This document is an attachment detailing the shell plating doubler requirements for the Steam Tug Hercules, which is referenced in a federal contract opportunity. The attachment provides a detailed overview of the work required, including the locations, dimensions, and corrosion percentages for various shell plates and doublers that need to be installed or repaired on the starboard and port sides of the vessel, from the stem to frame 77. The work is necessary to facilitate the vessel's safe return to the water. The related federal contract opportunity is for follow-on work for the Hercules Tugboat at Bay Ship & Yacht for the San Francisco Maritime National Historical Site, issued by the Department of the Interior National Park Service. The solicitation number is 140P8624Q0041, and it includes a revised Statement of Work and Price Schedule.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Plate S-A-2 17% Avg, Corrosion
Plate S-A-3 22% Avg. Corrosion
Plate S-A-1 23.2% Avg Corrosion
Plate S-A-4 44% Avg. Corrosion
Plate S-B-4
Plate S-B-1 19% Avg Corrosion overall
32% Avg Corrosion (Red hatch)
Plate S-B-2 11% Avg. CorrosionPlate S-B-3
11% Avg. Corrosion
Plate S-B-5
Plate P-B-4 24% Average Corrosion
Existing New Doubler
Existing Welded Doubler
Proposed New Welded Doubler
Contracted New Insert
Plate P-A-114% Avg Corrosion(excluding doubler) Plate P-A-2
Plate P-A-4 29% Avg. Corrosion
Plate P-A-3
Hole in Plate
Plate P-B-132% Avg. Corrosion Plate P-B-2 15% Avg. Corrosion Plate P-B-3
Plate S-C-2
B ul kh ea d
B ul kh ea d
B ul kh ea d
B ul kh ea d
B ul kh ea d
B ul kh ea d
Plate S-K-1
32% Avg. Corrosion Plate S-K-2 25% Avg. CorrosionPlate S-K-3
22.8% Avg. Corrosion
B ul kh ea d
Plate S-C-3
FORE PEAK
B ul kh ea d
FORECASTLE
Crew Berthing/ Ship Service
FORE PEAK FORECASTLE
Crew Berthing/ Ship Service
Plate P-K-2 32% Avg. Corrosion Plate P-K-3
34% Avg. Corrosion
Plate P-K-128% Avg. Corrosion
Plate S-K-4 41% Avg. Corrosion
B ul kh ea d
B ul kh ea d
BOILER RMF/O TANKS P/SAFT PEAK TANK
Ballast/Feed Water
B ul kh ea d
LAZARETTE TANK
Ballast/Feed Water
Plate P-K-4 34% Avg. Corrosion
BOILER RM
LAZARETTE TANK
Ballast/Feed Water
LAZARETTE TANK
Ballast/Feed Water
B ul kh ea d
ENGINE ROOM
F/O TANKS P/S ENGINE ROOM AFT PEAK TANK
Ballast/Feed Water
Plate S-K-5 26% Avg. Corrosion
Plate P-A-5 15% Avg. Corrosion
Plate P-A-6 XX% Avg. Corrosion
Plate P-A-7 27% Avg. Corrosion Plate P-A-8
27% Avg. Corrosion
Plate P-A-9 37% Avg. Corrosion
Plate P-A-10 Repairs (4.03.C)
2.0% Avg. Corrosion
Plate P-B-5 Plate P-B-6
Plate P-B-7 17% Avg. Corrosion Plate P-B-8
27% Avg. Corrosion
Plate P-B-9
Plate P-B-10
Plate P-K-5 16% Avg. Corrosion
Plate P-K-6 XX% Avg. Corrosion
Plate P-K-7 XX% Avg. Corrosion
Plate P-K-8 20% Avg. Corrosion
Plate P-K-9 27% Avg. Corrosion
Strake A (Under) 38 t
Strake B (Over) 38 t
Strake C (Under) 38"t
Strake D (Over) 38"t
Strake E (Under) 38"t
Strake F (Over) 12"t
Keel Strake "K" (Over 38 t)
Existing Welded Insert
Plate P-C-1 Plate P-C-2
