This document is a solicitation for the renovation and addition to Building No. 60, the Community Living Center, at the Robert J. Dole VA Medical Center in Wichita, Kansas. The project involves designing an 18,000 square foot one-story expansion with the capability of a future second story, as well as renovating approximately 13,000 square feet of existing space. Key work includes site work, landscaping, civil, structural, architectural, mechanical, plumbing, electrical, and technology systems. The solicitation has a base bid and four alternates that provide options to adjust the scope. The period of performance is 480 days base, with deductive alternates reducing the duration by up to 60 days. The project is being procured by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA 589-703 Renovation/Addition Building No. 60 CLC
Robert J. Dole VAMC - Wichita, Kansas
Bid Documents
09-06-23
Kansas Architectural Registration No: 6728 Kansas Structural Registration No: 28649
Kansas Fire Protection Registration No: 13506 Kansas Mechanical Registration No: 27054
Kansas Electrical Registration No: 28174 Kansas Landscape Registration No: LA0412
09-06-23
09/06/23
Kansas Civil Registration No: 27916
Kansas Technology Registration No: 328601
72 19 6
AL
AN LANE LACKEY
9/6/2023
Robert J. Dole VAMC – Wichita, Kansas
Bid Documents
05-28-21
00 01 10-1
TABLE OF CONTENTS
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 05-21
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20
01 33 23 Shop Drawings, Product Data, and Samples 05-17
01 35 26 Safety Requirements 07-20
01 42 19 Reference Standards 11-20
01 45 29 Testing Laboratory Services 11-18
01 56 39 Temporary Tree and Plant Protection
01 57 19 Temporary Environmental Controls 01-21
01 74 19 Construction Waste Management 01-21
01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 01-21
02 41 00 Demolition 08-17
02 82 11 Traditional Asbestos Abatement 01-21
02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21
02 82 13.21 Asbestos Roofing Abatement 01-21
02 83 33.13 Lead-Based Paint Removal and Disposal 01-21
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 01-21
DIVISION 04 – MASONRY
04 20 00 Unit Masonry 08-17
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18
05 36 00 Composite Metal Decking 01-21
05 40 00 Cold-Formed Metal Framing 01-21
05 50 00 Metal Fabrications 08-18
05 51 00 Metal Stairs 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
00 01 10-2
SECTION NO. DIVISION AND SECTION TITLES DATE
06 10 00 Rough Carpentry 10-17
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 01-21
07 13 52 Modified Bituminous Sheet Waterproofing 01-21
07 21 13 Thermal Insulation 01-21
07 22 00 Roof and Deck Insulation 01-21
07 24 00 Exterior Finish and Insulation System 01-21
07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 01-21
07 31 13 Asphalt Shingles 01-21
07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21
07 60 00 Flashing and Sheet Metal 01-21
07 81 00 Applied Fireproofing 10-17
07 84 00 Firestopping 01-21
