Attachment_1_-_Price_Schedule_FINAL.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Follow On Work for Hercules Tugboat at Bay Ship &
Solicitation number
140P8624Q0041
Issued by

About this file

This document is a Price Schedule related to a Request for Quote (RFQ) for follow-on work on the Hercules Tugboat at the San Francisco Maritime National Historical Site. The RFQ solicitation number is 140P8624Q0041.

The Price Schedule includes a list of Contract Line Item Numbers (CLINs) for various repair and maintenance services for the Hercules Tugboat, including cradling and temporary services, underwater hull system maintenance, structural repairs and installation, non-structural repairs, weldments and coatings, valve replacements, and structural shell plate renewal. The contractor is required to provide unit prices and total prices for each CLIN. The total proposed price for the base items and all option items is $0. The federal agency issuing the solicitation is the Department of the Interior National Park Service.

View the file

Other files

File Type Posted
Sol_140P8624Q0041_Amd_0007.pdf PDF
Attachment_1_-_Price_Schedule__Revised_Dated_8_28_24_0006.xlsx XLSX spreadsheet
Sol_140P8624Q0041_Amd_0006.pdf PDF
Attachment_2_-_Statement_of_Work_Revised_8_28_24_0006.pdf PDF
Attachment_1_-_Price_Schedule_Revised_8-21-24_0005.xlsx XLSX spreadsheet
Attachment_2_-_Statement_of_Work_Revised_8_21_2024_0005.pdf PDF
Sol_140P8624Q0041_Amd_0005.pdf PDF
Attachment_2_-_Statement_of_Work_Revised_8_7_2024_0004.pdf PDF
Attachment_1_-_Price_Schedule_Revised_8_4_2024_0004.xlsx XLSX spreadsheet
Attachment_15_-_Frame_Repairs_7-24-24_0004.pdf PDF
Sol_140P8624Q0041_Amd_0004.pdf PDF
Attachment_14_-_Shell_Plating_Doublers_8_24_0004.pdf PDF
Sol_140P8624Q0041_Amd_0003.pdf PDF
Sol_140P8624Q0041_Amd_0002.pdf PDF
Sol_140P8624Q0041_Amd_0001.pdf PDF
Attachment_2_-_Statement_of_Work_amended_7-09-2024_0001.pdf PDF
Attachment_1_-_Price_Schedule_FINAL_amended_7-9-24_0001.xlsx XLSX spreadsheet
Sol_140P8624Q0041.pdf PDF
Attachment_6_-_Hercules_Asbestos_and_Lead_Sample_Plan___Results__2020.pdf PDF
Attachment_9_-_Hercules_Cathodic_Protection_System_Drawings_1.pdf PDF
Attachment_8_-_DDE_Drawings_20030-20A_and_20030-30A.pdf PDF
Attachment_11_-_USCGSF_-MSIB_13-01_1.pdf PDF
Attachment_2_-_Statement_of_Work.pdf PDF
Attachment_3_-_Steam_Tug_Hercules_Docking_and_Blocking_Plan_1.pdf PDF
Attachment_13_-_SCA_Wage_Determination.pdf PDF
Attachment_10_-_Hercules_Stern_Tube_and_Shaft_Drawings_1.pdf PDF
Attachment_12_-_TOMAC_NDT_Services__Inc__Report__2001.pdf PDF
Attachment_7_-_USCG_NAVIC_7-01.pdf PDF
Attachment_5_-_Hercules_NPS_Drawings.pdf PDF
Attachment_4_-_Structural_Rehabilitation_Recommendations_-_Initial_Survey_Report__February_2021.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract Price Schedule
REQUEST FOR QUOTE: 140P8624Q0041
PARK - PMIS: SAFR - 255399, 341297, 317929, 215090, 215091
DEVELOPED AREAS: NHL Tugboat Hercules located at Hyde Street Pier in San Francisco
PROJECT TITLE:
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
BASE ITEMS
1.0Cradling and Temporary Services
1.01Cradling and Blocking (Lay days)100Day$0$ - 0
1.02Temporary Services100Day$0$ - 0
2.0Underwater Hull Systems Maintenance
2.01RUDDER, TAILSHAFT, STERNTUBE, AND PROPELLER REPAIRS, COATING, AND REINSTALLATION$ - 0
ARudder RepairsLS$0
BTailshaft CoatingsLS$0
CDepth SounderLS$0
3.0Structural Repairs and Installation