Plate P-C-3 Plate P-C-4 Plate P-C-5 Plate P-C-6 Plate P-C-7
Plate P-C-8
Plate P-C-9
Plate P-C-10
Plate P-C-11
Plate P-D-1 Plate P-D-2
Plate P-D-3 Plate P-D-4
Plate P-D-5 Plate P-D-6 Plate P-D-7 Plate P-D-8 Plate P-D-9
Plate P-D-10
Plate P-E-1
Plate P-E-2 Plate P-E-3
Plate P-E-5 Plate P-E-6 Plate P-E-7 Plate P-E-8 Plate P-E-9
Plate P-E-10
Plate P-F-1 Plate P-F-2
Plate P-F-3
Plate P-F-4 Plate P-F-5 Plate P-F-6 Plate P-F-7
Plate P-F-8 Plate P-F-9
Plate P-F-10
Plate P-F-11
Plate P-B-11
Plate S-C-4
Plate P-F-12
Plate S-A-5 XX% Avg. Corrosion
Plate S-B-6
Plate S-C-1
Plate S-D-1
Plate S-D-2
Plate S-E-1 Plate S-E-2
Plate S-F-2 Plate S-F-1
Keel Shoe Repairs
Plate S-K-6Plate S-K-7 Plate S-K-8
Plate S-K-9
Plate S-A-6Plate S-A-7
Plate S-A-10
Plate S-A-9 Plate S-A-8
Plate S-B-7 Plate S-B-8
Plate S-B-9
Plate S-B-10 Plate S-C-5
Plate S-C-6Plate S-C-7 Plate S-C-8Plate S-C-9
Plate S-C-10
Plate S-C-11 Plate S-D-3 Plate S-D-4Plate S-D-5Plate S-D-6Plate S-D-7Plate S-D-8
Plate S-D-9 Plate S-D-10
Plate S-D-11
Plate S-E-11
Plate S-E-3 Plate S-E-4
Plate S-E-5Plate S-E-6Plate S-E-7Plate S-E-8Plate S-E-9
Plate S-E-10 Plate S-E-11
Plate S-F-3 Plate S-F-4
Plate S-F-5Plate S-F-6Plate S-F-7Plate S-F-8Plate S-F-9Plate S-F-10
Weld in insert with no rivets
Extend existing interference doubler as indicated 9.4 Sq ft
Customer
Rules Paint
Design:
Approval:
Order no.
Drawing no.
Page
OfUSCG, ABS, DNV, etc.. Revision:
Scale:Description:
Date:
Date:Maritime Technical Services, LLC.
114 Tamal Vista, San Rafael CA. 94901
510-499-2995
WWW.MARITIMETECHSERVICES.COM
G
H
I
J
K
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
G
H
I
J
K
A
B
C
D
E
F
17 18
L
M
L
M
Steam Tug Hercules
Shell Plate Doubler NPS 08/07/24Tony G
N/A N/A 240805-1
No Scale 1
H
AutoCAD SHX Text Steam Tug Hercules Shell Expansion Plan
AutoCAD SHX Text Port Side: For Illustration only(Outside Looking at Hull)
AutoCAD SHX Text Steam Tug Hercules Shell Expansion Plan
AutoCAD SHX Text Starboard Side: For Illustration only(Outside Looking at Hull)
Plate S-A-2 17% Avg, Corrosion
Plate S-A-3 22% Avg. Corrosion
Plate S-A-1 23.2% Avg Corrosion
Plate S-B-1 19% Avg Corrosion overall
32% Avg Corrosion (Red hatch)
Plate S-B-2 11% Avg. CorrosionPlate S-B-3
11% Avg. Corrosion
Plate S-C-2
B ul kh ea d
Plate S-K-1
32% Avg. Corrosion Plate S-K-2 25% Avg. CorrosionPlate S-K-3
22.8% Avg. Corrosion
B ul kh ea d
Plate S-C-3
FORE PEAKFORECASTLE
Crew Berthing/ Ship Service
Plate S-K-4 41% Avg. Corrosion
Plate S-C-4
Plate S-C-1
Plate S-D-1
Plate S-D-2
Plate S-E-1 Plate S-E-2
Plate S-F-2 Plate S-F-1
Plate S-D-3
Plate S-E-3
Plate S-F-3 Plate S-F-4
Extend existing interference doubler as indicated 9.4 Sq ft
HERCULES
Starboard Side Doubler Outline
1. The following work is recommended to facilitate the vessels safe return to the water
2. The work identified here is from the stem to frame 23.
Customer
Rules Paint
Design:
Approval:
Order no.
Drawing no.
Page
OfUSCG, ABS, DNV, etc.. Revision:
Scale:Description:
Date:
Date:Maritime Technical Services, LLC.