07 92 00 Joint Sealants 10-17
07 95 13 Expansion Joint Cover Assemblies 01-21
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 14 00 Interior Wood Doors 01-21
08 31 13 Access Doors and Frames 01-21
08 41 13 Aluminum-Framed Entrances and Storefronts 01-21
08 42 29.13 Sliding Automatic Entrances
08 42 29.23 Blast-Rated Sliding Doors
08 51 13 Aluminum Windows 01-21
08 71 00 Door Hardware 01-21
08 71 13 Automatic Door Operators 01-21
08 80 00 Glazing 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 30 13 Ceramic/Porcelain Tiling 01-21
09 51 00 Acoustical Ceilings 12-18
09 65 13 Resilient Base and Accessories 01-21
09 65 16 Resilient Sheet Flooring 05-18
09 65 19 Resilient Tile Flooring 05-18
09 68 00 Carpeting 01-21
09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21
10 21 23 Cubicle Curtain Tracks 01-21
00 01 10-3
SECTION NO. DIVISION AND SECTION TITLES DATE
10 26 00 Wall and Door Protection 01-21
10 28 00 Toilet, Bath, and Laundry Accessories 01-21
10 44 13 Fire Extinguisher Cabinets 08-18
10 73 16 Modular Awning System
10 82 00 Grilles and Screens
DIVISION 11 – EQUIPMENT
11 40 11 Custom Fabricated Foodservice Equipment
11 41 00 Food Storage Equipment
11 44 00 Food Cooking Equipment
11 48 00 Cleaning and Disposal Equipment
11 73 00 Ceiling Mounted Patient Lift System 08-20
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 08-17
12 32 00 Manufactured Wood Casework 09-15
12 36 00 Countertops 12-18
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components
01-14
DIVISION 14– CONVEYING EQUIPEMENT – NOT USED
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20
22 05 12 General Motor Requirements for Plumbing Equipment 09-20
22 05 19 Meters and Gages for Plumbing Piping 09-20
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
22 08 00 Commissioning of Plumbing Systems 11-16
22 11 00 Facility Water Distribution 05-21
22 11 23 Domestic Water Pumps 09-15
22 13 00 Facility Sanitary and Vent Piping 09-20
22 13 23 Sanitary Waste Interceptors 09-20
22 13 33 Packaged, Submersible Sewerage Pump Units 09-20
22 14 00 Facility Storm Drainage 09-15
22 35 00 Domestic Water Heat Exchangers 09-20
22 40 00 Plumbing Fixtures 09-15
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15
22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15
00 01 10-4
SECTION NO. DIVISION AND SECTION TITLES DATE
22 66 00 Chemical-Waste Systems for Laboratory and Healthcare
Facilities
09-20
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02-20
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 08 00 Commissioning of HVAC Systems 02-20
23 09 23 Direct-Digital Control System for HVAC 09-11
23 10 00 Facility Fuel Systems 04-20
23 11 23 Facility Natural-Gas Piping 04-20
23 21 13 Hydronic Piping 02-20
23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 02-20
23 22 23 Steam Condensate Pumps 04-20
23 25 00 HVAC Water Treatment 02-20
23 31 00 HVAC Ducts and Casings 02-20
23 34 00 HVAC Fans 02-20
23 36 00 Air Terminal Units 02-20
23 37 00 Air Outlets and Inlets 02-20
