Attachment11B_QuestionsAnswers_3_0005.pdf
PDF 210 KB Posted
- Attached to
- GILA BOX GAOA CAMPGROUND IMPROVEMENTS Federal contract opportunity
- Solicitation number
- 140L0624R0032
About this file
This document is a set of Questions and Answers (#3) related to a federal contract opportunity for Gila Box Campground Improvements (Solicitation Number: 140L0624R0032) issued by the Department of the Interior, Bureau of Land Management National Office.
The key details are:
The questions address the insulation requirements for a pre-fabricated laundry building, specifically the R-values for the roof, walls, and floor. The government clarifies that the laundry building is exempt from the building thermal envelope requirements of the International Energy Conservation Code, and provides the required performance criteria, including R-values, roof turbines, louver, and door specifications for the approved pre-fabricated building model. The contractor is responsible for installing required flashing, seals, and gaskets to ensure the building is leak-proof.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
National Operations Center Building 85, Denver Federal Center
P.O. Box 2547 https://www.blm.gov
140L0624R0032 Gila Box Campground Improvements
Questions and Answers #3
1. Q: 129300. 2.8. There is no architectural details for the pre-fab laundry building, include insulation values. In discussions with the recommended supplier, the building comes with prefab panels with R Values as Roof =12 and Walls = 7.
The spec calls for:
"Roof Insulation: R-19 batt system with an R-11 liner system above, including thermal break spacer blocks.
Wall Insulation: R-13 batt system with R-6.5 continuous above, including thermal break spacer blocks."
There is no internal framing in the prefab building, and really no method available to install additional batt insulation to achieve these specified values. Please clarify or confirm the spec requirement for the additional batt insulation, or does the standard equipped building meet the intent without additional insulation?
A: Per the IECC (International Energy Conservation Code), the shed is exempt from the building thermal envelope provisions of the code. See performance criteria below to include R-Value, roof turbines, louver, and door requirements. Remaining criteria for the shed are represented in the specifications. Contractor to install required flashing, seals, and gaskets required to ensure shed is leak proof.
SHED
A. Manufacturer
1. Duramax
2. Or similar as approved by the government
B. Model:
1. 13x10 Gable Roof Insulated Building 30932
C. Performance Criteria:
1. 2- 12” Roof Turbines
2. 1- 16”x16” Louver
3. Door: 36 ¼” x 77 7/8”
4. Walls: R-5.9
5. Roof: R-5.6
6. Floor: Concrete https://www.blm.gov/