114 Tamal Vista, San Rafael CA. 94901
510-499-2995
WWW.MARITIMETECHSERVICES.COM
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
Install doubler plate over existing previously clad welded repair on plate S-A-2 from butt of new inert just aft of frame 10 to just aft of frame 11 to lower seam between S-A-2 and S-K-2. Approximate dimensions 2'-6.68" x 1'-5.82" x 0.375"t 3.75 ft² (58.14lbs)
Install doubler plate from bottom seam on plateover existing previously clad welded repair. Approximate dimensions 7'-0.59" x 0'-10.02" x 0.375"t 7ft² (90lbs)
A
Starboard Side Doublers Frame 0 to 26
NPS
See SOW See SOW
Tony G. See SOW
240805-1
08/07/24 N/A 2
0 7
1'-5.82"
2'-6.68"
7'-0.59" 0'-10.64"
Extend existing cropped out interference covering K and A strake at frame 16 to just aft of frame 18 covering the seam between -A-2 and S-K-3 as indicated. Extra doubler equals 9.3 ft² of steel or 139.2lbs
4'-7.71"
5'-0.06"
Install doubler plate from seam between S-K-3 and S-A-3 from doubler indicated in item 3 to existing doubler that starts between frames 21 and 22. Approximate dimensions 5'-9.71" x 1'-5.98" x 0.375"t 7ft² (133.4lbs)
5'-9.71"
1'-5.98"
3'-0.53"
1'-0.68"
Install doubler plate on S-K-4 at turn of CVK to approximately 18" Doubler to start at frame 22 and extend aft 37" to just forward of frame 24. Approximate dimensions 3'-0.53" x 1'-0.68" x 0.375"t 7ft² (49.2lbs)
Install doubler plate on S-A-4 at seam between S-A-4 and S-K-4 just aft of existing welded insert. Approximate dimensions 1'-2.57" x 0'11.36" x 0.375"t 7ft² (17.5lbs)
1'-2.57"
0'-11.36"
Plate S-A-4 44% Avg. Corrosion
Plate S-B-4
Plate S-B-5
B ul kh ea d
B ul kh ea d
Plate S-K-4 41% Avg. Corrosion
BOILER RMF/O TANKS P/S
Plate S-K-5 26% Avg. Corrosion
Plate S-A-5 XX% Avg. Corrosion
Plate S-B-6
Plate S-K-6Plate S-K-7
Plate S-A-6Plate S-A-7
Plate S-C-5 Plate S-C-6Plate S-C-7
Plate S-D-4Plate S-D-5Plate S-D-6Plate S-D-7
Plate S-E-4 Plate S-E-5Plate S-E-6
Plate S-F-5Plate S-F-6Plate S-F-7
Weld in insert with no rivets
Customer
Rules Paint
Design:
Approval:
Order no.
Drawing no.
Page
OfUSCG, ABS, DNV, etc.. Revision:
Scale:Description:
Date:
Date:Maritime Technical Services, LLC.
114 Tamal Vista, San Rafael CA. 94901
510-499-2995
WWW.MARITIMETECHSERVICES.COM
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
Install doubler plate over holes in S-K-5 strake between frames 34 and 36. Approximate dimensions 1'-11.92" x 3'-6.37" x 0.375"t 7 ft² (108.14lbs)
A
Starboard Side Doublers Frame 25 to 51
HERCULES
Starboard Side Doubler Outline
1. The following work is recommended to facilitate the vessels safe return to the water
2. The work identified here is from frame 26 to frame 51.
NPS
See SOW See SOW
Tony G. See SOW
240805-1
08/07/24 N/A 3
0 7
7 9
Install three doubler plates on K Strake at turn of CVK to approximately 18" Doubler. Approximate dimensions 3'-0.53" x 1'-0.68" x 0.375"t 7ft² (49.26lbs)
3'-6.37"
1'-11.92"
Install small 1.2 ft² doubler plates just under body roller at bulkhead
36. Approximate dimensions 1'-11.62" x 0'-7.72" x 0.375"t 6.5ft² (19.37lbs)1'-11.62"
0'-7.72"
0'-11.39"
1'-2.57"
B ul kh ea d
B ul kh ea d
AFT PEAK TANK
Ballast/Feed Water
B ul kh ea d
ENGINE ROOM
Plate S-K-8 Plate S-K-9
Plate S-A-7
Plate S-A-10
Plate S-A-9 Plate S-A-8
Plate S-B-7 Plate S-B-8
Plate S-B-9
Plate S-C-8Plate S-C-9
Plate S-C-10
Plate S-D-8 Plate S-D-9
Plate S-D-10
Plate S-E-11
Plate S-E-7Plate S-E-8Plate S-E-9
Plate S-E-10
Plate S-F-8Plate S-F-9Plate S-F-10
Customer
Rules Paint
Design:
Approval:
Order no.