23 64 00 Packaged Water Chillers 03-20
23 73 00 Indoor Central-Station Air-Handling Units 03-20
DIVISION 25 – INTEGRATED AUTOMATION – NOT USED
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17
26 05 26 Grounding and Bonding for Electrical Systems 01-17
26 05 33 Raceway and Boxes for Electrical Systems 01-18
26 05 39 Underfloor Raceways for Electrical Systems 01-18
26 05 41 Underground Electrical Construction 01-17
26 05 73 Overcurrent Protective Device Coordination Study 01-18
26 08 00 Commissioning of Electrical Systems 11-16
26 09 23 Lighting Controls 01-18
26 22 00 Low-Voltage Transformers 01-18
26 24 13 Distribution Switchboards 01-18
26 24 16 Panelboards 01-18
26 26 00 Power Distribution Units for Static Uninterruptible
Power Systems
01-18
26 27 26 Wiring Devices 01-18
26 29 11 Motor Controllers 01-18
26 29 21 Enclosed Switches and Circuit Breakers 01-17
26 32 13 Engine Generators 01-18
26 33 53 Static Uninterruptible Power Supply 01-17
00 01 10-5
SECTION NO. DIVISION AND SECTION TITLES DATE
26 36 23 Automatic Transfer Switches 01-17
26 41 00 Facility Lightning Protection 01-17
26 43 13 Surge Protective Devices 01-17
26 51 00 Interior Lighting 01-18
26 56 00 Exterior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 08 00 Commissioning of Communications Systems 11-16
27 10 00 Control, Communication and Signal Wiring 06-15
27 11 00 Telecommunications Room Fittings 06-15
27 15 00 Communications Structured Cabling 01-16
27 31 31 Voice Communications Switching and Routing Equipment
Extension
06-15
27 32 41 Two-Way Radio Equipment and Systems 10-18
27 41 31 Master Antenna Television Equipment and Systems 06-15
27 51 16 Public Address and Mass Notification Systems 10-18
27 51 23 Intercommunications and Program Systems 06-15
27 52 23 Nurse Call and Code Blue Systems 10-18
27 52 41 Miscellaneous Medical Systems 06-15
27 53 19 Distributed Radio Antenna (Within Building) Equipment and System
10-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16
28 13 00 Physical Access Control System 10-11
28 16 00 Intrusion Detection System 10-11
28 23 00 Video Surveillance 09-11
28 26 00 Electronic Personal Protection System 09-11
28 31 00 Fire Detection and Alarm 10-11
28 52 31 Emergency Call System 06-15
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form) 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16
32 12 16 Asphalt Paving 09-15
32 14 13 Concrete Pavers
00 01 10-6
SECTION NO. DIVISION AND SECTION TITLES DATE
32 17 23 Pavement Markings 08-16
32 31 13 Chain Link Fences and Gates 05-18
32 31 19 Fences and Gates
32 31 33 Vehicular Gate
32 84 00 Planting Irrigation 08-16
32 90 00 Planting 08-16
32 91 00 Landscape Boulders and Decorative Stone
DIVISION 33 – UTILITIES
33 08 00 Commissioning of Site Utility Systems 11-16
33 10 00 Water Utilities 03-17
33 30 00 Sanitary Sewer Utilities 06-13
33 40 00 Storm Sewer Utilities 12-17
33 51 00 Natural-Gas Distribution 10-11
DIVISION 34 – TRANSPORTATION – NOT USED
DIVISION 48 – Electrical Power Generation – NOT USED
Bid Documents
05-01-20