3.01Shell Plate Insert Repair$ - 0
AInsert P-A-5LS$0
BInsert P-B-6LS$0
CInsert P-F-11/12LS$0
DInsert S-A-5LS$0
EInsert S-B-5LS$0
FKeel ShoeLS$0
3.02Frame and Floor Repairs$ - 0
A-UFlatbar to Angle (FR 09-30)LS$0
FAdditional Forecastle Frame Repair (FR 14)LS$0
IAdditional Forecastle Frame Repairs (FR 17)LS$0
KAdditional Forecastle Frame Repairs (FR 19)LS$0
MAdditional Forecastle Frame Repairs (FR 21)LS$0
NAdditional Forecastle Frame Repairs (FR 22)LS$0
OAdditional Boiler Room Frame Repairs (FR 24)LS$0
QAdditional Boiler Room Frame Repairs (FR 26)LS$0
RAdditional Boiler Room Frame Repairs (FR27)LS$0
SAdditional Boiler Room Frame Repairs (FR 28)LS$0
TAdditional Boiler Room Frame Repairs (FR 29)LS$0
VNew Boiler Room Frame Repairs (FR 31)LS$0
WNew Boiler Room Frame Repairs (FR 32)LS$0
XNew Boiler Room Frame Repairs (FR 33)LS$0
3.03Additional Bilge Stringer RenewalLS$0$ - 0
4.0Non-Structural Repairs, Weldments and Coatings
4.01Prep & Paint Main/Boat Deck, Pilothouse, and Stack, Appurtenances and Fill Main Deck VoidsLS$0$ - 0
4.02Topside Repairs (Includes 6.03 Credit)LS$0$ - 0
TOTAL BASE PRICE --------------------------------------------------------------------------------------------------------------------------------------$0
OPTION ITEMS
5.0Transporting, Haul Out and Temporary Services
5.01ATransportation and Delivery (To MINSY vs HSP)LS$0$ - 0
BSteaming Escort to MINSYLS$0$ - 0
5.02AHaul Out and Blocking (Additional Lay days)1Day$0$ - 0
BWet Berthing (Lay days)1Day$0$ - 0
5.03Additional Temporary Services1Day$0$ - 0
6.0Valve Replacement
6.011 1/2" valveLS$0$ - 0
6.022" valveLS$0$ - 0
6.032 1/2" valveLS$0$ - 0
6.043" valveLS$0$ - 0
6.056" valveLS$0$ - 0
6.068" valveLS$0$ - 0
6.07Main Sea Suction Spool PipeLS$0$ - 0
7.0Non-Structural Repairs, Weldments and Coatings
7.01HFO Tank CoatingsLS$0$ - 0
7.02Guard Rail - OakLS$0$ - 0
7.03Prep and Paint Anchor WindlassLS$0$ - 0
7.04R/R Boiler LaggingLS$0$ - 0
7.05Epoxy Void Filling1SqFt$0$ - 0
8.0Structural Shell Plate Renewal
8.01Renew Plate P-K-3LS$0$ - 0
8.02Renew Plate P-A-3LS$0$ - 0
8.03Renew Plate P-A-4LS$0$ - 0
8.04Renew Plate P-B-4LS$0$ - 0
8.05Renew Plate P-B-5LS$0$ - 0
8.06Renew Plate S-K-4LS$0$ - 0
8.07Renew Plate S-A-2LS$0$ - 0
8.08Renew Plate S-A-3LS$0$ - 0
8.09Renew Plate S-A-4LS$0$ - 0
8.10Renew Plate S-B-4LS$0$ - 0
8.11Renew Plate S-C-4LS$0$ - 0
9.0Structural Component Repairs and Installation
9.01A3" x 3" x 3/8" Angle Iron1Lbs.$0$ - 0
B5" x 3" x 3/8" Angle Iron1Lbs.$0$ - 0
9.02A3/8" Plate Steel - Doubler (Welded)1Lbs.$0$ - 0
B3/8" Plate Steel - Insert (Welded/Riveted)1Lbs.$0$ - 0
C3/8" Plate Steel - Full Component Plate (Riveted)1Lbs.$0$ - 0
D1/2" Plate Steel - Insert (Welded/Riveted)1Lbs.$0$ - 0
E1/2" Plate Steel - Full Component Plate (Riveted)1Lbs.$0$ - 0
9.03AMC 6X12 C-Channel1Lbs.$0$ - 0
BC 5X9 C-Channel1Lbs.$0$ - 0
9.04CLAD Welding (25 pits per)25CLAD Weld$0$ - 0
9.05Additional Rivet Repairs
9.05.1Bobbing, Groups of 5050EA$0$0.00
9.05.2Frenching, Groups of 2525EA$0$0.00
9.05.3Ring Welding, Groups of 5050EA$0$0.00
9.05.4Replacement, Groups of 2525EA$0$0.00
TOTAL PRICE FOR ALL OPTIONS --------------------------------------------------------------------------------------------------------------------$0
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS --------------------------------------------------------------------------------------------$0

File details come from the government source that posted it. Updated .