Drawing no.
Page
OfUSCG, ABS, DNV, etc.. Revision:
Scale:Description:
Date:
Date:Maritime Technical Services, LLC.
114 Tamal Vista, San Rafael CA. 94901
510-499-2995
WWW.MARITIMETECHSERVICES.COM
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
Install doubler plate over holes in S-C-8 strake between frames 55 and 60. Approximate dimensions 2'-0.32" x 7'-0.65" x 0.375"t 14 ft² (219.lbs)
A
Starboard Side Doublers Frame 25 to 51
HERCULES
Starboard Side Doubler Outline
1. The following work is recommended to facilitate the vessels safe return to the water
2. The work identified here is from frame 26 to frame 51.
NPS
See SOW See SOW
Tony G. See SOW
240805-1
08/07/24 N/A 4
0 7
2'-0.32"
7'-0.65"
Plate P-A-114% Avg Corrosion(excluding doubler) Plate P-A-2
Plate P-A-3
Plate P-B-132% Avg. Corrosion Plate P-B-2 15% Avg. Corrosion Plate P-B-3
B ul kh ea d
B ul kh ea d
FORE PEAK FORECASTLE
Crew Berthing/ Ship Service
Plate P-K-2 32% Avg. Corrosion Plate P-K-3
34% Avg. Corrosion
Plate P-K-128% Avg. Corrosion
Plate P-C-1 Plate P-C-2
Plate P-C-3 Plate P-C-4
Plate P-D-1 Plate P-D-2
Plate P-D-3 Plate P-D-4
Plate P-E-1
Plate P-E-2 Plate P-E-3
Plate P-F-1 Plate P-F-2
Plate P-F-3
Plate P-F-4
Customer
Rules Paint
Design:
Approval:
Order no.
Drawing no.
Page
OfUSCG, ABS, DNV, etc.. Revision:
Scale:Description:
Date:
Date:Maritime Technical Services, LLC.
114 Tamal Vista, San Rafael CA. 94901
510-499-2995
WWW.MARITIMETECHSERVICES.COM
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
Install doubler plate over holes in P-K-3 strake between frames 21 and 25. Approximate dimensions 4'-6.23" x 1'-9.25" x 0.375"t 7.7ft² (122.5lbs)
B
Port Side Doublers Frame 0 to 26
HERCULES
Port Side Doubler Outline
1. The following work is recommended to facilitate the vessels safe return to the water
2. The work identified her is from the stem to frame 23.
NPS
See SOW See SOW
Tony G. See SOW
240805-1
08/07/24 N/A 5
0 7
4'-6.23"
1'-9.25"
Plate P-B-4 24% Average Corrosion
Plate P-A-4 29% Avg. Corrosion
B ul kh ea d
B ul kh ea d
Plate P-K-3 34% Avg. Corrosion Plate P-K-4
34% Avg. Corrosion
BOILER RM F/O TANKS P/S
Plate P-A-5 15% Avg. Corrosion
Plate P-A-6 XX% Avg. Corrosion
Plate P-A-7 27% Avg. Corrosion
Plate P-B-5 Plate P-B-6
Plate P-K-5 16% Avg. Corrosion
Plate P-K-6 XX% Avg. Corrosion
Plate P-K-7 XX% Avg. Corrosion
Plate P-C-5 Plate P-C-6 Plate P-C-7
Plate P-D-4
Plate P-D-5 Plate P-D-6 Plate P-D-7
Plate P-E-5 Plate P-E-6 Plate P-E-7
Plate P-F-5 Plate P-F-6 Plate P-F-7
Customer
Rules Paint
Design:
Approval:
Order no.
Drawing no.
Page
OfUSCG, ABS, DNV, etc.. Revision:
Scale:Description:
Date:
Date:Maritime Technical Services, LLC.
114 Tamal Vista, San Rafael CA. 94901
510-499-2995
WWW.MARITIMETECHSERVICES.COM
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
Install doubler over existing P-B-4 plate from aft butt of new insert to just aft of frame 34. Doubler should extend seam to seam and include 2" plug welds a minimum of 18" OC at each existing frame.