00 01 15 - 1
LIST OF DRAWINGS
SECTION 00 01 15
LIST OF DRAWINGS
The drawings listed below accompanying this specification form a part of the contract.
No. Title
GENERAL INFORMATION
001 G-000 COVER SHEET
002 GI001 GENERAL INFORMATION
003 GI011 PHASING PLANS
004 GI012 PHASING PLANS
005 GI013 OCCUPANCY PLAN - AREA A
006 GI014 OCCUPANCY PLAN - AREA B
007 GI015 INTERIM LIFE SAFETY PLAN
008 GI016 LIFE SAFETY PLAN - AREA A
009 GI017 LIFE SAFETY PLAN - AREA B
010 GI018 RECESS SLAB FLOOR PLAN
LANDSCAPE
011 LS-01 HARDSCAPE PLAN
012 LS-02 HARDSCAPE DETAILS
013 LS-03 HARDSCAPE DETAILS
014 LP-01 LANDSCAPE PLAN
015 LP-02 LANDSCAPE DETAILS
016 LI-01 IRRIGATION PLAN
017 LI-02 IRRIGATION DETAILS
CIVIL
018 CS000 TOPOGRAPHIC SURVEY
019 CS100 OVERALL LAYOUT
020 CS101 SITE LAYOUT
021 CS102 DEMOLITION LAYOUT
022 CS103 ENLARGED SITE LAYOUT (1 OF 2)
023 CS104 ENLARGED SITE LAYOUT (2 OF 2)
024 CS105 ENLARGED GRADING LAYOUT (1 OF 2)
025 CS106 ENLARGED GRADING LAYOUT (2 OF 2)
026 CS107 DRAINAGE AREA MAP LAYOUT
027 CS108 DRAINAGE AREA MAP CALCULATIONS
Bid Documents
05-01-20
00 01 15 - 2
LIST OF DRAWINGS
No. Title
028 CS109 UTILITY LAYOUT
029 CS110 STORM WATER POLLUTION PREVENTION PLAN
030 CS111 PLAN AND PROFILE (1 OF 2)
031 CS112 PLAN AND PROFILE (2 OF 2)
032 CS200 PAVEMENT AND DRAINAGE DETAILS
033 CS201 SANITARY SEWER DETAILS
034 CS202 WATER LINE DETIALS
035 CS203 SWPPP DETAILS
036 CS204 MISCELLANEOUS DETAILS
STRUCTURAL
037 SA001 STRUCTURAL GENERAL NOTES
038 SA002 STRUCTURAL GENERAL NOTES
039 SA010 STRUCTURAL SPECIAL INSPECTIONS
040 SA011 STRUCTURAL SPECIAL INSPECTIONS
041 SA030 TYPICAL DETAILS - CONCRETE
042 SA031 TYPICAL DETAILS - CONCRETE
043 SA050 TYPICAL DETAILS - STEEL
044 SA051 TYPICAL DETAILS - STEEL
045 SD101 STRUCTURAL DEMOLITION SITE PLAN
046 SD102 STRUCTURAL DEMOLITION FRAMING PLAN
047 SB100 OVERALL PLAN
048 SB101 FOUNDATION PLAN
049 SB102 PARTIAL EXISTING FOUNDATION PLAN
050 SB401 ENLARGED PLANS
051 SB501 FOUNDATION DETAILS
052 SB502 FOUNDATION DETAILS
053 SF101 ROOF FRAMING PLAN
054 SF102 PARTIAL EXISTING ROOF FRAMING PLAN
055 SF103 PENTHOUSE - ROOF FRAMING PLAN
056 SF501 FLOOR FRAMING DETAILS
057 SF504 ROOF FRAMING DETAILS
058 SF505 STRUCTURAL FRAMING DETAILS
059 SF506 STRUCTURAL FRAMING DETAILS
Bid Documents
05-01-20
00 01 15 - 3
LIST OF DRAWINGS
No. Title
ENVIRONMENTAL
060 HA001 ENVIRONMENTAL GENERAL NOTES
061 HA100 ENVIRONMENTAL HAZARDS - GROUND FLOOR
062 HA200 ENVIRONMENTAL HAZARDS - ROOF
ARCHITECTURAL
063 AS001 ARCHITECTURAL DEMOLITION SITE PLAN
064 AS010 ARCHITECTURAL NEW SITE PLAN
065 AD010 DEMOLITION PLAN
066 AD011 DEMOLITION PLAN
067 AD102 DEMOLITION REFLECTED CEILING PLAN
068 AE021 PARTITION TYPES AND DETAILS
069 AE101 OVERALL FLOOR PLAN
070 AE111 REFERENCE PLAN - AREA A
071 AE112 REFERENCE PLAN - AREA B
072 AE113 DIMENSION PLAN - AREA A
073 AE114 DIMENSION PLAN - AREA B
074 AE120 ROOF PLAN
075 AE121 PENTHOUSE PLANS
076 AC131 REFLECTED CEILING PLAN - AREA A
077 AC132 REFLECTED CEILING PLAN - AREA B
078 AC133 ENLARGED REFLECTED CEILING PLANS - AREA A
079 AC134 ENLARGED REFLECTED CEILING PLANS - AREA B
