C_Drawings_Riverview_Campground.pdf PDF
Attachment_6_Submittal_Schedule.pdf PDF
Attachment_3B_Specifications_Owl_Creek_Campground.pdf PDF
Attachment_3C_Specifications_Riverview_Campground.pdf PDF
Attachment_4A_Wage_Determination_AZ20230009.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF LAND MANAGEMENT

National Operations Center Building 85, Denver Federal Center

P.O. Box 2547 https://www.blm.gov

140L0624R0032 Gila Box Campground Improvements

Questions and Answers #2

1. Q: Attachment 2A, SH-A-111. Note 2 calls for locking enclosure for propane generator, no specs or references are provided. Please clarify.

A: Refer to keynote 8 sheet CS100 for basis of design. Must be lockable and weather resistant.

2. Q: There are no details for any interior water piping & connections for the laundry/electrical building. Are any details available?

A: See details 4 & 5 on Camp Host plans sheet CS502 for new laundry water and drain connection details.

3. Q: Section 017839. 1.4.B. Section 1.4 indicates the Contractor shall provide electronic 'digital data drawings in AutoCAD, but we do not own this design nor have the original AutoCAD files.

Please confirm this requirement and confirm BLM will provide the original CAD files.

A: This is a requirement. BLM will provide the original CAD files.

4. Q: 033000. 1.3.C. Section requires that the "Formwork Drawings: Prepared by or under the supervision of a qualified professional engineer, detailing fabrication, assembly, and support of formwork." Is this required for these simple slabs?

A: Shop drawings are required, yes. They do not have to be stamped by a professional engineer but must comply with plans and specifications and may be reviewed by BLM engineers or professional engineers on behalf of the BLM.

5. Q: 033000. 1.6.E. Section requires: Mock-Up - Build panel approximately 200 sq. ft. for slab-ongrade and 100 sq. ft. for formed surface in the location indicated or, if not indicated, as directed by Architect. Is this really required for the scope of the concrete slabs that we will be constructing?

A: Mock-ups will not be required by the Architect for this project.

6. Q: 312000. 1.6.A. Geotechnical Testing Agency Qualifications: Qualified according to ASTM E329 and ASTM D3740 for testing indicated. Is this required for earthwork scope QA?

A: Testing agency must be qualified for lab testing of subgrade under slabs and pavements, engineered fill and any disturbed (non native) soils that may support a foundation or footing.

https://www.blm.gov/

7. Q: Attachment 3D. Site furnishings quantities listed in the specification do not match the drawings or the bid schedule. We intend to propose on the drawings quantities, please confirm.

A: Refer to drawings. Attachment 3D Site Furnishings should reflect Site Host Administrative Site 1 Grill. Site Host Administrative Site fire ring is a Standard Fire Ring. Total section should reflect 21 Picnic Tables, 21 Grills, and 19 Standard Fire Rings and 2 ADA Fire Rings.

8. Q: 129300. 1.8. The specification requires: "Special Warranty on Metal Panel Finishes:

Manufacturer agrees to repair finish or replace metal panels that show evidence of deterioration of factory-applied finishes within specified warranty period. Finish Warranty Period: 20 years from date of Substantial Completion." This warranty is not available from the suggested manufacturer. The available warranty is a 7 Year Limited Warranty of the entire building. Please confirm the available warranty is acceptable.

A: The available warranty is acceptable.

9. Q: Attachment 2A Drawings Camp Host Site. G001 & E601. Sheet G001 indicates a 20KW generator requirement, sheet E601, single line diagram, indicates a 12KW generator. Please clarify the correct requirement.

A: The 12KW generator is the correct requirement to back up system.

10. Q: Repairs to a Romtec restroom building is being specified in the GAOA Gila Box solicitation. It is calling out for a new door and roofing. What is the door measurement to determine how old the building is?

Also, there is no details in the solicitation if they are wanting to replace the door and frame and the roof details are not clear. Do they need to replace just the roofing or the entire roof structure?

A: Door dimensions: Door measurement are 35 3/4" wide by 83 1/4" high by 1 3/4" thick.

Outside measurement of the door jam is 40" wide by 88" high by 8" thick. See photo below for hinge height.

Door and frame to be replaced.

Entire Roof to be replaced.