Approximate dimensions 14'-5.95" x 4'5.52" x 0.375t (64² ft or 990 lbs
B
Port Side Doublers Frame 0 to 26
HERCULES
Port Side Doubler Outline
1. The following work is recommended to facilitate the vessels safe return to the water
2. The work identified her is from the stem to frame 23.
NPS
See SOW See SOW
Tony G. See SOW
240805-1
08/07/24 N/A 6
0 7
14'-5.95"
4'-5.82"
13 13 Install doubler over existing hole on frame 32. Doubler should extend seam to seam just under body roller. Approximate dimensions 0'-3.14" x 1-'0.58" x 0.375t (0.3² ft or 4.34lbs
1'-1.58" 0'-3.14"
B ul kh ea d
B ul kh ea d
B ul kh ea d
ENGINE ROOM AFT PEAK TANK
Ballast/Feed Water
Plate P-A-7 27% Avg. Corrosion Plate P-A-8
27% Avg. Corrosion
Plate P-A-9 37% Avg. Corrosion
Plate P-A-10 Repairs (4.03.C)
2.0% Avg. Corrosion
Plate P-B-7 17% Avg. Corrosion Plate P-B-8
27% Avg. Corrosion
Plate P-B-9
Plate P-B-10
Plate P-K-7 XX% Avg. Corrosion
Plate P-K-8 20% Avg. Corrosion
Plate P-K-9 27% Avg. Corrosion
Plate P-C-8
Plate P-C-9
Plate P-C-10
Plate P-C-11Plate P-D-8 Plate P-D-9
Plate P-D-10
Plate P-E-7 Plate P-E-8 Plate P-E-9
Plate P-E-10Plate P-F-8 Plate P-F-9
Plate P-F-10
Plate P-F-11
Plate P-B-11
Customer
Rules Paint
Design:
Approval:
Order no.
Drawing no.
Page
OfUSCG, ABS, DNV, etc.. Revision:
Scale:Description:
Date:
Date:Maritime Technical Services, LLC.
114 Tamal Vista, San Rafael CA. 94901
510-499-2995
WWW.MARITIMETECHSERVICES.COM
A
1 2 3 4 5 6 7 8 9
B
C
D
E
F
A
B
C
D
E
F
Install doubler over existing P-B-7 just under sxisting doubler plate from aft butt of new insert to just aft of frame 34. Approximate dimensions 1'-7.99" x 1'-9.74" x 0.375t (3² ft or 46.7lbs)
B
Port Side Doublers Frame 51 to 77
HERCULES
Port Side Doubler Outline
1. The following work is recommended to facilitate the vessels safe return to the water
2. The work identified her is from frame 51 to frame 77.
NPS
See SOW See SOW
Tony G. See SOW
240805-1
08/07/24 N/A 7
0 7
1'-7.99"
1'-9.74"
13'-3.05"
4'-1.48"
4'-0.30"
5'-1.78"
Install doubler over existing P-C-8 plate from aft butt of existing welded doubler butt at frame 52 aft to but between P-C-8 and P-C-9 between frames 59 and 60 from. Doubler should extend seam to seam and include 2" plug welds a minimum of 18" OC at each existing frame. Approximate dimensions 13'-3.05" x 4'-1.48" x 0.375t (52.6² ft or 845.5 lbs)
Install doubler over existing P-B-9 just under existing new insert plate from aft butt of new insert to just aft of frame 68 from upper seam ato a minimum of 6" below seam between P-A-9 and P-B-9.
Approximate dimensions 4'-0.3" x 5'-1.78" x 0.375t (20.5² ft or 315lbs)
Remove existing small doubler on plate P-B-8 just aft of the but between P-B-7 and P-B-8. Remove coating covering rivets on the aft butt seam of plate P-B-7. Install new doubler over existing P-B-8 between frames 57 and 58 extending seam to seam.
Approximate dimensions 4'-8.86" x 0'-8.0" x 0.375t (3.16² ft or 48.4lbs)
4'-8.86"
0'-8.00"
| Sheets and Views |
| Shell Plating (Tony 8-1-24)-1 |
| Shell Plating (Tony 8-1-24)-2 |
| Shell Plating (Tony 8-1-24)-3 |
| Shell Plating (Tony 8-1-24)-4 |
| Shell Plating (Tony 8-1-24)-5 |
| Shell Plating (Tony 8-1-24)-6 |
| Shell Plating (Tony 8-1-24)-7 |
File details come from the government source that posted it. Updated .