080 AE201 BUILDING ELEVATIONS
081 AE202 BUILDING ELEVATIONS
082 AE203 BUILDING ELEVATIONS
083 AE301 BUILDING SECTIONS
084 AE302 BUILDING SECTIONS
085 AE303 BUILDING SECTIONS
086 AE311 WALL SECTIONS
087 AE312 WALL SECTIONS
088 AE313 WALL SECTIONS
089 AE401 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA A
090 AE402 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA A
091 AE403 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA A
092 AE404 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA A
Bid Documents
05-01-20
00 01 15 - 4
LIST OF DRAWINGS
No. Title
093 AE405 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA A
094 AE406 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA A
095 AE407 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
096 AE408 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
097 AE409 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
098 AE410 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
099 AE411 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
100 AE412 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
101 AE413 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
102 AE414 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
103 AE415 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
104 AE416 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
105 AE417 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
106 AE421 SECTION DETAILS
107 AE451 PLAN DETAILS
108 AE452 PLAN DETAILS
109 AE453 PLAN DETAILS
110 AE454 PLAN DETAILS
111 AE501 CEILING DETAILS
112 AE601 DOOR AND WINDOW SCHEDULES
113 AE610 DOOR AND WINDOW DETAILS
114 AE611 DOOR AND WINDOW DETAILS
115 AF701 FINISH FLOOR PLANS - AREA A
116 AF702 FINISH FLOOR PLANS - AREA B
117 AF711 FINISH SCHEDULE AND FINISH LEGEND
118 AF712 INTERIOR DETAILS
119 AF901 MILLWORK DETAILS
120 AF902 MILLWORK DETAILS
121 AI722 3D INTERIOR VIEWS
122 AQ801 EQUIPMENT PLAN - AREA A
123 AQ802 EQUIPMENT PLAN - AREA B
124 AW950 SIGNAGE PLAN - AREA A
125 AW951 SIGNAGE PLAN - AREA B
Bid Documents
05-01-20
00 01 15 - 5
LIST OF DRAWINGS
No. Title
FIRE PROTECTION
126 FA001 FIRE ALARM GENERAL NOTES, LEGEND, AND DIAGRAMS
127 FA101 FIRE ALARM AUDIBILITY GROUND FLOOR PLAN
128 FA102 FIRE ALARM PLAN - AREA A
129 FA103 FIRE ALARM PLAN - AREA B
130 FX101 FIRE SUPPRESSION HAZARD CLASSIFICATION GROUND FLOOR
PLUMBING
131 P-000 PLUMBING LEGEND
132 PD101 PLUMBING WASTE DEMOLITION PLAN
133 PD102 PLUMBING SUPPLY DEMOLITION PLAN
134 PD103 PLUMBING MEDICAL GAS DEMOLITION PLAN
135 PD104 PENTHOUSE PLUMBING DEMOLITION PLAN
136 PP101 PLUMBING SUPPLY PLAN - AREA A
137 PP102 PLUMBING SUPPLY PLAN - AREA B
138 PP401 PLUMBING SUPPLY ENLARGED PLANS
139 PL101 PLUMBING WASTE UNDERGROUND PLAN - AREA A
140 PL102 PLUMBING WASTE UNDERGROUND PLAN - AREA B
141 PL103 PLUMBING WASTE PLAN - AREA A
142 PL104 PLUMBING WASTE PLAN - AREA B
143 PL105 PLUMBING ROOF PLAN - AREA A
144 PL106 PLUMBING ROOF PLAN - AREA B
145 PG101 PLUMBING MEDICAL GAS PLAN - AREA A
146 PG102 PLUMBING MEDICAL GAS PLAN - AREA B
