About this file

This document is a set of Questions and Answers (#3) related to a federal contract opportunity for Gila Box Campground Improvements (Solicitation Number: 140L0624R0032) issued by the Department of the Interior, Bureau of Land Management National Office.

The key details are:

The questions address the insulation requirements for a pre-fabricated laundry building, specifically the R-values for the roof, walls, and floor. The government clarifies that the laundry building is exempt from the building thermal envelope requirements of the International Energy Conservation Code, and provides the required performance criteria, including R-values, roof turbines, louver, and door specifications for the approved pre-fabricated building model. The contractor is responsible for installing required flashing, seals, and gaskets to ensure the building is leak-proof.

View the file

Other files for this federal contract opportunity

Other files attached to GILA BOX GAOA CAMPGROUND IMPROVEMENTS, newest first.
File Type Posted
Sol_140L0624R0032_Amd_0005.pdf PDF
Sol_140L0624R0032_Amd_0004.pdf PDF
Attachment11A_QuestionsAnswers_2_0004.pdf PDF
Sol_140L0624R0032_Amd_0003.pdf PDF
Attachment_11_QuestionsAnswers_1_0003.pdf PDF
Attachment_12_Gila_Box_Potential_Laydown_Area_0003.pdf PDF
Attachment_10_24R0032_Site_Visit_Sign_In_Sheet_0003.pdf PDF
Attachment_3E_Specifications_Compaction_Test_Schedule_0003.pdf PDF
140L0624R0032_SF30_Continuation_Pages_Amend_3_0003.pdf PDF
Attachment_2D_Drawings_Kearney_Camp_Rd_Profile_May_2024_0003.pdf PDF
Sol_140L0624R0032_Amd_0002.pdf PDF
Attachment_3D_Site_Furnishings_Specifications_0001.pdf PDF
Sol_140L0624R0032_Amd_0001.pdf PDF
SF30_Continuation_Pages_Amend_1_0001.pdf PDF
Attachment_7_Gila_Box_Geotechnical_Evaluation.pdf PDF
Attachment_1_SOW_20240213.pdf PDF
Attachment_5_Price_Breakout.pdf PDF
Attachment_4B_Wage_Determination_AZ20240025.pdf PDF
Attachment_9_SF1442_Completion_Instructions.pdf PDF
Attachment_2B_Drawings_Owl_Creek_Campground.pdf PDF
Attachment_2A_Drawings_Camp_Host_Site.pdf PDF
Attachment_8_Lim_on_SubK_Breakout.xlsx XLSX spreadsheet
Attachment_4C_Wage_Determination_AZ20240029.pdf PDF
Sol_140L0624R0032.pdf PDF
Attachment_3A_Specifications_Camp_Host_Site.pdf PDF
Attachment_2C_Drawings_Riverview_Campground.pdf PDF
Attachment_6_Submittal_Schedule.pdf PDF
Attachment_3B_Specifications_Owl_Creek_Campground.pdf PDF
Attachment_3C_Specifications_Riverview_Campground.pdf PDF
Attachment_4A_Wage_Determination_AZ20230009.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

BUREAU OF LAND MANAGEMENT

National Operations Center Building 85, Denver Federal Center

P.O. Box 2547 https://www.blm.gov

140L0624R0032 Gila Box Campground Improvements

Questions and Answers #3

1. Q: 129300. 2.8. There is no architectural details for the pre-fab laundry building, include insulation values. In discussions with the recommended supplier, the building comes with prefab panels with R Values as Roof =12 and Walls = 7.

The spec calls for:

"Roof Insulation: R-19 batt system with an R-11 liner system above, including thermal break spacer blocks.

Wall Insulation: R-13 batt system with R-6.5 continuous above, including thermal break spacer blocks."

There is no internal framing in the prefab building, and really no method available to install additional batt insulation to achieve these specified values. Please clarify or confirm the spec requirement for the additional batt insulation, or does the standard equipped building meet the intent without additional insulation?

A: Per the IECC (International Energy Conservation Code), the shed is exempt from the building thermal envelope provisions of the code. See performance criteria below to include R-Value, roof turbines, louver, and door requirements. Remaining criteria for the shed are represented in the specifications. Contractor to install required flashing, seals, and gaskets required to ensure shed is leak proof.

SHED

A. Manufacturer

1. Duramax

2. Or similar as approved by the government

B. Model:

1. 13x10 Gable Roof Insulated Building 30932

C. Performance Criteria:

1. 2- 12” Roof Turbines

2. 1- 16”x16” Louver

3. Door: 36 ¼” x 77 7/8”

4. Walls: R-5.9

5. Roof: R-5.6

6. Floor: Concrete https://www.blm.gov/