Attachment_1_-_Price_Schedule_FINAL_amended_7-9-24_0001.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- 140P8624Q0041
About this file
This document is a Price Schedule for a Request for Quote (RFQ) related to the follow-on work for the Hercules Tugboat at the San Francisco Maritime National Historical Site (SAFR). The RFQ, Solicitation Number 140P8624Q0041, is issued by the Department of the Interior National Park Service.
The Price Schedule outlines various contract line items for the project, including cradling and temporary services, underwater hull systems maintenance, structural repairs and installation, non-structural repairs, weldments and coatings, valve replacement, and structural shell plate renewal. The schedule provides unit prices and total prices for each line item. The contract also includes base items and option items. The total proposed price for the base items plus all options is $0. The project is located in San Francisco County, California.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract Price Schedule |
| REQUEST FOR QUOTE: 140P8624Q0041 |
| PARK - PMIS: SAFR - 255399, 341297, 317929, 215090, 215091 |
| DEVELOPED AREAS: NHL Tugboat Hercules located at Hyde Street Pier in San Francisco |
| PROJECT TITLE: |
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE | |
| BASE ITEMS | ||||||
| 1.0 | Cradling and Temporary Services | |||||
| 1.01 | Cradling and Blocking | LS | $0 | $ - 0 | ||
| 1.02 | Temporary Services | LS | $0 | $ - 0 | ||
| 2.0 | Underwater Hull Systems Maintenance | |||||
| 2.01 | RUDDER, TAILSHAFT, STERNTUBE, AND PROPELLER REPAIRS, COATING, AND REINSTALLATION | $ - 0 | ||||
| A | Rudder Repairs | LS | $0 | |||
| B | Tailshaft Coatings | LS | $0 | |||
| C | Depth Sounder | LS | $0 | |||
| 3.0 | Structural Repairs and Installation | |||||
| 3.01 | Shell Plate Insert Repair | $ - 0 | ||||
| A | Insert P-A-5 | LS | $0 | |||
| B | Insert P-B-6 | LS | $0 | |||
| C | Insert P-F-11/12 | LS | $0 | |||
| D | Insert S-A-5 | LS | $0 | |||
| E | Insert S-B-5 | LS | $0 | |||
| F | Keel Shoe | LS | $0 | |||
| 3.02 | Frame and Floor Repairs | $ - 0 | ||||
| A-U | Flatbar to Angle (FR 09-30) | LS | $0 | |||
| F | Additional Forecastle Frame Repair (FR 14) | LS | $0 | |||
| I | Additional Forecastle Frame Repairs (FR 17) | LS | $0 | |||
| K | Additional Forecastle Frame Repairs (FR 19) | LS | $0 | |||
| M | Additional Forecastle Frame Repairs (FR 21) | LS | $0 | |||
| N | Additional Forecastle Frame Repairs (FR 22) | LS | $0 | |||
| O | Additional Boiler Room Frame Repairs (FR 24) | LS | $0 | |||
| Q | Additional Boiler Room Frame Repairs (FR 26) | LS | $0 | |||
| R | Additional Boiler Room Frame Repairs (FR27) | LS | $0 | |||
| S | Additional Boiler Room Frame Repairs (FR 28) | LS | $0 | |||
| T | Additional Boiler Room Frame Repairs (FR 29) | LS | $0 | |||
| V | New Boiler Room Frame Repairs (FR 31) | LS | $0 | |||
| W | New Boiler Room Frame Repairs (FR 32) | LS | $0 | |||
| X | New Boiler Room Frame Repairs (FR 33) | LS | $0 | |||
| 3.03 | Additional Bilge Stringer Renewal | LS | $0 | $ - 0 | ||
| 4.0 | Non-Structural Repairs, Weldments and Coatings | |||||
| 4.01 | Prep & Paint Main/Boat Deck, Pilothouse, and Stack, Appurtenances and Fill Main Deck Voids | LS | $0 | $ - 0 | ||
| 4.02 | Topside Repairs (Includes 6.03 Credit) | LS | $0 | $ - 0 | ||