147 PS201 NATURAL GAS CONNECTION PLAN
148 PS202 NATURAL GAS ENLARGED PLANS
149 P-301 PLUMBING RISER SUPPLY DIAGRAM
150 P-302 DRAIN WASTE VENT RISER - AREA A
151 P-303 DRAIN WASTE VENT RISER - AREA B
152 P-304 MEDICAL GAS RISER
153 P-401 PLUMBING PENTHOUSE PLAN
154 P-501 PLUMBING DETAILS
155 P-502 PLUMBING DETAILS
156 P-601 PLUMBING SCHEDULES
Bid Documents
05-01-20
00 01 15 - 6
LIST OF DRAWINGS
No. Title
MECHANICAL
157 M-000 LEGEND AND ABBREVIATIONS
158 MT101 MECHANICAL TEMPORARY PLAN
159 MD101 MECHANICAL HVAC DEMOLITION PLAN
160 MD102 MECHANICAL PIPING DEMOLITION PLAN
161 MD103 MECHANICAL ROOF DEMOLITION PLAN
162 MD104 MECHANCIAL PENTHOUSE DEMOLITION PLAN
163 MH101 MECHANICAL HVAC DUCT PLAN - AREA A
164 MH102 MECHANICAL HVAC DUCT PLAN - AREA B
165 MH103 MECHANICAL ROOF PLAN
166 MH131 MECHANICAL HVAC AIRFLOW PLAN - AREA A
167 MH132 MECHANICAL HVAC AIRFLOW PLAN - AREA B
168 MP101 MECHANICAL HVAC PIPING PLAN - AREA A
169 MP102 MECHANICAL HVAC PIPING PLAN - AREA B
170 M-201 MECHANICAL FLOW DIAGRAMS
171 M-301 MECHANICAL SECTIONS
172 M-401 MECHANICAL PENTHOUSE ENLARGED PLANS
173 M-402 MECHANICAL UTILITY YARD PLAN
174 M-501 MECHANICAL DETAILS
175 M-502 MECHANICAL DETAILS
176 M-503 MECHANICAL DETAILS
177 M-504 MECHANICAL DETAILS
178 M-601 MECHANICAL SCHEDULES
179 M-602 MECHANICAL SCHEDULES
180 M-701 MECHANICAL CONTROLS
181 M-702 MECHANICAL CONTROLS
182 M-703 MECHANICAL CONTROLS
183 M-704 MECHANICAL CONTROLS
184 M-705 MECHANICAL CONTROLS
Bid Documents
05-01-20
00 01 15 - 7
LIST OF DRAWINGS
No. Title
ELECTRICAL
185 E-001 ELECTRICAL SYMBOLS & ABBREVIATIONS
186 ES101 ELECTRICAL OVERALL SITE PLAN
187 ES102 ELECTRICAL PARTIAL SITE PLANS
188 ED101 ELECTRICAL POWER DEMOLITION PLAN
189 ED102 ELECTRICAL LIGHTING DEMOLITION PLAN
190 ED103 ELECTRICAL ROOF DEMOLITION PLAN
191 EP101 ELECTRICAL POWER PLAN - AREA A
192 EP102 ELECTRICAL POWER PLAN - AREA B
193 EL201 ELECTRICAL LIGHTING PLAN - AREA A
194 EL202 ELECTRICAL LIGHTING PLAN - AREA B
195 EQ101 MECHANICAL COORDINATION POWER PLAN - AREA A
196 EQ102 MECHANICAL COORDINATION POWER PLAN - AREA B
197 EQ103 MECHANICAL COORDINATION POWER PLAN - ROOF
198 EQ104 ELECTRICAL LIGHTING PROTECTION PLAN
199 EP401 ELECTRICA UTILITY YARD AND ELECTRICAL ROOM PLANS
200 E-501 ELECTRICAL AND LIGHTING PROTECTION SYSTEM DETAILS
201 E-502 ELECTRICAL DETAILS
202 E-503 LIGHTING DETAILS
203 E-601 ELECTRICAL ONE-LINE DIAGRAM - DEMOLITION
204 E-602 ELECTRICALONE-LINE DIAGRAM - NEW WORK
205 E-603 ELECTRICAL PANEL SCHEDULES - EXISTING
206 E-604 ELECTRICAL PANEL SCHEDULES - NEW WORK
207 E-605 ELECTRICAL PANEL SCHEDULES - NEW WORK
208 E-606 LIGHTING SCHEDULES
TECHNOLOGY
209 T-000 TECHNOLOGY SYMBOLS & ABBREVIATIONS
210 TS101 TECHNOLOGY SITE PLAN
211 TS102 TECHNOLOGY SITE FIBER ROUTING PLAN
212 TD101 TECHNOLOGY DEMOLITION PLAN
213 TN201 TECHNOLOGY TELECOMMUNICATIONS PLAN - AREA A
214 TN202 TECHNOLOGY TELECOMMUNICATIONS PLAN - AREA B
215 TY301 TECHNOLOGY SECURITY PLAN - AREA A
216 TY302 TECHNOLOGY SECURITY PLAN - AREA B
217 T-401 TECHNOLOGY DETAILS
Bid Documents
05-01-20
00 01 15 - 8
LIST OF DRAWINGS
No. Title
218 T-402 TECHNOLOGY DETAILS
219 T-501 TECHNOLOGY RISER DIAGRAMS
FOOD SERVICE
220 FS1.1 FOOD SERVICE EQUIPMENT ARRANGEMENT PLAN
221 FS1.2 FOOD SERVICE EQUIPMENT ELEVATIONS
222 FS2.1 FOOD SERVICE EQUIPMENT SPECIAL CONDITIONS PLAN
223 FS3.1 FOOD SERVICE EQUIPMENT PLUMBING CONNECTIONS PLAN
224 FS4.1 FOOD SERVICE EQUIPMENT ELECTRICAL CONNECTIONS PLAN
225 FS5.1 FOOD SERVICE EQUIPMENT VENTILATOR PLAN
226 FS5.2 FOOD SERVICE EQUIPMENT VENTILATOR PLAN
227 FS5.3 FOOD SERVICE EQUIPMENT VENTILATOR PLAN
228 FS5.4 FOOD SERVICE EQUIPMENT VENTILATOR PLAN
229 FS6.1 FOOD SERVICE EQUIPMENT SNEEZE GUARD PLAN
- - - E N D - - -
Bid Documents
11-01-21
01 00 00 -1
GENERAL REQUIREMENTS
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the renovation of and addition to Building No. 60 Community Living Center as required by drawings and specifications.
B. Only one site visit will be scheduled prior to the bid date. Attendance is highly recommended.
C. Offices of Spur Design, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
F. Throughout this Section, reference to ‘Resident Engineer’ or ‘Project
Engineer’ is synonymous with ‘COR’.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, BASE BID: Work includes general construction, alterations, roads, walks, grading, drainage, mechanical work, electrical work, plumbing work, necessary removal of existing structures and construction and certain other items. This project involves designing
VHACLERigerD Highlight
VHACLERigerD Underline
Bid Documents
11-01-21
01 00 00 -2
GENERAL REQUIREMENTS
an addition to building 60 as well a renovation of existing spaces. The
18,000 square foot expansion will be one story with the capability of building a second story for future expansion. Renovation of approx.
13,000 square feet of existing space will occur on the East wing and a portion of the South wing of the building. The design shall also include relocation of the existing garden from the north side of the building to the south side of the building, creating a meditation space and new front entrance to building 60. Period of performance is 480 days.
B. ALTERNATE NO. 1: includes removal of casework in Resident Rooms
119, 121, 122, 134, 135, 136, 139, 140, 142, 143, 145, 146, 151, 152, 153, 155, 156, 157, 158, 159, 160, 161, 162, 163, 164, 173 and 175 from scope of work. Deduct 10 days from period of performance; 470 days total.
C. ALTERNATE NO. 2: includes previous alternates and remove millwork and final finishes in 130 Conference Room, 128 Art Room, 144 Den, 132 Multipurpose Room and 132A Multipurpose Room Storage from scope of work; remove casework only at 123 & 127 Nursing Station and 133 & 166C Pantry Kitchens from scope of work. Deduct 10 days from period of performance; 460 days total.
D. ALTERNATE NO. 3: includes previous alternates and remove security gates north of new building expansion, motion sensor, concrete and curbs for gates from scope of work. Deduct 20 days from period of performance;
440 days total.