| TOTAL BASE PRICE -------------------------------------------------------------------------------------------------------------------------------------- | $0 | |||||
| OPTION ITEMS | ||||||
| 5.0 | Transporting, Haul Out and Temporary Services | |||||
| 5.01 | A | Transportation and Delivery (To MINSY vs HSP) | LS | $0 | $ - 0 | |
| B | Steaming Escort to MINSY | LS | $0 | $ - 0 | ||
| 5.02 | A | Haul Out and Blocking (Additional Lay days) | 1 | Day | $0 | $ - 0 |
| B | Wet Berthing (Lay days) | 1 | Day | $0 | $ - 0 | |
| 5.03 | Additional Temporary Services | 1 | Day | $0 | $ - 0 | |
| 6.0 | Valve Replacement | |||||
| 6.01 | 1 1/2" valve | LS | $0 | $ - 0 | ||
| 6.02 | 2" valve | LS | $0 | $ - 0 | ||
| 6.03 | 2 1/2" valve | LS | $0 | $ - 0 | ||
| 6.04 | 3" valve | LS | $0 | $ - 0 | ||
| 6.05 | 6" valve | LS | $0 | $ - 0 | ||
| 6.06 | 8" valve | LS | $0 | $ - 0 | ||
| 6.07 | Main Sea Suction Spool Pipe | LS | $0 | $ - 0 | ||
| 7.0 | Non-Structural Repairs, Weldments and Coatings | |||||
| 7.01 | HFO Tank Coatings | LS | $0 | $ - 0 | ||
| 7.02 | Guard Rail - Oak | LS | $0 | $ - 0 | ||
| 7.03 | Prep and Paint Anchor Windlass | LS | $0 | $ - 0 | ||
| 7.04 | R/R Boiler Lagging | LS | $0 | $ - 0 | ||
| 7.05 | Epoxy Void Filling | 1 | SqFt | $0 | $ - 0 | |
| 8.0 | Structural Shell Plate Renewal | |||||
| 8.01 | Renew Plate P-K-3 | LS | $0 | $ - 0 | ||
| 8.02 | Renew Plate P-A-3 | LS | $0 | $ - 0 | ||
| 8.03 | Renew Plate P-A-4 | LS | $0 | $ - 0 | ||
| 8.04 | Renew Plate P-B-4 | LS | $0 | $ - 0 | ||
| 8.05 | Renew Plate P-B-5 | LS | $0 | $ - 0 | ||
| 8.06 | Renew Plate S-K-4 | LS | $0 | $ - 0 | ||
| 8.07 | Renew Plate S-A-2 | LS | $0 | $ - 0 | ||
| 8.08 | Renew Plate S-A-3 | LS | $0 | $ - 0 | ||
| 8.09 | Renew Plate S-A-4 | LS | $0 | $ - 0 | ||
| 8.10 | Renew Plate S-B-4 | LS | $0 | $ - 0 | ||
| 8.11 | Renew Plate S-C-4 | LS | $0 | $ - 0 | ||
| 9.0 | Structural Component Repairs and Installation | |||||
| 9.01 | A | 3" x 3" x 3/8" Angle Iron | 1 | Lbs. | $0 | $ - 0 |
| B | 5" x 3" x 3/8" Angle Iron | 1 | Lbs. | $0 | $ - 0 | |
| 9.02 | A | 3/8" Plate Steel - Doubler (Welded) | 1 | Lbs. | $0 | $ - 0 |
| B | 3/8" Plate Steel - Insert (Welded/Riveted) | 1 | Lbs. | $0 | $ - 0 | |
| C | 3/8" Plate Steel - Full Component Plate (Riveted) | 1 | Lbs. | $0 | $ - 0 | |
| D | 1/2" Plate Steel - Insert (Welded/Riveted) | 1 | Lbs. | $0 | $ - 0 | |
| E | 1/2" Plate Steel - Full Component Plate (Riveted) | 1 | Lbs. | $0 | $ - 0 | |
| 9.03 | A | MC 6X12 C-Channel | 1 | Lbs. | $0 | $ - 0 |
| B | C 5X9 C-Channel | 1 | Lbs. | $0 | $ - 0 | |
| 9.04 | CLAD Welding (25 pits per) | 25 | CLAD Weld | $0 | $ - 0 | |
| 9.05 | Additional Rivet Repairs | |||||
| 9.05.1 | Bobbing, Groups of 50 | 50 | EA | $0 | $0.00 | |
| 9.05.2 | Frenching, Groups of 25 | 25 | EA | $0 | $0.00 | |
| 9.05.3 | Ring Welding, Groups of 50 | 50 | EA | $0 | $0.00 | |
| 9.05.4 | Replacement, Groups of 25 | 25 | EA | $0 | $0.00 | |
| TOTAL PRICE FOR ALL OPTIONS -------------------------------------------------------------------------------------------------------------------- | $0 | |||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS -------------------------------------------------------------------------------------------- | $0 |
File details come from the government source that posted it. Updated .