E. ALTERNATE NO.4: includes previous alternates and remove medical gas and vacuum systems from scope of work. Deduct 20 days from period of performance; 420 days total.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
VHACLERigerD Highlight
VHACLERigerD Underline
VHACLERigerD Underline
VHACLERigerD Underline
VHACLERigerD Underline
VHACLERigerD Highlight
VHACLERigerD Highlight
VHACLERigerD Highlight
Highlight
Bid Documents
11-01-21
01 00 00 -3
GENERAL REQUIREMENTS
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall install all permanent cores at completion of the work. See Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
Bid Documents
11-01-21
01 00 00 -4
GENERAL REQUIREMENTS
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of permits shall be issued for General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center Facility Manager.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the
Bid Documents
11-01-21
01 00 00 -5
GENERAL REQUIREMENTS
Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting
Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the COR .
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not more than two work
Bid Documents
11-01-21
01 00 00 -6
GENERAL REQUIREMENTS
days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved.
I. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and Contractor.
J. Building No. 60 will be occupied during performance of work; but immediate areas of alterations will be vacated.
1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of
Veterans Affairs personnel and patients through other construction
Bid Documents
11-01-21
01 00 00 -7
GENERAL REQUIREMENTS
areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.
Coordinate alteration work in areas occupied by Department of
Veterans Affairs so that Medical Center operations will continue during the construction period.
2. Immediate areas of alterations not mentioned in preceding Subparagraph 1 will be temporarily vacated while alterations are performed.
K. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.
Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm
(one inch) above grade. Remove the fence when directed by COR.
L. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
M. Utilities Services: Maintain existing utility services for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
Bid Documents
11-01-21
01 00 00 -8
GENERAL REQUIREMENTS
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR
ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to
COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
N. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, Bid Documents
11-01-21
01 00 00 -9
GENERAL REQUIREMENTS
capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
O. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
P. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by
Bid Documents
11-01-21
01 00 00 -10
GENERAL REQUIREMENTS
Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE
CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of
Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations
Bid Documents
11-01-21
01 00 00 -11
GENERAL REQUIREMENTS
in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (FAR 52.236-9)
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the
Contractor fails or refuses to repair the damage promptly, the
Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and
Bid Documents
11-01-21
01 00 00 -12
GENERAL REQUIREMENTS
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge
Elimination System (NPDES) permit is required for this project. The
Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements.
Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the
Contractor's method of operations and operations planning and the
Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:
1. Designating areas for equipment maintenance and repair;
2. Providing waste receptacles at convenient locations and provide regular collection of wastes;
3. Locating equipment wash down areas on site, and provide appropriate control of wash-waters;
4. Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and
5. Providing adequately maintained sanitary facilities.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the
COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and
Bid Documents
11-01-21
01 00 00 -13
GENERAL REQUIREMENTS
electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"
(FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).
1.11 PHYSICAL DATA – SOIL CONDITIONS
A. Data and information furnished or referred to below is for the
Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Merestone
Surveying.
(FAR 52.236-4)
B. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically in the geotechnical report.
C. A copy of the soil report will be made available for inspection by bidders upon request to the Engineering Officer at the VA Medical
Center, and shall be considered part of the contract documents.
D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly.
1.12 PROFESSIONAL SURVEYING SERVICES
A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the
Bid Documents
11-01-21
01 00 00 -14
GENERAL REQUIREMENTS
Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.
1.13 LAYOUT OF WORK
A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work.
The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the
Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through
Contractor's negligence before their removal is authorized, the
Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the
Contractor.
(FAR 52.236-17)
B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, roads, parking lots, are in accordance with lines and elevations shown on contract drawings.
C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark
(through use of appropriate batter boards or other means) sufficient additional survey control points or system of points
Bid Documents
11-01-21
01 00 00 -15
GENERAL REQUIREMENTS
as may be…